ROAD WORKS & EVENTS INFORMATION: East Cambs 16th-31st October 2017 For further information on the below please contact 0345 045 5212 Not all road works are included in the list below as some are issued at very short notice due to emergencies or very small works which don't require a long period of notice. The Police can also close roads for safety reasons. KEY: :denotes Road Closure Organisation/Contractor Road Locality Traffic Proposed Proposed End Works Description Management Start Date Date Fulcrum Pipelines Limited DYSONS DROVE BURWELL TWO-WAY 18-Oct-2017 27-Oct-2017 Excavate and lay approx 76.7m new gas pipe. Approx SIGNALS 0.5m verge, 5.3m c/way and 70.9 verge. E: 558778 N: 268072 - E: 558719 N: 268110 ANGLIAN WATER HIGH STREET BURWELL MULTI-WAY 26-Oct-2017 27-Oct-2017 Meter option SIGNALS Highways BOYS GRAVE CHIPPENHAM ROAD 30-Oct-2017 14-Nov-2017 Road Closure ROAD CLOSURE Closure of bridge on Boys Grave Road 2000 - 0600 ANGLIAN WATER SUMMERHAYES ELY SOME C/W 16-Oct-2017 18-Oct-2017 Stoptap Replacements INCURSION ANGLIAN WATER ELY SOME C/W 16-Oct-2017 20-Oct-2017 To install equipment to monitor for pressures and detect BYPASS INCURSION leaks in area ANGLIAN WATER BARTON ROAD ELY TWO-WAY 16-Oct-2017 18-Oct-2017 New connection SIGNALS ANGLIAN WATER VICTORIA STREET ELY SOME C/W 17-Oct-2017 19-Oct-2017 communication pipe repair INCURSION Harlaxton Energy Networks LISLE LANE ELY TWO-WAY 18-Oct-2017 31-Oct-2017 Excavation required for remedial reinstatement. SIGNALS Excavation in C/W. Two way portable traffic signals required CAMBRIDGESHIRE BROAD STREET ELY SOME C/W 18-Oct-2017 24-Oct-2017 Connections Highway Services:Interim to INCURSION Permanent:NEW SUPPLY TO NEW FEEDER PILLAR CAMBRIDGESHIRE WITCHFORD ELY TWO-WAY 23-Oct-2017 03-Nov-2017 Renew highway drainage outfalls and upgrade headwalls BYPASS SIGNALS CAMBRIDGESHIRE BOHEMOND ELY ROAD 23-Oct-2017 27-Oct-2017 Scaffolding erection works STREET CLOSURE VIRGIN MEDIA NORFOLK ROAD ELY SOME C/W 26-Oct-2017 30-Oct-2017 NEW TEE REQUIRED IN F/W O/S THE PROPERTY. INCURSION 9.0M X 0.5M. 1M F/W TARMAC + 7M C/W TARMAC + 1M VERGE CAMBRIDGESHIRE NEWMARKET FORDHAM TWO-WAY 17-Oct-2017 18-Oct-2017 Trial holes to locate and record depth of Intermediate ROAD SIGNALS pressure gas main and water main in the footway and verge. Cadent Gas Limited COLLINS HILL FORDHAM GIVE & TAKE 23-Oct-2017 27-Oct-2017 LAY A NEW GAS SERVICE TO 14A COLLINS HILL Organisation/Contractor Road Locality Traffic Proposed Proposed End Works Description Management Start Date Date ANGLIAN WATER WEST STREET PRIORITY 16-Oct-2017 18-Oct-2017 New connection WORKING UK POWER NETWORKS SUN STREET ISLEHAM TWO-WAY 19-Oct-2017 25-Oct-2017 Connections Small Service:NEW SERVICE: (APPROX EASTERN& LONDON SIGNALS DEPTH 450mm-600mm):EXCAVATE AND REINSTATE JOINT HOLE FOR 2 NEW SERVICES TM REQUIRED: 2 WAY LIGHTS, FOOTWAY CLOSURE, TEMP WALKWAY BT STATION ROAD KENNETT TWO-WAY 26-Oct-2017 01-Nov-2017 KENTFORD 18 - DSLAM 423106, 423114 - ALL IN ONE (B1085) SIGNALS STREET CABINET& POWER INSTALLATION. Excavate to lay approx 6m BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay approx 14m duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. CAMBRIDGESHIRE BLACK BANK ROAD LITTLE ROAD 20-Oct-2017 03-Nov-2017 Road Recycling DOWNHAM CLOSURE ANGLIAN WATER LYNN ROAD PRIORITY 16-Oct-2017 18-Oct-2017 communication pipe repair WORKING UK POWER NETWORKS LYNN ROAD (A10) LITTLEPORT TWO-WAY 16-Oct-2017 16-Oct-2017 Connections Projects:NEW INDIVIDUAL SUPPLY::Lane EASTERN& LONDON SIGNALS closure required to allow for new pole and transformer to be erected for new supply to broadband cabinet CAMBRIDGESHIRE MILDENHALL ROAD LITTLEPORT TWO-WAY 23-Oct-2017 03-Nov-2017 Replace damaged culvert SIGNALS UK POWER NETWORKS ROAD LITTLEPORT SOME C/W 25-Oct-2017 31-Oct-2017 Connections Small Service:NEW SERVICE: (APPROX EASTERN& LONDON INCURSION DEPTH 450mm-600mm):Excavate and Backfill 2M Trench& Joint hole. TM FOOTPATH CLOSURE WITH TEMP W/W IN C/W BT HASSE ROAD TWO-WAY 16-Oct-2017 26-Oct-2017 Install 10m of 1 way poly duct in Carriageway,Install 248m SIGNALS of 1 way poly duct in Verge UK POWER NETWORKS FORDHAM ROAD SOHAM SOME C/W 16-Oct-2017 20-Oct-2017 Connections Projects:NEW SUPPLY SCHEME: (APPROX EASTERN& LONDON INCURSION DEPTH 450mm-600mm):lay new low voltage cable

UK POWER NETWORKS REGAL LANE SOHAM SOME C/W 16-Oct-2017 24-Oct-2017 Connections Projects:NEW SUPPLY SCHEME: (APPROX EASTERN& LONDON INCURSION DEPTH 450mm-600mm):excavate to lay and connect new low voltage cable ANGLIAN WATER ROAD SOHAM MULTI-WAY 17-Oct-2017 19-Oct-2017 mains fitting SIGNALS ANGLIAN WATER ELY ROAD SOHAM MULTI-WAY 17-Oct-2017 19-Oct-2017 For traffic light head only - in conjunction with AD031- SIGNALS 54052586 BT BARCHAM ROAD SOHAM MULTI-WAY 20-Oct-2017 25-Oct-2017 Build 1 precast chamber in 915mm x 445mm x 965mm SIGNALS deep in Footway,Install 19m of 1 way poly duct in Carriageway,Install 42m of 1 way poly duct in Verge Organisation/Contractor Road Locality Traffic Proposed Proposed End Works Description Management Start Date Date Cadent Gas Limited FORDHAM ROAD SOHAM TWO-WAY 23-Oct-2017 27-Oct-2017 EAGD171393Abandon approximately 22m of 6" SI main SIGNALS and Opencut 22m tolaythe new (diverted) 180mm PE main0 Services ANGLIAN WATER READS STREET MULTI-WAY 24-Oct-2017 26-Oct-2017 burst main SIGNALS UK POWER NETWORKS LOWER ROAD TWO-WAY 30-Oct-2017 10-Nov-2017 Connections Projects:NEW SUPPLY SCHEME: (APPROX EASTERN& LONDON SIGNALS DEPTH 450mm-600mm):excavate to lay and connect new low voltage cable ANGLIAN WATER HIGH STREET SUTTON TWO-WAY 16-Oct-2017 20-Oct-2017 Excavate and reinstate to repair on collapsed sewer in (B1381) SIGNALS carriageway ANGLIAN WATER CHURCH LANE SUTTON TWO-WAY 17-Oct-2017 19-Oct-2017 chamber/cover/frame SIGNALS ANGLIAN WATER THE BROOK SUTTON MULTI-WAY 18-Oct-2017 20-Oct-2017 Communication Pipe Repair SIGNALS CAMBRIDGESHIRE HIGH STREET SUTTON MULTI-WAY 23-Oct-2017 25-Oct-2017 Lining of new zebra crossing SIGNALS ANGLIAN WATER TOWER ROAD SUTTON SOME C/W 30-Oct-2017 03-Nov-2017 Installation of new meter to monitor leakage levels. INCURSION CAMBRIDGESHIRE LONG NORTH FEN SUTTON ROAD 30-Oct-2017 03-Nov-2017 Carriageway resurfacing DROVE CLOSURE BT COMMERCIAL END SWAFFHAM SOME C/W 17-Oct-2017 19-Oct-2017 Build 1 concrete chamber 725mm x 255mm x 665mm BULBECK INCURSION deep in Footway,Install 7m of 1 way poly duct in Footway CAMBRIDGESHIRE WITCHFORD WENTWORTH TWO-WAY 23-Oct-2017 03-Nov-2017 Renew highway drainage outfalls and upgrade headwalls BYPASS SIGNALS ANGLIAN WATER WESTLEY WESTLEY ROAD 16-Oct-2017 18-Oct-2017 New supply off site WATERLESS WATERLESS CLOSURE ANGLIAN WATER TWENTYPENCE TWO-WAY 23-Oct-2017 27-Oct-2017 To install meter to monitor customer pressures - ROAD SIGNALS carriageway/footway GAS TRANSPORTATION CO FIELD END WITCHFORD STOP/GO 16-Oct-2017 20-Oct-2017 2 x HV track for HV pull at POC on Clover End LTD BOARDS CAMBRIDGESHIRE WITCHFORD WITCHFORD TWO-WAY 23-Oct-2017 03-Nov-2017 Renew highway drainage outfalls and upgrade headwalls BYPASS SIGNALS GAS TRANSPORTATION CO VICTORIA GREEN WITCHFORD STOP/GO 23-Oct-2017 03-Nov-2017 2x HV track for HV pull at POC on Clover End LTD BOARDS Cadent Gas Limited MAIN STREET WITCHFORD TWO-WAY 30-Oct-2017 03-Nov-2017 LAY 13.5M NEW DOMESTIC SERVICE FROM THE MAIN SIGNALS IN THE FARSIDE FOOTWAY BT CROCKFORDS GIVE & TAKE 16-Oct-2017 18-Oct-2017 NEWMARKET 433352 - Overlay -PROVISON OF ROAD SERVICE - EXCAVATE AND LAY 23M DUCT FROM EXISTING JUF10 BOUNDARY OF CUSTOMERS PROPERTY fw ANGLIAN WATER SCHOOL ROAD WOODDITTON TWO-WAY 16-Oct-2017 16-Oct-2017 Jetting works to clear blockage - no excavation SIGNALS Organisation/Contractor Road Locality Traffic Proposed Proposed End Works Description Management Start Date Date CAMBRIDGESHIRE CROCKFORDS WOODDITTON PRIORITY 17-Oct-2017 26-Oct-2017 Construct footway o/s 45 ROAD WORKING ANGLIAN WATER ROAD WOODDITTON ROAD 23-Oct-2017 25-Oct-2017 stoptap replacement CLOSURE CAMBRIDGESHIRE WITCHFORD WENTWORTH TWO-WAY 23-Oct-2017 03-Nov-2017 Renew highway drainage outfalls and upgrade headwalls BYPASS SIGNALS