Title slide INSERT IMAGE

1

Click on the icon to insert an image

2

Select the image you want to use and click on ‘Insert’

Look around Insert and meet the of Van Oord 3

Port Academy 2020 | Jakarta | 08 March 2020 Select the miniature slide, click on the right mouse button and choose ‘Reset slide’

Place here a screenshot of Layout the miniature Reset slide Text (M) & Image (XL) TEXT LEVELS INSERT IMAGE

Home About us Level up 1

Level down Click on the icon to insert an image Our Company

1 Basic text (16 pt.) − Founded 150 years ago in the 2 - Bullet (16 pt.) 3 - Sub-bullet (16 pt.) − Started with a bucket dredger powered by steam, now a large fleet with state- 2 4 Colored sub-header (20 pt.) of-the-art equipment 5 1. Numbers (16 pt.) Select the image you want to use − Leading international marine contractor and click on ‘Insert’ 6 - Bullet(16 pt.) − Specialised in:

7 - Sub-bullet (14 pt.) − Dredging Insert

8 Colored sub-header (20 pt.) − Offshore oil & gas

9 Italic text (14 pt) − Offshore wind 3 − Independent family-owned business Select the miniature slide, click on the right mouse button and choose ‘Reset slide’ Web

Place here a screenshot of Layout the miniature Reset slide 3 Text (M) & Image (XL) TEXT LEVELS INSERT IMAGE

Home About us - Our Purpose & Mission Level up 1

Level down Click on the icon to insert an image Purpose

1 Basic text (16 pt.) Our purpose is to create a better world for future generations by delivering Marine ingenuity. 2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.) 2 4 Colored sub-header (20 pt.)

5 1. Numbers (16 pt.) Select the image you want to use and click on ‘Insert’ 6 - Bullet(16 pt.)

7 - Sub-bullet (14 pt.) Insert

8 Colored sub-header (20 pt.)

9 Italic text (14 pt) Mission 3

Select the miniature slide, click on the As a global maritime contractor, we focus on dredging, oil & gas infrastructure and offshore wind. right mouse button and choose ‘Reset slide’ We work safe and closely with our clients and stakeholders to create innovative and sustainable solutions.

Place here a screenshot of Layout the miniature Reset slide 4

Text (M) & Image (L) TEXT LEVELS INSERT IMAGE

Home About us – Ingenious People Level up 1

Level down Click on the icon to insert an image We Work Together

1 Basic text (16 pt.) • Working in approximately 42 2 - Bullet (16 pt.) countries 3 - Sub-bullet (16 pt.) • Diversity: 68 nationalities 2 4 Colored sub-header (20 pt.) • 4,900 well trained ingenious 5 1. Numbers (16 pt.) employees Select the image you want to use and click on ‘Insert’ 6 - Bullet(16 pt.)

7 - Sub-bullet (14 pt.) Insert

8 Colored sub-header (20 pt.)

9 Italic text (14 pt) 3

If you want to scale or drag the image go to ‘Picture Tools’ and click on ‘Crop’

Crop

5 Text (L) & Image (M) TEXT LEVELS INSERT IMAGE

Home About Van Oord – Say Yes to Safety Level up 1

Level down Click on the icon to insert an image Say Yes to Safety

1 Basic text (16 pt.) Safety is vital to Van Oord. 2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.) That is why we have an extensive safety program informing everyone that Van Oord is embracing safety: say YES to safety. 2 4 Colored sub-header (20 pt.) To say YES to safety means taking care for ourselves, each other, 5 1. Numbers (16 pt.) and the environment in which we work. Select the image you want to use and click on ‘Insert’ 6 - Bullet(16 pt.)

7 - Sub-bullet (14 pt.) Projects executed in line with Van Oord Insert Total Recordable Injury Rate (TRIR) Management System, based on standards: 8 Colored sub-header (20 pt.) 0,73 0,67 • ISO 9001 9 Italic text (14 pt) • ISO 14001 3 • OHSAS 18001 If you want to scale or drag the image • ISM code go to ‘Picture Tools’ and click on ‘Crop’

• Maritime Labor Convention

• VCA 2017 2018 Crop

6 Text (L) & Image (XL) TEXT LEVELS INSERT IMAGE

Home About us – Sustainability Level up 1

Level down Click on the icon to insert an image Value creation through Marine ingenuity

1 Basic text (16 pt.) − Minimise any harmful effects, and encourage 2 - Bullet (16 pt.) positive ones

3 - Sub-bullet (16 pt.) − Van Oord Guards programme: 2 4 Colored sub-header (20 pt.) − PlumeGuard 5 1. Numbers (16 pt.) Select the image you want to use and click on ‘Insert’ − FaunaGuard 6 - Bullet(16 pt.) − ReefGuard 7 - Sub-bullet (14 pt.) Insert

8 Colored sub-header (20 pt.) Web

9 Italic text (14 pt) 3

Select the miniature slide, click on the right mouse button and choose ‘Reset slide’

Place here a screenshot of Layout the miniature Reset slide 3 pillars TEXT LEVELS INSERT IMAGE

Home Activities – Four Business Units Level up 1

Level down Click on the icon to insert an image Dredging Netherlands

1 Basic text (16 pt.)

2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.) 2 4 Colored sub-header (20 pt.)

5 1. Numbers (16 pt.) Select the image you want to use and click on ‘Insert’ 6 - Bullet(16 pt.)

7 - Sub-bullet (14 pt.) Insert

8 Colored sub-header (20 pt.) Offshore Oil & Gas Offshore Wind 9 Italic text (14 pt) 3

If you want to scale or drag the image go to ‘Picture Tools’ and click on ‘Crop’

Crop Image (XL) & Text (L) TEXT LEVELS INSERT IMAGE

Home Activities – Dredging Level up 1

Level down Click on the icon to insert an image Dredging

1 Basic text (16 pt.) − Ports and waterways 2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.) − and constructing artificial islands 2 4 Colored sub-header (20 pt.) − Constructing dikes, revetments and coastal defences 5 1. Numbers (16 pt.) Select the image you want to use and click on ‘Insert’ − Building jetties, groynes and quay walls 6 - Bullet(16 pt.)

7 - Sub-bullet (14 pt.) − Removing contaminated bed sediment Insert

8 Colored sub-header (20 pt.) − Vertical and horizontal drainage

9 Italic text (14 pt) Looking closer 3

New parallel Suez Canal Select the miniature slide, click on the Vimeo right mouse button and choose ‘Reset slide’ Megaproject

Web Maasvlakte 2 Place here a Back screenshot of Layout the miniature Reset slide 9 Image (XL) & Text (L) TEXT LEVELS INSERT IMAGE

Home Activities – Dredging Level up 1

Level down Click on the icon to insert an image Megaproject Palm Jumeirah

1 Basic text (16 pt.) − World-class tourist venue in 2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.) − Artificial island in the shape of a palm tree 2 4 Colored sub-header (20 pt.) − Dredged more than 110 million m³ of sand

5 1. Numbers (16 pt.) Select the image you want to use − 700 ha of new land and click on ‘Insert’ 6 - Bullet(16 pt.)

7 - Sub-bullet (14 pt.) Insert

8 Colored sub-header (20 pt.)

9 Italic text (14 pt) Looking closer 3

New parallel Suez Canal Select the miniature slide, click on the Vimeo right mouse button and choose ‘Reset slide’ Megaproject Palm Jumeirah

Web Maasvlakte 2 Place here a screenshot of Back Layout the miniature Reset slide 10 Text (L) & Image (XL) TEXT LEVELS INSERT IMAGE

Home Activities – Offshore oil & gas Level up 1

Level down Click on the icon to insert an image Offshore oil & gas

1 Basic text (16 pt.) − Integrated solutions for the installation of 2 - Bullet (16 pt.) nearshore pipelines, cables and offshore constructions 3 - Sub-bullet (16 pt.) - Landfall construction - Trenching and backfilling 2 4 Colored sub-header (20 pt.) - Installation of shallow water pipelines, cables and buoy mooring systems Select the image you want to use 5 1. Numbers (16 pt.) - Installation of gravity based structures and click on ‘Insert’ 6 - Bullet(16 pt.) - Subsea rock installation for the stabilisation and 7 - Sub-bullet (14 pt.) protection of pipelines, cables and other Insert constructions on the sea bed 8 Colored sub-header (20 pt.)

9 Italic text (14 pt) Looking closer 3

U-864 counterfill project Select the miniature slide, click on the Vimeo right mouse button and choose ‘Reset Tetney Sea line project slide’

Web Place here a screenshot of Back Layout the miniature Reset slide 11 Text (M) & Image (L) TEXT LEVELS INSERT IMAGE

Home Activities – Offshore oil & gas Level up 1

Level down Click on the icon to insert an image Tetney Sea line project

1 Basic text (16 pt.) − Replaced 4.5 km of pipeline for 2 - Bullet (16 pt.) oil refinery in North Lincolnshire, United Kingdom 3 - Sub-bullet (16 pt.) 2 4 Colored sub-header (20 pt.) − Logistic puzzle due to short time frame and remote location 5 1. Numbers (16 pt.) Select the image you want to use − Installed Pipe Line End Manifold and click on ‘Insert’ 6 - Bullet(16 pt.) (PLEM) and buoy 7 - Sub-bullet (14 pt.) Insert − Decommissioned redundant 8 Colored sub-header (20 pt.) section of pipeline and old PLEM

9 Italic text (14 pt) Looking closer 3

If you want to scale or drag the image U-864 counterfill project go to ‘Picture Tools’ and click on ‘Crop’ Tetney Sea line project

Vimeo

Back Web Crop 12 Image (XL) & Text (M) TEXT LEVELS INSERT IMAGE

Home Activities – Offshore wind Level up 1

Level down Click on the icon to insert an image Offshore wind

1 Basic text (16 pt.) − Engineering, Procurement and 2 - Bullet (16 pt.) Construction (EPC) contractor

3 - Sub-bullet (16 pt.) − Complete package to build entire 2 4 Colored sub-header (20 pt.) offshore wind parks.

5 1. Numbers (16 pt.) − Full balance of plant scope: Select the image you want to use foundations, scour protection, and click on ‘Insert’ 6 - Bullet(16 pt.) infield cables, offshore high- voltage substations, export 7 - Sub-bullet (14 pt.) cables, WTG installation and Insert 8 Colored sub-header (20 pt.) onshore works.

9 Italic text (14 pt) Looking closer 3

Vimeo Gemini Select the miniature slide, click on the right mouse button and choose ‘Reset slide’

Web Place here a Back screenshot of Layout the miniature Reset slide 13 Image (XL) & Text (M) TEXT LEVELS INSERT IMAGE

Home Activities – Offshore wind Level up 1

Level down Click on the icon to insert an image Gemini

1 Basic text (16 pt.) − One of the largest offshore wind 2 - Bullet (16 pt.) projects in

3 - Sub-bullet (16 pt.) − 85 km off the coast of Groningen, 2 4 Colored sub-header (20 pt.) the Netherlands

5 1. Numbers (16 pt.) − 150 4 MW Siemens wind turbines Select the image you want to use and click on ‘Insert’ 6 - Bullet(16 pt.) − 600 MW of renewable energy for 7 - Sub-bullet (14 pt.) 785,000 households Insert

8 Colored sub-header (20 pt.)

9 Italic text (14 pt) Looking closer 3

Gemini Select the miniature slide, click on the Vimeo right mouse button and choose ‘Reset slide’

Web Place here a screenshot of Back Layout the miniature Reset slide 14 SUBMENU TEXT LEVELS INSERT IMAGE

Home Activities - Equipment types Level up 1

Level down Click on the icon to insert an image Equipment

1 Basic text (16 pt.) − We operate the world’s most Trailing suction Cutter suction 2 - Bullet (16 pt.) advanced equipment hopper dredger dredger

3 - Sub-bullet (16 pt.) − State-of-the-art vessels 2 4 Colored sub-header (20 pt.) − Highest quality and safety and 5 1. Numbers (16 pt.) sustainable standards Select the image you want to use and click on ‘Insert’ 6 - Bullet(16 pt.) − Continuous investment programme 7 - Sub-bullet (14 pt.) Insert

8 Colored sub-header (20 pt.)

9 Italic text (14 pt) 3

If you want to scale or drag the image go to ‘Picture Tools’ and click on ‘Crop’

Crop Text (M) & Image (L) TEXT LEVELS INSERT IMAGE

Home Activities – Equipment types Level up 1

Level down Click on the icon to insert an image Trailing suction hopper dredger

1 Basic text (16 pt.) − Large, powerful pumps & engines 2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.) − To dredge sand, clay, sludge 2 4 Colored sub-header (20 pt.) − Can empty its hopper in various ways: 5 1. Numbers (16 pt.) Select the image you want to use and click on ‘Insert’ − Depositing: opening doors or valves 6 - Bullet(16 pt.)

7 - Sub-bullet (14 pt.) − Pumping: dredge pumps pump Insert resulting mixture through pipeline 8 Colored sub-header (20 pt.) attached to vessel

9 Italic text (14 pt) − Rainbowing: contents sprayed over vessel’s bow at desired location 3

If you want to scale or drag the image go to ‘Picture Tools’ and click on ‘Crop’

Back

Web Crop

16 Text (M) & Image (L) TEXT LEVELS INSERT IMAGE

Home Activities – Equipment types Level up 1

Level down Click on the icon to insert an image Cutter suction dredger

1 Basic text (16 pt.) − Stationary or self-propelled 2 - Bullet (16 pt.) vessel 3 - Sub-bullet (16 pt.) − Uses rotating cutter head to 2 4 Colored sub-header (20 pt.) loosen material in the bed (cutting) 5 1. Numbers (16 pt.) Select the image you want to use and click on ‘Insert’ − Discharges dredged material 6 - Bullet(16 pt.) directly to shore via a floating pipeline 7 - Sub-bullet (14 pt.) Insert − Discharges dredged material into a 8 Colored sub-header (20 pt.) barge using special loading system

9 Italic text (14 pt) 3 − Two giant self-propelled vessels: Athena and Artemis If you want to scale or drag the image go to ‘Picture Tools’ and click on ‘Crop’

Back

Web Crop

17 Text (M) & Image (L) TEXT LEVELS INSERT IMAGE

Home Activities – Equipment types Level up 1

Level down Click on the icon to insert an image Water injection dredger

1 Basic text (16 pt.) − Good manoeuvrability makes it 2 - Bullet (16 pt.) ideal for small, shallow ports and marinas 3 - Sub-bullet (16 pt.) 2 4 Colored sub-header (20 pt.) − Can dredge very close to embankments and quay walls 5 1. Numbers (16 pt.) Select the image you want to use − Injection beam underneath the and click on ‘Insert’ 6 - Bullet(16 pt.) vessel injects large volumes of 7 - Sub-bullet (14 pt.) water, under low pressure, into Insert silt or fine sand to re-suspend it 8 Colored sub-header (20 pt.)

9 Italic text (14 pt) 3

If you want to scale or drag the image go to ‘Picture Tools’ and click on ‘Crop’ Back

Web

Crop

18 Text (XXL) TEXT LEVELS Van Oord - Yard Home Level up

Level down

1 Basic text (16 pt.)

2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.)

4 Colored sub-header (20 pt.)

5 1. Numbers (16 pt.)

6 - Bullet(16 pt.)

7 - Sub-bullet (14 pt.) PT Van Oord Batam 8 Colored sub-header (20 pt.)

9 Italic text (14 pt) Van Oord yard in Indonesia

• Slipway and repair workshop

• Sparepart and Maintenance

• Hub for

• Indonesian Engineer

19 Title slide INSERT IMAGE

1 Port of Benoa, 2018 Click on the icon to insert an image Dredging the access channel and basin

2 Self-Propelled Cutter Suction Select the image you want to use Dredger “Artemis”: 24,700kW and click on ‘Insert’

Insert

3

Select the miniature slide, click on the right mouse button and choose ‘Reset slide’

Trailing Suction Hopper Dredger “HAM 318”: 37,300m3 Place here a screenshot of Layout the miniature Reset slide

IMAGE 100% INSERT IMAGE History – Van Oord foot print at Indonesia 1

Click on the icon to insert an image Port of Surabaya, access channel 1911

2

Select the image you want to use and click on ‘Insert’

Insert

3

Select the miniature slide, click on the right mouse button and choose ‘Reset slide’

Place here a screenshot of Layout the miniature Reset slide 21 Text (M) & Image (L) TEXT LEVELS INSERT IMAGE

Home History – Van Oord Footprint in Indonesia Level up 1

Level down Click on the icon to insert an image TSHD HAM 2

1 Basic text (16 pt.) • Hopper dredger 2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.) • Built in 1911 2 4 Colored sub-header (20 pt.) • Steam powered

5 1. Numbers (16 pt.) Select the image you want to use • 700 m3 Hopper Capacity and click on ‘Insert’ 6 - Bullet(16 pt.)

7 - Sub-bullet (14 pt.) Insert

8 Colored sub-header (20 pt.)

9 Italic text (14 pt) 3

If you want to scale or drag the image go to ‘Picture Tools’ and click on ‘Crop’

Crop IMAGE 100% INSERT IMAGE Project Experience of Van Oord in Indonesia 1

Belawan Karimum Besar Kalimantan Halmahera West Papua Click on the icon to insert an image • Belawan Port Package-2 (2017), • Tanjung Balai (2009), New • Banjarmasin (2010-2011), Barito Access • Waters of Halmahera • Tangguh (2009), Dredging dock and • Reclamation Container Yard construction yard Channel (2010) Salvage LNG approach channel • South (2008), Dredging of a new access • Tangguh (2007) Dumping of rock channel • Balikpapan (2004-2005), Maintenance dredging

2

Select the image you want to use and click on ‘Insert’

Bengkulu • Capital dredging (2011 and 2013) Insert • Maintenance dredging (2012-2014) • Maintenance dredging (2019)

Surabaya • Surabaya Western Access Channel (2014- 2015) 3 Lampung • Manyar Port Terminal (2014-2015) • Sumatra-Java Pipeline • SWAC Maintenance (2015-2016) (2013-2014) Dredging • SWAC Maintenance (2018) Select the miniature slide, click on the trench right mouse button and choose ‘Reset Bali slide’ • Sanur (2003), Dredging sea sand & DKI Jakarta stockpile filling Banten • Pluit City (2015-..), Construction of an island • Kuta (2008), Bali Beach conservation Place here a • KS – POSCO Cilegon • Tanjung Priok (2013 – 2016), Dredging access channel & project screenshot of Layout (2011), Reclamation Reclamation • Benoa Port (2018), Port deepening the miniature Yard • Tanjung Priok (2013 – 2014), Urgent rehabilitation dredging • Airport (2018), reclamation for apron Reset slide • Kapuk Naga Indah (2012 – 2014), Land reclamation extention IMAGE 100% INSERT IMAGE BUMN Clients of Van Oord in Indonesia 1

Click on the icon to insert an image

2

Select the image you want to use and click on ‘Insert’

Insert

3

Select the miniature slide, click on the right mouse button and choose ‘Reset slide’

Place here a screenshot of Layout the miniature Reset slide Text (XXL) TEXT LEVELS Van Oord project experience - Indonesia Home Level up

Level down Belawan Port Package-2

1 Basic text (16 pt.) Client 2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.) PT WIKA-HUTAMA JO / Pelindo -1

4 Colored sub-header (20 pt.)

5 1. Numbers (16 pt.) Scope 6 - Bullet(16 pt.) Sand supply to reclamation area for 7 - Sub-bullet (14 pt.) Container Yard 400 x 450 m3 (3.400.000 m3 sand to supply) 8 Colored sub-header (20 pt.)

9 Italic text (14 pt) Execution

2017

25 Text (XXL) TEXT LEVELS Van Oord project experience in Indonesia Home Level up

Level down North Kalibaru - Tanjung Priok

1 Basic text (16 pt.) Client 2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.) PT PP (Persero) Tbk

4 Colored sub-header (20 pt.)

5 1. Numbers (16 pt.) Scope 6 - Bullet(16 pt.) Port deepening, reclaiming land for a new 7 - Sub-bullet (14 pt.) terminal area, expanding and deepening the access channel. 8 Colored sub-header (20 pt.) A total of 25 mio m3 of material will be 9 Italic text (14 pt) moved and 10 mio m3 will be delivered

Execution

2013 - 2017

27

Text (L) & Image (M) TEXT LEVELS INSERT IMAGE

Home Van Oord project experience in Indonesia Level up 1

Level down Click on the icon to insert an image SWAC New channel entrance Buoy 5 1 Basic text (16 pt.) Old channel entrance Client 2 - Bullet (16 pt.)

3 - Sub-bullet (16 pt.) Pelindo-III Outer channel 2 4 Colored sub-header (20 pt.)

5 1. Numbers (16 pt.) Select the image you want to use Scope and click on ‘Insert’ 6 - Bullet(16 pt.) Deepening and widening of channel to ports 7 - Sub-bullet (14 pt.) of Surabaya Insert Inner channel 8 Colored sub-header (20 pt.) Deepening to -13 m and 150 m width Dredging 9.7mio m3 soft soil 9 Italic text (14 pt) 3

Shoals TJ. Perak If you want to scale or drag the image Execution go to ‘Picture Tools’ and click on ‘Crop’

May 2014 – March 2015

Crop

2929 IMAGE 100% INSERT IMAGE THANK YOU FOR YOUR ATTENTION - TERIMA KASIH 1

Click on the icon to insert an image

2

Select the image you want to use and click on ‘Insert’

Insert

3

Select the miniature slide, click on the right mouse button and choose ‘Reset slide’

Place here a screenshot of Layout the miniature 30 Reset slide