R& Family Welfare Department
Total Page:16
File Type:pdf, Size:1020Kb
Government of West Bengal 'r & Family Welfare Department • National Health Mission · II'tt• • GN-29, 4th Floor, ~wasthya Sathi Building, Swasthya Bhawan Premises, II ..•• • Sector - V, Salt-Lake, Bidhannagar, Kolkata - 700091 (Phone) 033-2333 0238; (Fax) 033-2357 7930 Email: ponhmwbl@gmail.~om/po [email protected]; Web:www.wbhealth.gov.in No. HFW/NHM-275/2021/ 2..1.11 't Dated. l'1 . 09· 2;02-1 ORDER Administrative Approval and Financial Sanction is hereby accorded for "Construction of 29 (Twenty Nine) new Su-Sasthya Kendras " at an estimated amount of Rs. 8,80,06,619.00/- (Rupees Eight Crore Eighty lakh Six Thousand Six Hundred & Nineteen Only) , against unit cost of Rs. 30,34,711.00 per Su-Sasthya Kendra. Details are as follows:- Name of the Sub- Sanctioned SI. No. District Name of the Block Centre Amount (in Rs) I 1 Hooghly Chinsurah Mogra Debanandapur ~ 30,34,711.00 2 Hooghly Haripal Malia ~ 30,34,711.00 3 Hooghly Haripal Baganbati ~ 30,34,711.00 4 Hooghly Tarakeswar Astara ~ 30,34,711.00 5 Hooghly Tarakeswar Joynagar ~ 30,34,711.00 6 Hooghly Khanakul-II Harishchak (West) ~ 30,34,711.00 7 Hooghly Khanakul-II Balpai ~ 30,34,711.00 8 Hooghly Pursurah Dhapdhara ~ 30,34,711.00 9 Hooghly Polba-Dadpur Anti ~ 30,34,711.00 10 Hooghly Chinsurah Mogra Talandu ~ 30,34,711.00 11 Hooghly Dhaniakhall Julkul ~ 30,34,711.00 12 Hooghly Chinsurah-Mogra Bispara ~ 30,34,711.00 13 Hooghly I Chinsurah-Mogra Saptagram ~ 30,34,711.00 14 Hooghly Chinsurah-Mogra Rabindranagar ~ 30,34,711.00 15 Hooghly Chinsurah-Mogra Narayanpur ~ 30,34,711.00 16 Hooghly Dhaniakhall Habibpur ~ 30,34,711.00 17 Hooghly Dhaniakhall Joyharipur ~ 30,34,711.00 18 Hooghly 1 Chinsurah-Mogra Basanta Bagan ~ 30,34,711.00 19 Hooghly Chinsurah-Mogra Bhagabatidanga ~ 30,34,711.00 20 Hooghly Chinsurah-Mogra Manaspur ~ 30,34,711.00 21 Hooghly Chinsurah-Mogra Kanagarh ~ 30,34,711.00 22 Hooghly Singur Beraberi ~ 30,34,711.00 23 Hooghly I Sera m pore-Uttarpa ra Milki ~ 30,34,711.00 24 Hooghly I Sera m pore-Uttarpara Satghara ~ 30,34,711.00 25 Hooghly Sera m pore-Uttarpara Bangihati ~ 30,34,711.00 26 Hooghly i Sera mpore-Utta rpara Gumodanga ~ 30,34,711.00 27 Hooghly I Sera mpore-Utta rpara Nabagram ~ 30,34,711.00 28 Hooghly I Sera mpore-Utta rpa ra Barujibi ~ 30,34,711.00 29 Hooghly I Serampore-Uttarpa ra Basai ~ 30,34,711.00 TOTAL ~ 8,80,06,619.00 2. The Scope of Works includes the following: a. Block-wise Detailed Project Report(DPR) including soil exploration report of Su-Sasthya Kendras following the model drawing(s) (as attached in Annexure 'A' and Annexure 'B'), by engaging Design Consultant, by inviting NleT. b. Detailed Estimate of Sinking of tube-well with provision of pump for each centre. c. Implementation of the works mentioned in (a) & (b). 3. The cost of WBSEDCL establishment charges for electrical connections has also been included in the AAFS amount for each centre. 4. The documents of 51. No.2 (a) & (b) is required to be submitted at Engineering Cell, SPMU, National Health Mission and also vetted by competent vetting authority before inviting tender for implementation of works. 5. The works at 51. No. (2) - (a) & (b) are required to be completed within 15 days from the date of issuance of this AAFS. 6. The implementing agency shall complete the tendering process of the execution of the works within 45 days from the date of issuance of AAFS, but the L.O.A/Work Order may only be issued after confirmation of the fund source from Sate Engineering Wing. 7. No price escalation will be allowed. No deviation will be allowed other than the sanctioned scheme. 8. The work will be executed by the Engineering Wing of District Health & Family Welfare Samity, Hooghly / any other executing agency as deemed fit by the District Administration in conformity with the norms prescribed in Finance Department G.O. No. 5400-F(Y) Dated. 25/06/2012 read with G.O No. 3060-F(Y) Dated. 11/07/2014. 9. Fund will be released after submission of requisition of fund along with the copy of Work Order (WO) for each facility in favour of District Health & Family Welfare Samity, Hooghly for payment to the implementing agency. 10. State Team may visit the sites periodically to review the quality and quantity of works. 11. The tally head and FMR code of these works shall be informed in due course. 12. Any change in the nomenclature of the notified Sub-Centre, if required, should be immediately informed to State Project Management Unit (SPMU) for issuance of necessary amendments. 13. Detailed photography of the site before commencement of work, during intermediate stages of the work in progress and after completion of the work is required to be kept in record at Engineering Cell of DPMU which may be asked to submit at SPMU, as and when required for future verification. 14. This order is issued with the approval of the Mission Director, National Health Mission. 15. All concerned are being informed. Progra~ficer,s: NHM & Dy. Secretary to the Government of West Bengal. No. HFW/NHM-275/2021/2~"1{IJ6) Dated. Iq· 0 g'l~1-1 Copy forwarded for information and necessary action to the:- 1. Director of Health Services, West Bengal. 2. District Magistrate, Hooghly. 3. Chief Medical Officer of Health & Secretary, District Health & Family Welfare Samity, Hooghly. 4. Engineer-in Charge, National Health Mission. 5. Sr. Accounts Officer, National Health Mission. 6. District Nodal Officer, Infrastructure, Hooghly. 7. State Consultant (CPHC, Infrastructure & Logistics), SPMU, National Health Mission. 8. Assistant Engineer -1 & 2 (Civil), SPMU, National Health Mission. 9. District Programme Manager, DPMU, Hooghly. 10. Assistant Engineer, DPMU, Hoog 11. District Accounts Manager, DPM ,Hooghly. 12. Sub-Assistant Engineer, SPMU, Nlational Health Mission. 13. Sr. P.S to Mission Director, National Health Mission & Secretary, Department of Health & Family Welfare, Government of West Bengal. 14. IT Cell for upload this order on the website of Health & Family Welfare Department. 15. Copy for the Guard File. 16. Office Copy. i. Program~cer, NHM & Dy. Secretary to the Government of West Bengal. :\10DEL AI{ IIITECT RAL PL.,\" OF IIEAI~A~O WELL. :SS CEynn: (FOR ALL DISTRICT) ,---,I 1600 l.·P -,3~W~[rl~2~ I EXA~I ROO,\I (2958 '2000) CliO ROOM (3552X3375) 02 '------' 02 ========:1 D1 1250 WIDE r'ASSAGE HI 02 ~.-- --,J 01 Dl Dl A~'1 ROO:\l LAB C M STORE \\'AITL'G AI{EA (3552X3125) ROOi') (3175X296S) (4090X3125) I -LlL-.- _ I t 1------4L15~- \ I' 1 ~ WIDI: I S[~GLE STOREY DOOR & \VI:\DO\,yS SCHF:DLLJ' BUrLDI:~G - --- tructurc .- Sl.. ~O ;\),uU": J)ESCRII'rJO\ Sr?!}~ ~e~ WOOD\-:\ PA~EL I I J) 1200X21 J)()O'~ no w 00 J)E\ 2 DI l'i\~FLI'\I.l' ;\11' I U" 1onuxz: 00 U()OJ{ \OTJ.;: ---,-q, i) ALL ()L\1E~SIO,\'S ARJ.: I~ 1\1\<1 ~ D1 I P\,(' nOOR 750XlI 011 ii) II 1-:1c: liT OF SLAB TOP FnO;\1 1'.1. ,UU \ I iii) SII.L LEV~.L 01, WI "DO\\ (J,lJ \1. .j w \1.1'\11\11'\1 \\ I'OOW J 200XI2 00 - Dcpui of fuundariuu will be a P{'" design to he 5 \\1 AI.l'\-II\'IL\1 \\ [\))0\\ l)OOXI!lt 10 considered. -- ,--- r.\~1.I(;1I r 6 FI -I 6tWX.j:; (I ,\IX'"'''! 'I l .--- -'------ - - _ J PAS A E 1400 "VIDE D 'OTE: i) ALL DIMENSIONS AI~E.IN ;\1;\1 ii) HE IGHT OF SLA n TOP FRO,\l P.L 3.1 n i\ 1 .-' -"9·' iii) ILL LE EL OF \v1~DOW o.c I\J. DEPTH OF FOUNDATION SHALL BE. CO, WERED AS PEn DESIGN AND ITE CmWJTION. DOOR§ & vVINOO\VS SCHEDULE ,L:,\O ;\1,\IU~ DE HIPTIO. SI1,E WOOOE PA'iEL 1 D 1200~21 no nOOR I I " 00 0E.:" : 01 I 1'.\0' ELl,\ LL.\II~I \1 100()\2Iflf) I POO It I J n; 1'\' • DOOR 750X21f1n -1 xv '\UI,\lI'1Il'\I W101>0\ 1200:\1200 5 \\ I ALlI'"'1IL \1 \\ I:"DO\ tzoox I SOO I F \, '1,1(; liT t (i f 1.-2 600\400 ALU'Ilh IU'" -- I -.. - ---- -.---- r LAB ( l600X2400) OJ D2 WI'Il] ~ REA (1475X2400) PA AGE 1400 'VIDE HO ROdi\'l MAI.N '1EUltAL (-125()X24 00) "TORE 3750X2.WO) t ru ctu r e i ALL nJ\\lEN IO:-{, RE.l.'.; \1;\1 ii) HEIGHT OF LAO TOI' FROi\II'.L.3.IO i\l iii) 'IL I.EVEL OF WINDOW n.t) ;\1. DEPTH OF FO NOA TIO, sn LL nt 0, lOEHED A PER OESIG ;\ 'f). In: I CO~OITI()N. Do4RS & \VINDOWS SCHEDULE ----- -----I "ru, .- WOOLlEN I'A:'I'rL !) noon 1200'(2100 I \\'OODF:'\' r \;\ 1"1 I Ll 'l1i1- II i\l 1000'(21 WI I POOH J rn I've DOOR 750:,(210() ,\ Ll i\JI IU">I \ 1:--DO v 120n:-; 1200 ,I,< }VI 12nO:\IS[Jn lcalh b. ~---+-~--r--------------~--------~~-lGOcr ~ F,\;-;LIGIIT 6 I 1.-. (inn '\':O() ,\LlI;\lI~ill 1\1 '- - - 0- ROUGH COSTESTI~ATE (TYPE 2- Including Wall Putty(Walls),Vitrified Tiles(Floor)} ( For all Districts other than Hill Areas of Darjeeling) Structural Cost Tvpe of Structure I (Rs) Masonry Structure I 2,985.00 Type I Breadth ( in m) Building Dimensions 7.75 IPh., I Area(A) 66.841 ' Depth of Foundation = 1.3 m Ground LE'velto Plinth level ~ 0.6 m Number of Floors = 2 'Ioor to floor height - 3.1 m Roof Treatment = 0.1 m I-lelght of Structure = 7.55 m Area of staircase = 10.14 m' Heght of Staircase = 2.5 m '10111111(' of Structure (in m' \ I 530.020 m' Rough Cost (Civil) ~ 1,582,110.63 Extra Addillon for Acrylic P21nt~ \1 ally Puttv-vitrifled Tiles ~ 227,419.00 Total ROUChC05 (Civil) ~ 1,809,529.63 Sanitary & Plumbing ~Vorks @ 15% -: 237,316.59 ( .Including soak Pit, inspection pit) Electrical Works t!!> 20% ~ 237,316.59 WBSEDCL establishrr ent charge lI! 100,00').00 I Cost for Soil Exploration & DP~ (1.5% of Total cost) -: 27,142.94 Additional cost for water Augmentation (15%) lI! 271,429.44 GST 0 12~ lI! 321,928.23 r Total after G~T lI! 3,004,663.44 J labour Cess ~% lI! 30,046.63 Total Rough Es~imate : ~ 3,034,710.07 ROUGH COST ESTIMATE ( TYPE 2- Including Wall Putty(WallstVitrified Tiles(Floor)) ( For Hill Areas of Darjeeling) Structural Cost