East Midlands HS2 Growth Strategy: World Class - Locally Driven
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Notice of Poll and Situation of Polling Stations
Nottinghamshire County Council Election of County Councillor for the Beeston Central and Rylands County Electoral Division NOTICE OF POLL Notice is hereby given that: 1. The following persons have been and stand validly nominated: SURNAME OTHER NAMES HOME ADDRESS DESCRIPTION (if NAMES OF THE PROPOSER (P), any) SECONDER (S) AND THE PERSONS WHO SIGNED THE NOMINATION PAPER Carr Barbara Caroline 5 Tracy Close, Beeston, Nottingham, Liberal Democrats Graham M Hopcroft(P), Audrey P NG9 3HW Hopcroft(S) Foale Kate 120 Cotgrave Lane, Tollerton, Labour Party Celia M Berry(P), Philip D Bust(S) Nottinghamshire, NG12 4FY McCann Duncan Stewart 15 Enfield Street, Beeston, Nottingham, The Conservative June L Dennis(P), James Philip Christian NG9 1DN Party Candidate Raynham-Gallivan(S) Venning Mary Evelyn 14 Bramcote Avenue, Beeston, Green Party Christina Y Roberts(P), Daniel P Nottingham, Nottinghamshire, NG9 4DG Roberts(S) 2. A POLL for the above election will be held on Thursday, 6th May 2021 between the hours of 07:00 and 22:00. 3. The number to be elected is ONE. The situation of the Polling Stations and the descriptions of the persons entitled to vote at each station are set out below: PD Polling Station and Address Persons entitled to vote at that station BEC1 Oasis Church - Union Street Entrance, Willoughby Street, Beeston, Nottingham, NG9 2LT 1 to 1284 BEC2 Humber Lodge, Humber Road, Beeston, Nottingham, NG9 2DP 1 to 1687 BEC3 Templar Lodge, Beacon Road, Beeston, Nottingham, NG9 2JZ 1 to 1654 BER1 Beeston Rylands Community Centre, Leyton Crescent, -
HOUSE of LORDS Parliamentary Debates
2 Volume Index to the HOUSE OF LORDS Parliamentary Debates SESSION 2014–15 7th July, 2014—26th September, 2014 (VOLUME 755) £00·00 Obtainable on standing order only The first time a Member speaks to a new piece of parliamentary business, the following abbreviations are used to show their party affiliation: Abbreviation Party/Group CB Cross Bench Con Conservative Con Ind Conservative Independent DUP Democratic Unionist Party GP Green Party Ind Lab Independent Labour Ind LD Independent Liberal Democrat Ind SD Independent Social Democrat Lab Labour Lab Ind Labour Independent LD Liberal Democrat LD Ind Liberal Democrat Independent Non-afl Non-affiliated PC Plaid Cymru UKIP UK Independence Party UUP Ulster Unionist Party No party affiliation is given for Members serving the House in a formal capacity, the Lords spiritual, Members on leave of absence or Members who are otherwise disqualified from sitting in the House. © Parliamentary Copyright House of Lords 2015, this publication may be reproduced under the terms of the Open Parliament licence, which is published at www.parliament.uk/site-information/copyright/. 7th July, 2014—26th September, 2014 1 - INDEX TO THE PARLIAMENTARY DEBATES OFFICIAL REPORT INDEX FOR SESSION 2014–15, Volume 755 7th July, 2014—26th September, 2014 EXPLANATION OF ARRANGEMENT AND ABBREVIATIONS Dates of proceedings are indicated by numerals in brackets. Volume numbers are shown in square brackets. Bills: Read First, Second or Third Time = 1R, 2R, 3R. Column numbers in italics refer to Written Answers. - - A417: A436: Advisory Bodies: Ahmad of Wimbledon, Lord— Question, [755] (26.9.14) WA466. Questions, [755] (8.7.14) WA23. -
The HS2 Station at Toton – an Assessment of the Economic Development Opportunities
The HS2 Station at Toton – An Assessment of the Economic Development Opportunities Final Report November 2016 TABLE OF CONTENTS 1 INTRODUCTION AND CONTEXT ....................................................................................... 1 2 EVIDENCE BASE AND SECTOR ANALYSIS .................................................................... 5 3 THE SCALE OF THE OPPORTUNITY .............................................................................. 15 4 THE NATURE OF THE OPPORTUNITY – ECONOMIC GROWTH SCENARIOS ........... 27 5 VISION AND PREFERRED SCENARIO ........................................................................... 31 6 INTERVENTIONS TO ACHIEVE THE VISION .................................................................. 33 1 Introduction and Context Introduction 1.1 This report is the final output from the work commissioned by East Midlands Councils to explore the economic development opportunities arising from the HS2 station at Toton, and its connections to surrounding sites and communities in the East Midlands. The study is one of a number of pieces of work feeding into the development of an HS2 Growth Strategy for the East Midlands. Study Objectives 1.2 The purpose of the economic development opportunities study was to provide an evidence-based understanding of the potential for economic development arising from HS2 investment in Toton and the associated activity across the East Midlands. As well as the development at the Hub station site, the work has considered the connections to surrounding sites and centres, -
Zero Carbon Broxtowe
Zero Carbon Broxtowe An action plan devised by Broxtowe Liberal Democrats Zero Carbon Broxtowe Contents Introduction 1 Part One Vision, Legislation and Policies 3 Vision 4 The Legislation and Policy Context 5 The National Planning Policy Framework (NPPF) 6 Broxtowe’s Local Plan 9 Council Resolutions 12 Part Two The Planning System 13 Supplementary Planning Documents 14 Part Three Aspirations For Change 19 The Councils Carbon And Environmental Footprint 20 Improving Existing Buildings 23 Transport 24 Lobbying 25 Policy DP1 - Proposed Fracking Policy 27 Policy DP2 - HS2 28 Zero Carbon Broxtowe Zero Carbon Broxtowe Introduction The world faces a climate crisis. Global temperatures are on the increase, and the International Panel on Climate Change (IPCC) reported that we had just 12 years to prevent catastrophic climate change. Thankfully it is not too late to do something about it. However, making the necessary changes does mean that we need to take radical action and to take it now. Local authorities are in prime position to bring these changes about. This paper sets out a number of steps that can be taken, and that Broxtowe Liberal Democrats propose are implemented locally. The purpose of this paper is to provide guidance to officers of the council in drafting new policies, and also for members of the public about the changes that we are seeking to implement. This paper is a wide-ranging document covering a number of “The fate of future generations depends on different subjects. In preparing it we have looked at best practice our ability to take radical action to deal in other authorities. -
The Economics of High Speed 2
HOUSE OF LORDS Economic Affairs Committee 1st Report of Session 2014‒15 The Economics of High Speed 2 Ordered to be printed 10 March 2015 and published 25 March 2015 Published by the Authority of the House of Lords London : The Stationery Office Limited £price HL Paper 134 Select Committee on Economic Affairs The Economic Affairs Committee is appointed by the House of Lords in each session “to consider economic affairs”. Membership The Members of the Select Committee on Economic Affairs are: Baroness Blackstone Lord Carrington of Fulham Lord Griffiths of Fforestfach Lord Hollick (Chairman) Lord Lawson of Blaby Lord May of Oxford Lord McFall of Alcluith Lord Monks Lord Rowe-Beddoe Lord Shipley Lord Skidelsky Lord Smith of Clifton Baroness Wheatcroft Declaration of interests See Appendix 1 A full list of Members’ interests can be found in the Register of Lords’ Interests: http://www.parliament.uk/mps-lords-and-offices/standards-and-interests/register-of-lords-interests Publications All publications of the Committee are available at: http://www.parliament.uk/hleconomicaffairs Parliament Live Live coverage of debates and public sessions of the Committee’s meetings are available at: http://www.parliamentlive.tv Further information Further information about the House of Lords and its Committees, including guidance to witnesses, details of current inquiries and forthcoming meetings is available at: http://www.parliament.uk/business/lords Committee staff The staff who worked on this inquiry were Robert Whiteway (Clerk), Ben McNamee (Policy Analyst), Stephanie Johnson (Committee Assistant) and Oswin Taylor (Committee Assistant). Contact details All correspondence should be addressed to the Clerk of the Economic Affairs Committee, Committee Office, House of Lords, London SW1A 0PW. -
Walking Routes of the Blue Plaques of Beeston, Chilwell, Attenborough, Toton, Stapleford & Bramcote Please Note the Map Is Not to Scale
Suggested Walking Routes of the Blue Plaques Of Beeston, Chilwell, Attenborough, Toton, Stapleford & Bramcote Please note the map is not to scale. The numbered plaque locations follow the order of the Blue Plaque Guide available from local public buildings Beeston & A to B Plaque 16 (Beeston Manor House) to Chilwell retail park and turn left at 4 Miles Continue down Church St. and turn left, the lights onto Nottingham Road. Chilwell 2-3 hours crossing the road the plaque is on the first Continue onto the next set of lights and From the University Boulevard Tram house on the right. Plaque 17 (West End) turn right. The plaque is on the left at Stop to Cator Lane Tram Stop Turn around and walk down Dovecoat the entrance to the park. Lane turning right West End, the plaque is Plaque 6 (Edward Joseph Lowe, FRS). Toton to D to E From the tram stop, walk toward the mounted on the wall on the left. Plaque 3.5 miles University West Entrance and turn left 18 (Sid Standard) Continue down West Stapleford 1-2 hours End turning right up and to the end of Hall onto Broadgate, the plaque is 160 meters, Connecting walk on the left. Plaque 7 (Thomas Humber) Croft, the plaque is located on the front of the building on your right. Plaque 19 (T H Walk through the park and follow the Continue down Broadgate and turn left River Erewash keeping left, crossing onto Humber Road, the site of the Barton, OBE) Continue down the high road away from Beeston for 300 metres, the footbridge. -
Annual Monitoring Report 2013
Annual Monitoring Report December 2013 Cheshire West and Chester Council Contents 1 Introduction 2 2 Spatial portrait 6 3 The Local Development Scheme 11 4 Business development services and town centres 15 5 Housing 23 6 Environmental quality 34 Annual Monitoring Report 2013 7 Transport and accessibility 44 8 Minerals 50 9 Waste 52 Appendices A Glossary of terms 56 B Local Plan evidence base 60 C Employment land supply 62 1 Introduction 2 Cheshire West and Chester Council 1 Introduction Planning and the Local Development Framework 1.1 This report covers the period 1 April 2012 to 31 March 2013 and is the fifth Annual Monitoring Report (AMR) for Cheshire West and Chester Council, published to comply with the requirements of Section 35 of The Planning and Compulsory Purchase Act 2004 (as amended by the Localism Act 2011) which requires local planning authorities to produce a report containing information in relation to the following: implementation of the Local Development Scheme (LDS) Annual Monitoring Report 2013 extent to which the policies set out in the Local Development Documents are being achieved. 1.2 From March 2011 it was announced that local planning authorities would no longer be required to submit their AMRs to central government. The Localism Act has removed this part of the legislation, but it still requires the report to be made public to share the performance and achievements of the planning service with the local community. 1.3 Monitoring is essential to establish what is happening now and what may happen in the future and to compare these trends against existing policies and targets to determine what needs to be done. -
Broxtowe Borough Gedling Borough Nottingham City Greater Nottingham Aligned Core Strategies Part 1 Local Plan
Greater Nottingham Broxtowe Borough Gedling Borough Nottingham City Aligned Core Strategies Part 1 Local Plan Adopted September 2014 Contact Details: Broxtowe Borough Council Foster Avenue Beeston Nottingham NG9 1AB Tel: 0115 9177777 [email protected] www.broxtowe.gov.uk/corestrategy Gedling Borough Council Civic Centre Arnot Hill Park Arnold Nottingham NG5 6LU Tel: 0115 901 3757 [email protected] www.gedling.gov.uk/gedlingcorestrategy Nottingham City Council LHBOX52 Planning Policy Team Loxley House Station Street Nottingham NG2 3NG Tel: 0115 876 3973 [email protected] www.nottinghamcity.gov.uk/corestrategy General queries about the process can also be made to: Greater Nottingham Growth Point Team Loxley House Station Street Nottingham NG2 3NG Tel 0115 876 2561 [email protected] www.gngrowthpoint.com Alternative Formats All documentation can be made available in alternative formats or languages on request. Contents Working in Partnership to Plan for Greater Nottingham 1 1.1 Working in Partnership to Plan for Greater Nottingham 1 1.2 Why the Councils are Working Together 6 1.3 The Local Plan (formerly Local Development Framework) 6 1.4 Sustainability Appraisal 9 1.5 Habitats Regulations Assessment 10 1.6 Equality Impact Assessment 11 The Future of Broxtowe, Gedling and Nottingham City in the Context of Greater Nottingham 13 2.1 Key Influences on the Future of the Plan Area 13 2.2 The Character of the Plan Area 13 2.3 Spatial Vision 18 2.4 Spatial Objectives 20 2.5 Links to Sustainable Community -
Review of Potential Infrastructure Interdependencies in Support of Proposed Route HS2 Phase 2 Consultation
Investigation into the Development of a Framework for the Identification and Appraisal of Infrastructure Interdependencies with Application to Critical UK Infrastructure: Case Study Report for Infrastructure UK and the Department for Transport. Review of Potential Infrastructure Interdependencies in Support of Proposed Route HS2 Phase 2 Consultation Final Report Published 30th October 2014 DOI: 10.14324/20141455383 This report is delivered under the Terms and Conditions of HM Treasury Contract HMT 1055 (University of Bristol Contract Ref 42523) Review of Potential Infrastructure Interdependencies in Support of Proposed Route HS2 Phase 2 Consultation Case Study Report for Infrastructure UK and the Department for Transport Final Report Published 30th October 2014 Report Authors Dr Ges Rosenberg, Research Manager, Systems Centre & Department of Civil Engineering, University of Bristol, Bristol BS8 1UB, United Kingdom. (Email: [email protected]). Dr Neil Carhart, Research Associate, Systems Centre & Department of Civil Engineering, University of Bristol, Bristol BS8 1TR, United Kingdom. (Email: [email protected]). Acknowledgement This report comprises a case study for a programme of research entitled ‘The Development of a Framework for the Identification and Appraisal of Infrastructure Interdependencies with Application to Critical UK Infrastructure’, completed on behalf of Infrastructure UK. The research was led Prof. Brian Collins1 and Prof. Patrick Godfrey2 as Principal Investigators, and was funded by Infrastructure UK, University College London and the University of Bristol. The authors would like to acknowledge the support of The Bartlett Faculty of the Built Environment at UCL, the Department for Transport, Infrastructure UK and those from industry, government and academia who attended the workshop and generously shared their time and expertise. -
Appendix M Extension of Tram West of Toton R1
FEASIBILITY STUDY – EXTENSION OF NET TRAM WEST OF TOTON (EAST MIDLANDS HUB) January 2014 CONTENTS 1. EXECUTIVE SUMMARY ............................................................................................... 3 2. INTRODUCTION ........................................................................................................... 4 3. AN ASSESSMENT OF THE POTENTIAL MARKETS AND THEIR DEMAND ................ 5 4. DEVELOPMENT OF AN EFFECTIVE TRANSPORT HUB AT TOTON ........................ 15 5. CONCLUSION ............................................................................................................. 17 6. RECOMMENDATION .................................................................................................. 17 1 Rev Date Details Prepared by Checked by Approved by !F 28.1.2014 Final draft agreed with client JC/DG MD JC !F 30.1.2014 Final agreed with client JC/DG MD JC 2 1. EXECUTIVE SUMMARY 1.1 Current proposals from HS2 Ltd include a station at Toton, with provision to extend the Nottingham Express Transit (NET)tram service from Toton Lane to the new station. 1.2 This study considers the options for extending the NET to the west of the proposed HS2 station at Toton and considers the potential demand from local communities. It concludes that whilst rail and bus services may be capable of meeting much of the current demand for access to the station, planned housing growth in the area and the establishment of the HS2 station will significantly increase the level of demand. It is recommended that infrastructure should be provided to enable pedestrians, cyclists and other traffic to access the site. In addition consideration should be given to adjusting the terminus of the proposed extension into Toton station by extending to the south and providing a structure to cross the HS2 line. It is recommended that further investigation should be undertaken to assess in more detail the level of demand and the infrastructure need to enable Toton to function as an effective transport hub. -
The Plan for Growth Implementation Update
Plan for Growth implementation update March 2013 Plan for Growth implemenation update March 2013 © Crown copyright 2013 You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit http://www.nationalarchives.gov.uk/doc/open- government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Any queries regarding this publication should be sent to us at: [email protected]. ISBN 978-1-909096-83-7 PU1463 Contents Page Chapter 1 Implementing the Plan for Growth 1 Annex A Update on measures 9 Implementing 1 the Plan for Growth 1.1 The Government is delivering ambitious structural reforms to enable the UK to compete in a rapidly changing global economy. These reforms are a key part of the Government’s economic strategy, alongside fiscal consolidation, monetary activism, and reform of the financial system. 1.2 The Plan for Growth1, published in March 2011 and with further reforms announced at Autumn Statement 20112, set out a programme of structural reforms to remove barriers to growth for businesses and equip the UK to compete in the global race. These reforms span a range of policies, including improving the UK’s infrastructure, cutting red tape, root and branch reform of the planning system and boosting trade and inward investment, to achieve the Government’s four ambitions for growth: • creating the most competitive tax system in the G20; • encouraging investment and exports as a route to a more balanced economy; • making the UK the best place in Europe to start, finance and grow a business; and • creating a more educated workforce that is the most flexible in Europe. -
The Rail User Express. We Continue with the Usual Roundup of News
September 2018 Welcome to the Rail User Express. Feel free to forward it to a colleague, or to reproduce items in your own newsletter (quoting sources). For further detail of any of the stories mentioned, consult the relevant website, or come back to me for the source material. Please say if you no longer wish to receive Rail User Express, or if you know of anyone or any Rail User Group (RUG) who would like to be added to the circulation list. Inevitably but regrettably, this month’s issue is largely taken up by the impact of the May timetable change, exacerbated by ongoing industrial action. Passengers’ habits are changing: many now use the car for some or all of their journey, which is bad news for the environment, but potentially fatal for further expansion of the railway. Winning them back will be a challenge for all of us. Roger Smith We continue with the usual roundup of news items from groups around the UK. Please keep your contributions coming: they are all gratefully received. Friends of the Far North Line The Far North Review Team, which was set up in 2016 to review every aspect of the Far North Line, met on 7 September to discuss progress so far, and future plans in respect of line capacity, higher speed limits, signalling, better trains and timetable structure. NR, ScotRail and Transport Scotland are working on a raft of improvements, some incremental and some radical. The fruits of the discussions cannot yet be shared, as announcements will be made in due course, but Mike Lunan and Ian Budd from FoFNL came away smiling broadly! Rail Action Group, East of Scotland Replacement of 6-car sets on the North Berwick line by 4-car sets due to the late rollout of the Hitachi Class 385 trains and a shortage of rolling stock led to serious overcrowding.