Passenger Amenities Station Amenity Amount Status Toilets `1 lakh Constructed Provision of Passenger Amenities and Platform Works `30 lakh Completed facilities, and its improvements at Malkajgiri Platform Works `1.11 crore Completed Railway Stations is one of the most 2 Escalators important aspect in Railway Services. Hitech 2 Escalators `6.00 crore Proposed Fatehnagar 2 Escalators 1. Provision of Electronic Train/Coach Indication/ Passenger Borabanda CCTV Cameras Guidance Board is being provided at Lalaguda, , Charlapalli, Ghatkesar, Malkajgiri, Dayanand Nagar, Hitech City CCTV Cameras , Gate, , Bharatnagar CCTV Cameras `1.84 crore Proposed , Cavalry Barraks, , Bolarum Bazar, G Pochampalli, Gowdavalli, stations under Fatehnagar CCTV Cameras MMTS Phase II project with cost of `4.59 crore. Bharatnagar 2 ATVMs 2. Installation of Electronic Train/ Coach Indication/ Hitech City 2 ATVMs Passenger Guidance Board is being done at Ammuguda, Borabanda 2 ATVMs Sanatnagar, Firoziguda, Suchitra Centre, Bhudevinagar, ` , Moula Ali Housing Board Colony as a part Malkajgiri 2 ATVMs 16.5 lakh Installed of MMTS Phase II project with cost of `3.90 crore. Ghatkesar ATVM Malkajgiri Parliamentary Constituency 3. Proposed for construction of Toilets at Bolarum ATVM Gate, Safilguda, Ramakistapuram, Ammuguda, Nature Cure Shri Narendra Modi Cavalry Barracks, Alwal and Bolarum Bazar with an ATVM Hon’ble Prime Minister estimated cost of `4.46 crore. Hitech City 2 CoTVMs `13.5 lakh Installed 4. Proposed for Platform extension works at Bharatnagar CoTVM Cherlapalli, Lallaguda, Ramakistapuram, Safilguda, Ammuguda, Alwal, Bolarum Bazar and Dayanand Malkajgiri CIB/TIB `14.14 lakh Provided Nagar with an extimated cost of `9 crore. Moula Ali Adarsh Station `3.60 crore Developed RAIL DEVELOPMENTAL WORKS 5. Proposed for development of circulating area at Moula Ali Circulating Area `1.80 crore Developed Ammuguda, Cavalry Barracks, Alwal, bolarum Bazar, Bolarum Bazar PF Shelter `3.1 lakh Proposed Malkajgiri Parliamentary Constituency Jurisdiction lallaguda Gate, Safilguda and Ramakistapuram with an extimated cost of `2.38 crore. Dayanand Nagar PF Shelter `3.2 lakh Proposed Hitech City Toilets `0.10 crore In Progress Toilets `0.10 crore In Progress Bharat Nagar 2 Lifts `1 crore In Progress Borabanda 2 Lifts `1 crore In Progress South Central Railway Hitech City 2 Lifts `1 crore In Progress serving the entire state of LallagudaGate 1 Lift `0.5 crore In Progress 9 Stations Wi-Fi `14 lakh Provided , major portion of Andhra Pradesh and Passenger Train Services considerable portion of SOUTH CENTRAL Details of Special Trains/ Provision of Stoppages/ Extension of Trains in Malkajgiri Karnataka, Maharastra Parliamentary Constituency Jurisdiction. states and small parts RAILWAY Provision of Stoppage Extension of Service of Tamilnadu and 1.Tr.No.17417/17418 Tirupati-Sainagar 1. Tr.No.57448 Mahabubnagar– Passenger is Madhya Pradesh. Shirdi-Tirupati Weekly Express extended to Mirzapalli with stoppages at Lallaguda Gate, given stoppage at Malkajgiri Malkajgiri, Dayanandnagar, Safilguda, Ramakistapuram Gate, Ammuguda, Cavalry Barracks, Alwal, Bolarum Bazaar, Malkajgiri Parliamentary 2.Tr.No.18112/18111 Yesvantpur- Constituency falls under Tatanagar-Yesvantpur Weekly Bolarum, , Gowdavalli, Medchal, Express given stoppage at Moula- Dabilpura, Kuchavaram Halt and stations. Telangana State. Entire Ali Running of Special trains Railway Network of 3 . T r . N o . 1 7 2 2 9 / 1 7 2 3 0 1. Bolarum to Gadwal 12 special trains this constituency Thiruvananthapuram Central– 2. Bolarum to Mahabubnagar 1 special train -Thiruvananthapuram 3. Malkajgiri to Basar 24 special trains is being served by CentralSabari Express given 4. Malkajgiri to Nizamabad 10 special trains South Central Railway. stoppage at Charlapalli (Total 47 special Trains) ASSEMBLY SEGMENTS Road Over / Under Bridges With a view to strengthen safety at Level Crossing gates and to avoid untoward incidents and also to provide seamless journey to road traffic, the following Road under/over Medchal Bridges are constructed/proposed for construction under Malkajgiri Parliamentary Malkajgiri constituency.

Qutbullapur Road Over Bridges (ROB) Road Under Bridges (RUB) Kukatpalle 1. Construction of ROB in lieu of LC No.15-T between 1. RUB at Lallaguda Gate Station Yard in lieu of LC Secunderabad and Kazipet with the cost of ` 42.57 No.256 is under progress with Sanctioned Cost of Uppal crore. `29.10 crore 2. Construction of ROB between and 2. Proposed for construction of RUB in lieu of LC Lal Bahadur Nagar Ghatkesar in lieu of LC No.12 with the cost of No.254 at Safilguda with an estimated cost of Secunderabad Cantt. `32.20 crore is in progress. `30.82 crore. Alignment to be finalised by State 3. Construction of ROB between Gundlapochampalli Govt. and Medchal Stations in lieu of Manned LC 3. Proposed for construction of RUB between No.246/A with an estimated cost of ` 38 crore is in Ammuguda and Moula Ali Stations in lieu of LC progress. No.BP-8 with an estimated cost of ` 29.99 crore RAIL DEVELOPMENTAL WORKS and Alignment to be finalised by State Govt. 4. Construction of RUB between Ammuguda and Moula Ali Stations in lieu of LC No.BP-11 witn an Infrastructural Development Capacity enhancement estimated cost of ` 27 crore is in progress. 1. Upgradation of Yard remodeling works are New Railway Lines completed in Malkajgiri and Moula ali with the cost 1. ConstructionMa ofl knewaj glineir underi Pa rMMTSliam - Phaseenta IIr fory Conofst `it 95u lakh.ency Jurisdiction a distance of 84 Kms with an estimated cost of 2. Development of loading facilities for handling `817 crore is under progress containers is completed with a cost of ` 25 lakh at 2. Proposed for Extension of MMTS - Phase II upto Medchal. Yadadri for a distance of 33 Kms with an estimated 3. Development of satellite terminal at Charlapalli cost of ` 412 crore. Green Initiatives station is under progress with the cost of ` 220 crore. Electrification of Railway Lines 1. Towards Environment/conservation measures , Revival of Water bodies is completed in the jurisdiction It is proposed for electrification of Manmad – Dhone 4. Proposed for Conversion of Siding 1 as UP loop of Malkajgiri parliamentary Constituency with a cost of `1.04 lakh. (coaching fit) and Siding 2 as goods loop with for a distance of 868 Kms with an estimated cost of direct reception and dispatch facilities at Moula Ali 2. Towards energy saving LED lighting is provided in all stations. `1031 crore. ` with an estimated cost of 5.73 crore. 3. 617 kWp Solar Panels at Lallaguda Workshop, 120 kWp Solar panels at EMU Car Shed/Moula-Ali and 20 kWp Solar Panels at Diesel Loco Shed/Moula-Ali are installed. Safety – The First Priority Proposed FOBs Station Cost in `crore Safety is the priority on SCR, to Moula Ali 1.53 ensure safety of the Rail users, Foot Lallaguda Gate 1.10 over Bridges (FoBs)/ Road under/over Malkajgiri 1.85 Bridges are constructed / proposed for construction at various stations/ Bolarum 1.10 locations in Malkajgiri Parliamentary Constituency Jurisdiction. Construction of FoB at Moula-Ali with the cost of `1.61 crore is in progress.