L-1161 Conference Room & Community Room Audio-Visual Upgrades
Total Page:16
File Type:pdf, Size:1020Kb
BID DOCUMENTS COVER SHEET CONTRACT DOCUMENTS FOR L‐1161 CONFERENCE ROOM & COMMUNITY ROOM AUDIO‐VISUAL UPGRADES AT Los Medanos College 2700 East Leland Road, Pittsburg, CA 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT Consists of the following: VOLUME 2 DRAWINGS DSA Appl. #01‐119293 Architect: SMITH, FAUSE & McDONALD, INC. San Francisco, CA 94103 Tel (415) 255‐9140 February 19, 2021 COMMUNITY AND CONFERENCE ROOMS AV UPGRADES LOS MEDANOS COLLEGE 2700 E. LELAND ROAD, PITTSBURG, CALIFORNIA LOCATION MAP VICINITY MAP INDEX OF DRAWINGS D SEALS AND SIGNATURES C ISSUE SCHEDULE NO. DATE PLAN REVIEW SUBMITTAL V1 12/30/2020 PLAN REVIEW SUBMITTAL V2 02/03/2021 ABBREVIATIONS LEGEND/ SYMBOLS DEFINITIONS GENERAL NOTES PROJECT DESCRIPTION SCOPE · · · · B · APPLICABLE CODES & STANDARDS · · · BUILDING TYPE SUMMARY · LOS MEDANOS COLLEGE PROJECT TEAM CLIENT ELECTRICAL COMMUNITY ROOM & CONFERENCE ROOM AV UPGRADES A SHEET TITLE: ARCHITECTURAL COVER SHEET AUDIO VISUAL 100% CONSTRUCTION DOCUMENTS SCALE: AS SHOWN PROJECT NUMBER: 01-119293 SHEET NUMBER: G-001 10/26/20 1 2 3 4 5 D SEALS AND SIGNATURES THE HATCHED AREA IS NOT IN CONTRACT C U.O.N. ISSUE SCHEDULE NO. DATE PLAN REVIEW SUBMITTAL V1 12/30/2020 PLAN REVIEW SUBMITTAL V2 02/03/2021 KEY PLAN B PROJECT TRUE NORTH NORTH LOS MEDANOS COLLEGE COMMUNITY ROOM & CONFERENCE ROOM AV UPGRADES A SHEET TITLE: OVERALL INFO. RESOURCE CENTER FIRST FLOOR FLOOR 100% CONSTRUCTION DOCUMENTS NORTH PLAN OVERALL INFORMATION RESOURCE CENTER FIRST FLOOR FLOOR PLAN FULL CAMPUS SITE PLAN SCALE: AS SHOWN 2 1 NORTH 1/8" = 1'-0" 1/8" = 1'-0" PROJECT NUMBER: 01-119293 SHEET NUMBER: A111 10/26/20 1 2 3 4 5 D 30" CLR. MIN R33 (E) SEALS AND SIGNATURES ALS C ISSUE SCHEDULE NO. DATE PLAN REVIEW SUBMITTAL V1 12/30/2020 NORTH PLAN REVIEW SUBMITTAL V2 02/03/2021 COMMUNITY, STORAGE & WORKROOM FLOOR PLANS ALS 1 1/4" = 1'-0" ASSISTIVE LISTENING KEY PLAN B SYSTEM IS AVAILABLE PROJECT TRUE PLEASE ASK FOR A NORTH NORTH RECEIVER. R18 R18 (E) WEST WALL AT ROOM 113 3 1/4" = 1'-0" ALS ALS LOS MEDANOS COLLEGE MP1 MP1 (E) FC6 (E) FC6 AVCFT AVCFT COMMUNITY ROOM & CONFERENCE ROOM AV UPGRADES A SHEET TITLE: COMMUNITY AND CONFERENCE ROOMS L108/ L109 NEW 100% CONSTRUCTION DOCUMENTS FLOOR PLANS SCALE: AS SHOWN PROJECT NUMBER: 01-119293 (E) EAST WALL AT ROOM 113 CONFERENCE ROOMS L108/ L109 FLOOR PLANS NORTH 4 2 1/4" = 1'-0" 1/4" = 1'-0" SHEET NUMBER: A112 10/26/20 1 2 3 4 5 SEALS AND SIGNATURES ISSUE SCHEDULE NO. DATE KEY PLAN PROJECT TRUE NORTH NORTH LOS MEDANOS COLLEGE COMMUNITY & CONFERENCE ROOMS AV UPGRADES SHEET TITLE: DETAILS 100% CONSTRUCTION DOCUMENTS SCALE: AS SHOWN PROJECT NUMBER: 2039 SHEET NUMBER: A113 D SEALS AND SIGNATURES C THE HATCHED AREA IS ISSUE SCHEDULE NO. DATE PLAN REVIEW SUBMITTAL V1 12/30/2020 NOT IN CONTRACT PLAN REVIEW SUBMITTAL V2 02/03/2021 U.O.N. KEY PLAN B PROJECT TRUE NORTH NORTH LOS MEDANOS COLLEGE COMMUNITY ROOM & CONFERENCE ROOM AV UPGRADES A SHEET TITLE: OVERALL CORE BUILDING FOURTH FLOOR FLOOR PLAN 100% CONSTRUCTION DOCUMENTS NORTH OVERALL CORE BUILDING FOURTH FLOOR FLOOR PLAN 1 SCALE: AS SHOWN 1/4" = 1'-0" PROJECT NUMBER: 01-119293 SHEET NUMBER: A141 10/26/20 1 2 3 4 5 R18 MP1 CTW SEALS AND SIGNATURES CONFERENCE ROOM 420 ISSUE SCHEDULE NO. DATE SP SP NORTH (E) SOUTH WALL AT CONFERENCE ROOM 420 CONFERENCE ROOM 420 FLOOR PLAN 2 CORE BUILDING 1 CORE BUILDING 1/4" = 1'-0" KEY PLAN PROJECT TRUE NORTH NORTH LOS MEDANOS COLLEGE COMMUNITY & CONFERENCE ROOMS AV UPGRADES SHEET TITLE: PARTIAL CONFERENCE ROOM 420 SOUTH INTERIOR ELEVATION CONFERENCE ROOM 3 100% CONSTRUCTION DOCUMENTS CORE BUILDING 1/2" = 1'-0" 420 NEW FLOOR PLAN SCALE: AS SHOWN PROJECT NUMBER: 2039 SHEET NUMBER: A142 A & S D SEALS AND SIGNATURES C ISSUE SCHEDULE NO. DATE PLAN REVIEW SUBMITTAL V1 12/30/2020 PLAN REVIEW SUBMITTAL V2 02/03/2021 F KEY PLAN B PROJECT TRUE NORTH NORTH LOS MEDANOS COLLEGE GYPBOARD EMT CONDUIT THREADED COMPRESSION EMT FITTING CAST BOX WITH 1/2" STEEL STUDS THREADED HUB FILL FITTING WITH COMMUNITY ROOM & NEOPRENE GASKETING NON-HARDENING SEALANT CONFERENCE ROOM STAINLESS STEEL OR STEEL STUD BLOCKING WEATHERPROOF COVERPLATE AS PER AV UPGRADES PLANS A SHEET TITLE: ELECT. SYMBOLS, GFI RECEPTACLE LEGENDS, ABBREV., & 100% CONSTRUCTION DOCUMENTS IN ADDITION TO GASKETING GENERAL NOTES CAULK AROUND BOX AND CUTOUT IN GYPBOARD AND AROUND PERIMETER OF COVERPLATE SCALE: AS SHOWN PROJECT NUMBER: 01-119293 RECESSED CAST BOX INSTALLATION DETAIL 1 NO SCALE SHEET NUMBER: E0.1 10/26/20 1 2 3 4 5 A & S D SEALS AND SIGNATURES C ISSUE SCHEDULE NO. DATE PLAN REVIEW SUBMITTAL V1 12/30/2020 PLAN REVIEW SUBMITTAL V2 02/03/2021 KEY PLAN B ELECTRICAL FLOOR PLAN 1 PROJECT TRUE NORTH NORTH AREA OF WORK LOS MEDANOS COLLEGE COMMUNITY ROOM & CONFERENCE ROOM AV UPGRADES A SHEET TITLE: COMMUNITY ROOM & CONFERENCE ROOMS L108/ L109 ELECTRICAL 100% CONSTRUCTION DOCUMENTS FLOOR PLAN SCALE: AS SHOWN TRUE PROJECT NUMBER: 01-119293 NORTH ELECTRICAL KEY PLAN 3 SHEET NUMBER: E113 10/26/20 1 2 3 4 5 A & S D SEALS AND SIGNATURES CONFERENCE CONFERENCE C ROOM 420 ROOM 420 ISSUE SCHEDULE NO. DATE PLAN REVIEW SUBMITTAL V1 12/30/2020 PLAN REVIEW SUBMITTAL V2 02/03/2021 NORTH NORTH ELECTRICAL PARTIAL FLOOR PLAN - DEMO WORK ELECTRICAL PARTIAL FLOOR PLAN - NEW WORK 1 1 KEY PLAN B PROJECT TRUE NORTH NORTH LOS MEDANOS COLLEGE COMMUNITY ROOM & CONFERENCE ROOM AV UPGRADES A SHEET TITLE: ELECTRICAL PARTIAL AREA OF WORK CONFERENCE ROOM 420 FLOOR PLAN- 100% CONSTRUCTION DOCUMENTS DEMO & NEW WORKS SCALE: AS SHOWN TRUE PROJECT NUMBER: 01-119293 NORTH ELECTRICAL KEY PLAN 3 SHEET NUMBER: E143 10/26/20 1 2 3 4 5 1. REFER TO SPECIFICATIONS FOR COMPLETE REQUIREMENTS. SURFACE RACEWAY. A.D.A. AMERICANS WITH DISABILITIES ACT MMF MULTI MODE OPTICAL FIBER A.F.C. ABOVE FINISHED CEILING FOR COMMUNICATIONS AND POWER SYSTEM MOD. MODULAR A.F.F. ABOVE FINISHED FLOOR 2. PROVIDE CONDUIT, BOXES AND FITTINGS SHOWN ON AUDIO VISUAL SYSTEMS (AV) PROVIDED UNDER DIV. 27. MPOE MINIMUM POINT OF ENTRY DRAWINGS UNDER THE WORK OF SECTION 27 05 33 COMMUNICATIONS RACEWAYS, ALT ALTERNATE MARK INDICATES RACEWAY DROP FROM CEILING. (N) NEW BOXES AND FITTINGS. UNLESS OTHERWISE INDICATED, PROVIDE 1 INCH TRADE SIZE A.M.F.F. ABOVE MEZZANINE FINISHED FLOOR COORDINATE EXACT LOCATION WITH DIV. 27 PLANS. NEC NATIONAL ELECTRICAL CODE MINIMUM. PROVIDE RACEWAY SIZE AS REQUIRED FOR A MAXIMUM OF 30 PERCENT BDF BUILDING DISTRIBUTION FACILITY N.I.C. NOT IN CONTRACT WIRE FILL. NEW WIRE AND/OR CABLE IN EXPOSED CONDUIT B.F.C. BELOW FINISHED CEILING OR RACEWAY. FILL PER SCHEDULE, PLANS NTS NOT TO SCALE BLDG. BUILDING 3. PROVIDE FIRESTOPPING UNDER THE WORK OF SECTION 27 05 33. AND SPECIFICATIONS. O.C. ON CENTER B.O.H. BACK OF HOUSE NEW WIRE AND/OR CABLE INSIDE NEW CONDUIT WALLS OR IN CEILING . O.D. OUTSIDE DIAMETER 4. LOCATIONS SHOWN ON THE ARCHITECTURAL DRAWINGS TAKE PRECEDENCE OVER C. CONDUIT O.F.E. OWNER FURNISHED EQUIPMENT LOCATIONS SHOWN ON THE COMMUNICATIONS SYSTEMS DRAWINGS. CAT. CATEGORY OPP. OPPOSITE CABLE/RACEWAY TURNS UP CBC CALIFORNIA BUILDING CODE 5. DEVICE QUANTITIES SHOWN ON FLOOR PLANS AND REFLECTED CEILING PLANS TAKE OSP OUTSIDE PLANT CEC CALIFORNIA ELECTRICAL CODE PRECEDENCE OVER DEVICE QUANTITIES SHOWN ON FUNCTIONAL DIAGRAMS. PNL. PANEL D COMM. COMMUNICATIONS CABLE/RACEWAY TURNS DOWN PROJ. PROJECT 6. QUANTITIES SHOWN ON FUNCTIONAL DIAGRAMS TAKE PRECEDENCE OVER C.L. CENTERLINE P.S.R.H PROJECT STANDARD RECEPTACLE HEIGHT +18" ATT, U.O.N. QUANTITIES SHOWN ON RACK ELEVATIONS. HOME RUN C.O. CONDUIT ONLY P.S.S.H. PROJECT STANDARD SWITCH HEIGHT +48" AFF TO U.O.N. CONT. CONTINUATION RE: REFER TO 7. QUANTITIES SHOWN ON DEVICE SCHEDULES TAKE PRECEDENCE OVER QUANTITIES 701 WIRING NOTES CS COMMUNICATIONS SYSTEM SHOWN ON FUNCTIONAL DIAGRAMS, FLOOR PLANS AND REFLECTED CEILING PLANS. REF. REFERENCE (D) DEMOLISH EXISTING S.A.D. SEE ARCHITECTURAL DRAWINGS TKA1 KEYNOTES 8. LOCATIONS SHOWN ON LARGE SCALE DRAWINGS TAKE PRECEDENCE OVER DED DEDUCTIVE S.E.D. SEE ELECTRICAL DRAWINGS LOCATIONS SHOWN ON SMALL SCALE DRAWINGS. DIA. DIAMETER S.I.D. SEE INTERIORS DRAWINGS DIV DIVISION S.M.D. SEE MECHANICAL DRAWINGS 9. NOT USED. (E) EXISTING SIM. SIMILAR EA. EACH 10. WIRING FOR THE WORK OF AUDIO VISUAL SYSTEMS IS NOT PERMITTED TO SHARE SMF SINGLE MODE OPTICAL FIBER CONDUIT, SLEEVES OR J-HOOKS WITH WIRING FOR WORK OF COMMUNICATIONS EIA ELECTRONIC INDUSTRIES ASSOCIATION SN SHEET NOTE WIRES, CABLES AND RELATED. MAINTAIN AT LEAST 2 INCHES SEPARATION IF ELEV. ELEVATION SP SHIELDED PAIR - SEE SPECIFICATIONS RUNNING PARALLEL. MAINTAIN AT LEAST 1 INCH OF SEPARATION VERTICALLY IF E.O.L. END OF LINE SPEC SPECIFICATION CROSSING AT RIGHT ANGLES. ROOM KEY DETAIL SYMBOL EQPT. EQUIPMENT XXXX ROOM NAME 1 DRAWING NUMBER S.R. SURFACE RACEWAY 1 FIN FINISHED XXXX ROOM NUMBER SHEET NUMBER STD STANDARD FUT FUTURE STP SHIELDED TWISTED PAIR H.R. HOME RUN T.C. TELECOMMUNICATIONS CLOSET 1 HT. HEIGHT TEL TELEPHONE DRAWING NUMBER COLUMN GRID 1 1 IDF INTERMEDIATE DISTRIBUTION FACILITY SHEET NUMBER GRID LINES TELCOM TELECOMMUNICATIONS J, JBOX JUNCTION BOX TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION A1 SEALS AND SIGNATURES LAN LOCAL AREA NETWORK TP TWISTED PAIR BLDG. SECTION KEY MAX. MAXIMUM TYP. TYPICAL 1 1 BUILDING LABEL DRAWING NUMBER MDF MAIN DISTRIBUTION FACILITY 1 1 U.O.N. UNLESS OTHERWISE NOTED SHEET NUMBER MIN. MINIMUM W/ WITH WP WEATHERPROOF WALL SECTION KEY DRAWING MATCH LINE 1 DRAWING NUMBER 1 C SHEET NUMBER ELEVATION KEY ISSUE SCHEDULE NO. DATE REVISION SYMBOL 1 PLAN REVIEW SUBMITTAL V1 12/30/2020 1 REVISION NUMBER DRAWING NUMBER 1 PLAN REVIEW SUBMITTAL V2 02/03/2021 SHEET NUMBER ALS SCHEDULE SYMBOL H W D COMPLY WITH CBC 1104B.2 ASSISTIVE-LISTENING SYSTEMS IN ASSEMBLY AREAS.