Corporate Powerpoint Presentation

Corporate Powerpoint Presentation

Title slide INSERT IMAGE 1 Click on the icon to insert an image 2 Select the image you want to use and click on ‘Insert’ Look around Insert and meet the world of Van Oord 3 Port Academy 2020 | Jakarta | 08 March 2020 Select the miniature slide, click on the right mouse button and choose ‘Reset slide’ Place here a screenshot of Layout the miniature Reset slide Text (M) & Image (XL) TEXT LEVELS INSERT IMAGE Home About us Level up 1 Level down Click on the icon to insert an image Our Company 1 Basic text (16 pt.) − Founded 150 years ago in the 2 - Bullet (16 pt.) Netherlands 3 - Sub-bullet (16 pt.) − Started with a bucket dredger powered by steam, now a large fleet with state- 2 4 Colored sub-header (20 pt.) of-the-art equipment 5 1. Numbers (16 pt.) Select the image you want to use − Leading international marine contractor and click on ‘Insert’ 6 - Bullet(16 pt.) − Specialised in: 7 - Sub-bullet (14 pt.) − Dredging Insert 8 Colored sub-header (20 pt.) − Offshore oil & gas 9 Italic text (14 pt) − Offshore wind 3 − Independent family-owned business Select the miniature slide, click on the right mouse button and choose ‘Reset Web slide’ Place here a screenshot of Layout the miniature Reset slide 3 Text (M) & Image (XL) TEXT LEVELS INSERT IMAGE Home About us - Our Purpose & Mission Level up 1 Level down Click on the icon to insert an image Purpose 1 Basic text (16 pt.) Our purpose is to create a better world for future generations by delivering Marine ingenuity. 2 - Bullet (16 pt.) 3 - Sub-bullet (16 pt.) 2 4 Colored sub-header (20 pt.) 5 1. Numbers (16 pt.) Select the image you want to use and click on ‘Insert’ 6 - Bullet(16 pt.) 7 - Sub-bullet (14 pt.) Insert 8 Colored sub-header (20 pt.) 9 Italic text (14 pt) Mission 3 Select the miniature slide, click on the As a global maritime contractor, we focus on dredging, oil & gas infrastructure and offshore wind. right mouse button and choose ‘Reset slide’ We work safe and closely with our clients and stakeholders to create innovative and sustainable solutions. Place here a screenshot of Layout the miniature Reset slide 4 Text (M) & Image (L) TEXT LEVELS INSERT IMAGE Home About us – Ingenious People Level up 1 Level down Click on the icon to insert an image We Work Together 1 Basic text (16 pt.) • Working in approximately 42 2 - Bullet (16 pt.) countries 3 - Sub-bullet (16 pt.) • Diversity: 68 nationalities 2 4 Colored sub-header (20 pt.) • 4,900 well trained ingenious 5 1. Numbers (16 pt.) employees Select the image you want to use and click on ‘Insert’ 6 - Bullet(16 pt.) 7 - Sub-bullet (14 pt.) Insert 8 Colored sub-header (20 pt.) 9 Italic text (14 pt) 3 If you want to scale or drag the image go to ‘Picture Tools’ and click on ‘Crop’ Crop 5 Text (L) & Image (M) TEXT LEVELS INSERT IMAGE Home About Van Oord – Say Yes to Safety Level up 1 Level down Click on the icon to insert an image Say Yes to Safety 1 Basic text (16 pt.) Safety is vital to Van Oord. 2 - Bullet (16 pt.) 3 - Sub-bullet (16 pt.) That is why we have an extensive safety program informing everyone that Van Oord is embracing safety: say YES to safety. 2 4 Colored sub-header (20 pt.) To say YES to safety means taking care for ourselves, each other, 5 1. Numbers (16 pt.) and the environment in which we work. Select the image you want to use and click on ‘Insert’ 6 - Bullet(16 pt.) 7 - Sub-bullet (14 pt.) Projects executed in line with Van Oord Insert Total Recordable Injury Rate (TRIR) Management System, based on standards: 8 Colored sub-header (20 pt.) 0,73 0,67 • ISO 9001 9 Italic text (14 pt) • ISO 14001 3 • OHSAS 18001 If you want to scale or drag the image • ISM code go to ‘Picture Tools’ and click on ‘Crop’ • Maritime Labor Convention • VCA 2017 2018 Crop 6 Text (L) & Image (XL) TEXT LEVELS INSERT IMAGE Home About us – Sustainability Level up 1 Level down Click on the icon to insert an image Value creation through Marine ingenuity 1 Basic text (16 pt.) − Minimise any harmful effects, and encourage 2 - Bullet (16 pt.) positive ones 3 - Sub-bullet (16 pt.) − Van Oord Guards programme: 2 4 Colored sub-header (20 pt.) − PlumeGuard 5 1. Numbers (16 pt.) Select the image you want to use and click on ‘Insert’ − FaunaGuard 6 - Bullet(16 pt.) − ReefGuard 7 - Sub-bullet (14 pt.) Insert 8 Colored sub-header (20 pt.) Web 9 Italic text (14 pt) 3 Select the miniature slide, click on the right mouse button and choose ‘Reset slide’ Place here a screenshot of Layout the miniature Reset slide 3 pillars TEXT LEVELS INSERT IMAGE Home Activities – Four Business Units Level up 1 Level down Click on the icon to insert an image Dredging Netherlands 1 Basic text (16 pt.) 2 - Bullet (16 pt.) 3 - Sub-bullet (16 pt.) 2 4 Colored sub-header (20 pt.) 5 1. Numbers (16 pt.) Select the image you want to use and click on ‘Insert’ 6 - Bullet(16 pt.) 7 - Sub-bullet (14 pt.) Insert 8 Colored sub-header (20 pt.) Offshore Oil & Gas Offshore Wind 9 Italic text (14 pt) 3 If you want to scale or drag the image go to ‘Picture Tools’ and click on ‘Crop’ Crop Image (XL) & Text (L) TEXT LEVELS INSERT IMAGE Home Activities – Dredging Level up 1 Level down Click on the icon to insert an image Dredging 1 Basic text (16 pt.) − Ports and waterways 2 - Bullet (16 pt.) 3 - Sub-bullet (16 pt.) − Land reclamation and constructing artificial islands 2 4 Colored sub-header (20 pt.) − Constructing dikes, revetments and coastal defences 5 1. Numbers (16 pt.) Select the image you want to use and click on ‘Insert’ − Building jetties, groynes and quay walls 6 - Bullet(16 pt.) 7 - Sub-bullet (14 pt.) − Removing contaminated bed sediment Insert 8 Colored sub-header (20 pt.) − Vertical and horizontal drainage 9 Italic text (14 pt) Looking closer 3 New parallel Suez Canal Select the miniature slide, click on the Vimeo right mouse button and choose ‘Reset slide’ Megaproject Palm Jumeirah Web Maasvlakte 2 Place here a Back screenshot of Layout the miniature Reset slide 9 Image (XL) & Text (L) TEXT LEVELS INSERT IMAGE Home Activities – Dredging Level up 1 Level down Click on the icon to insert an image Megaproject Palm Jumeirah 1 Basic text (16 pt.) − World-class tourist venue in Dubai 2 - Bullet (16 pt.) 3 - Sub-bullet (16 pt.) − Artificial island in the shape of a palm tree 2 4 Colored sub-header (20 pt.) − Dredged more than 110 million m³ of sand 5 1. Numbers (16 pt.) Select the image you want to use − 700 ha of new land and click on ‘Insert’ 6 - Bullet(16 pt.) 7 - Sub-bullet (14 pt.) Insert 8 Colored sub-header (20 pt.) 9 Italic text (14 pt) Looking closer 3 New parallel Suez Canal Select the miniature slide, click on the Vimeo right mouse button and choose ‘Reset slide’ Megaproject Palm Jumeirah Web Maasvlakte 2 Place here a screenshot of Back Layout the miniature Reset slide 10 Text (L) & Image (XL) TEXT LEVELS INSERT IMAGE Home Activities – Offshore oil & gas Level up 1 Level down Click on the icon to insert an image Offshore oil & gas 1 Basic text (16 pt.) − Integrated solutions for the installation of 2 - Bullet (16 pt.) nearshore pipelines, cables and offshore constructions 3 - Sub-bullet (16 pt.) - Landfall construction - Trenching and backfilling 2 4 Colored sub-header (20 pt.) - Installation of shallow water pipelines, cables and buoy mooring systems Select the image you want to use 5 1. Numbers (16 pt.) - Installation of gravity based structures and click on ‘Insert’ 6 - Bullet(16 pt.) - Subsea rock installation for the stabilisation and 7 - Sub-bullet (14 pt.) protection of pipelines, cables and other Insert constructions on the sea bed 8 Colored sub-header (20 pt.) 9 Italic text (14 pt) Looking closer 3 U-864 counterfill project Select the miniature slide, click on the Vimeo right mouse button and choose ‘Reset Tetney Sea line project slide’ Web Place here a screenshot of Back Layout the miniature Reset slide 11 Text (M) & Image (L) TEXT LEVELS INSERT IMAGE Home Activities – Offshore oil & gas Level up 1 Level down Click on the icon to insert an image Tetney Sea line project 1 Basic text (16 pt.) − Replaced 4.5 km of pipeline for 2 - Bullet (16 pt.) oil refinery in North Lincolnshire, United Kingdom 3 - Sub-bullet (16 pt.) 2 4 Colored sub-header (20 pt.) − Logistic puzzle due to short time frame and remote location 5 1. Numbers (16 pt.) Select the image you want to use − Installed Pipe Line End Manifold and click on ‘Insert’ 6 - Bullet(16 pt.) (PLEM) and buoy 7 - Sub-bullet (14 pt.) Insert − Decommissioned redundant 8 Colored sub-header (20 pt.) section of pipeline and old PLEM 9 Italic text (14 pt) Looking closer 3 If you want to scale or drag the image U-864 counterfill project go to ‘Picture Tools’ and click on ‘Crop’ Tetney Sea line project Vimeo Back Web Crop 12 Image (XL) & Text (M) TEXT LEVELS INSERT IMAGE Home Activities – Offshore wind Level up 1 Level down Click on the icon to insert an image Offshore wind 1 Basic text (16 pt.) − Engineering, Procurement and 2 - Bullet (16 pt.) Construction (EPC) contractor 3 - Sub-bullet (16 pt.) − Complete package to build entire 2 4 Colored sub-header (20 pt.) offshore wind parks.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    27 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us