Chichester Pipeline Chichester Investing in Your City’S Future a Southernwater Partnership

Total Page:16

File Type:pdf, Size:1020Kb

Chichester Pipeline Chichester Investing in Your City’S Future a Southernwater Partnership How we will build the pipe The pipeline will range from 250mm to 315mm in diameter – which is roughly the same as a dinner plate. In some sections, such as those that are environmentally sensitive, we’ll be using Chichester pipeline a trenchless technique called directional drilling. This means that rather than digging up large stretches of ground, Investing in your city’s future we can create small pits from which we can drill underground tunnels to insert pipework. This means less disruption at What about archaeological ground level. finds? Where this is not possible, we will need to cut into the ground to lay pipework. We commissioned a team from In these areas, we’ll be reinstating the Archaeology South-East to check the ground to its original condition. areas in which we might be working. They unearthed some important relics, dating What about impact on the back as far as 1500BC. community and environment? Careful examination gives a fascinating glimpse into our past. When will the work take place? What next? Limiting this is a priority for us and we must work within strict parameters. Among the most significant finds were: We hope to be able to start in summer We’d really appreciate your feedback, 2018, completing construction within so we can consider it before finalising We’ve carried out a detailed • A previously-unknown section of the about 18 months, and reinstatement of all our design and submitting our planning Environmental Impact Assessment (EIA) ancient Chichester Entrenchments, working areas within two years. application in late November. and liaised closely with local authorities, a complex series of ditches and banks as well as organisations such as Natural thought to have been constructed We intend to start at the eastern end You can leave feedback a number of ways: working westwards from Tangmere with England, the Environment Agency, Sussex around the late Iron Age Via our website pumping station 3 being followed by Wildlife Trust and Highways England. southernwater.co.uk/chichesterpipeline • Evidence of wooden posts suggesting pumping station 2 and finally pumping Community – we’ll do all we can to Iron Age timber buildings station 1. Email limit disruption. We’ll always tell you • Large quantities of pottery dating from [email protected] before we start work in your area and will However, the final programme is around 200 to 300AD. have dedicated customer liaison teams dependent on numerous factors. Write to: Capital Communications – Chichester on hand. We’ll be able to share a finalised project, Southern Water, Lewes Road construction programme, including A relatively small amount of construction Falmer, Brighton, BN1 9PY vehicles will be in use during the project traffic management, once we’ve secured but we expect this to have minimal impact planning permission. on the local roads. Environment – a huge study has been undertaken to ensure the environment is More details can be found at protected. Our work has included surveys southernwater.co.uk/chichesterpipeline to look for badgers, reptiles, bats and A Southern Water Partnership birds, among others. Be aware of bogus callers All Southern Water staff and agents carry and show an identity card with their photograph and name. If you want to confirm we sent the caller, ring us on 0330 303 0368 (available 24 hours a day, charged 4398c_08.17 at local rate). southernwater.co.uk/bogus-callers 4398c_Chichester_A5_6pp_v3.indd 1-3 01/09/2017 13:52 What we’re doing We’re planning to build a 10km sewer New Road pipeline that will run from the west of Chichester, across the north of the Goodwood Motor Racing city and through to Tangmere. Circuit Here, it will connect to our Tangmere Claypit Lane new Wastewater Treatment Works. Our sewer proposals also include three pumping Roman Road A27 East stations along the route. A286 Hampnett B2178 proposed This sewer will take away the wastewater pumping station 2 Existing from proposed developments identified new et Tangmere Tangmere in the Chichester District Council’s sewer tre Madgwick Lane S Wastewater Local Plan, while protecting the local Stane new Treatment environment. Chichester Works new University sewer Pumping station kiosks (above) and a treatment unit (right) will be the only visible structures First, we need planning permission for sewer St Richard’s A27 proposed Hospital the project and we’re aiming to submit pumping station 3 Once completed the only visible Numerous routes were looked at in our application to West Sussex County Chichester structures will be at the sites of the three detail but this proposed, final plan Tangmere Road Council in late November 2017. proposed pumping stations, two of which will be was considered the best, taking into s A285 s pumping a built in the planned developments that account environmental and customer p B2144 station 1 West y the pipeline will serve. The pumping impact, existing infrastructure and the Where? B Sussex B2144 r County A259 e stations will be largely below ground. needs of the developments. t In our proposed plans, the first Council Chichester s A27 e Above-ground will be green kiosks and a Cathedral Bognor Road h pumping station will be at the start of c i treatment unit as pictured. the pipeline. A second will be built close h Chichester Bypass C to Madgwick Lane and the third in Railway Tangmere, to the west of Tangmere Station A259 Directional drilling Military Aviation Museum. s Stage 1: A pilot hole is drilled with a precision-guided drilling rig. s a p Only two small pits are required, one at each end of the section of pipe that is being replaced. C y hic r B hester Bypass Chicheste A259 A286 Precision-guided Pit 2 drilling rig Pit 1 The proposed pipeline • Pass along Wellington Road and under • Cross Stane Street, continuing Chichester Dyke and the University across farmland and under the A27 Drilling rod Cutting head route will: of Chichester playing fields, past the to the western side of Copse Farm, Merton Centre and east into fields before turning northeast parallel with Stage 2: The new pipe is pulled back through the hole. Leave the area near Whitehouse Farm Pipe coil • north of Kingsmead Avenue Tangmere Road where the B2178 crosses the Centurion Way cycle/footpath • Cross the River Lavant, where the • A third pumping station will be built to second pumping station will be built the west of Tangmere Military Aviation Run east across public open space • Museum. The pipe will run to the south to St Paul’s Road before it follows the • Go south of the Goodwood Circuit and of the museum and through Chichester road north and east, then crossing north of the Rolls Royce site, keeping Swivel Pit 2 Business Park, before reaching Pit 1 under the rear car park of St to the edge of the field south-east of Tangmere treatment works. Richard’s Hospital Sidengreen Lane Diagram courtesy of Clancy Docwra Drilling rod Reamer Shroud New pipe 4398c_Chichester_A5_6pp_v3.indd 4-6 01/09/2017 13:52.
Recommended publications
  • Gate One Submission for Thames Water to Southern Water Transfer Date: 05 July 2021
    Strategic regional water resource solutions: Preliminary feasibility assessment Gate one submission for Thames Water to Southern Water Transfer Date: 05 July 2021 i Glossary Acronym Terms to use / Definition AA Appropriate Assessment - under the Habitats Regulations ACWG All Company Working Group AIC Average Incremental Cost AMP Asset Management Plan AONB Area of Outstanding Natural Beauty BBOWT Berkshire, Buckinghamshire and Oxfordshire Wildlife Trust BNG Biodiversity net gain BNL Biodiversity net loss CAP Competitively Appointed Provider CCG Customer Challenge Group – a regional CCG has been established by WRSE CCW Consumer Council for Water CEB Chemically Enhanced Backwash CEC Contaminants of Emerging Concern CEMP Construction and Environmental Management Plan CO2 Carbon Dioxide CPO Compulsory Purchase Order DAF Dissolved Air Floatation DCO Development Consent Order – planning under the Planning Act 2008 Defra Department for Environment, Food and Rural Affairs DI Ductile Iron DO Deployable Output DPC Direct Procurement for Customers DWI Drinking Water Inspectorate DYAA Dry Year Annual Average EA Environment Agency EES Thames Water’s Engineering Estimating System EIA Environmental Impact Assessment ENG Environmental Net Gain ERD Energy Recovery Devices FD Ofwat Final Determination FEPS Final Effluent Pumping Station GAC Granular Activated Carbon HE Historic England HIOWWT Hampshire and Isle of Wight Wildlife Trust HRA Habitat Regulations Assessment ICA Instrumentation Control and Automation INNS Invasive Non-Native Species IP Infrastructure
    [Show full text]
  • Potable Freshwater Pre-Planning Enquiry
    Potable freshwater pre-planning enquiry A pre-planning enquiry can assist developers in identifying possible constraints that may be associated with servicing a development site and the potential costs and timescales involved in servicing a site prior to land acquisition or the submission of a planning application. Please complete this form and save a copy and email it to [email protected] or alternatively post it to: Developer Services, Southern House, Yeoman Road, Worthing, West Sussex BN13 3NX All fields are required unless otherwise stated. Please note incomplete information may cause delays to your application. When answering the yes/no questions please tick in the appropriate box. Please keep a copy of the completed application for your records. If you need any help completing the form please call us on 0330 303 0119 and we’ll be happy to help. We aim to respond to enquiries within five calendar days from receipt of your completed enquiry form. Section 1: About you Are you? (please tick) Developer Consultant Landowner Other (please state) Name: Address: Company name (if applicable): Phone: Email: Postcode: Section 2: Development details Please see our portal for further details: developerservices.southernwater.co.uk. For developments of less than 500 units a Level 1 preliminary freshwater capacity can be undertaken. This is a simple check that will identify whether the required capacity is available adjacent to or close to the proposed development. Should capacity not be available, you will be provided with an indication of the nearest point at which capacity is available and a Level 2 Indicative Hydraulic Assessment can be considered.
    [Show full text]
  • Proposals for Selsey
    Our Bathing Water Enhancement Programme - proposals for Selsey Working together to protect and enhance bathing water across our region between now and summer 2019 Protecting and enhancing our bathing waters Our region’s bathing waters are precious and among the cleanest in the UK, and you’ve quite rightly asked us to continue to protect and enhance them. So, we’re carrying out a multi-million pound Bathing Water Enhancement Programme, the first of its kind in the UK, to do just that. We’ve set aside £31.5 million of funding for this innovative programme, and are working together with local councils, the Environment Agency and other stakeholders to deliver it. Between now and the 2019 bathing season, we’ll work together to investigate 21 of our region’s beautiful bathing waters, and to make sure that seven of them reach the ‘excellent’ quality standard. Although our programme’s investment comes to an end in 2019, we’re confident the enhancements that are delivered will help to maintain excellent water quality at these sites for many years to come. Dartford Gravesend Our bathing waters Herne Bay Isle of Chatham Sheppey Ramsgate Gillingham Canterbury Faversham Sevenoaks Maidstone Deal Basingstoke SUTTON & Andover EAST SURREY SOUTH EAST Tonbridge WATER THAMES WATER KENT Dover WATER Ashford SOUTH EAST Tunbridge Wells Folkestone WESSEX WATER Crawley WATER Haslemere Weir Wood Bewl Water Winchester AFFINITY Salisbury Horsham Haywards EAST SUSSEX New WATER Otterbourne Heath Romney Petersfield Darwell HAMPSHIRE WEST SUSSEX Burgess SOUTH EAST Lydd
    [Show full text]
  • Modification of the Conditions of Appointment of Southern Water Services Limited
    WATER SERVICES REGULATION AUTHORITY WATER INDUSTRY ACT 1991, SECTION 13(1) Modification of the Conditions of Appointment of Southern Water Services Limited Made on 22 March 2021 Coming into effect on 23 March 2021 The Water Services Regulation Authority, in exercise of the power conferred on it by section 13(1) of the Water Industry Act 1991 (the "Act"), after giving notice as required by section 13(2) of the Act, hereby makes the modifications described in the Schedule attached hereto to the Conditions of the Appointments of Southern Water Services Limited (the "Appointee") as a water and sewerage undertaker under Chapter I of Part II of the Act, the Appointee having consented to these modifications. Signed for and on behalf of the Water Services Regulation Authority Keith Mason Senior Director Schedule 1. The following new definitions will be inserted into paragraph 3 of Condition A at the appropriate alphabetical place: “Capacity Charge” means the charge of that name under the Havant Thicket Agreement; “Havant Thicket Activities” has the meaning given to it in paragraph 2 of Condition B of the Instrument of Appointment of Portsmouth Water Limited; “Havant Thicket Agreement” means the agreement (including for the bulk supply of water) between the Appointee and Portsmouth Water Limited in respect of the Havant Thicket Activities; 2. The following new Condition T will be inserted after Condition S: “Condition T: Havant Thicket Introduction This Condition requires the Appointee to comply in all material respects with the terms of the Havant Thicket Agreement entered into between the Appointee and Portsmouth Water Limited.
    [Show full text]
  • Writing on Behalf of Click and Type Name of Networks
    Press Release Utility Networks Partnership 24 June 2020 United front by utilities to help customers in vulnerable situations People who need extra help during a water, electricity or gas emergency will benefit from a new partnership approach by 12 utility companies. They have created a joint video to promote the Priority Services Register, a service that all utilities provide for people needing extra support for a variety of reasons. The companies involved are all members of the Utility Networks Partnership and are already working closely together to help customers living in vulnerable circumstances. They are Affinity Water, Anglian Water, Northumbrian Water, Essex and Suffolk Water, SES Water, SGN, South East Water, Southern Water, Thames Water, UK Power Networks Cadent Gas and Cambridge Water. Andy Clowes, Head of Customer Insight and Strategy, South East Water said: “Taking care of our customers is at the heart of everything we do. “That’s why across the utility sector we have come together to make the Priority Services Register even easier to use, giving our customers extra support when they need it most. It’s completely free of charge and it’s simple to sign up.” Kerry Potter, UK Power Networks’ consumer vulnerability manager, who chairs the Utility Networks Partnership, said: “It’s fantastic to work as a team to create a new video promoting the Priority Services Register which is making it easier for eligible people to get support. When 12 utility companies share a consistent message, we can help far more people. “Collaboration is key to tackling vulnerability and our utility networks group work together to provide consistent services for vulnerable customers in the regions we serve.” Press Release Utility Networks Partnership Thirty-five charity partners have helped develop the video to increase awareness about the free help available from utilities in the event of a gas, water or electricity outage.
    [Show full text]
  • Sponsorship Pack
    SPONSORSHIP PACK Birmingham | 20 May 2020 Water Industry Awards 2020 Birmingham | 20 May 2020 WELCOME The Water Industry Awards are back – 20 May 2020 – to celebrate and reward outstanding achievement and innovation in this dynamic UK water industry. Now in its 14th year, the glittering black-tie event at Birmingham’s premier Metropole Hotel, marks a high point in the industry calendar. We’ll be welcoming over 500 water and wastewater In addition to a great evening of entertainment companies and many of their key contractor and and celebration, we make sure the winning supplier partners, to find out if their projects entries receive the promotion they deserve, in and initiatives have been selected as winners a special WWT supplement, on WWT’s website by our expert judging panel. It’s a rigorous two- and in an extensive programme features stage process ensuring the awards command and case studies throughout the year. credibility and respect in the water sector. With a host of opportunities for sponsorship and branding, as well as on-the-night options for a dazzling VIP experience, there has never been a better time to align your brand with the very best of the UK water sector. We look forward to seeing you there! Alec Peachey Content director WWT Water Industry Awards 2020 Birmingham | 20 May 2020 WHY SPONSOR THE WATER INDUSTRY AwARDS? CHAMPION SUccESS NEtwORKING Your support and participation in the As an awards category sponsor, you are awards highlights your commitment to a given the opportunity to present your successful water industry. category to the award winner as well as table of 10 in a key location to host your customers & colleagues for an evening of fine dining & entertainment.
    [Show full text]
  • Executive Summary
    Executive Summary We are pleased to provide Southern Water’s response to Ofwat’s Draft Determination. We have welcomed Ofwat’s collaborative approach in reaching its conclusions to date and look forward to this continuing as we move towards conclusion of the price review process. While Ofwat has recognised many strengths in our evolving plan, we consider there to be a number of significant challenges in the Draft Determination that still need to be discussed and addressed in order for us to be confident that we can deliver our business plan and commitments to customers. In this response to the DD, our Board has been clear that our response should focus on the most material issues having bearing on our customers’ portfolio of preferences and the integrity of the package as a whole. In addition to delivering our commitments in AMP6, AMP7 and beyond, there is ongoing work that we are doing to address historical performance issues and this is continuing to gain traction. We have come a long way in operational efficiency improvements through our company-wide transformation programme, particularly our approach to integrated business planning, operationalising our performance improvement and incident management action plans and we have now developed our plans to improve our long term resilience. We have done a lot already in identifying the key areas for improvement and the corresponding, ambitious efficiencies that we can make. These were fully factored into our response to the Initial Assessment of Plans (IAP). In our response to Ofwat’s IAP, we developed a comprehensive, constructive submission addressing all actions.
    [Show full text]
  • Southern Water Southern Water’S Identity Vision
    Case study iWelcome key to Southern Water Southern Water’s identity vision A leap forward in the Identity journey for Southern Water UK utility company Southern Water identified Identity & Access Management (IAM) as the cornerstone for protecting and offering IT-services. They contracted Capgemini and iWelcome to enable access for employees and contractors to their IT-services, with guarantees for a seamless end-user experience that integrated security management and governance. Next on the roadmap: offering the same user friendly and secure experience to (end) customers, both commercial and domestic, to improve the customer journey whilst crucially maintaining security standards. Southern Water is a private utility company providing water and wastewater treatment services across Kent, Sussex, Hampshire, the Isle of Wight and parts of Surrey and Berkshire. The company supplies drinking water to roughly one million households through its 95 water supply works and 13,700 kilometres of water mains. Wastewater is treated by the company’s network of 370 wastewater treatment works and almost 40,000 kilometres of sewers. Southern Water directly employs just over 2,000 people and has over 4,000 people employed by their 3rd party partner organisations. For this essential role, Southern Water is part of UK’s critical ‘National Infrastructure’. This status increases the challenges for a company that wishes to implement seamless access to its infrastructure for employees and contractors and for its retail and wholesale customers. Following DEFRA (Department for Environment, Food and Rural Affairs) and CPNI (Centre for Protection of National Infrastructure) regulations, Southern Water is required to have robust information security controls in place.
    [Show full text]
  • Company Business Plan Presentations
    Company business plan presentations Briefing for Ofwat Non-Executive Directors and senior leadership Page 1 | 26 Contents Contents 2 1. Background 3 1.1 Company pen pic 3 1.2 List of attendees 4 2. Key business plan metrics 5 PR19 themes 5 Customer bills 8 Customers’ expectations and preferences 10 Metrics 11 Financial Resilience 12 Dividends 14 Appendix 1: Attendee biographies 15 Appendix 2: Business plan executive summary 18 Appendix 3: CCG report executive summary 19 Appendix 4: Current operational performance 20 Appendix 5: PR19 proposed performance commitments 23 Appendix 6: Expenditure 24 Appendix 7: Trust, confidence, and assurance 25 Page 2 | 26 1. Background 1.1 Company pen pic Please provide a short summary of the ownership structure of the company, including whether there have been any changes to this since 2014 [max. 150 words] Investors committed to our business Southern Water, a water and wastewater company in South East England. Greensands Holding Group, ultimate holding company, formed 2007 solely for this purpose. Four principal long-term investors bringing global expertise: § a planned injection of £700m of equity to improve our financial resilience as we move towards 1 April 2020. § provided support through difficult periods e.g. AMP5 revenue shortfall § supported changing governance structure to align with Ofwat principles on board leadership, transparency and governance. Since 2014: § STC and Australian Super has sold holdings in Greensands Holdings Limited to other shareholders § Northern Trust Company (Future Fund) has sold holding in Greensands Holdings Limited and Eurobonds in Greensands Europe Limited. § Southern Water chairman is no longer on the Board of Greensands Holdings Limited § closure of financing company registered in Cayman Islands was announced.
    [Show full text]
  • Ofwat: Post Hearing Submission
    December 2020 Reference of the PR19 fnal determinations: Costs and outcomes – Ofwat December response Reference of the PR19 final determinations: Costs and Outcomes – Ofwat December response Reference of the PR19 final determinations: Costs and Outcomes – Ofwat December response Contents 1. Introduction ......................................................................................................... 2 2. The use of outturn 2019-20 data in the base cost econometric models .................. 3 3. Average pumping head ......................................................................................... 6 4. Impact of Covid ..................................................................................................... 9 5. Covid impact on productivity ................................................................................ 11 6. Use of ASHE or AWE for the labour cost true up ..................................................... 14 7. Growth unit cost adjustment ................................................................................ 18 8. Elsham Direct Procurement for Customers scheme ............................................. 20 9. Northumbrian Water sewer flooding ..................................................................... 25 10. Our response to further new cost and outcomes issues .....................................28 1 Reference of the PR19 final determinations: Costs and Outcomes – Ofwat December response 1. Introduction We welcome the opportunity to provide this additional submission to
    [Show full text]
  • (DWMP) New Forest Catchment
    Drainage and Wastewater Management Plan (DWMP) New Forest Catchment 1 Drainage and Wastewater Management Plans New Forest Catchment - DRAFT Strategic Context for the New Forest DWMP The Environment Agency has previously defined the River Basin District catchments in their River Basin Management Plans prepared in response to the European Union’s Water Framework Directive. These river basin catchments are based on the natural configuration of bodies of water (rivers, estuaries, lakes etc.) within a geographical area, and relate to the natural watershed of the main rivers. We are using the same catchment boundaries for our Level 2 DWMPs. A map of the New Forest river basin catchment is shown in figure 1. Figure 1: The New Forest river basin catchment in Hampshire LONDON ENGLISH CHANNEL Based upon the Ordnance Survey map by Southern Water Services Ltd by permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. Crown copyright Southern Water Services Limited 1000019426 2 Drainage and Wastewater Management Plans New Forest Catchment - DRAFT Overview of the New Forest catchment The New Forest catchment in Hampshire covers a geographical area of around 300 km2, the majority of which is forested common land located within the New Forest National Park boundary. The catchment is essentially rural but there is significant industrial development located to the east, along Southampton Water. The catchment includes a number of small towns including New Milton, Lyndhurst, Brockenhurst, and Lymington, and four sizeable villages: Ashurst, Brockenhurst, Lyndhurst, and Sway. Outside of The Forest are clusters of larger urban areas including Totton, Marchwood, Dibden, Hythe and Fawley to the east, and New Milton, Milford on Sea, and Lymington to the south-west.
    [Show full text]
  • All Small-Sized Cwss That Have Certified Completion of Their RRA (Pdf)
    Community water systems serving a population of 3,001 to 49,999 that certified completion of a risk and resilience assessment as required by Section 2013 of America's Water Infrastructure Act, as of July 30, 2021. PWSID Community Water System Town/City State ZIP Code 1 001570671 PACE WATER SYSTEM, INC. PACE FL 32571-0750 2 010106001 MPTN Water Treatment Department Mashantucket CT 06338 3 010109005 Mohegan Tribal Utility Authority Uncasville CT 06382 4 020000005 ST. REGIS MOHAWK TRIBE Akwesasne NY 13655 5 043740039 CHEROKEE WATER SYSTEM CHEROKEE NC 28719 6 055293201 MT. PLEASANT Mount Pleasant MI 48858 7 055293603 East Bay Water Works Peshawbestown MI 49682 8 055293611 HANNAHVILLE COMMUNITY WILSON MI 49896-9728 9 055293702 LITTLE RIVER TRIBAL WATER SYSTEM Manistee MI 49660 10 055294502 Prairie Island Indian Community Welch MN 55089 11 055294503 Lower Sioux Indian Community Morton MN 56270 12 055294506 South Water Treatment Plant Prior Lake MN 55372 13 055295003 SOUTH-CENTRAL WATER SYSTEM Bowler WI 54416 14 055295310 Giiwedin Hayward WI 54843 15 055295401 Lac du Flambeau Lac du Flambeau WI 54538 16 055295508 KESHENA KESHENA WI 54135 17 055295703 ONEIDA #1 OR SITE #1 ONEIDA WI 54155 18 061020808 POTTAWATOMIE CO. RWD #3 (DALE PLANT) Shawnee OK 74804 19 061620001 Reservation Water System Eagle Pass TX 78852 20 062004336 Chicksaw Winstar Water System Ada OK 74821 21 063501100 POJOAQUE SOUTH Santa Fe NM 87506 22 063501109 Isleta Eastside Isleta NM 87022 23 063501124 Pueblo of Zuni - Zuni Utility Department Zuni NM 87327 24 063503109 Isleta Shea Whiff Isleta NM 87022 25 063503111 LAGUNA VALLEY LAGUNA, NM 87026 NM 87007 26 063506008 Mescalero Apache Inn of the Mountain Gods Public Water System Mescalero NM 88340 27 070000003 SAC & FOX (MESKWAKI) IN IOWA TAMA IA 52339 28 083090091 TOWN OF BROWNING BROWNING MT 59417 29 083890023 Turtle Mountain Public Utilities Commission Belcourt ND 58316 30 083890025 Spirit Lake Water Management RWS St.
    [Show full text]