13 HINKLEY F 12 HINKLEY POINT 400kV 11 POINT 275kV SUBSTATION 10 SUBSTATION 9 " 8 " 7 SHURTON 400kV ZG1 L L JP6 SUBSTATION 6 L JP5 Stolford 5 L " JP1 JP4 1 4 Contains OS data © Crown L JP4-BM01 2 Copyright and database right ZZ1 L L JP3 L MM (Type 3) Wick Moor 3 2020 VQ1 L JP2 VQ3C-BM02 East Brook

VQ2 (Type 3) Key

L VQ3 M ZZ2 L L VQ3A M Proposed Construction Components and Access L L ZZ5 West Brook ZZ4 L M L VQ3B ZZ3 M L Haul Road M VQ3C-BM01 M VQ3C-BM03 Major Primary Construction Traffic Route (Type 3) (Type 3) L VQ4 Bellmouth and Reference ZZ7 L North Brook Proposed Development Wick L Proposed 400kV Standard Lattice Pylon Position CP Proposed Route for 400kV Overhead Line

Existing and Consented Infrastructure

" Existing Substation Shurton " Consented Shurton 400kV Substation

Stogursey Brook

Stockland Bristol South Brook CP Otterhampton CP

Stogursey CP

Cockwood

UPDATED VERSION (FROM VOLUME D 14/04/2021 SB CB CB 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME C 14/09/2020 SB CB CB 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME B 02/07/2015 CB BC BC 5.26.5) FOR DCO SUBMISSION

A 19/01/2015 UPDATED VERSION (FROM VOLUME CB BC BC 5.22.3) FOR DCO SUBMISSION ISSUE DATE COMMENTS DRAWCHK'DAPP'D Title NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT)

CONSTRUCTION ROUTES AND BELLMOUTH LOCATION PLANS Coultings INSET 1 CP Cannington CP South Moor

Main Brook NG INVESTMENT No. APPLICATION No. A3 20897 EN0200001 Nether FIGURE No. DRAWING No. SCALE Stowey CP Bonson 0 200 400 600 800 1,000 ANNEX C G1979.2504.1D 1:20,000 Metres ISSUE Contains OS data © Crown Copyright and database right 2020 SHEET 1 OF 13 D 13 F 12 11 10 Otterhampton CP 9 8 Pawlett CP 7 6 Walpole 5 1 4 Contains OS data © Crown 2 Down End 3 Copyright and database right 2020

Puriton CP Key Dunball CP Proposed Construction Components and Access

Major Primary Construction Traffic Route

Dismantling Route

Cannington Brook

Chilton Trinity CP Cannington CP

Cannington Without CP CP Cannington Brook Cannington Chilton Brook Trinity

Perry Green

Perrymoor Brook Bradley Green Bradley Green Reedmoor Rhyne

UPDATED VERSION (FROM VOLUME D 13/04/2021 SB CB CB 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME C 14/09/2020 SB CB CB 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME B 02/07/2015 CB BC BC 5.26.5) FOR DCO SUBMISSION

A 19/01/2015 UPDATED VERSION (FROM VOLUME CB BC BC 5.22.3) FOR DCO SUBMISSION ISSUE DATE COMMENTS DRAWCHK'DAPP'D Title NATIONAL GRID (HINKLEY POINT C Gothelney CONNECTION PROJECT) Green Wembdon Newtown CONSTRUCTION ROUTES AND CP BELLMOUTH LOCATION PLANS Bridgwater CP INSET 2

Gothelney Green Eastover NG INVESTMENT No. APPLICATION No. BRIDGWATER A3 20897 EN0200001 Bridgwater and FIGURE No. DRAWING No. SCALE CP Sydenham Taunton Canal Northfield ANNEX C G1979.2504.2D 1:20,000 0 200 400 600 800 1,000 ISSUE Metres BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY NATIONAL GRID LICENSE NO. 100022488 Contains OS data © Crown Copyright and database right 2020 SHEET 2 OF 13 D

M M

King's Knowle 13 ZGA1 Cossington CP BRIDGWATER Drain 12 Wembdon VQ043R TEE (BATH F164 Bawdrip F CP VQ044R ROAD) COMPOUND 11 VQ043R-BM01 10

9

(Type 2) F165 M M 8 Chilton 7 Trinity 6 F166 5 Chilton 1 Horsey Bawdrip CP 4 Trinity CP 2 Contains OS data © Crown F167 Level Rhyne 3 Copyright and database right Bradney 2020 Key F168 Proposed Construction Components and Access River Parrett Reedmoor Haul Road Rhyne F169 Major Primary Construction Traffic Route

Pendon Rhyne Dismantling Route

F170 Bellmouth and Reference Slape Cross Proposed Development

F171 T Proposed 400kV T-Pylon Position Stawell CP L Proposed 132kV Standard Lattice Pylon Position Proposed Temporary Pylon Position F172 Parchey East Bower West Moor % Newtown F Route Lattice Pylon for Removal Bridgwater Proposed Route for 400kV Overhead Line Without CP F173 Proposed Route for Temporary Overhead Line F Route Overhead Line to be dismantled

F174 Proposed Compound /Laydown Area

Proposed 400kV Underground Cable Route LoD Eastover BRIDGWATER F165 Chedzoy CP Bridgwater and Bridgwater CP Sydenham Taunton Canal

F166

F177

F178 UPDATED VERSION (FROM VOLUME D 13/04/2021 SB CB CB 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME C 14/09/2020 SB CB CB 5.26.5) FOR CTMP ADDENDUM F179 Lang Moor Hamp UPDATED VERSION (FROM VOLUME B 02/07/2015 CB BC BC F180 5.26.5) FOR DCO SUBMISSION

Chedzoy A 19/01/2015 UPDATED VERSION (FROM VOLUME CB BC BC New Cut 5.22.3) FOR DCO SUBMISSION ISSUE DATE COMMENTS DRAWCHK'DAPP'D Title NATIONAL GRID (HINKLEY POINT C Dunwear CONNECTION PROJECT) Bussex CONSTRUCTION ROUTES AND BELLMOUTH LOCATION PLANS Horsey Liney INSET 3 Moor Drain CP Stock Moor Stockmoor North Rhyne Village Petherton CP

Westonzoyland NG INVESTMENT No. APPLICATION No. A3 20897 EN0200001

Stock Moor FIGURE No. DRAWING No. SCALE

ANNEX C G1979.2504.3D 1:20,000 Huntworth 0 200 400 600 800 1,000 ISSUE Metres BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY NATIONAL GRID LICENSE NO. 100022488 Contains OS data © Crown Copyright and database right 2020 SHEET 3 OF 13 D T

%

T Cripps River Mark CP West F146 LD7 CP 13 % F 12 West

Huntspill T LD6 11

M Huntspill CP C-LD9-BM03 M River F147 10 (Type 3) Huntspill Moor 9 C-LD9-BM01 % M (Type 2) C-LD9-BM02 8 T LD5 (Type 3) 7 East M F148 6 Huntspill CP % 5 T LD4 1 F149 4 Contains OS data © Crown 2 % 3 Copyright and database right 2020 T LD3 F150 % Key Proposed Construction Components and Access T LD2 Haul Road LD1 % F151 F151B Major Primary Construction Traffic Route L

% Dismantling Route

% F151A C-LDL3-BMZ0G1A13 M Pawlett CP ZG043 (M Type 2)

% C-ZGA13-BM01 M Bellmouth and Reference

M (Type 2)

F152

M M C-ZGA12-BM01 Proposed Development ZGA12 T (Type 1) % F153 T Proposed 400kV T-Pylon Position

L Proposed 132kV Standard Lattice Pylon Position F154 % Proposed Temporary Pylon Position

T ZGA11

C-ZGA4-BM01 M % F Route Lattice Pylon for Removal C-ZGA4-BM02 M (Type 1) (Type 1) CP MM Proposed Route for 400kV Overhead Line % F155 Proposed Route for Temporary Overhead Line T ZGA10 F Route Overhead Line to be dismantled

F156 % Proposed Compound /Laydown Area C-ZGA4-BM04 T ZGA9

(Type 3) Proposed 400kV Underground Cable Route LoD

M C-ZGA4-BM05 M Puriton Walpole (Type 3) F157 Woolavington CP MM % T ZGA8 Down End F158 % T ZGA7 F159 % Cossington CP T ZGA6 Dunball T ZGA5 F160 % T ZGA4 F161 UPDATED VERSION (FROM VOLUME D 13/04/2021 SB CB CB % 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME C 14/09/2020 SB CB CB 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME B 02/07/2015 CB BC BC T ZGA3 F162 5.26.5) FOR DCO SUBMISSION % Cossington A 19/01/2015 UPDATED VERSION (FROM VOLUME CB BC BC Chilton 5.22.3) FOR DCO SUBMISSION

Trinity CP C-ZGA3-BM01 ISSUE DATE COMMENTS DRAWCHK'DAPP'D M (M Type 1) T ZGA2 Title F163 NATIONAL GRID (HINKLEY POINT C Bridgwater % Without CP CONNECTION PROJECT) T ZGA1 King's Knowle Sedgemoor CONSTRUCTION ROUTES AND BRIDGWATER Drain Chilton BELLMOUTH LOCATION PLANS TEE (BATH F164 Bawdrip VQ044R ROAD) COMPOUND Polden CP INSET 4 L % Bawdrip CP L VQ043R-BM01

VQ043R

(Type 2) F165

M M %

NG INVESTMENT No. APPLICATION No.

F166 A3 % 20897 EN0200001 FIGURE No. DRAWING No. SCALE Bridgwater CP Horsey ANNEX C G1979.2504.4D 1:20,000 F167 Level Rhyne 0 200 400 600 800 1,000 ISSUE Bradney % StaweMlel tCresP BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY NATIONAL GRID LICENSE NO. 100022488 SHEET 4 OF 13 D

%