Pre-Feasibility Report and Draft Terms of Reference
PRE-FEASIBILITY REPORT AND DRAFT TERMS OF REFERENCE OF EXPANSION OF TUBACHI BABALESHWARA LIFT IRRIGATION SCHEME TO EXPAND A COMMAND AREA FROM 42,500 TO 52,700 Ha NEAR KAVATAGI VILLAGE, JAMAKHANDI TALUK, BAGALKOT DISTRICT SCHEDULE 1(C) OF EIA NOTIFICATION, 2006, CATEGORY – A, TOTAL COST OF THE PROJECT – 3572.00 CRORES Submitted to THE DIRECTOR AND MEMBER SECRETARY, RIVER VALLEY AND HYDROELECTRIC PROJECTS, MINISTRY OF ENVIRONMENT, FORESTS AND CLIMATE CHANGE (MOEF), GOVT. OF INDIA NEW DELHI - 110003. Submitted by THE CHIEF ENGINEER KARNATAKA NEERAVARI NIGAMA LTD., IRRIGATION NORTH ZONE BELAGAVI – 590001 KARNATAKA Prepared by ENVIRONMENTAL HEALTH & SAFETY CONSULTANTS PVT LTD # 13/2, 1ST MAIN ROAD, NEAR FIRE STATION, NABET/ EIA/ RA080/ 55 Dated: 03.12.2015 INDUSTRIAL TOWN, RAJAJINAGAR,BENGALURU-560 010, KARNATAKA SEPTEMBER 2017 Expansion of Tubachi-Babaleshwara Lift Irrigation Scheme PFR & Draft ToRs near Kavatagi village, Jamakhandi taluk, Bagalkot District Table of Contents 1. Executive Summary ......................................................................... 1 2. Introduction of the Project/ Background Information .......................... 3 3. Project Description .........................................................................15 4. Site Analysis ..................................................................................27 5. Planning ........................................................................................28 6. Proposed Infrastructure .................................................................
[Show full text]