Improvement of State Highways, Major District Roads, Other District and B

Total Page:16

File Type:pdf, Size:1020Kb

Improvement of State Highways, Major District Roads, Other District and B Abstract Roads and Bridges – Highways Department – Improvement of State Highways, Major District Roads, Other District and Bridges under CRIDP for 2008-09 – Administrative Sanction Accorded – Orders issued --------------------------------------------------------------------------------------------------------------------- Highways (HN1) Department G.O. (Ms) No. 172 Dated: 03-07-2008 Read: From the Chief Engineer (General), Highways Department, Letter No. 13883/Thittam2/2008, dated 6.6.2008 ------- ORDER:- During the year 2007-08, Government accorded administrative sanction for taking up of various roads and bridges works under Comprehensive Road Infrastructure Development Programme at a cost of Rs.729.213 crores. Apart from the above, there were spill over works of 2006-07 for Rs.977.31 crores under CRIDP. The Chief Engineer (General) has stated that against the above new sanctions accorded during 2007-08 and spill over works, works to the tune of Rs.1127.773 crores have been completed upto 30.4.2008 and the balance works are in various stages of completion and implementation. 2. The Chief Engineer (General) has now submitted proposals for widening and strengthening of roads at a cost of Rs.905.19 crores under CRIDP for the year 2008-09 against the budget provision available for the year as detailed below:- Length No. of Bridges / Cost (Rs. in (Kms) Culverts crores) i) State Highways 819.552 98 353.67 ii) Major District Roads 787.917 55 236.55 iii) Other District Roads 1353.754 99 204.33 iv) Other District Roads (Special 822.799 32 110.64 Component Plan) Total 3784.022 284 905.19 2 3. The Government have examined the proposal of the Chief Engineer (General), Highways and have decided to approve the proposal. Accordingly, the Government accord administrative sanction for improvement of State Highways, Major District Roads and bridges culverts, Other district Roads at a total cost of Rs.905.19 crores (Rupees Nine hundred and five crores and ninteen lakhs only) under the Comprehensive Road Infrastructure Development Programme for the year 2008-09 as per outlay indicated in para 2 above. The details of the works are annexed to this order. 4. The expenditure sanctioned in para 3 above shall be debited to the following heads of account:- (i) State Highways:- 5054 – Capital Outlay on Roads and Bridges – 03. State Highways – 337 – Road Works – JI. Comprehensive Road Infrastructure Development Programme – State Highways – 16. Major works. (DP Code 5054-03-337-JI-1602) (ii) Major District Roads:- 5054 - Capital Outlay on Roads and Bridges – 04 District and Other Roads - 337 Road Works – JT. Comprehensive Road Infrastructure Development Programme – Major District Roads – 16. Major works. (DP Code 5054-04-337-JT-1609) (iii) Other District Roads:- 5054 - Capital Outlay on Roads and Bridges – 04 District and Other Roads 337 Road Works – JU. Comprehensive Road Infrastructure Development Programme – Other District Roads – 16 Major works. (DP Code 5054-04-337-JU-1607) (iv) S.C.P. (ODR):- 5054 - Capital Outlay on Roads and Bridges – 04 - District and Other Roads – 789 – Special Component Plan for Scheduled Castes – JC Comprehensive Road Infrastructure Development Programme – Other District Roads – Under Special Component Plan – 16 Major works. (DP Code 5054-04-789-JC-1606) 3 5. The Chief Engineer (General) is directed to take up the works early and furnish monthly progress report to Government. He is also requested to ensure that the works sanctioned now are not included in any other Schemes. 6. The Chief Engineer (General), Highways is also authorised to make changes in the nomenclature of works or delete / substitute works without exceeding the total cost of the work, subject to obtaining approval of the Government. 7. This orders issues with the concurrence of Finance Department vide its U.O. No. 259/DS(AR)2008, dated:03-07-2008 (By order of the Governor) K. ALLAUDIN Principal Secretary to Government To The Chief Engineer (General), Chennai – 5 All CE's in Highways Department, Chennai The Accountant General, Chennai – 18/35 All Treasury Officers, The Pay and Accounts Officer, South/East/North/, Chennai -35/5/79 The Chairman and Managing Director, Tamil Nadu Tourism Development Corporation, Chennai-2 The Director, Highways Research Station, Chennai – 32 Copy to:- Secretary to Hon’ble Chief Minister, Chennai – 9 Special PA, to the Hon’ble Minister (Highways), Chennai – 9 The Private Secretary to Principal Secretary to Government, Highways Department, Chennai – 9 The Editor, Tamil Arasu, Government Estate, Chennai – 2 The Finance (BG-1, BG II, Ways and Means, PW1) Department, Chennai – 9 The Director, I & PR, Chennai – 9 Concerned Sections in Highways Department, Chennai – 9 NIC, Chennai – 9 sf/sc //Forwarded by order// Section Officer. 4 ANNEXURE G.O. (Ms) No. 172, Highways (HN-1) Department, Dated: 03.07.2008. COMPREHENSIVE ROAD INFRASTRUCTURE DEVELOPMENT PROGRAMME 2008-09 STATE HIGHWAYS Ultimate Length Sl. Cost Division Constituency Name of Work Propose No. (Rs. in d in Km. lakhs) 1 2 3 4 5 6 II IMPROVEMENTS Strengthening of Inner Ring T.nagar,Anna 1 City Roads Road at Km 4/5– 5/7 (LS & 1.200 167.00 nagar RS) Strengthening of Inner Ring T.nagar,Anna 2 City Roads Road at Km 5/7– 7/0 (LS & 1.300 180.00 nagar RS) Strengthening of Inner Ring 3 City Roads Villivakkam 1.200 163.00 Road at Km 8/0-9/2 (LS &RS) Strengthening of Inner Ring 4 City Roads Villivakkam Road at Km 12/2 – 14/2 (LS & 2.000 190.00 RS) Sub Total 5.700 700.00 III CD WORKS Widening Box culvert at Km 5 City Roads Anna nagar 100.00 6/4 of Inner Ring Road Construction of balancing Pipe Culverts at km 0/7,0/8,0/9 of 6 City Roads Alandur 30.00 Pallavaram Thoraipakkam road Sub Total 130.00 IV STRUCTURES Construction of storm water 7 City Roads Villivakkam drain in km 13/0-13/4 of Inner 50.00 Ring Road Sub Total 50.00 TOTAL 5.700 880.00 6 Ultimate Length Sl. Cost Division Constituency Name of Work Propose No. (Rs. in d in Km. lakhs) 1 2 3 4 5 6 I WIDENING (SL-DL) Widening to double Lane and improvements to Chennai - 8 Tiruvallur Ponneri Pulicat Road Km. 16/0-17/5 1.500 80.00 including Reconstruction of culverts at Km. 16/4 & 16/10 Sub Total 1.500 80.00 I WIDENING (SL- IL) Widening to Intermediate Lane of Walajabad- 9 Tiruvallur Tiruttani 6.900 166.00 Sunguvarchatram-Keelacheri road Km. 24/0-30/9 Widening to Intermediate 10 Tiruvallur Pallipet Lane of Nagari -Pallipet Km. 9.200 226.00 1/0-1/6 & 1/8-10/4 Widening to Intermediate Lane at Km. 8/2-12/0 including Reconstruction of pipe culvert 11 Tiruvallur Pallipet 3.800 105.00 at Km. 8/6(i) (ii), 8/8(i) (ii), 8/10,9/2 & 9/4 of Tiruttani- Podathurpet-Pallipet road Sub Total 19.900 497.00 II IMPROVEMENTS Improvements to black spot in Km.8/0-8/5 of Kosathalayar 12 Tiruvallur Gummidi-poondi 0.500 50.00 Bridge - Puthur road including CD work at Km. 8/4 Improvements to black spot at 13 Tiruvallur Pallipattu Km.27/4 of Chittoor- Thiruttani 15.00 road Improvements to block spot at Km. 50/8 of Singaperumalkoil 14 Tiruvallur Tiruvallur – Sriperumbudur – Tiruvallur- 13.00 Redhills road and at Km. 0/2 of Melanur-Meyyur road 7 Ultimate Length Sl. Cost Division Constituency Name of Work Propose No. (Rs. in d in Km. lakhs) 1 2 3 4 5 6 Improvements to Chittoor- 15 Tiruvallur Pallipattu Thiruttani road Km. 30/0-35/8 5.800 150.00 Providing bus lay bye 2 Nos. 16 Tiruvallur Pallipattu at Km. 0/2 of R.K.Pet- 0.200 10.00 Pallipattu road Improvements to 17 Tiruvallur Tiruvallur Thirumazhisai- Sathiyavedu 1.600 130.00 road Km.20/4-22/0 Sub Total 8.100 368.00 III CD WORKS Construction of Highlevel bridge inlieu of Bed level causeways at Km 18 Tiruvallur Gummidi-poondi 227.00 12/6,13/6,18/6 and 18/10 of Kaverapettai-Sathiyavedu road(4nos) Sub Total 227.00 TOTAL 29.500 1172.00 I WIDENING (SL- IL) Widening from single lane to intermediate lane km10/0-16/0 & improve ments from Km.16/0 - 18/0 of Cheyyur - 19 Chengalpattu Acharapakkam Wandawasi - Polur Road 8.000 180.00 including reconstruction of culverts @ Km..10/10,12/8, 13/6,13/8,14/2,14/10,15/4,15/ 10 Widening from Single lane to intermediate lane from Km.18/7 - 22/0 of 20 Chengalpattu Acharapakkam 3.300 90.00 Madurantakam - Vennangupet Road including culvert @ Km.21/6 8 Ultimate Length Sl. Cost Division Constituency Name of Work Propose No. (Rs. in d in Km. lakhs) 1 2 3 4 5 6 Widening from Single lane to intermediate lane from Km.28/4 - 30/0 and 36/6 - 37/6 21 Chengalpattu 2.600 70.00 Acharapakkam of Madurantakam - Vennangupet Road including culverts @ Km.28/4 Widening from single Lane to intermediate Lane from Km.13/900 - 14/0 & 14/8 - 22 Chengalpattu Sriperumbudur 3.700 100.00 18/4 of Walajabad - Sunguvarchathiram - Keelachery road Sub Total 17.600 440.00 II IMPROVEMENTS Improvements from Km.8/0 - 23 Chengalpattu Acharapakkam 10/0 of Madhuranthagam - 2.000 50.00 Vennagupattu Road Improvements from Km.0/0 - 2/7, 3/4 - 4/4 & 5/4 - 5/9 of 24 Chengalpattu Kancheepuram 4.200 122.00 Kanchipuram - Wandawasi Road Improvements from Km.24/4 - 27/0, 29/8, 32/0 - 33/6, 34/4 - ChengalpattuThi 36/6 of Sadras - Chengalpattu 25 Chengalpattu 6.600 194.00 ruporur - Kanchipuram - Arakkonam - Thiruthani Road Improvements from Km.45/0 - 46/7 & 48/0 - 50/4 of Sadras Chengalpattu 26 Chengalpattu - Chengalpattu - Kanchipuram 4.100 110.00 Thiruporur - Arakkonam -Thiruthani Road Improvements from Km.3/0 - 6/0 of Walajabad - 27 Chengalpattu Uthiramelur Sunguvarchathiram - 3.000 85.00 Keelacheri Road Sub Total 19.900 561.00 9 Ultimate Length Sl.
Recommended publications
  • OCCASIO I AL PAPER O. 36 RECORDS of the ZOOLOGICAL SURVEY of INDIA
    MISCELLANEOUS PUBLICATION OCCASIO I AL PAPER o. 36 RECORDS OF THE ZOOLOGICAL SURVEY OF INDIA MISCELLANEOUS PUBLICATION OCCASIONAL PAPER No. 36 A SURVEY OF THE CAUVERY RIVER SYSTEM WITH A MAJOR ACCOUNT OF ITS FISH FAUNA BY K. C. Jayaram Zoological Survey C!! India, Oalcutta-700 016 AND T~ Venkateswarlu" M. B. Ragunathan S.kern Regional Station, Zoological Survey of India, Madras 600 028 Edited by the Director, Zoological Survey. of India 1982 ® Copyright 1982, Government of India Published in August, 1982 PRICE: 1 nlana : Rs. 4~.OO Foreign : £ 6.00 $ 9,50 PRINTED ~N INDIA BY THB BANI PRESS, 16 HBMENDRA SBN STRBBT, CALCUTTA-700 006 AND PUBLISHED BY THB DIRBCTOR, ZOOLOGICAL SURVBY OP INDIA, CALCUTTA. RECORDS OF THE ZOOLOGICAL SURVEY OF INDIA Miscellaneous Publication Occasional Paper No. 36 1982 Pages 1-115 CONTENTS PAGE INTRODUCTION 1 WORK PROGRAMME ... 1 AUTHORSHIP ASSIGNMENTS 2 ACKNOWLEDGEMENTS 3 THE CAUVERY RIVER 3 CLIMATE AND VEGETATION 5 TRIBUTARIES 5 COLLECTING STATIONS WITH ECOLOGICAL NOTES 7 MARGINAL AND AQUATIC BIOTA 18 SYSTEMATIC LIST OF CAUVERY FISHES 20 SYSTEMATIC ACCOUNT ••• 28 DISCUSSION 107 CONCLUSIONS AND RECOMMENDATIONS 110 REFERENCES • • . , •• 112 INTRODUCTION Cauvery, Krishna and Godavary rivers constitute the major three ,1.er systems in South India. Geologically they are much older than die Oanga, Indus and Brahmaputra rivers of Northen India. The eco­ nomic prosperity of the southern states of Andhra Pradesh, Tamil Nadu Kerala and Karnataka is closely intertwined with the water-supply and potentialities of these three rivers. Since historical times their. waters have been extensively utilised for agriculture, fisheries, irrigation and tllYigation purposes.
    [Show full text]
  • Banks Branch Code, IFSC Code, MICR Code Details in Tamil Nadu
    All Banks Branch Code, IFSC Code, MICR Code Details in Tamil Nadu NAME OF THE CONTACT IFSC CODE MICR CODE BRANCH NAME ADDRESS CENTRE DISTRICT BANK www.Padasalai.Net DETAILS NO.19, PADMANABHA NAGAR FIRST STREET, ADYAR, ALLAHABAD BANK ALLA0211103 600010007 ADYAR CHENNAI - CHENNAI CHENNAI 044 24917036 600020,[email protected] AMBATTUR VIJAYALAKSHMIPURAM, 4A MURUGAPPA READY ST. BALRAJ, ALLAHABAD BANK ALLA0211909 600010012 VIJAYALAKSHMIPU EXTN., AMBATTUR VENKATAPURAM, TAMILNADU CHENNAI CHENNAI SHANKAR,044- RAM 600053 28546272 SHRI. N.CHANDRAMO ULEESWARAN, ANNANAGAR,CHE E-4, 3RD MAIN ROAD,ANNANAGAR (WEST),PIN - 600 PH NO : ALLAHABAD BANK ALLA0211042 600010004 CHENNAI CHENNAI NNAI 102 26263882, EMAIL ID : CHEANNA@CHE .ALLAHABADBA NK.CO.IN MR.ATHIRAMIL AKU K (CHIEF BANGALORE 1540/22,39 E-CROSS,22 MAIN ROAD,4TH T ALLAHABAD BANK ALLA0211819 560010005 CHENNAI CHENNAI MANAGER), MR. JAYANAGAR BLOCK,JAYANAGAR DIST-BANGLAORE,PIN- 560041 SWAINE(SENIOR MANAGER) C N RAVI, CHENNAI 144 GA ROAD,TONDIARPET CHENNAI - 600 081 MURTHY,044- ALLAHABAD BANK ALLA0211881 600010011 CHENNAI CHENNAI TONDIARPET TONDIARPET TAMILNADU 28522093 /28513081 / 28411083 S. SWAMINATHAN CHENNAI V P ,DR. K. ALLAHABAD BANK ALLA0211291 600010008 40/41,MOUNT ROAD,CHENNAI-600002 CHENNAI CHENNAI COLONY TAMINARASAN, 044- 28585641,2854 9262 98, MECRICAR ROAD, R.S.PURAM, COIMBATORE - ALLAHABAD BANK ALLA0210384 641010002 COIIMBATORE COIMBATORE COIMBOTORE 0422 2472333 641002 H1/H2 57 MAIN ROAD, RM COLONY , DINDIGUL- ALLAHABAD BANK ALLA0212319 NON MICR DINDIGUL DINDIGUL DINDIGUL
    [Show full text]
  • Final Report
    FINAL REPORT MAJOR RESEARCH PROJECT UNIVERSITY GRANTS COMMISSION, NEW DELHI [Rc.A13/OCA-UGC/8594/2011-29.06.2011, F.No.40-297/2011 (SR) 11.09.2014. AU: DO&CAS: UGC project: 2014] TITLE OF THE PROJECT ―Micro Level Mapping of Morphological Changes in the Beaches Caused by Tsunami in between Cuddalore and Nagapattinam, Tamilnadu, East Coast of India‖ Submitted by Dr. R.KARIKALAN Principal Investigator DEPARTMENT OF GEOLOGY ALAGAPPA UNIVERESITY KARAIKUDI – 630003 TAMILNADU INDIA 2015 1 ALAGAPPA UNIVERSITY Department of Geology (A State University Established in 1985) KARAIKUDI - 630 003, Tamil Nadu, India www.alagappauniversity.ac.in 2017 2018 2018 2018 2019 Graded as Category-1 India Rank : 20 Accredited with Swachh Campus A+ Grade by NAAC & Rank : 28 BRICS Rank: 104 (CGPA : 3.64) Rank : 4 Asia Rank : 216 Granted Autonomy ===================================================================== Dr. R. KARIKALAN Associate Professor and Head Certificate I Dr. R.KARIKALAN, declare that the work presented in this report is original and carried throughout independently by me during the complete tenure of major research project of UGC, New Delhi. 2 ACKNOWLEDGEMENTS I would like to thank University Grants Commission, New Delhi for granting me this project under Major Research Project Scheme. It is great privilege to express my profound and deep sense of gratitude to Vice Chancellor, Alagappa University, Karaikudi, for his guidance and valuable support extended for me, to complete this Major Research Project work. This research work could not have been completed without outstanding help offered to me by The Registrar, Alagappa University, Karaikudi. I wish to express my thanks to all my friends who helped me a lot during the period of this project.
    [Show full text]
  • Habitat Mapping of Chinangudi
    HABITAT MAPPING OF CHINANGUDI A Study of Chinnangudi Village in connection with Tsunami Reconstruction Project Benny Kuriakose South Indian Federation of Fishermen Societies South Indian Federation of Fishermen Societies (SIFFS) HABITAT MAPPING OF CHINNANGUDI A Study of Chinnangudi Village in Connection with Tsunami Reconstruction Project Benny Kuriakose South Indian Federation of Fishermen Societies June 2006 Habitat Mapping of Chinnangudi Village HABITAT MAPPING OF CHINNANGUDI A Study of Chinnangudi Village in Connection with Tsunami Reconstruction Project Benny Kuriakose South Indian Federation of Fishermen Societies June 2006 Habitat Mapping of Chinnangudi Village HABITAT MAPPING OF CHINNANGUDI A Study of Chinnangudi Village in Connection with Tsunami Reconstruction Project June 2006 By Benny Kuriakose Published by V.Vivekanandan for South Indian Federation of Fishermen Societies (SIFFS) Karamana, Trivandrum - 695 002, Kerala, INDIA Email: [email protected], Web: http://www.siffs.org Edited by Dr. Ahana Lakshmi Cover Sketch by Pratheep Mony M.G Designed by C.R.Aravindan, SIFFS Printed at St.Joseph Press, Trivandrum South Indian Federation of Fishermen Societies C O N T E N T S FOREWORD ................................................................................................................ i PREFACE ................................................................................................................ ii CHAPTER 1: INTRODUCTION ....................................................................................... 1 1.1
    [Show full text]
  • Urban and Landscape Design Strategies for Flood Resilience In
    QATAR UNIVERSITY COLLEGE OF ENGINEERING URBAN AND LANDSCAPE DESIGN STRATEGIES FOR FLOOD RESILIENCE IN CHENNAI CITY BY ALIFA MUNEERUDEEN A Thesis Submitted to the Faculty of the College of Engineering in Partial Fulfillment of the Requirements for the Degree of Masters of Science in Urban Planning and Design June 2017 © 2017 Alifa Muneerudeen. All Rights Reserved. COMMITTEE PAGE The members of the Committee approve the Thesis of Alifa Muneerudeen defended on 24/05/2017. Dr. Anna Grichting Solder Thesis Supervisor Qatar University Kwi-Gon Kim Examining Committee Member Seoul National University Dr. M. Salim Ferwati Examining Committee Member Qatar University Mohamed Arselene Ayari Examining Committee Member Qatar University Approved: Khalifa Al-Khalifa, Dean, College of Engineering ii ABSTRACT Muneerudeen, Alifa, Masters: June, 2017, Masters of Science in Urban Planning & Design Title: Urban and Landscape Design Strategies for Flood Resilience in Chennai City Supervisor of Thesis: Dr. Anna Grichting Solder. Chennai, the capital city of Tamil Nadu is located in the South East of India and lies at a mere 6.7m above mean sea level. Chennai is in a vulnerable location due to storm surges as well as tropical cyclones that bring about heavy rains and yearly floods. The 2004 Tsunami greatly affected the coast, and rapid urbanization, accompanied by the reduction in the natural drain capacity of the ground caused by encroachments on marshes, wetlands and other ecologically sensitive and permeable areas has contributed to repeat flood events in the city. Channelized rivers and canals contaminated through the presence of informal settlements and garbage has exasperated the situation. Natural and man-made water infrastructures that include, monsoon water harvesting and storage systems such as the Temple tanks and reservoirs have been polluted, and have fallen into disuse.
    [Show full text]
  • Annexure-V State/Circle Wise List of Post Offices Modernised/Upgraded
    State/Circle wise list of Post Offices modernised/upgraded for Automatic Teller Machine (ATM) Annexure-V Sl No. State/UT Circle Office Regional Office Divisional Office Name of Operational Post Office ATMs Pin 1 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA PRAKASAM Addanki SO 523201 2 Andhra Pradesh ANDHRA PRADESH KURNOOL KURNOOL Adoni H.O 518301 3 Andhra Pradesh ANDHRA PRADESH VISAKHAPATNAM AMALAPURAM Amalapuram H.O 533201 4 Andhra Pradesh ANDHRA PRADESH KURNOOL ANANTAPUR Anantapur H.O 515001 5 Andhra Pradesh ANDHRA PRADESH Vijayawada Machilipatnam Avanigadda H.O 521121 6 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA TENALI Bapatla H.O 522101 7 Andhra Pradesh ANDHRA PRADESH Vijayawada Bhimavaram Bhimavaram H.O 534201 8 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA VIJAYAWADA Buckinghampet H.O 520002 9 Andhra Pradesh ANDHRA PRADESH KURNOOL TIRUPATI Chandragiri H.O 517101 10 Andhra Pradesh ANDHRA PRADESH Vijayawada Prakasam Chirala H.O 523155 11 Andhra Pradesh ANDHRA PRADESH KURNOOL CHITTOOR Chittoor H.O 517001 12 Andhra Pradesh ANDHRA PRADESH KURNOOL CUDDAPAH Cuddapah H.O 516001 13 Andhra Pradesh ANDHRA PRADESH VISAKHAPATNAM VISAKHAPATNAM Dabagardens S.O 530020 14 Andhra Pradesh ANDHRA PRADESH KURNOOL HINDUPUR Dharmavaram H.O 515671 15 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA ELURU Eluru H.O 534001 16 Andhra Pradesh ANDHRA PRADESH Vijayawada Gudivada Gudivada H.O 521301 17 Andhra Pradesh ANDHRA PRADESH Vijayawada Gudur Gudur H.O 524101 18 Andhra Pradesh ANDHRA PRADESH KURNOOL ANANTAPUR Guntakal H.O 515801 19 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA
    [Show full text]
  • Cauvery and Mettur Dam Project – an Analysis
    Vol 6 Issue 1 July 2016 ISSN No :2231-5063 InternationaORIGINALl M ARTICLEultidisciplinary Research Journal Golden Research Thoughts Chief Editor Dr.Tukaram Narayan Shinde Associate Editor Publisher Dr.Rajani Dalvi Mrs.Laxmi Ashok Yakkaldevi Honorary Mr.Ashok Yakkaldevi Welcome to GRT RNI MAHMUL/2011/38595 ISSN No.2231-5063 Golden Research Thoughts Journal is a multidisciplinary research journal, published monthly in English, Hindi & Marathi Language. All research papers submitted to the journal will be double - blind peer reviewed referred by members of the editorial board.Readers will include investigator in universities, research institutes government and industry with research interest in the general subjects. Regional Editor Dr. T. Manichander International Advisory Board Kamani Perera Mohammad Hailat Hasan Baktir Regional Center For Strategic Studies, Sri Dept. of Mathematical Sciences, English Language and Literature Lanka University of South Carolina Aiken Department, Kayseri Janaki Sinnasamy Abdullah Sabbagh Ghayoor Abbas Chotana Librarian, University of Malaya Engineering Studies, Sydney Dept of Chemistry, Lahore University of Management Sciences[PK] Romona Mihaila Ecaterina Patrascu Spiru Haret University, Romania Spiru Haret University, Bucharest Anna Maria Constantinovici AL. I. Cuza University, Romania Delia Serbescu Loredana Bosca Spiru Haret University, Bucharest, Spiru Haret University, Romania Ilie Pintea, Romania Spiru Haret University, Romania Fabricio Moraes de Almeida Anurag Misra Federal University of Rondonia, Brazil Xiaohua Yang DBS College, Kanpur PhD, USA George - Calin SERITAN Titus PopPhD, Partium Christian Faculty of Philosophy and Socio-Political ......More University, Oradea,Romania Sciences Al. I. Cuza University, Iasi Editorial Board Pratap Vyamktrao Naikwade Iresh Swami Rajendra Shendge ASP College Devrukh,Ratnagiri,MS India Ex - VC. Solapur University, Solapur Director, B.C.U.D.
    [Show full text]
  • Transmission Lines / Elements Details Proposed Date & Time
    TAMIL NADU TRANSMISSION CORPORATION LIMITED Consolidation of LC for the month of April 2017 at 3rd TNSOCC Meeting Transmission Lines / Elements Details Proposed Date & Time Name of Voltage Recommend From To No. of Sl. No From Substation To Substation Purpose conditions From Date To Date Remarks SE Approval the LDC Level (KV) ations Time Time days On 110KV Kayathar - Eppodumvandaran A) For Monthly maintenance work. B) For Tower to 1 Madurai 110 KV KAYATHAR 230 KV During the LC period. there will be no supply in entire feeder . Hence no SS affected POSSIBLE Sat, 01-Apr-2017 9:00 Sat, 01-Apr-2017 17:00 1 0 Approved feeder breaker with CT & entire line. Tower inspection subject to 110KV ARASUR feeder Breaker,CTs and 2 Erode 110 KV THINGALUR 230 KV Monthly Maintenace Works 110KV VELAMPALAYAM SS availing total shutdown.Feeder will be back charged. possible Sat, 01-Apr-2017 9:00 Sat, 01-Apr-2017 17:00 1 velampalayam ss Approved Line isolators. availing tsd subject to AUTO Transformer 1,HV 1 and LV 1's 3 Erode 230 KV THINGALUR 230 KV Monthly Maintenance Works. 110KV VELAMPALAYAM SS availing total shutdown.No SS will be affected. possible Sat, 01-Apr-2017 9:00 Sat, 01-Apr-2017 17:00 1 velampalayam ss Approved Breakers with CTs availing tsd subject to 110 KV ERODE - THIRUVACHI FEEDER DURING LC PERIOD METTUKADAI 110 KV SS UNDER TOTAL SHUTDOWN 4 Erode 110 KV Erode 110 KV MONTHLY MAINENANCE WORK. possible Sat, 01-Apr-2017 9:00 Sat, 01-Apr-2017 15:00 1 mettukadai ss Approved BREAKER AND CT CONDITION.
    [Show full text]
  • 1 February 2021
    1 www.journalsofindia.com February 2021 2 www.journalsofindia.com February 2021 Content AGRICULTURE ______________________________________________________________________________________ 7 NATIONAL INNOVATIONS IN CLIMATE RESILIENT AGRICULTURE (NICRA) _______________________________________________ 7 PARTICIPATORY GUARANTEE SYSTEM (PGS) __________________________________________________________________ 7 DOMESTIC SYSTEMICALLY IMPORTANT BANKS _________________________________________________________________ 8 GRAPENET SYSTEM __________________________________________________________________________________ 8 SAHI FASAL CAMPAIGN ________________________________________________________________________________ 9 DISASTER MANAGEMENT ____________________________________________________________________________ 9 COVID-19 PERFORMANCE INDEX _________________________________________________________________________ 9 ARTIFICIAL LAKE IN CHAMOLI ____________________________________________________________________________ 9 AIR AMBULANCE ___________________________________________________________________________________10 ECONOMY ________________________________________________________________________________________10 SINGLE SECURITIES CODE FOR FINANCIAL SECTOR _____________________________________________________________10 SCHEME TO AUGMENT CITY BUSES & URBAN GREEN MOBILITY ____________________________________________________11 SCHEME FOR ADDITIONAL GRANT FOR APPAREL MANUFACTURING UNITS UNDER SCHEME FOR INTEGRATED TEXTILE PARK (SITP) _______11 INTEGRATED
    [Show full text]
  • Soiled Agriculture and Spoiled Environment: Socio-Economic Impact of Groundwater Pollution in Tamilnadu
    Working Paper No. 175 Soiled Agriculture and spoiled environment: Socio-economic impact of groundwater pollution in Tamilnadu by S. Janakarajan Madras Institute of Development Studies 79, Second Main Road, Gandhi Nagar Adyar, Chennai 600 020 September 2002 SOILED AGRICULTUREAND SPOILED ENVIRONMENT: • •SOCIO-ECONOMIC IMPACT OF· GROUNDWATER• POLLUTION IN TAMILNADU• S.JANAKARAJAN Madras Institute of Development Studies Abstract The problem of water pollution• poses a great threat to basic human living. The ramification of pollution is indeed more• severe in the less developed countries that are afflictedwith chronic problems of political instability, lack of political will, high• level of illiteracy, unceasing poverty, increasing degree• of urbanization, lack of basic needs• and basic• infrastructureand women subordination• . The subject matter of groundwater and surfacewater pollution gains further significance due to• economic • .liberaliz.ation policy, to which most underdeveloped countries have been subjected. In other words, the phrase, "sustainable development" emphasized in many international fora, has seemingly no meaning in many underdeveloped countries. • Most river basins, in particular India, are heavily• polluted. In addition, the river basins are stressed due to competing demand for water across different uses and users; there is an intense competition in tapping the good quality water among the sectors such as agriculture, industry and domestic. In the process, milUons of gallons• of good quality water• is transported~ ' from rural to urban areas everyday; the• net result• is the flourishing water trade• and the depletion of• groundwater potential. It causes more anxiety not only because a huge quantity of • water is transported from rural to urban areas,• but also because of the release of comparable quantity of water • as effluent.
    [Show full text]
  • The Available Cauvery Waters Will Have to Be Divided on a Pro Rata Basis: Duraimurugan Saptarshi Bhattacharya Sep 26, 2016
    Interview The available Cauvery waters will have to be divided on a pro rata basis: Duraimurugan Saptarshi Bhattacharya Sep 26, 2016 Aerial view of the Cauvery River on June 30, 2008. Photo: R. Ragu The Hindu The Karnataka government's refusal to release water to Tamil Nadu despite a Supreme Court ruling has added a new and crucial angle to the Cauvery water sharing dispute between the two States. A former Public Works Department (PWD) Minister of Tamil Nadu, Duraimurugan, traces the gradual escalation of the bilateral water sharing issue into a crisis involving constitutional law. In an interview to The Hindu Centre for Politics and Public Policy’s Senior Coordinator, Saptarshi Bhattacharya, Duraimurugan says that given a larger constitutional question on the extent of the jurisdiction of the Supreme Court and how binding its orders are on governments, time has come to discuss constitutional law once again. Excerpts: You have served for a long time as a PWD [Public Works Department] Minister in Tamil Nadu. During your three tenures as PWD Minister what was your experience in handling the Cauvery issue which is very contentious and now has become even more emotive between Karnataka and Tamil Nadu? Even before my term, around 1967 when the DMK [Dravida Munnetra Kazhagam] came to power, the problem had begun. The Karnataka government tried to construct dams around that time. That is when the problem started. At that time, people did not know much about it. Water kept flowing by and nobody bothered about it. So, when you construct a dam across the river, it will lead to obstruction of water that is meant to flow into the Cauvery delta.
    [Show full text]
  • An Analysis of Physico-Chemical Variables of Water in Lower Anicut, Thanjavur District, Tamil Nadu, India
    International Journal of Zoology and Applied Biosciences ISSN: 2455-9571 Volume 3, Issue 3, pp: 417-420, 2018 http://www.ijzab.com Research Article AN ANALYSIS OF PHYSICO-CHEMICAL VARIABLES OF WATER IN LOWER ANICUT, THANJAVUR DISTRICT, TAMIL NADU, INDIA P. Balasubramanian¹ and R. Sivakami²* ¹PG & Research Department of Zoology,Government Arts College (Autonomous), Kumbakonam-612002, India. ²PG & Research Department of Zoology, Arignar Anna Govt. Arts College, Musiri-621211, Tamil Nadu, India. Article History: Received 25th April 2018; Accepted 24th May 2018; Published 31st May2018 ABSTRACT During the last few years, the water quality of most Indian aquatic systems have been deteriorating because of increased anthropogenic activity organisms especially phytoplankton which are the producers of aquatic systems depend directly on the physico-chemical variables of water. Hence, physico-chemical variables play an important role in the composition and diversity of aquatic organism. Hence, the present study was attempted at Lower Anicut at Anakkarai area in Thanjavur District, Tamil Nadu. Various physico-chemical variables have been analysed on a seasonal basis and the results interpreted with those of similar workers. Keywords: Physico-chemical, Phytoplankton, Water quality, Aquatic systems. INTRODUCTION MATERIALS AND METHODS Though water is a renewable resource, reckless usage and The Lower Anicut is located at Anakkarai, Thanjavur improper management of water systems can cause serious District, Tamil Nadu, India (Latitude: 10.95, and the problems in availability and quality of water (Raja et al., Longitude: 79.38). Water samples from Lower Anicut were 2008). During the last few years, the water quality of most collected during the three different seasons of the year Indian aquatic systems including rivers have been subjected (2017-18).
    [Show full text]