4398c_Chichester_A5_6pp_v3.indd 1-3 birds, among others. to and look for reptiles, bats badgers, surveys included has work Our protected. toundertaken ensure environment the is Environment roads. local the on impact minimal to have this expect we but project the during use in be will vehicles construction of amount small A relatively on hand. teams liaison customer dedicated have will and area your in work start we before you tell We’ll always disruption. limit Community Wildlife Trust and England. Highways England, Environment the Agency, as well such as as organisations Natural authorities, local and with liaised closely (EIA) Assessment Environmental Impact adetailed out We’ve carried parameters. strict within work must we and us for apriority is this Limiting community andenvironment? What aboutimpactonthe ground original to condition. its the reinstating we’ll be areas, these In pipework. to lay ground the into to cut need will we possible, not is this Where ground level. pipework. This means less disruption at can drill underground tunnels to insert we which from pits small create can we digging up large stretches of ground, than This means rather drilling. that a technique trenchless directional called using we’ll be sensitive, environmentally are that those as such sections, some In plate. adinner as same the roughly is –which diameter in 315mm to 250mm from range will pipeline The How wewillbuildthepipe – we’ll do all we can to can we –we’ll all do – a huge study has been been has study –ahuge

•  •  •  were: finds significant most the Among glimpse into our past. Careful examination a gives fascinating 1500BC. as far as back dating relics, some important unearthed They working. be might we which in areas to check the South-East Archaeology from ateam We commissioned finds? What aboutarchaeological around 200 to 200 300AD around from dating pottery of Large quantities Iron Age timber buildings suggesting posts wooden of Evidence Age Iron late the around constructed been to have thought banks and ditches of series a complex ancient Entrenchments, the of section A previously-unknown .

southernwater.co.uk/chichesterpipeline More detailscanbefoundat planning permission. once management, traffic we’vesecured programme, includingconstruction afinalised to share We’ll able be dependent on numerous factors. is programme final However, the station 1. 2pumping and station finallypumping by followed 3being station pumping fromworking Tangmere westwards with end eastern the at to start We intend years. two within areas working all of reinstatement and months, 18 about within 2018, completing construction summer in to start able to be We hope When will the work take place? at localrate).southernwater.co.uk/bogus-callers caller, ring us on03303030368(available24hours aday, charged with theirphotographandname. Ifyouwanttoconfirmwesentthe All SouthernWater staff andagentscarryshowanidentitycard Be awareofboguscallers Falmer, , BN1 9PY BN1 Falmer, Brighton, Water, Road Lewes Southern project, – Chichester Communications Capital to: Write [email protected] Email southernwater.co.uk/chichesterpipeline Via our website ways: of anumber You feedback leave can November. late in application our planningour design and submitting finalising before it consider can we so We’d really appreciate your feedback, What next?

4398c_08.17 Chichester pipeline Chichester Investing in your city’s future A SouthernWater Partnership

01/09/2017 13:52 What we’re doing

We’re planning to build a 10km sewer New Road pipeline that will run from the west of Chichester, across the north of the Goodwood Motor Racing city and through to Tangmere. Circuit

Here, it will connect to our Tangmere Claypit Lane new Works. Our sewer proposals also include three pumping Roman Road A27 East stations along the route. A286 Hampnett B2178 proposed This sewer will take away the wastewater pumping station 2 Existing from proposed developments identified new et Tangmere Tangmere in the Chichester District Council’s sewer tre Madgwick Lane S Wastewater Local Plan, while protecting the local Stane new Treatment environment. Chichester Works new University sewer Pumping station kiosks (above) and a treatment unit (right) will be the only visible structures First, we need planning permission for sewer St Richard’s A27 proposed Hospital the project and we’re aiming to submit pumping station 3 Once completed the only visible Numerous routes were looked at in our application to County Chichester structures will be at the sites of the three detail but this proposed, final plan Tangmere Road

Council in late November 2017. proposed pumping stations, two of which will be was considered the best, taking into s

A285 s

pumping a built in the planned developments that account environmental and customer p B2144

station 1 West y the pipeline will serve. The pumping impact, existing infrastructure and the

Where? B

Sussex B2144 r

County A259 e stations will be largely below ground. needs of the developments. t

In our proposed plans, the first Council Chichester s

A27 e Above-ground will be green kiosks and a

Cathedral Bognor Road h

pumping station will be at the start of c i treatment unit as pictured. the pipeline. A second will be built close h Chichester Bypass C to Madgwick Lane and the third in Railway Tangmere, to the west of Tangmere Station A259 Directional drilling Military Aviation Museum. s Stage 1: A pilot hole is drilled with a precision-guided drilling rig. s a p Only two small pits are required, one at each end of the section of pipe that is being replaced. C y hic r B hester Bypass Chicheste A259 A286

Precision-guided Pit 2 drilling rig Pit 1 The proposed pipeline • Pass along Wellington Road and under • Cross Stane Street, continuing Chichester Dyke and the University across farmland and under the A27 Drilling rod Cutting head route will: of Chichester playing fields, past the to the western side of Copse Farm, Merton Centre and east into fields before turning northeast parallel with Stage 2: The new pipe is pulled back through the hole. Leave the area near Whitehouse Farm Pipe coil •  north of Kingsmead Avenue Tangmere Road where the B2178 crosses the Centurion Way cycle/footpath • Cross the River Lavant, where the • A third pumping station will be built to second pumping station will be built the west of Tangmere Military Aviation Run east across public open space •  Museum. The pipe will run to the south to St Paul’s Road before it follows the • Go south of the Goodwood Circuit and of the museum and through Chichester road north and east, then crossing north of the Rolls Royce site, keeping Swivel Pit 2 Business Park, before reaching Pit 1 under the rear car park of St to the edge of the field south-east of Tangmere treatment works. Richard’s Hospital Sidengreen Lane Diagram courtesy of Clancy Docwra Drilling rod Reamer Shroud New pipe

4398c_Chichester_A5_6pp_v3.indd 4-6 01/09/2017 13:52