Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, , (((Form(FormForm----1111))))

APPENDIX I (See paparrrragragragragraaaaphphphph----6666)))) FORM 1 III.I... Basic InfoInformrmrmrmationation

S. Item Details No. 1. Name of the project Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur (Raj.). 2. S. No. in the Schedule Building and Construction Project, Category ‘B2’ [(As per 14.09.2006 Notification, Project or Activity-8 (a)] 3. Proposed Particular Old EC approval Revised EC Total plot capacity/area/length/tonnage to be 23304.60 sq. m. 23304.60 sq. m. area handled/command area/lease 40293.52 sq. m. 40630.44 sq. m. area/number of wells to be drilled FAR (1.72 %) (1.74 %) Total Built --- 75698.88 sq. m. 85099.28 sq. m. up area Ground 8113.83 (34.81 % 8147.46 (34.96 % Coverage of Total Plot area) of Total Plot area) Green area 4670 (20 % of 3520 (15.10 % of developme Total Plot area) Total Plot area) ntntnt

4. New/Expansion/Modernization Expansion ProjectProject:::: The revised Environmental clearance is being applied by adding of 2 vertical top floors in Existing Project “Mall cum Multiplex. 5. Existing Capacity/Area etc. Particular Existing Details Total plot area 23304.60 sq. m. FAR 40293.52 sq. m. (1.72 %) Total Built ---up area 75698.88 sq. m. 8113.83 sq. m. (34.81 % of Ground Coverage Total Plot area) Green area 4670 sq. m. (20 % of Total Plot development area)

6. Category of Project i.e.' A'or'B' Category ‘B’ 7. Does it attract the general condition? If No yes, Please specify. 8. Does it attract the specific condition? If No 'yes, please specify. 9. Location: Vijayraje Nagar Scheme, Pali Road, NH-65, Jodhpur (Rajasthan). Plot/Survey/Khasra. No. Land is allotted as “Mall cum Multiplex”

M/s. Sepset Real Estate Ltd. 1 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

Village Vijayraje Nagar Tehsil Jodhpur District Rajasthan 10. Nearest Railway Station/ Airport along : 2.5 km in the N direction with distance in kms. Basni Railway StationStation: ~ 3.0 km in W direction Bagat Ki Kothi Railway Station : ~ 4.5 km in NW direction Jodhpur Junction railway stationstation: ~ 7.0 km in NNW direction 11. Nearest Town, city, District Jodhpur City: 4.0 km in NNW direction. Headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Jodhpur Municipal Corporation Municipal Corporation, Local body Polytechnic College Campus, (complete postal addresses with Residency Road, telephone nos. to be given) Jodhpur – 342001. Phone: 0291-2651491, 0291-2651498 Fax: 0291-2651464 13. Name of the applicant M/s. Sepset Real Estate Ltd. 14. Registered address E-29, First Floor, Connaught Place, New Delhi - 110 001 15. Address for correspondence (1) : Name Mr. Parth Sharma Designation (Owner/ Partner/CEO) Manager Authorization letter annexed as Annexure -.1 Address Indiabulls House 448-451, Udhyog Vihar, Phase V, Gurgaon (HR) Pin Code 122016 E-mail [email protected] TelephonNo. Mobile No. 09212023931 Fax No. - Address for correspondence (2): Environment Consultant Dr. R.L. Meena (A.V.P & EIA Coordinator) J.M. EnviroNet (P) Ltd. 1st & 2 nd Floor, S.C.O. 16, M/s. Sepset Real Estate Ltd. 2 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

Sector 10 – A, Gurgaon (Haryana) Tel. 0124 – 3206559 Mobile No. 09971699906 Email: [email protected] Disclosure of the consultant has been enclosed as Annexure -2---222 16. Details of Alternative Sites examined, if Not Applicable, as it is a construction project, which is any. always on a pre-determined site for which the license / Location of these sites should be CLU issued by the development authority / shown on a topo sheet. department. Keeping in view the above narrated facts, no alternative site can be given here. 17. Interlinked Projects Not Any 18. Whether separate application of Not Applicable interlinked project has been submitted 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable as this is a Construction Project. 21. Whether the proposal involves Not Applicable approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980 ? (b) The Wildlife (Protection) Act, 1972 ? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government Not Applicable Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not involved 24. Whether there is any litigation pending No litigation is pending against the project and/or land against the project and/or land in in which the project is proposed to be set up. which the project is proposed to be set up? (a)Name of the Court (b)Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project II.II.II. ActActi iiivvvviiiittttyyyy 1.1.1. Construction, operation ororor decodecom mmmmmissioningissioning ofofof thethethe Project inininv in vvvoooollllvvvvinginginging actions, wwwh whhhiiiichchchch wwwill willillill M/s. Sepset Real Estate Ltd. 3 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

cause pphhhhyyyysicalsical changes in the lllocalilocaliocalittttyyyy (topograp(topographhhhyyyy,,,, land use, changchangeeeess ins in wwwawaaaterter bboooodies,dies, etc.)

S. Information / Checklist Yes/ Details thetherererereofof (((w (wwwiiiitttthh appapprrrroximateoximate qquauauauantities/ntities/ rraaaatetetetessss,, NoNoNo confirmconfirmaaaationtion NoNoNo wwwhewhehehererererevvvverer possible) wwwiwiiithththth source ooofof information ddaaaatatatata

1.1 Permanent or temporary No The Proposed project is a Vertical Expansion of Existing change in land use, land cover Project “Mall cum Multiplex” at Vijay Raje Nagar or topography including Scheme, Pali Road, NH-65, Jodhpur, Rajasthan. In increase in intensity of landuse earlier total built-up area of the project was 75698.88 (with respect to local landuse sq.m. After expansion the proposal will have total built plan) up area of 85099.28 sq. m. (Land ownership documents are enclosed as Annexure-Annexure -1--1).11).).). There will be green-area development on 3520 sq.m. (15.10 % of Total Plot area) to provide beautiful and natural environment to the site.

1.2 Clearance of existing land, No The proposed Project is a vertical expansion of existing vegetation and buildings? project of “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan. Total plot area of the project is 23,304.60 sq.m & it will remain same after the Expansion of the Project. The proposed expansion will be only by adding two vertical top floors on existing building, thus there will be no need of any clearing of vegetation and buildings. Site photographs showing the present condition of the site have been enclosed as Annexure -4---444

1.3 Creation of new land uses? No The Proposed project is a Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan. Hence there will not be creation of new land use.

1.4 Pre-construction investigations Yes Soil investigation was carried out and the results were e.g. bore houses, soil testing? found satisfactory.

1.5 Construction works? Yes This is a building construction project. The construction activities will be confined within the project site; there is being/ will be no physical changes due to project development activities outside the project boundary.

1.6 Demolition works? No No demolition is required.

1.7 Temporary sites used for No The construction activities is being/will be confined construction works or housing within the project site only. Construction workers is

M/s. Sepset Real Estate Ltd. 4 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

of co nstruction work ers? being/ will be hired from nearby area, so no temporary labour hutments are proposed to be constructed.

1.8 Above ground buildings, No The Proposed project is a Vertical Expansion of Existing structures or earthworks Project “Mall cum Multiplex” hence no need of cut and including linear structures, cut fill or excavations. and fill or excavations

1.9 Underground works including No The Proposed project is a Vertical Expansion of Existing mining or tunneling? Project “Mall cum Multiplex” there is not any underground works including mining or tunneling.

1.10 Reclamation works? No No reclamation work required.

1.11 Dredging? No No dredging required.

1.12 Offshore structures? No No offshore structures required.

1.13 Production and manufacturing No Since, it is a construction of Commercial Project, hence, processes? no production / manufacturing process is involved.

1.14 Facilities for storage of goods Yes Separate raw material storage yard is being/will be or materials? made during construction phase: • Cement will be separately stored under cover in bales. • Sand will be stacked neatly under tarpaulin cover. • Bricks and steel will be laid in open • The raw material handling yard will be located within the project site and separated by enclosures.

1.15 Facilities for treatment or Yes Solid Waste disposal of solid waste or Solid wastes which are likely to be generated in project liquid effluents? will be domestic in nature. Domestic wasteswastes:::: Approximately, 2715 kg/day of domestic wastes will be generated from the project activity; these will be collected from designated locations and segregated into inorganic and organic wastes. The inorganic non- biodegradable wastes will be sold to vendors for recycling and the organic biodegradable wastes (waste vegetables, foods etc.) will be composed for conversion into manure. Commercial waste (E(E----wasteswastes ):::: E-waste will start being

M/s. Sepset Real Estate Ltd. 5 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

generated after a latency period of 4 -5 years. Since most of these components are recyclable in nature, efforts will be made to recycle it to the maximum extent, hence actual waste generated as E-waste should be minimal. It is estimated that from the proposed project about 0.25- 0.50 MT/yr E-waste will be generated. The generated e- waste will be handed over to authorized vendor for recycling and safe disposal. Liquid EffluentEffluent:::: During construction phase, sewage will be treated and disposed through septic tanks with soak pits. During operation phase, Approx 293 KLD waste water will be generated which will be treated in the Sewage Treatment Plant (STP) having capacity of 330 KLD up to tertiary level. Dewatered/ dried sludge from STP will be used as manure in horticulture. Hazardous WastesWastes:::: No hazardous wastes will be produced from project activities except some Spent Oil (Category 5.1) generated from D.G. sets; it will be sold to recyclers authorized by State Pollution Control Board.

1.16 Facilities for long term housing No No facilities for long term housing of operational of operational worker worker are proposed.

1.17 New road, rail or sea traffic No The project site is well connected to the NH 65, So no during construction or new road will be laid during construction or operation operation? of the project activities except for internal roads.

1.18 New road, rail, air waterborne No The area is already developed. It is well connected by or other transport roads to whole of the city, so there will be no alteration infrastructure including new or of routes or laying down of new routes done due to altered routes and stations, project activity. ports, airports etc? Internal roads within the project site is being/will be constructed for smooth movement of traffic.

1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements?

1.20 New or diverted transmission No There will be no shifting of electrical transmission line.

M/s. Sepset Real Estate Ltd. 6 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

lin es or pipelin es?

1.21 Impoundment, damming, No No impoundment, damming, culverting, realignment or culverting, realignment or other changes to the hydrology of surface watercourses other changes to the is proposed. hydrology of watercourses or aquifers.

1.22 Stream crossings? No Not applicable

1.23 Abstraction or transfers of Yes Total water requirement for the proposed project water form ground or surface activity will be 328 KLD including Fresh water (86 waters? KLD) and recycled water (242 KLD). The water will be sourced from Municipal Water supply for which permission is being/will be taken from the concerned authority.

1.24 Changes in water bodies or the No Surface drainage will not be affected. land surface affecting drainage or runoff?

1.25 Transport of personnel or Yes Transport of personnel/ material during construction materials for construction, and operation phase are envisaged. operation or Road network for smooth flow of traffic and adequate decommissioning? parking space will be provided for operational phase. During operational phase, total parking space for 1090 ECS will be provided.

1.26 Long-term dismantling or No Not applicable decommissioning or restoration works?

1.27 Ongoing activity during No Not applicable. decommissioning which could have an impact on the environment?

1.28 Influx of people to an area in Yes Construction workers from nearby areas is being/will be either temporarily or hired. permanently?

1.29 Introduction of alien species? No All tree and plants proposed is being/will be planted will be native to the area.

1.30 Loss of native species or No Not applicable genetic diversity?

M/s. Sepset Real Estate Ltd. 7 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

1.31 Any other actions? None

2. Use of Natural resources for construction or operationoperation of the Project (such as land, water, materials or energy, especially any resources which are nonnon----renewablerenewable or in short supply):

S. Information / Checklist Yes/ Details thetherererereofof (((w (wwwiiiitttthh appapprrrroximateoximate qquauauauantities/ntities/ rraaaatetetetessss,, No. confirmconfirmaaaationtion NoNoNo wwwhewhehehererererevvvverer possible) wwwiwiiithththth source ooofof information ddaaaatatatata

2.1 Land especially undeveloped No The vertical expansion of existing Building by adding or agricultural land (ha) two top floor, which is located in already developed area which the license / CLU issued by the development authority / department. Hence there will not be creation of new land use and no use of agricultural or undeveloped land.

2.2 Water (expected source & Yes Total water requirement for the project activity will be competing users) unit: KLD 328 KLD including Fresh water (86 KLD) and recycled water (242 KLD). The water will be sourced from municipal water supply for which permission will be taken from the concerned authority.

2.3 Minerals (MT) No Not applicable

2.4 Construction material-stone, Yes Construction materials required as follows aggregates, sand/ soil S. No. Material QuaQuan nnntitititittttyyyy (expected source-MT) 1. Steel (tones) 5000 2. Cement (bags) 400000 3. Stone Aggregate (cu. m) 18000 4. Sand (cu. m) 25000 5. Bricks (cu. m) 12000 6. Glass (cu. m) 14000 7. Fly-ash based products (cu. m.) 250 Source: Steel and cement is being/will be procured from authorized vendors. Sand & aggregate will be procured from local material suppliers.

2.5 Forests and timber (source– No Timber required is being/will be taken from nearby MT) markets.

2.6 Energy including electricity and Maximum demand load will be 3924 KVA and it will be fuels (source, competing users) sourced from Jodhpur Vidyut Vitran Nigam Limited Unit: fuel (MT), energy (MW) (JHVVNL). 4 D.G. sets of total capacity 6000 KVA (2 x 2000 + 1 x M/s. Sepset Real Estate Ltd. 8 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

1500 + 1 x 500 ) will be used for back -up.

2.7 Any other natural resources None Not applicable (use appropriate standard units)

3.3.3. Use, stststor st orororage,age, tttr trrransansanspopopoport,rt,rt,rt, handling ororor prodprodu uuuctictictictioooonnnn ofofof subsubsubs sub sssttttaaaancesnces ororor mmma maaaterials,terials, wwwh whhhiiiicccchhhh could bbbebe harmful tototo hhhuman human hhhe heeealthalth ororor thethethe enenenv en vvviiiirrrronmentonment ororor rrraise raise ccconc conconcerererernsnsnsns aaab abbboutout aaac accctualtual ororor perpercccceieieieivvvvedededed risks to human healthealthhhh.

S. Information / Checklist Yes/ Details thetherererereofof (((w (wwwiiiitttthh appapprrrroximateoximate qquauauauantities/rntities/rntities/raaaates,tes, No. confirmconfirmaaaationtion NoNoNo wwwhewhehehererererevvvverer possible) wwwiwiiithththth source ooofof information ddaaaatatatata

3.1 Use of substances or materials, No The vertical expansion of existing commercial building which are hazardous (as per construction project, and hence, no storage of MSIHC rules) to human health hazardous chemicals (as per MSIHC rules) will be done, or the environment (flora, except HSD required to run standby D.G. sets, for fauna, and water supplies) which the quantity stored is being/will be below the threshold limit specified in the MSIHC rules. Necessary permission will be obtained from the Explosives Dept.

3.2 Changes in occurrence of No Suitable drainage and waste management measures is disease or affect disease vectors being/will be adopted in both construction and (e.g. insect or water borne operational phase, which will restrict the stagnation of diseases) water or accumulation of waste. This is being/will be effectively restricted the reproduction and growth of disease vectors.

3.3 Affect the welfare of people No No use, storage, transport, handling or production of e.g. by changing living any harmful product is envisaged from the proposed conditions? project activities. Thus, no major adverse impacts on the human health / environment are envisaged. Moreover, this project is being/will be provide employment to local labours in the construction phase and workers during operation phase. The proposed project will have beneficial impacts.

3.4 Vulnerable groups of people No Not applicable. who could be affected by the project e.g. hospital patients, children, the elderly etc.,

3.5 Any other cause None Not applicable.

M/s. Sepset Real Estate Ltd. 9 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

4.4.4. Production of solid wastes during construction or ooperationperation or decommissioning (MT/month)

S. Information / Checklist Yes/ Details thetherererereofof (((w (wwwiiiitttthh appapprrrroximateoximate qquauauauantities/ntities/ rrra raaates,tes, No. confirmconfirmaaaationtion NoNoNo wwwhewhehehererererevvvverer possible) wwwiwiiithththth source ooofof information ddaaaatatatata

4.1 Spoil, overburden or mine No No such spoil, overburden or mine wastes will be wastes generated.

4.2 Municipal waste (domestic and Yes Solid wastes likely to be generated in project are of or commercial wastes) domestic nature. Domestic wastes 2715 kg/day will be collected from designated location and segregated into inorganic and organic wastes. The inorganic non- biodegradable wastes will be sold to vendors for recycling and the organic biodegradable wastes (waste vegetables, foods etc.) will be composted for conversion into manure. The mechanism of sludge drying will be centrifuge and the dewatered/ dried sludge from STP will be converted to cakes and will be used as manures in horticulture.

4.3 Hazardous wastes (as per Yes Spent Oil from D.G. sets is being/will be carefully stored Hazardous Waste Management in High Density Polythene (HDPE) drums in isolated Rules) covered facility. This spent oil is being/will be sold to vendors authorized by RSPCB/ MoEF for the treatment of same. Suitable care will be taken so that spills / leaks of spent oil from storage could be avoided.

4.4 Other industrial process wastes No Not applicable

4.5 Surplus product No Not applicable

4.6 Sewage sludge or other sludge Yes The mechanism of sludge drying will be centrifugation from effluent treatment and the dewatered/ dried sludge from STP will be converted to cakes and will be used as manures in horticulture and also disposed to designated municipal area.

4.7 Construction or demolition Yes Construction waste generation is being/will be limited wastes to the construction phase only and is being/will be limited to project site only. These will be reused for backfilling after manual segregation. Unusable and excess construction debris is being/will be disposed at

M/s. Sepset Real Estate Ltd. 10 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

designated places in tu ne with the local nor ms . These wastes is being/will be used for road development activities.

4.8 Redundant machinery or No Not applicable equipment

4.9 Contaminated soils or other No Not applicable materials

4.10 Agricultural wastes No Not applicable

4.11 Other solid waste No

5.5.5. Release of pollutants or any hazardous, toxic or nonoxiousxious substances to air (Kg/hr)

S. Information / Checklist Yes/ Details thetherererereofof (((w (wwwiiiitttthh appapprrrroximateoximate qquauauauantities/rntities/rntities/raaaates,tes, No. confirmconfirmaaaationtion NoNoNo wwwhewhehehererererevvvverer possible) wwwiwiiithththth source ooofof information ddaaaatatatata

5.1 Emissions from combustion of Yes The operation of proposed project does not envisage fossil fuels from stationary or any major air pollutant generating sources except D.G. mobile sources sets and vehicular movement. The emissions from stationary sources (D.G. sets) have been predicted.

5.2 Emissions from production No Not applicable. processes

5.3 Emissions from materials Yes Dust emissions may arise due to the materials handling handling including storage or during construction phase; These is being/will be transport restricted to the construction phase and to the construction site only. Regular water sprinkling & tarpaulin covers is being/will be provided to prevent dust emissions.

5.4 Emissions from construction Yes This is being/will be restricted to the construction phase activities including plant and and to the construction site only. Though these are equipment being/will be negligible in amount as they will occur from the equipments movement involved in the construction. Still suitable preventive measure will be taken.

5.5 Dust or odours from handling Yes Dust is likely to be generated during construction, this is of materials including being/will be water sprinkled and tarpaulin covers construction materials, sewage will be provided over stored raw material to and waste reduce dust emission. On site sanitation facilities is being/will be provided for

M/s. Sepset Real Estate Ltd. 11 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

co nstruct ion w orkers during co nstr uction phase so no odor generation is envisaged.

5.6 Emissions from incineration of No Not applicable wastes

5.7 Emissions from burning of No Open burning of biomass / other material is /will be waste in open air (e.g. slash prohibited. materials, construction debris)

5.8 Emissions from any other No Not applicable sources

6.6.6. Generation of Noise and Vibration, and Emissions ofof Light and Heat:

S. Information / Checklist Yes/ Details thetherererereofof (((w (wwwiiiitttthh appapprrrroximateoximate qquauauauantities/rntities/rntities/raaaates,tes, No. confirmconfirmaaaationtion NoNoNo wwwhewhehehererererevvvverer possible) wwwiwiiithththth source ooofof information ddaaaatatatata

6.1 From operation of equipment Yes The machinery which is being/will be used for e.g. engines, ventilation plant, construction are of high standard and of reputed crushers make and will adhere to international standard. These standards itself take care of noise pollution control / vibration control and air emission control. Hence insignificant impacts due to construction machinery are envisaged. Apart from this, the construction activities is being/will be restricted to daytime only. Sources of noise in the operational phase will be D.G. sets and from vehicular movement only. The D.G. sets will be in operation during power failure only and will generate noise level below 75 dB (A) each.

6.2 From industrial or similar No Not applicable processes

6.3 From construction or Yes Due to the various construction activities, there is demolition being/will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities: • Excavation activities etc. • Concreting and mixing • Construction plant

M/s. Sepset Real Estate Ltd. 12 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

• Heavy vehicle movement and • Operation of D.G. sets

6.4 From blasting or piling No No blasting or mechanized piling is being/will be done in construction phase.

6.5 From construction or Yes Some noise is being/will be generated from vehicular operational traffic movement in the construction and operational phase.

6.6 From lighting or cooling Yes Cooling towers is being/will be efficient & of latest systems technology.

6.7 From any other sources No Not applicable

777.7... Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. Information/ Checklist Yes/ Details thetherererereofof (((w (wwwiiiitttthh appapprrrroximateoximate qquauauauantities/rntities/rntities/raaaates,tes, No. confirmconfirmaaaationtion NoNoNo wwwhewhehehererererevvvverer possible) wwwiwiiithththth source ooofof information ddaaaatatatata

7.1 From handling, storage, use or No Used oil from D.G. sets is being/will be handled with spillage of hazardous materials care, it is being/will be stored in HDPE drums and provided to authorize vendor. Hence, no risk of contamination is envisaged.

7.2 From discharge of sewage or No The wastewater after treatment is being/will be fully other effluents to water or the reused for flushing, horticultural and cooling purposes land(expected mode and place (D.G. Sets), so no adverse effect is envisaged. of discharge) No waste water is being/will be discharged outside the project area.

7.3 By deposition of pollutants No Minor Air emissions is being/will be generated due to emitted to air into the land or increased vehicular movement and occasional use of into water D.G. sets for which effective measures will be taken like adequate greenbelt development and use of low sulphur diesel in D.G. sets etc. So there would not be any deposition of pollutants emitted to air, land or water.

7.4 From any other sources No Not applicable

7.5 Is there a risk of long term No Not applicable build up of pollutants in the environment from these sources?

8.8.8. Risk of accidents during construction or operation of the Project, which could affect human health or M/s. Sepset Real Estate Ltd. 13 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

the environment

S. Information / Checklist Yes/ Details thetherererereofof (((w (wwwiiiitttthh appapprrrroximateoximate qquauauauantities/rntities/rntities/raaaates,tes, No. confirmconfirmaaaationtion NoNoNo wwwhewhehehererererevvvverer possible) wwwiwiiithththth source ooofof information ddaaaatatatata

8.1 From explosions, spillages, No This is a Commercial project and does not involve fires etc from storage, major hazardous construction activity. Hence chances of handling, use or explosions, spillages, fires are minimal. production of hazardous During construction all construction workers are substances being/will be provided with suitable personal protective equipment as required under the health & safety norms. Awareness & Training about safety norms is being/will be provided to all the supervisors of construction workers involved in construction activities. No major hazardous waste is being/will be stored within project site. No industrial or process activity is involved in this project hence chances of chemical hazards and accidents are minimal. However, suitable fire fighting measures is being/will be provided to reduce chances of fire-accidents.

8.2 From any other causes No Not applicable.

8.3 Could the project be affected Yes The area under study falls in Zone-II, according to the by natural disasters causing Indian Standard Seismic Zoning Map. Suitable seismic environmental damage (e.g. coefficients in horizontal and vertical directions floods, earthquakes, landslides, respectively, have to be adopted while designing the cloudburst etc)? structures. There are no possibilities of the proposed project site getting flooded as per records available.

9.9.9. Factors which should be considered (such as consequconsequentialential development) which could lead to environmental effects or the potential for cumulativecumulative impacts with other existing or planned activities in the locality

S. Information / Checklist Yes/ Details thetherererereofof (((w (wwwiiiitttthh appapprrrroximateoximate qquauauauantities/rntities/rntities/raaaates,tes, No. confirmconfirmaaaationtion NoNoNo wwwhewhehehererererevvvverer possible) wwwiwiiithththth source ooofof information ddaaaatatatata

9.1 Lead to development of Yes The proposed project is for Commercial use; it may supporting utilities, ancillary lead to development of supporting services and development or development infrastructure in and around the area. stimulated by the project which could have impact on

M/s. Sepset Real Estate Ltd. 14 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

the enviro nm ent e.g.:

• Supporting infrastructure Yes The project will have positive impact on the ancillary (roads, power supply, waste infrastructure like roads, markets, public health, or waste water treatment, amenities, conveyance facilities etc. in the area. etc.)

• housing development No Not applicable

• extractive industries No Not applicable

• supply industries No Not applicable

• other No Not applicable

9.2 Lead to after-use of the site, No Not applicable which could have an impact on the environment

9.3 Set a precedent for later No Not applicable developments

9.4 Have cumulative effects due No Not applicable to proximity to other existing or planned projects with similar effects

III.III.III. Environmental Sensitivity

S. AreAreaaaassss NaNaNam Na mmme/e/ Aerial distadistannnncece (((w (wwwiiiitttthinhin 15 km.) Proposed pprrrrojectoject No. IdentiIdentittttyyyy locloclocaloc aaatitititioooonn boundary 1 Areas protected under • Mehrangarh Fort is ~ 9.0 km in NNW direction international conventions, Fort & from project site. national or local legislation for City Palace • City Palace is ~ 7.5 km in N direction from their ecological, land scape, project site. cultural or other related value.

2 Areas which are important or • Jojari River is ~2.5 km in S direction from project sensitive for ecological Jojari River, site. • reasons- Wetlands, Forest, Forest ~5.5 km in NNE direction from project watercourses or other water Kalyana site. bodies,coastal zone, biospheres, • Lake, Ranisar Kalyana Lake ~11 km in NNW from project site. mountains, forests • Lake and Ranisar lake ~9.0 km in NNW direction from site. Balsamand • Balsamand Lake distance of approximately 13 km lake etc. in NW direction from the proposed project site

3 Areas used by protected, Machia • Machia Biological Park, is ~11.5 km in NNW important or sensitive species of Biological direction from project site. flora or fauna for breeding, Park & • Fishworld aquarium is ~ 7.5 km in NNW M/s. Sepset Real Estate Ltd. 15 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

nesting, foraging, resting, over Fishworld direction from project site. wintering, migration aquarium 4 Inland, coastal, marine or None Not located within 15 km of the proposed project underground waters location. 5 State, National boundaries None Not located within 15 km of the proposed project location.

6 Routes or facilities used by the NH-65, NH- • NH-65 is adjacent to the Project Site public for access to 114, Jodhpur • Jodhpur Airport is ~ 2.5 km in N direction from recreation or other tourist, Airport, project site. pilgrim areas Jodhpur • Jodhpur Railway Station is ~ 7.00 km in NNW Railway direction from project site. Station • NH 114 is ~ 13.00 km in N direction from project site. 7 Defense installations Air Force Approx. 4 km in N direction area 8 Densely populated or built-up Jodhpur city Project within Jodhpur urban area. area 9 Areas occupied by sensitive RSM Particular Distance Direction manmade land uses (hospitals, International RSM International School ~3.0 km NW School , schools, places of worship, Government Secondary ~3.5 km NW community facilities) Government School Secondary Medipulse Hospital ~4.0 km NW School , Gurdwara ~4.0 km NNW Medipulse Bala sati Mata ~5.0 km NW Hospital , Government Hospital ~6.0 km NNW Gurdwara , Ganesh Temple Ratanada Bala sati ~6.0 km N Mata , Government Ayurvedic ~8.0 km NNW Hospital Government Government Sattelite Hospital , ~8.5 km NW Hospital, Ganesh Kunj Bihari Temple Temple ~8.5 km NNW Ratanada , B R Birla Public School ~9.0 km WNW Government Maa Chamunda Mata ~9.0 km NNW Ayurvedic Temple St Sebastian’s Church ~9.5 km W

Hospital , Government Sattelite Hospital, Kunj Bihari Temple , B R Birla Public M/s. Sepset Real Estate Ltd. 16 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

School , Maa Chamunda Mata Temple , St Sebastian’s Church , 10 Areas containing important, No Not any high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to No Not any pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural None The area under study falls in Zone-II, according to hazard which could cause the the Indian Standard Seismic Zoning Map. Suitable project to present seismic coefficients in horizontal and vertical environmental problems directions respectively, will be adopted while (earthquakes, subsidence, designing the structures to mitigate the seismic landslides erosion, flooding o impacts. There are no possibilities of the proposed project site getting flooded as per records available.

M/s. Sepset Real Estate Ltd. 17 J.M. EnviroNet Pvt. Ltd. Revised Environment Clearance for Vertical Expansion of Existing Project “Mall cum Multiplex” at Vijay Raje Nagar Scheme, Pali Road, NH-65, Jodhpur, Rajasthan (((Form(FormForm----1111))))

IVIVIV.IV ... Proposed Terms of ReferenReferencccce:e: Not ApplicabApplicablllle.e.e.e. “I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.”

Date: For M/s. Sepset Real Estate Ltd Place: Gurgaon

(Authorized Signatory)

NOTE: 1. The projects involving clearance under Coastal Regulation Zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden "thereon (at the stage of EC)." 3. All correspondence with the Ministry of Environment & Forests including submission "of application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project". ***********