Army Civil Works Program Bayou Meto Basin, Ar

Total Page:16

File Type:pdf, Size:1020Kb

Army Civil Works Program Bayou Meto Basin, Ar ARMY CIVIL WORKS PROGRAM FY 2018 WORK PLAN - MISSISSIPPI RIVER AND TRIBUTARIES SUMMARY OF WORK TO BE 2018 ADDITIONAL LINE ITEM OF SUMMARY OF WORK TO BE TOTAL FY 2018 ACCOMPLISHED WITH STATE DIVISION PROGRAM NAME EXPLANATORY WORK PLAN ADDITIONAL ACCOMPLISHED WITH ALLOCATION ADDITIONAL FUNDING STATEMENT AMOUNT FUNDING 1/ CONFERENCE ALLOCATION ALLOCATION Investigations Funds will be used to initiate and MS MVD NORTH DESOTO CO., MS 1,500,000 1,500,000 2 complete the feasibility phase of the study. Perform Water Control Data Collection Platforms; Survey of Permanent Ranges; Sediment Quality Survey; Data collection at stream/tributary Mississippi River Numerical Modeling river gages; Replacement and repair and Data Integration; Mississippi River of stage gages; conduct Multile System Geomorphology and COLLECTION AND STUDY OF Geomorphic and Potamology XX MVD 2,700,000 2,910,000 5,610,000 2 Potamology Analysis; Lower BASIC DATA activities that are essential in the Mississippi River Endangered Species planning, design, construction, and Compliance; Advancing Risk-Based operation and maintenance of Analysis for the MR&T Project; Old authorized projects. River Low Sill Structure Evaluation; and continue Memphis District SGO LIDAR data collection. Construction Perform supervision & administration AR MVD BAYOU METO BASIN, AR 600,000 600,000 3 of Prior Year Awarded Contracts. The planned dike work consists of the Award contract to construct following items: Randolph/Hatchie CHANNEL IMPROVEMENT, DIKES, Mississippi River Dikes at Kentucky AR MVD 14,610,000 5,700,000 20,310,000 3 Towhead, TN; Barfield Bend, AR AR, IL, KY, LA, MS, MO & TN Point, KY; Randolph (Lower), TN; and Phase 1; Ajax Bar, MS and Planning, Warfield Point & Island 84 Dikes Engineering and Design. Revetment Construction: Planning, Engineering and Design; 1,200 LF Peters, AR; 1,400 LF Rescue, MS; CHANNEL IMPROVEMENT, 2,200 LF Hickman-Reelfoot, KY; AR MVD REVETMENT OPERATIONS, AR, IL, 65,501,000 65,501,000 1,000 LF President's Island, TN; 9,700 KY, LA, MS, MO & TN LF Reinforcement; and Planning, Design and Construction of the Mat Sinking Unit. Perform supervision & administration AR MVD GRAND PRAIRIE REGION, AR 600,000 600,000 3 of Prior Year Awarded Contracts. Perform levee seepage/stability repairs at Harvey - Nine Mile Point; award contract for MS River Levee Initiate and complete: Award Item 407- Item 398-R, Phase 1, Yucatan-Lake R, Point Pleasant-Yucatan levee Bruin, LA, Levee Enlarge & Berms; enlargement and berm; Relocation LA continue the preparation of Highway 604; Baton Rouge Front MISSISSIPPI RIVER LEVEES, AR, environmental documentation for AR MVD 25,750,000 14,100,000 39,850,000 2 Phase 4; and, the Planning, IL, KY, LA, MS, MO & TN approximately 250 miles of existing Engineering, Design and the constructed MRL levee segments continued Supervision and whose impacts have not previously Administration of previously awarded been evaluated under NEPA; and contracts. preliminary data collection for engineering & design for upcoming work Award Cultural Resource Contract for Ten Mile Bayou & Ditch 15 Diversion Chnl, AR; Continue Right of Way AR MVD ST FRANCIS BASIN, AR & MO 1,070,000 1,070,000 2 acquisition, 15 Mile Bayou, AR (Miles 21.4-27.5); and Complete Economic Update. Monitoring of Buffalo Cove Water ATCHAFALAYA BASIN, FLOODWAY Management Unit; Real Estate LA MVD 650,000 650,000 SYSTEM, LA Acqisition and Planning, Engineeering and Design Evaluation of floodgate at Charenton, LA to Identify a solution; stabilize berm at HW 2017 - W124-A Levee Bank LA MVD ATCHAFALAYA BASIN, LA 1,500,000 16,000,000 17,500,000 2 Planning, Engineering, and Design (Phase 1) and HW 2017 - W124-A Levee Bank - (Phase 2); perform sheetpile floodwalls stability analysis at HW 2017 - E 77 and E 87 Execute Delta Headwaters Program erosion control structure survey and YAZOO BASIN - DELTA MS MVD 8,950,000 8,950,000 3 design; Execute contracts for BS-16- HEADWATERS PROJECT, MS 01, BS-15-03, RP-16-05, and BC-17- 01. ARMY CIVIL WORKS PROGRAM FY 2018 WORK PLAN - MISSISSIPPI RIVER AND TRIBUTARIES SUMMARY OF WORK TO BE 2018 ADDITIONAL LINE ITEM OF SUMMARY OF WORK TO BE TOTAL FY 2018 ACCOMPLISHED WITH STATE DIVISION PROGRAM NAME EXPLANATORY WORK PLAN ADDITIONAL ACCOMPLISHED WITH ALLOCATION ADDITIONAL FUNDING STATEMENT AMOUNT FUNDING 1/ CONFERENCE ALLOCATION ALLOCATION Perform construction of Item 7D including dredging and bank stabilization, and Lambfish Bridge YAZOO BASIN - UPPER YAZOO Replacement and Removal of Existing MS MVD 8,000,000 8,000,000 2 PROJECTS, MS Approaches; design Chute Bridge Floodwater Management Structure; and perform survey and mapping of item 8B. Perform construction of Big Sunflower YAZOO BASIN, BIG SUNFLOWER SRS phase IV, phase VI, and phase MS MVD 4,200,000 4,200,000 2 RIVER, MS VII work; perform Big Sunflower SRS phase VIII survey/design. YAZOO BASIN, YAZOO MS MVD 6,000,000 6,000,000 2 Purchase Mitigation land BACKWATER AREA, MS Operation and Maintenance CHANNEL IMPROVEMENT, Perform dike maintenance of the AR MVD (DIKES), AR, IL, KY, LA, MS, MO & 2,600,000 2,600,000 Mississippi River TN CHANNEL IMPROVEMENT, Perform annual Maintenance Dredging Perform dredging maintenance of the AR MVD (DREDGING), AR, IL, KY, LA, MS, 14,923,000 2,534,000 17,457,000 1 on the Main Line Mississippi River Mississippi River MO & TN Navigation Channel CHANNEL IMPROVEMENT, Perform bank stabilization AR MVD (REVETMENTS), AR, IL, KY, LA, MS, 41,371,000 41,371,000 maintenance activities associated with MO & TN Mississippi River channel revetment Funding will be used to dredge the HELENA HARBOR, PHILLIPS AR MVD 915,000 915,000 harbor channel and conduct channel COUNTY, AR surveys. Perform inspections of 3 pumping Perform periodic Inspections and INSPECTION OF COMPLETED AR MVD 421,000 171,000 592,000 2 stations, 1 floodwall, 612 miles of Maintenance; update National Levee WORKS, AR levee and associated structures. Database Management Funding will be used to perform LOWER ARKANSAS RIVER, NORTH routine operation and maintenance of Design Big Bayou Meto Drainage AR MVD 235,000 200,000 435,000 2 BANK, AR the project, including levee slide Structure repairs and gravel surfacing. Funding will be used for routine LOWER ARKANSAS RIVER, SOUTH operation and maintenance (O&M), Procure and place Levee Surfacing AR MVD 158,000 200,000 358,000 2 BANK, AR including levee slide repairs and materials on levees gravel surfacing. Procure and place Levee Surfacing materials on levees; perform System 26 (Farrenburg/New Madrid, MO) Conduct levee maintenance including Levee Renovations (Phase II)-10-MRL- MISSISSIPPI RIVER LEVEES, AR, slide repairs, relief wells, water control AR MVD 9,917,000 7,755,000 18,097,000 2 M; repair Splash Pads for Relief Wells; IL, KY, LA, MS, MO & TN data systems; and maintain mitigation perform Mound City North Pump lands Station Gravity Flow Culvert Replacement; and perform Levee Safety and Repairs. MISSISSIPPI RIVER LEVEES, AR, Operate the Jesse Brent Lower AR MVD 425,000 3 IL, KY, LA, MS, MO & TN Mississippi River Museum; Perform Engineering and Design to Funding will be used for routine complete Elk Chute S Levee Setback, operation and maintenance of the MO, St. Francis River Blockage south Huxtable pumping plant and the of HWY 90 / HWY 84 , and St. Francis Drainage District 17 pumping plant, River Blockage south of HWY 412; AR MVD ST FRANCIS BASIN, AR & MO 5,900,000 4,400,000 10,300,000 2 for the supervision and administration design and construct cleanout of Ditch of previously awarded contracts, and 10 and St Francis River Hydraulic to perform routine aerial brush kill, Analysis between MO state line and channel and environmental surveys, AR HWY 18, AR/MO border; and and channel maintenance. Provide gravel surfacing to levee segments prioritized by condition Funding will be used to perform Replace to 2 impeller bell TENSAS BASIN, BOEUF AND routine O&M, including inspections, AR MVD 1,987,000 1,130,000 3,117,000 2 housing/cones; Fully fund utilities for TENSAS RIVERS, AR & LA data collection, analysis, and real Lake Chicot Pumping Plant estate management. Funding will be used for routine Perform additional maintenance AR MVD WHITE RIVER BACKWATER, AR 900,000 100,000 1,000,000 2 operation and maintenance activities. activities-White River Backwater, AR Perform inspections of 3 pumping INSPECTION OF COMPLETED IL MVD 27,000 27,000 stations, 2 floodwalls, 22 miles of WORKS, IL levee and associated structures. ARMY CIVIL WORKS PROGRAM FY 2018 WORK PLAN - MISSISSIPPI RIVER AND TRIBUTARIES SUMMARY OF WORK TO BE 2018 ADDITIONAL LINE ITEM OF SUMMARY OF WORK TO BE TOTAL FY 2018 ACCOMPLISHED WITH STATE DIVISION PROGRAM NAME EXPLANATORY WORK PLAN ADDITIONAL ACCOMPLISHED WITH ALLOCATION ADDITIONAL FUNDING STATEMENT AMOUNT FUNDING 1/ CONFERENCE ALLOCATION ALLOCATION Perform inspections of 1 pumping INSPECTION OF COMPLETED KY MVD 20,000 20,000 station, 1 floodwall, 28 miles of levee WORKS, KY and associated structures. manage, operate, and protect natural ATCHAFALAYA BASIN, FLOODWAY resources on approximately 50,000 LA MVD 1,807,000 1,807,000 SYSTEM, LA acres of fee-owned project lands, including visitor assistance Operate and maintain this flood risk management project feature to maintain the integrity and reliability of the existing structures and facilities. Perform dredging of Three Rivers, Operate and maintain navigation Tidewater Point, Berwick Bay Harbor, LA MVD ATCHAFALAYA BASIN, LA 13,639,000 2,000,000 51,789,000 1 features, conduct inspections; dredge Berwick Lock Forebay to Full Tidewater point, Berwick Bay Harbor, Dimension Berwick Lock and Three Rivers; Perform operations and routine maintenance. Perform Bank Stablization/ Revetments Repairs at Bayou Big Graw, Petite Prairie and Calumet Flood Gate; procurement of Levee Surfacing Materials; repair Morganza Control Structure Expansion Joints LA MVD ATCHAFALAYA BASIN, LA 24,850,000 2 and Gate Seals; process Morganza Control Structure - Paint Contract Claim; perform Bayou Boeuf Lock major gate maintenance and dewatering; repair Timber guidewall and chamber wall at Bayou Sorrel and Bayou Bouef Lock.
Recommended publications
  • Rules and Regulations Federal Register Vol
    61277 Rules and Regulations Federal Register Vol. 80, No. 197 Tuesday, October 13, 2015 This section of the FEDERAL REGISTER ACTION: Final rule. on the first day of the first applicable contains regulatory documents having general pay period beginning on or after SUMMARY: applicability and legal effect, most of which The U.S. Office of Personnel December 14, 2015. are keyed to and codified in the Code of Management (OPM) is issuing a final Federal Regulations, which is published under rule to establish special wage schedules FOR FURTHER INFORMATION CONTACT: 50 titles pursuant to 44 U.S.C. 1510. specific to nonsupervisory, leader, and Madeline Gonzalez, by telephone at supervisory wage employees of the U.S. (202) 606–2858 or by email at pay-leave- The Code of Federal Regulations is sold by Army Corps of Engineers (USACE) who the Superintendent of Documents. Prices of [email protected]. work at flood control dams (also known new books are listed in the first FEDERAL SUPPLEMENTARY INFORMATION: On June 5, REGISTER issue of each week. as reservoir projects) at the Vicksburg District of the Mississippi Valley 2015, OPM issued a proposed rule (80 Division. This final rule assigns lead FR 32042) to establish special wage OFFICE OF PERSONNEL agency responsibility for establishing schedules specific to nonsupervisory, MANAGEMENT and issuing these special wage leader, and supervisory wage employees schedules to the Department of Defense of the U.S. Army Corps of Engineers 5 CFR Part 532 (DOD). The special wage schedules (USACE) who work at flood control established will have rates of pay dams (also known as reservoir projects) RIN 3206–AN17 identical to the Memphis, TN, at the Vicksburg District of the appropriated fund Federal Wage System Prevailing Rate Systems; Special Wage Mississippi Valley Division.
    [Show full text]
  • STATE of TENNESSEE V. MICHAEL DALE RIMMER
    IN THE COURT OF CRIMINAL APPEALS OF TENNESSEE AT JACKSON August 2006 Session STATE OF TENNESSEE v. MICHAEL DALE RIMMER Direct Appeal from the Criminal Court for Shelby County No. 98-01033-34 W. Fred Axley, Judge No. W2004-02240-CCA-R3-DD - Filed December 15, 2006 Capital Appellant Michael Dale Rimmer appeals as of right his sentence of death resulting from the 1997 murder of Ricci Ellsworth. In November 1998, Appellant Rimmer was convicted of theft of property, aggravated robbery and premeditated first degree murder. He was sentenced to death for the murder conviction. On direct appeal, a panel of this Court affirmed Appellant Rimmer’s convictions but, concluding that the sentencing verdict was “enigmatic and uncertain,” vacated the sentence of death and remanded for a new sentencing hearing. See State v. Michael D. Rimmer, No. W1999-00637-CCA-R3-DD, 2001 WL 567960, at *1 (Tenn. Crim. App., at Jackson, May 25, 2001). Accordingly, the case was remanded to the Criminal Court for Shelby County for re-sentencing. At the conclusion of the re-sentencing hearing in January 2004, the jury found the presence of one statutory aggravating circumstance, i.e., that the defendant was previously convicted of one or more felonies whose statutory elements involved the use of violence to the person, T.C.A. § 39-13-204(i)(2) (1997). The jury further determined that the aggravating circumstance outweighed the mitigating circumstances beyond a reasonable doubt and imposed a sentence of death. The trial court approved the sentencing verdict. Appellant Rimmer
    [Show full text]
  • Recreation.Gov Lafayette County Sheriff Dept
    At Enid Lake you will find some of the most modern exceptional fishing opportunities for other species as camping facilities in the region. Our campgrounds well including: bass, bluegill and catfish. Enid’s staff 101 are extremely popular among camping enthusiasts. partners with local volunteers annually to enhance The U.S. Army Corps of Engineers at Enid Lake fish habitat through placement of approximately maintains and operates 5 Class A campgrounds 1,500 cedar tree tops and 2,000 wooden stakes to 97 98 which include: Wallace Creek, Persimmon Hill, construct 500 fish shelters in the lake bed. Located at 75 79 99 Chickasaw Hill, Ford’s Well and Water Valley the Outlet Channel Recreation Area is a large fishing 100 78 96 Road Enid Dam 73 74 94 95 637 Landing. pier with facilities and access specifically designed for 76 77 80 85 43 81 87 use by the physically challenged. 46 82 1 83 89 44 84 86 93 Enid Lake not only provides premier camping 4 45 88 2 90 3 47 opportunities, but offers many other recreational Enid also has 13 boat ramps located around the lake 6 48 92 8 5 59 91 opportunities including hiking, boating, swimming, to provide boating access for a variety of boating 49 57 68 7 58 60 69 71 picnicking, fishing, hunting, boating, horseback needs. The largest and most utilized of these boat 9 50 61 6270 riding and wildlife viewing. Enid Lake has been ramps is McCurdy Point which offers a floating boat 10 51 52 63 72 11 66 64 recognized as one of America’s Top 10 Fishing dock and rubber landing which eases loading and CR38 56 165 55 67 65 Spots, and Enid’s Persimmon Hill Campground has unloading of equipment and to accommodate larger CR39 53 54 Wallace Creek been selected as one of America’s Top 100 Family vessels.
    [Show full text]
  • Where to Go Camping
    Order of the arrow Chicksa Lodge #202 2009 Year of the Turtle Written by Michael Dozier and Malachi Baggett, VCC Camp Yocona Location: Camp Yocona 878 Boy Scout Rd. Randolph, MS 38864 Phone: 662-842-2871 Website: www.campyocona.org Blue Bluff Campground and Recreation Location: 20051 Blue Bluff Road Aberdeen, MS Monroe County Mailing: 20051 Blue Bluff Road Aberdeen, MS 39730 Phone: 662.369.2832 (Toll-Free: 877.444.6777 Website: http://www.reserveusa.com Sites: 92 RV sites (paved), 4 pull-thrus (60'), 88 back-ins (60'), 39 full hookups (89W, 89E), 20/30/50 amps, shaded spots, dump station, handicapped accessible, pet restrictions Facilities: restrooms, showers, laundry, 6 reservable pavillions Recreation: swimming, fishing, boating, wildlife viewing, hiking trails, biking trails, playgrounds, game courts Lake Monroe Campground Location: 20018 Lake Monroe Drive Aberdeen, MS Monroe County Mailing: 20018 Lake Monroe Drive Aberdeen, MS 39370 Phone: 662.256.9637 Website: http://www.mdwfp.com Sites: Tent sites, 20 RV sites (paved, gravel), 1 pull-thru (12'X24'), 19 back-ins (12'x24'), hook ups (20W, 20E), 30 amps, shaded spots Facilities: Restrooms, showers Recreation: Fishing Choctaw Lake Campground Location: Forest Service 967 Ackerman, MS Choctaw County Mailing: P.O. Box 912 Ackerman, MS 39725 Phone: 662.285.3264 Fax: 601.285.3608 Toll-Free: 877.444.6777 Website: http://www.recreation.gov Sites: Tent sites, 20 RV sites (paved, back-ins - 35'), hook-up(s) (20W, 20E), 30 amps, dump station, handicapped accessible. Reservations must be made at least 4 days in advance. During peak season (May 1- Sept.
    [Show full text]
  • Download the Visitors Guide
    VISITORS GUIDE 1 Find Yourself South of the Ordinary. 1 You don’t have to know how to get there. You’ll know it when you see it. Real places. Real food. Real life. Miles of winding roads and windier waterways. Stories without endings. Pages unturned. It’s all there. And it’s always been there, just waiting. There’s nowhere else you really need to be. Not really. So why not… explore? There’s plenty to find, if you let yourself look around. You’ll know it when you see it. 2 HERNANDO Anderson’s Pottery your-own fruit and vegetables, fireworks, hayrides, Handmade stoneware pottery is thrown on a potter’s a corn maize, “Trail of Terror”, pumpkin picking and wheel and glazes are mixed by hand. Each piece is breakfast, brunch or dinner with the Easter Bunny and dishwasher safe, nontoxic, oven proof and can be Santa. Also, choose and cut your own Christmas tree. used in the microwave. Call for appointment. 008 Love Road · 662-429-2540 · www.gocedarhillfarm.com 2701 Scott Road · 662-429-7922 · cell 901-828-0873 www.jimandersonpottery.com DeSoto Arts Council Gallery The DeSoto Arts Council serves as the countywide Baptist Industrial College Marker home for the arts with space for exhibits, classes, Founded in 1900 by the North Mississippi Baptist meetings and special events with local artisans’ work. Educational Convention, the college was the first school Be sure and visit the gift shop. Check the website in DeSoto County to offer instruction through grade for a schedule of events and workshops.
    [Show full text]
  • Saul Brown Photograph Collection
    Saul Brown Photograph Collection Memphis Public Library and Information Center Memphis and Shelby County Room Collection processed by Emily Baker with special thanks to Wayne Dowdy and Gina Cordell 2010 1 Saul Brown Biography 3 Scope and Provenance 3 Contents Summary 4 Detailed Finding Aid 6 Name Index 109 2 Saul Brown Biography Saul Brown was born in 1910 in New York to Russian immigrants. As a young adult, Brown attended Tech High School in Memphis and graduated from the Memphis Academy of Fine Arts with a degree in Fine Art. Brown served in the Air Force during World War II. After graduation, he found work with Loew’s Theaters, where he created publicity displays. Brown worked as a staff photographer for the Memphis Press-Scimitar for twenty years, retiring in April of 1980 as the newspaper’s chief photographer. After retirement, Brown continued taking publicity photographs for various Memphis theaters as well as images of public figures, personal friends, and Memphis and its residents. He received the Freedom Foundation Award in 1972. In 1986, Brown donated $5,000 to Memphis State University to establish the Saul Brown/Memphis Press Scimitar Award, awarded to students in news journalism and news photography beginning in the 1987-1988 academic year. In 1987, due to his financial support of the school’s academic fund, Brown was granted membership in the school’s Presidents Club. Saul Brown passed away in Memphis on March 13, 1992 at the home of Myron Taylor, the brother of Mildred, his late wife. Scope and Provenance The Saul Brown Photograph Collection was donated to the Memphis Public Library and Information Center in 2007.
    [Show full text]
  • MR&T FY12 OMB Committee (7 Feb 12)Rev.Xlsx
    ARMY CORPS OF ENGINEERS ‐‐ CIVIL WORKS Allocations of Additional Funding for Ongoing Work MISSISSIPPI RIVER AND TRIBUTARIES Fiscal Year 2012 Line Item of President's Statement of Additional Total Statement Additional Budget Managers Work Plan of Managers + Funding Project or Program Amount Amount Amount Additional (see Key) INVESTIGATIONS BIG SUNFLOWER RIVER WATERSHED (QUIVER RIVER), MS 0 0 100,000 100,000 T MEMPHIS METRO AREA, STORM WATER MGMT STUDY, TN 100,000 98,000 2,000 100,000 U CONSTRUCTION CHANNEL IMPROVEMENT, AR, IL, KY, LA, MS, MO & TN 45,570,000 44,694,000 4,219,000 48,913,000 T GRAND PRAIRIE REGION, AR 0 0 592,000 592,000 U MISSISSIPPI RIVER LEVEES, AR, IL, KY, LA, MS, MO & TN 24,180,000 23,715,000 4,012,000 27,727,000 T ST FRANCIS BASIN, AR & MO 0 0 300,000 300,000 T ATCHAFALAYA BASIN, FLOODWAY SYSTEM, LA 1,900,000 1,863,000 7,037,000 8,900,000 U ATCHAFALAYA BASIN, LA 6,300,000 6,179,000 292,000 6,471,000 T YAZOO BASIN, BACKWATER PUMPING PLANT 0 0 235,000 235,000 T YAZOO BASIN, BIG SUNFLOWER RIVER, MS 0 0 250,000 250,000 T YAZOO BASIN, DELTA HEADWATERS 0 0 5,774,000 5,774,000 U YAZOO BASIN, MAIN STEM, MS 0 0 25,000 25,000 T YAZOO BASIN, UPPER YAZOO PROJECTS, MS 0 0 110,000 110,000 T YAZOO BASIN, YAZOO BACKWATER AREA, MS 0 0 50,000 50,000 T WEST TENNESSEE TRIBUTARIES, TN 0 0 200,000 200,000 T OPERATION AND MAINTENANCE CHANNEL IMPROVEMENT, AR, IL, KY, LA, MS, MO & TN 61,230,000 60,053,000 4,000,000 64,053,000 S HELENA HARBOR, PHILLIPS COUNTY, AR 122, 000 120, 000 0 120, 000 INSPECTION OF COMPLETED WORKS, AR 189,000 185,000
    [Show full text]
  • Memphis South RV Park and Campground
    Memphis South RV Park And Campground 256 Campground Drive Normal Rate: $48.00 * Cold Water, MS 38618 PA Rate: $24.00 * Local Phone: (662) 622-0056 Website: memphissouthrvpark.com/ Email: [email protected] GPS: 34.695100, -89.969000 Highlights Country style with grass and gravel, distance between RVs. 82 full hookup/pull thru sites. 30/50 amp, clean restrooms, hot showers, laundry facility, swimming pool (during summer months), covered pavilion with BBQ grills, free high speed WiFi, picnic tables, storage facility, ice, small playground (for children under 10), and pet walk. Nearby Attractions: close to Tanger Mall on I-55, Graceland, Beale Street, Memphis Zoo, Memphis Landmarks - Pyramid, botanical gardens, Tunica River Park - River boat attraction on the Mississippi River, Batesville outlet Mall, Arkabutla Lake, Sardis Lake, DeSoto Convention Center, DeSoto Museum, and Coldwater Trade days = June-August-October. We are located 25 minutes from Memphis, TN; Batesville, MS; and Tunica Casinos. 45 Minutes from Oxford, MS. Located 5 miles North of Senatobia, MS: Home to the main campus of Northwest Mississippi Community College. Important Campground Notes * Open year-round. Two nights minimum stay required (PA is valid on both nights). PA is valid for 7 nights max. PA discount is not valid during holidays, special events, and major holidays. No tent camping. Cash payments only. No smoking. Pets welcome. *PA rate including tax is $25 per night. Rates are based on two people, $5.00 additional charge per night per each extra person. Directions GPS: 34.6951N, -89.969W From Memphis, TN: South on I-55, take Coldwater Exit 271.
    [Show full text]
  • Freshwater Common to Mississippi
    mississippi department of wildlife, fisheries, and parks FRESHWATER FISHES COMMON TO MISSISSIPPI a fish identification guide MDWFP • 1505 EASTOVER DRIVE • JACKSON, MS 39211 • WWW.MDWFP.COM Table of Contents Contents Page Number • White Crappie . 4 • Black Crappie. 5 • Magnolia Crappie . 6 • Largemouth Bass. 7 • Spotted Bass . 8 • Smallmouth Bass. 9 • Redear. 10 • Bluegill . 11 • Warmouth . 12 • Green sunfish. 13 • Longear sunfish . 14 • White Bass . 15 • Striped Bass. 16 • Hybrid Striped Bass . 17 • Yellow Bass. 18 • Walleye . 19 • Pickerel . 20 • Channel Catfish . 21 • Blue Catfish. 22 • Flathead Catfish . 23 • Black Bullhead. 24 • Yellow Bullhead . 25 • Shortnose Gar . 26 • Spotted Gar. 27 • Longnose Gar . 28 • Alligator Gar. 29 • Paddlefish. 30 • Bowfin. 31 • Freshwater Drum . 32 • Common Carp. 33 • Bigmouth Buffalo . 34 • Smallmouth Buffalo. 35 • Gizzard Shad. 36 • Threadfin Shad. 37 • Shovelnose Sturgeon. 38 • American Eel. 39 • Grass Carp . 40 • Bighead Carp. 41 • Silver Carp . 42 White Crappie (Pomoxis annularis) Other Names including reservoirs, oxbow lakes, and rivers. Like other White perch, Sac-a-lait, Slab, and Papermouth. members of the sunfish family, white crappie are nest builders. They produce many eggs, which can cause Description overpopulation, slow growth, and small sizes in small White crappie are deep-bodied and silvery in color, lakes and ponds. White crappie spawn from March ranging from silvery-white on the belly to a silvery-green through May when water temperatures are between or dark green on the back with possible blue reflections. 58ºF and 65ºF. White crappie can tolerate muddier There are several dark vertical bars on the sides. Males water than black crappie. develop dark coloration on the throat and head during the spring spawning season, which can cause them to be State Record mistaken for black crappie.
    [Show full text]
  • H Water Resources in Development Mississippi 1993
    H WATER RESOURCES US Army Corps IN DEVELOPMENT Vicksburg District MISSISSIPPI 1993 Arkabutla Lake, the northern-most Corps flood control lake in Mississippi, celebrated its 50th anniversary in 1993. The lake, known for sailing and crappie, is 30 minutes from Memphis, Tennes­ see. (Photo by Brad Emerson) This publication is authorized by the Secretary of the Army as required by Public Law 99-662 7^7 775 , h ^ WATER RESOURCES DEVELOPMENT BY THE U.S. ARMY CORPS OF ENGINEERS IN MISSISSIPPI U.S. ARMY CORPS OF ENGINEERS LOWER MISSISSIPPI VALLEY DIVISION VICKSBURG, MISSISSIPPI May 1993 Mississippi Water Resources Basins This publication is compiled and edited by the U.S. Army Corps of Engineers’ Vicksburg District. For additional copies Water Resources Development in Mississippi 1993 Contents FOREWORD................................................. 4-5 PASCAGOULA RIVER BASIN.................41 INTRODUCTION..........................................7 Introduction....................................... 42 Civil Works Overview........................7 Projects...............................................42 Mississippi River Commission........12 Studies................................................ 46 Flood Plain Management................. 48 MISSISSIPPI RIVER....................................13 PEARL RIVER BASIN............................... 49 Introduction.........................................15 Projects................................................ 15 Introduction....................................... 51 Studies................................................
    [Show full text]
  • Crappie Masters Championship: Rockin’ at Grenada Lake....4 by Tim Huffman the Classic, Is the Super Bowl of Fishing
    November 2019 - Issue #105 Using Kayaks to Seek Out Slabs How the Pros Won on Lake Grenada Destination:1 Crappie NOW November Northeast 2019 Mississippi November 2019 Features Crappie Masters Championship: Rockin’ at Grenada Lake....4 by Tim Huffman The Classic, is the Super Bowl of fishing. Read about the exciting Grenada Lake event and how the winners caught fish. Destination: Northwest Mississippi.....12 by Richard Simms With some of the most productive crappie waters in the United States, Northwest Mississippi is a “must visit” area for crappie anglers. A Fish Tale, by Gil ‘Roadkill’ Lackey....16 Gil Lackey always sees everything from a different, sometimes odd perspective. Growing up in an orphanage is a tough start, but the author’s addiction to all things fishy helped him gain confidence and eliminated his childhood fears. CrappieNow Senior Writer Wins Lifetime Achievement Award....18 Tim Huffman was recognized for his amazing contributions to the sport by Crappie Masters Rig That “Yak” for Crappie....22 by Ed Mashburn Kayaks rigged for crappie fishing are very effective boats for finding and catching big crappie. Departments Vern’s Cooking & Tidbits....34 Crappie Clubs....42 Tournament Results....36 Crappie Calendar....43 2 Crappie NOW November 2019 Opening Cast - Riding the Confidence Wave EDITOR Happy November everyone. I November 2019 Richard Simms can’t believe it is already Fall. It sure hasn’t felt like it in the south. SENIOR WRITER Tim Huffman I am confident that this heat will relinquish soon. WRITERS Speaking of confidence, Tim Whiteley Vic Attardo having confidence in all we do Darl Black can improve any outcomes, John Felsher Brent Frazee especially fishing.
    [Show full text]
  • U N S U U S E U R a C S
    Ava Puxico WAYNE SCOTT SHANNON Ellsinore CHRISTIAN DOUGLAS CARTER Sikeston Bloomfield Wappapello Training 108th Congress of the United States Site Wappapello Grandin STODDARD Morehouse Essex Dexter Penermon Dudley Fisk Baker Taneyville Matthews West Plains Current River Poplar Bluff Canalou BUTLER Bernie Alton TANEY OZARK Brandsville Doniphan North Catron Lilbourn Qulin Gainesville Parma Malden Lilbourn Theodosia Sundown HOWELL OREGON Neelyville Risco Bakersfield Thayer RIPLEY Tallapoosa Marston Campbell NEW Republic CoRd State MISSOURI State Rd 358 Line Rd Line Rd Clay County Road 320 MADRID Diamond City ARKANSAS 1 Mammoth Spring 0 1 Gideon y Success 67 w Clarkton Bull Shoals Lake S McDougal H 139 StHwy t t St. Francis S H w y t) S S Corning 62 Portageville y S t t Maynard H H w 3 w tH i n y 93 9 S 5 5 Ma w Pollard Holcomb 5 ( Lead Hill y 2 y 9 Main St 1 S 1 wy 67 tH w H y 2 8 w w St tH 63 H 5 2 y t Trl 1 62 South Lead Hill Norfork Lake sho e 412 S 9 1 y 1 5 8 4 S e 2 78 rs 1 1 o S 1 w 4 y H 1 Hayward w t StHwy 2 3 1 H Bull H H y t 7 t y 62 Viola y S w wy 1 w S y H w S Datto H Piggott North Wardell H w Shoals t H U FULTON t t S Lakeview Salem CLAY S 7 S 5 Reyno Wardell ( S Mountain Home RANDOLPH T S StH Greenway t h t H w H o Knobel y w 9 w Biggers BOONE 90 m 0 Homestown y y LAKE Cherokee Village StHw a y 1 s 139 StHwy 7 Hardy 9 v Bergman 8 Cotter Ravenden Springs i 0 Nimmons S l 62 tH l e 135 StHwy w BAXTER S 67 1 y US t wy StHwy 90 2 S H ) 5 Flippin wy 6 H t 2 H Pascola USHwy 62 Peach Orchard Rector Bragg Zinc w Gassville 412 Summit
    [Show full text]