Note Continued
Total Page:16
File Type:pdf, Size:1020Kb
TamilNadu Transmission Corporation Limited (A Subsidiary of TNEB Ltd) FORMAT-STOA2 APPROVAL FOR SHORT – TERM OPEN ACCESS (Issued by SLDC) Ref :Gayatri Green Power Private Ltd Letter dated 16.12.20 (Last NOC Received from DD/TANGEDCO on 31.12.20) Nodal SLDC SLDC/STOA/TP/1139/2020-2021 Date 07.01.21 Approval No. 1 Customer Application Gayatri Green Power Private Ltd Date 16.12.20 No. Letter dated 16.12.20 2 Period of Transaction 08.01.2021 to 31.01.2021 3 Nature of customer Thirdparty User 4 Customer Name R.G.R.Spinners HTSC No. 039094350415 5 Customer EDC Coimbatore Metro 6 Details of Transaction Party’s to Grid Injecting Entity Drawee Entity Name of the Entity Gayatri Green Power Private Ltd R.G.R.Spinners Status of Entity Thirdparty Thirdparty User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details of Injecting/Drawee connectivity with Intra-State System Injecting Entity Drawee Entity Name Transmission 110/22KV Angalakurichi 110/11 Peedampalli SS of Sub- Distribution N/A N/A Station Voltage Transmission 110 KV N/A level Distribution N/A 11 Name of Licensee(Owner of TANTRANSCO TANGEDCO S/S) Intervening Intra-State N/A Licensee Intervening Inter-State N/A Licensee 8 Open Access Granted for: Period Requested Quantum at Injection end Approved Quantum at Injection end (MW) (MW) From To Peak Slots Non-Peak Slots Peak Slots Non-Peak Slots (18:00 to (00:00 to 18:00 & (18:00 to (00:00 to 18:00 & 22:00 22:00) hrs 22:00 to 24:00)hrs 22:00) hrs to 24:00)hrs 08/01/21 31/01/21 0.457 0.457 0.457 0.457 9 Details of Non- Refundable Application Fee made TANTRANSCO collection Instrument Details A/C Head Receipt No. Date Amount (Rs.) 62.962 E Receipt 15/12/20 Rs.5000/- TamilNadu Transmission Corporation Limited (A Subsidiary of TNEB Ltd) 10) The approved transaction shall be incorporated in day –ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations- 2014. 11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations, 2014 and any other relevant Regulation/Order/Code as amended and applicable from time to time. 12) In addition to the above, the thirdparty users shall abide by the terms and conditions vide Annexure. 13) As per the Schedule of payment enclosed,the short-term open access customer shall deposit with SLDC the transmission charges and SLDC charges for the entire period of open access within three working days of grant of the short- term open access by SLDC, but before the commencement of open access. 14) Cross subsidy surcharge determined on Per Unit basis shall be payable on monthly basis, by the open access customers based on the actual energy drawn during the month through open access. Place : Chennai Date :07.01.21 //Sd//***07.01.21 Superintending Engineer/CO Enclosure: Annexure To 1. R.G.R.Spinners, S.F.NO-68/1A, Peedampalli (PO), Ondipudur (Via), Coimbatore-641016 2. Gayatri Green Power Private Ltd Copy Submitted To The Chief Engineer/ Grid Operation /Chennai, The Chief Financial Controller /Revenue/TANGEDCO The Chief Financial Controller /Revenue/TANTRANSCO The Chief Engineer/Distribution/Madurai Copy to The Financial Controller/Cost/TANGEDCO The Superintending Engineer/Operation/Coimbatore The Superintending Engineer/Udumalpet /EDC The Superintending Engineer/EDC/Coimbatore Metro The Superintending Engineer/LD&GO/Chennai Executive Engineer/LD/ Erode . TamilNadu Transmission Corporation Limited (A Subsidiary of TNEB Ltd) FORMAT-STOA2 APPROVAL FOR SHORT – TERM OPEN ACCESS (Issued by SLDC) Ref :Gayatri Green Power Private Ltd Letter dated 16.12.20 Nodal SLDC SLDC/STOA/TP/1140/2020-2021 Date 07.01.21 Approval No. 1 Customer Application Gayatri Green Power Private Ltd Date 16.12.20 No. Letter dated 16.12.20 2 Period of Transaction 08.01.2021 to 31.01.2021 3 Nature of customer Thirdparty User 4 Customer Name AMMAN SPINTEX HTSC No. 049094360013 5 Customer EDC Gobichettipalayam 6 Details of Transaction Party’s to Grid Injecting Entity Drawee Entity Name of the Entity Gayatri Green Power Private Ltd AMMAN SPINTEX Status of Entity Thirdparty Thirdparty User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details of Injecting/Drawee connectivity with Intra-State System Injecting Entity Drawee Entity Name Transmission 110/22KV Angalakurichi Vettaikaran Kovil SS 110/11 Kv of Sub- Distribution N/A N/A Station Voltage Transmission 110 KV N/A level Distribution N/A 11 Name of Licensee(Owner of TANTRANSCO TANGEDCO S/S) Intervening Intra-State N/A Licensee Intervening Inter-State N/A Licensee 8 Open Access Granted for: Period Requested Quantum at Injection end Approved Quantum at Injection end (MW) (MW) From To Peak Slots Non-Peak Slots Peak Slots Non-Peak Slots (18:00 to (00:00 to 18:00 & (18:00 to (00:00 to 18:00 & 22:00 22:00) hrs 22:00 to 24:00)hrs 22:00) hrs to 24:00)hrs 08/01/21 31/01/21 0.186 0.186 0.186 0.186 9 Details of Non- Refundable Application Fee made TANTRANSCO collection Instrument Details A/C Head Receipt No. Date Amount (Rs.) 62.962 DUD9688466 16/12/20 Rs.5000/- TamilNadu Transmission Corporation Limited (A Subsidiary of TNEB Ltd) 10) The approved transaction shall be incorporated in day –ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations- 2014. 11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations, 2014 and any other relevant Regulation/Order/Code as amended and applicable from time to time. 12) In addition to the above, the thirdparty users shall abide by the terms and conditions vide Annexure. 13) As per the Schedule of payment enclosed,the short-term open access customer shall deposit with SLDC the transmission charges and SLDC charges for the entire period of open access within three working days of grant of the short- term open access by SLDC, but before the commencement of open access. 14) Cross subsidy surcharge determined on Per Unit basis shall be payable on monthly basis, by the open access customers based on the actual energy drawn during the month through open access. Place : Chennai Date :07.01.21 //Sd//***07.01.21 Superintending Engineer/CO Enclosure: Annexure To 1. AMMAN SPINTEX, No.155, Thangamani Building, Mill Road,Gobichettipalayam, Erode- 638476 2. Gayatri Green Power Private Ltd Copy Submitted To The Chief Engineer/ Grid Operation /Chennai, The Chief Financial Controller /Revenue/TANGEDCO The Chief Financial Controller /Revenue/TANTRANSCO The Chief Engineer/Distribution/Coimbatore Copy to The Financial Controller/Cost/TANGEDCO The Superintending Engineer/Operation/Coimbatore The Superintending Engineer/Udumalpet /EDC The Superintending Engineer/EDC/Gobichettipalayam The Superintending Engineer/LD&GO/Chennai Executive Engineer/LD/ Erode . TamilNadu Transmission Corporation Limited (A Subsidiary of TNEB Ltd) FORMAT-STOA2 APPROVAL FOR SHORT – TERM OPEN ACCESS (Issued by SLDC) Ref :Gayatri Green Power Private Ltd Letter dated 16.12.20 Nodal SLDC SLDC/STOA/TP/1141/2020-2021 Date 07.01.21 Approval No. 1 Customer Application Gayatri Green Power Private Ltd Date 16.12.20 No. Letter dated 16.12.20 2 Period of Transaction 08.01.2021 to 31.01.2021 3 Nature of customer Thirdparty User 4 Customer Name Seethalakshmi Textiles HTSC No. 049094360075 5 Customer EDC Gobichettipalayam 6 Details of Transaction Party’s to Grid Injecting Entity Drawee Entity Name of the Entity Gayatri Green Power Private Ltd Seethalakshmi Textiles Status of Entity Thirdparty Thirdparty User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details of Injecting/Drawee connectivity with Intra-State System Injecting Entity Drawee Entity Name Transmission 110/22KV Angalakurichi Vettaikaran Kovil SS 110/11 Kv of Sub- Distribution N/A N/A Station Voltage Transmission 110 KV N/A level Distribution N/A 11 Name of Licensee(Owner of TANTRANSCO TANGEDCO S/S) Intervening Intra-State N/A Licensee Intervening Inter-State N/A Licensee 8 Open Access Granted for: Period Requested Quantum at Injection end Approved Quantum at Injection end (MW) (MW) From To Peak Slots Non-Peak Slots Peak Slots Non-Peak Slots (18:00 to (00:00 to 18:00 & (18:00 to (00:00 to 18:00 & 22:00 22:00) hrs 22:00 to 24:00)hrs 22:00) hrs to 24:00)hrs 08/01/21 31/01/21 0.149 0.149 0.149 0.149 9 Details of Non- Refundable Application Fee made TANTRANSCO collection Instrument Details A/C Head Receipt No. Date Amount (Rs.) 62.962 DUD9688958 16/12/20 Rs.5000/- TamilNadu Transmission Corporation Limited (A Subsidiary of TNEB Ltd) 10) The approved transaction shall be incorporated in day –ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations- 2014. 11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations, 2014 and any other relevant Regulation/Order/Code as amended and applicable from time to time. 12) In addition to the above, the thirdparty users shall abide by the terms and conditions vide Annexure. 13) As per the Schedule of payment enclosed,the short-term open access customer shall deposit with SLDC the transmission charges and SLDC charges for the entire period of open access within three working days of grant of the short- term open access by SLDC, but before the commencement of open access. 14) Cross subsidy surcharge determined on Per Unit basis shall be payable on monthly basis, by the open access customers based on the actual energy drawn during the month through open access.