FORM-I AND PRE-FEASIBILITY REPORT

MINING OF GYPSUM (MINOR MINERAL) PRODUCTION CAPACITY- 38,000 TPA, MINING LEASE AREA-10.20 HECTARE LEASE PERIOD: 10 YEARS PROJECT COST: 8.00 CRORES COST FOR EMP: 10.60 LAKHS COST FOR CSR: 12.00 LAKHS AT SAHARWA, DARIYAPUR AND GARANPUR KALAN DISTRICT- HISAR AND , As per EIA Notification dated 14.09.2006 and as amended in EIA Notification on dated 15.01.2016, the project activity falls under Category ‘B2’ beacuse mining lease area is less than 25 Ha and there is no other mining lease area within 500m radius of this mining project.

APPLICANT M/s Joginder Enterprises, Through Shri Rakesh Goyal Maan colony,Bhiwani Road,

Contact:+91-9728510885

ENVIRONMENT CONSULTANT

Vardan Environet (NABET/EIA/1316IA001) D-142, Sec. 57, Gurgaon (Haryana) Contact no.- 9810355569 E-Mail: [email protected]

Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises. CONTENTS

S. No. PARTICULARS PAGE NO. 1 FORM-1 1-12 2 PRE-FEASIBILITY REPORT 13-26 3 ANNEXURE-I (LETTER OF INTENT) 27-32 4 ANNEXURE-II (KEY PLAN) 33 5 ANNEXURE-III (NABET CERTIFICATE) 34-35

2 Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises. FORM – I (I) BASIC INFORMATION S. N ITEMS DETAILS

1. Name of the Project Mining of Gypsum minerals at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani, Haryana by M/s Joginder Enterprises through Shri Rakesh Goyal. 2. Serial no. in schedule Project or Activity 1(a). 3. Proposed capacity Mining Lease Area-10.20 Ha. Geological Reserve- 4,10,550 MT Mineable Reserve-3,69,495MT Production Capacity-38,000 TPA 4. New/Expansion/Mode New Lease ation 5. Existing Existing Capacity: Nil capacity/Area Land area 10.20 Ha. (Mining) 6. Category of project As per EIA Notification dated 14.09.2006 and as amended in EIA Notification on dated 15.01.2016, the project activity falls under Category ‘B2’ beacuse mining lease area is less than 25 Ha and there is no other mining lease area within 500m radius of this Gypsum block area. 7. Does it attract the NA general condition 8. Does it attract the NA specific condition? 9. i) Location of unit Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District- ii) Plot, Survey No, Bhiwani. Khasra No. Village Khasra number Tentative Total village tentativ wise area e area. (in Ha.) (in Ha.) Saharwa 143/12m,13m,17m,18,19m,22m,23m, 8.30 (District- Hisar) 24m,25m.

146/3m,4,5m,6m,7,8m,12m,13m,14,1 5m,16m,17m,18m,24m,25m.

180/1m,9m,10m,11m,12m,13m,18m, 10.20 19m.181/5m,6m.

Dariyapur (District- 590/444 , 269/1 0.90 Bhiwani) GaranpurKalan 62/22m,23m,24m. 1.00 (District- Bhiwani) 80/2m,3m,4m. iii) District iv) State Hisar and Bhiwani Haryana 10. a) Nearest Railway Railway station – 9.5 Km, W station b) Air Port Indira Gandhi International Airport, Delhi – 138.50 Km, SE 11 Nearest City Siwani– 9.5 Km, W . Distt. Head Quarter Bhiwani – 37.00 Km, SE and Hisar-24.00 Km, N 12. Village Panchayat, Village-Saharwa of Dist.- Hisar

3 Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises. Zila Parishad Village-Dariyapur and Garanpur Kalan of Dist. Bhiwani 13. Name of Applicant Shri Rakesh Goyal Prop. of M/s Joginder Enterprises 14. Regd. Address Shri Rakesh Goyal Prop. of M/s Joginder Enterprises Maan colony,Bhiwani Road, Tosham Distt- Bhiwani

15. Address for correspondence: Name Shri Rakesh Goyal Prop. of M/s Joginder Enterprises Designation Proponent Address Maan colony,Bhiwani Road, Tosham Distt- Bhiwani Pin Code 127021 E mail Telephone +91-8529712326 Fax 16. Detail of alternative Project is mineral specific, hence no alternative site is proposed site, if any 17. Interlinked Project None 18. Whether separate Not Applied application for interlinked project has been submitted. 19. If, Yes Date of Not Applicable Submission 20. If no, reason Not Applicable 21. Whether proposal involves approval/clearance under: if yes, details of same and status to given a) Forest No. The Project area is free from forest (conservation) 1980 b) Wild life No. The Project area is not falling under wild life. protection Act 1972 c) CRZ No. The Project area is not falling under CRZ notification. notification 1991 22 Whether there is any The LOI of mining lease was granted to M/s Joginder Enterprises through Shri Rakesh . Govt. order/policy Goyal by the Director General of Mines and Geology, Haryana vide letter no. relevant/relating site DMG/HY/ML/Gypsum/HSR/Bhi/2016/3338 dated 22/06/2016 (Copy of LOI is enclosed as Annexure-I). 23. Forest land The Project site is free from forest. involved 24. Whether there is There is no court case against this project, however there is a court case in the matter of any litigation M/s Om minerals v/s State of Haryana and others [CWP No. 7991 of 2014], wherein the pending against the petitioner had challenged the demand/levy of stamp duty on execution of (Contract project and / or land Agreement). The State Government (Dept. of Mines and Geology) has issued LoI in which is project subject to the outcome of this case. The above mentioned case is still pending before is proposed to be Hon’ble Punjab and Haryana High Court for adjudication. setup: The Project Proponent has not filed any court case against any department neither he is a a) Name of party in this case.

4 Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises. the Court b) Case No. Order/direction of court if any and its relevance with proposed project

(II) Activity: 1. Construction, Operation or Decommissioning of the Project Involving Actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes Details Thereof (With Approximate Quantities/ Rates, Confirmation /No Wherever Possible) With Source Of Information Data 1.1 Permanent or temporary change in Yes  Land Use- The lease area is consists of plain terrain. land use, land cover or topography  Land Cover- The mining activity will have localized impact including increase in intensity of and create physical change in the existing environment due land use (with respect to local land to the change in the existing land use. use plan).  Topography- The topography of the area is generally plain terrain. The elevation ground level is 198 m amsl to 200 m amsl and working is proposed 6.0 mts below ground level. After mining activity, after mining excavated land will be reclaimed, Hence it will be cultivable again. 1.2 Clearance of existing land, No The mining lease area is Private Agricultural Land. Mining vegetation and building? lease area generally plain terrain and has agricultural land and no buildings in the area. So no clearance will be required for existing land, vegetation, and building. 1.3 Creation of new land uses? Yes Creation of land in the form of pits, same area would be reclaimed with the help of top soil and it will be reclaimed and for other used for cultivation. 1.4 Pre-construction investigations e.g. No Proposed project is for mining of “Gypsum Minerals” already bore house, soil testing? present in the undulating topography. 1.5 Construction works? No The opencast mechanized working in the plain terrain does not involve any construction work. 1.6 Demolition works? No Not Applicable during mining operation phase. However, the demolition of temporary structures like mine office; stores, workshops, rest-shelters etc. shall take place after the expiry of the lease period. 1.7 Temporary sites used for Yes The laborers deployed will be from nearby villages only. Rest construction works or Housing of shelter will be provided. As per the rule 62 and 63 of Mines construction workers? Rules 1955. 1.8 Above ground building , structures No Mine excavation in the form of pits. or Earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No No underground work will be envisaged. mining or tunneling? 1.10 Reclamation works? Yes After mining activity some area will be reclaimed with the help of overburden/ top soil of 18000 M3 per year. 1.11 Dredging? No Open cast mining doesn’t require any dredging operation. 1.12 Offshore structures? No As it is a Gypsum mining and these are not required for this project. 1.13 Production and manufacturing Yes The mining will be done by mechanized open cast method using processes? excavators and loaders. The production of mineral will be approx. 38,000 Tons per year.

5 Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises. 1.14 Facilities for storage of goods or No No storage facility is required as Gypsum will be mined out and materials? simultaneously transported to local market. 1.15 Facilities for treatment or disposal No No solid waste or liquid effluents will be generated. However of solid waste or liquid effluents? 18000 M3 per year of top soil will be generated which will be stack at separate site, and will be used for reclamation and plantation. 1.16 Facilities for long term housing of No The mine workers will be from nearby villages so no long term operational workers? housing facility is required. 1.17 New road, rail or sea traffic during No Roads are already available for transportation of mineral and construction of operation? machinery. Haul road connected to mettled road. 1.18 New road, rail, air waterborne or No The existing mode of transportation will be used. No new other transport infrastructure facility is required. including new or altered routes and stations, ports, airport etc? 1.19 Closure or diversion of existing No No closure/diversion of existing transport routes or transport routes or infrastructure infrastructure is required. leading to changes in traffic movements? 1.20 New or diverted transmission No As there will be no electricity or large scale water requirement lines or pipelines? for the project, therefore no transmission lines or pipelines are involved. 1.21 Impoundment, damming, culver No In view of neither any Impoundment through damming or ting, realignment or other changes realignment of the stream/river is envisaged in the mine area, to the hydrology of watercourses there will not be any changed in surface hydrology. Mining will or aquifers? be done above ground water table. Water table will not intersect during mining. 1.22 Stream crossings? No Neither any surface drain nor any water course (minor) passes through the mine area. 1.23 Abstraction or transfers of water No No abstraction of natural flow of water in the form of ground or from ground or surface waters? surface water in the lease area and working will be done above water table. 1.24 Changes in water bodies or the No No change in water bodies, drainage or runoff is anticipated land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes Road transportation for personnel will be arranged by lessee’s materials for construction, vehicles and material will be transported by 2 Nos. operation or decommissioning? Tippers/Trucks. 1.26 Long-term dismantling or No Long-term dismantling or decommissioning or restoration decommissioning or restoration works are not involved. works? 1.27 Ongoing activity during No Not applicable. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes The work will be carried out during day time by deploying either temporarily or local labour, which will come to the work in the lease area and permanently? return to their home. 1.29 Introduction of alien species? No No such introduction of alien species is foreseen. 1.30 Loss of native species or genetic No No loss of native species or genetic diversity is expected. diversity? 1.31 Any other actions? No Not applicable

6 Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises. 2. Use of Natural Resources for Construction or Operation of the Project (such as land, water, materials or energy, especially any Resources which are Non-renewable or in short supply): S. No. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/ rates, No wherever possible) with source of information data 2.1 Land especially undeveloped or No No agricultural land is involved. agricultural land (ha) 2.2 Water (expected source and competing Yes About 10.00 KLD of water will be required for Dust users) unit: KLD suppression and 3.00 KLD for Domestic propose and 5.00 KLD for plantations. Total water required for the proposed mining project is 18.00 KLD. This water will be sourced from the nearby tube wells through tankers. 2.3 Mineral (MT) No As this is mining of Gypsum, so no other minerals are used in this mining. 2.4 Construction material–Gypsum, No No construction material is required for this project. Only aggregates, and/soil (expected source– temporary office, rest shelters will be provided. MT) 2.5 Forests and timber (source – MT) No Not required for this project. 2.6 Energy including electricity and fuels Yes The mine will operate in one shifts and operational (source, competing users) Unit: fuel machinery is diesel operated which will be sourced from (MT), energy (MW) nearby outlet and required electricity for lighting arrangement will be made as per MMR 1961, Regulation 146. Diesel will be used on an average 280 L/day. 2.7 Any other natural resources (use No No other natural resources will be used. appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. No Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/ rates, No wherever possible) with source of information data

3.1 Use of substance or materials, which are No Not Applicable. hazardous (as per MSIHC rules) to human health or the environment (flora, fauna and water supplies) 3.2 Changes in occurrence of disease or No No change in occurrence of diseases, due to mining of affect disease vectors (e.g. insect or Gypsum mineral. water borne diseases) 3.3 Affect the welfare of people e.g. by Yes Project will encourage the economy of the local people by changing living conditions? direct and indirect employment opportunity. Besides this, social welfare measures shall be undertaken as CSR/EMP activity which will ameliorate the economic status of the people around the project area. 3.4 Vulnerable groups of people who could No No hospital, school exists within 10 Km radius. be affected by the project e.g. hospital patients, children, the elderly etc 3.5 Any other causes No -

7 Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises. 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. confirmation wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes Yes Total 18000 M3 per year of top soil will be generated which will be stack at separate site, and will be used for reclamation and plantation. 4.2 Municipal waste (domestic and or Yes Domestic and office effluent will be treated in individual commercial wastes) septic tanks. 4.3 Hazardous wastes (as per Hazardous No No hazardous wastes are envisaged. Waste Management Rules) 4.4 Other industrial process wastes No No industrial process waste is envisaged. 4.5 Surplus product No No surplus products are expected. 4.6 Sewage sludge or other sludge from No Not applicable as sludge will be taken out from soak pit and effluent treatment will be treated before used as manure after appropriate treatment. 4.7 Construction or demolition wastes No No construction or demolition wastes are expected. 4.8 Redundant machinery or equipment No Not, till closer of mining operation. Machinery will be used at the other site. 4.9 Contaminated soils or other materials No No contaminated soil or other materials are envisaged as it is open cast mining. However, the contamination of the soil due to scanty incidence of spillage of Petroleum, Oil and Lubricants (POL) from the machinery cannot be ruled out. Utilization of tray (generator set, other machinery) or paving of area will minimize the impact. 4.10 Agricultural wastes No No agricultural wastes are produced. 4.11 Other solid wastes Nil No other solid wastes are generated.

5. Release for pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. confirmation wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes There will be some emissions from combustion of fossil fuels from stationary or mobile fuel will be from vehicle used for transportation of sources minerals. Proper mitigation measures will be taken up for machineries and vehicles through timely over hauling and maintenance, which will be out sourced. 5.2 Emissions from production processes Yes During extraction of mineral dust particles will be generated which may be control by regular sprinkling of water. 5.3 Emissions from materials handling Yes During transportation of mineral dust will be generated including storage or transport which will be controlled by regular sprinkling of water on haul road and the greenbelt will be develop on the haul road. Mineral loaded vehicle will be covered with tarpaulin. 5.4 Emissions from construction No No construction will be done at the mining site. Hence, no activities including plant and emissions are anticipated. equipment. 5.5 Dust or odors from handling of Yes Fugitive dust emission is expected during handling of materials including construction minerals i.e. during loading/unloading of minerals. materials, sewage and waste. 5.6 Emissions from incineration of waste No No incineration of waste will be done. 5.7 Emissions from burning of waste in No No burning of waste is done, hence no emission is open air (e.g. slash materials, expected. construction debris).

8 Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises. 5.8 Emissions from any other sources. No None

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S. No. Information/Checklist Yes/No Details thereof (with approximate quantities/ confirmation rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes Mining operations will require equipment such as engines, ventilation plant, crushers Excavator, Tippers/Trucks etc. All the equipments will be of highest standard of reputed make. This manufacturer itself will take significant care of noise pollution control. Further, a vegetative barrier is also proposed for the purpose. All the equipments will be regularly maintained to keep noise level within the prescribed limit of 65 dB (A). 6.2 From industrial or similar processes No No industrial process is involved at mine lease area. 6.3 From construction or demolition No No construction or demolition is proposed. 6.4 From blasting or piling No Gypsum extraction will not require any drilling, blasting activities. 6.5 From construction or operational Yes During operational stage running of Tippers/Trucks will traffic produce very less noise, which will not cause any impact. 6.6 From lighting or cooling systems No Not Applicable. 6.7 From any other sources No None

7. Risks of contamination of land or water from releases of pollutants into the ground of into sewers, surface waters, groundwater, coastal waters or the sea S. No. Information/Checklist Yes/No Details thereof (with approximate quantities/ confirmation rates, wherever possible) with source of information data 7.1 From handling, storage, use or No Not Applicable. spillage of hazardous materials 7.2 From discharge of sewage or other No Domestic sewage will be generated and disposed into effluents to water or the land septic tank /soak pits. (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to No The emission is localized and is controlled by efficient air into the land or into water control measure. 7.4 From any other sources No None 7.5 Is there a risk of long term build up No The mine will be worked up for 10 years only, thus, no of pollutants in the environment incidence of long term buildup of pollutants is from these sources? expected. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. No. Information/Checklist Yes/No Details thereof (with approximate quantities/ confirmation rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc No Mining will be done open cast in a safe and scientific from storage, handling, use or manner and precautions will be taken against all risks as production of hazardous substances per norms prescribed by DGMS. 8.2 From any other causes Yes Risk of accidents are expected: a) During loading of minerals into truck/tractors- trolley.

9 Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises. b) During transportation. c) Accidents can be avoided by taking good safety practices. 8.3 Could the project be affected by No Low probability of earthquake as the area falls in natural disasters causing seismic Zone III. No landslides or cloudburst have been environmental damage (e.g. floods, observed in recent years. earthquakes, landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

9.1 Lead to development of supporting Proposed project will result in further growth of the facilities, ancillary development or surrounding area by increasing direct and indirect development stimulated by the project employment opportunities in the region. which could have impact on the environment e.g. All supporting temporary infrastructure will be -Supporting infrastructure (roads, power Yes developed. Mining site is approachable from SH-19 supply, waster or wastewater treatment, and NH-65. Temporary Office, rest shelter, first aid etc.) station will be constructed. - - housing development No There will no provision for housing in scope area.

- extractive industries Yes The Gypsum has vital role In the manufacture of blended cement. - supply industries No None - other No None 9.2 Lead to after-use of the site, which could Yes The top mined out benches will be converted into have an impact on the environment. green belt which will have positive impact on environment. 9.3 Set a precedent for later developments Yes Proposed plantation will help to increases aesthetic beauty of the area and pits converted into water reservoir which help in recharge of water table. 9.4 Have cumulative effects due to proximity No The area is free from any disturbances. There are not to other existing or planned projects with any industries or development projects in its close similar effects proximity.

(III) ENVIRONMENTAL SENSITIVITY S. No. Information/Checklist confirmation Name/ Identity Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 1. Areas protected under international None - conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2. Areas which are important or sensitive None - for ecological reasons – Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains and forests.

10 Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises. 3. Areas used by protected, important or None - sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or underground None - waters 5. State, National boundaries None - 6. Routes or facilities used by the public for Siwani Railway 9.5 Km, W access to recreation or other tourist, Station pilgrim areas. IGI Airport, Delhi 138.50 Km, SE 7. Defense installations None - 8. Densely populated or built-up area No - 9. Areas occupied by sensitive manmade Hospital land uses (hospitals, schools, places of Sindhu Hospital, 10.6 Km, SW worship, community facilities) School Saharwa 1.62 Km NE Garanpura 0.8 Km S Dariyapur 0.60 Km SE Community Facilities . Siwani Police- Station 9.5 Km. W 10. Areas containing important, high quality None - or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals). 11. Areas already subjected to pollution or None - environmental damage. (Those where existing legal environmental standards are exceeded). 12. Areas susceptible to natural hazard which No The study area lies in Seismic Zone III. could cause the project to present However, natural hazards due to environmental problems (earthquakes, earthquakes are not anticipated to be a subsidence, landslides, erosion, flooding major environmental issue. Also no or extreme or adverse climatic major structures are part of the proposed conditions) development. Hence environmental impacts due to the proposed development are ruled out.

Enclosure: Pre-feasibility Report

11 Form-I Mining of “Gypsum (Minor Mineral)” at Village-Saharwa of District-Hisar and Village Dariyapur, Garanpur Kalan of District-Bhiwani Haryana by M/s Joginder Enterprises.

Undertaking

“I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost”.

Date: 27.07.2016

Place: Bhiwani Signature of the Applicant

(Authorized Signatory)

12