Mystic River Watershed INITIATIVE
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Boston Harbor Watersheds Water Quality & Hydrologic Investigations
Boston Harbor Watersheds Water Quality & Hydrologic Investigations Fore River Watershed Mystic River Watershed Neponset River Watershed Weir River Watershed Project Number 2002-02/MWI June 30, 2003 Executive Office of Environmental Affairs Massachusetts Department of Environmental Protection Bureau of Resource Protection Boston Harbor Watersheds Water Quality & Hydrologic Investigations Project Number 2002-01/MWI June 30, 2003 Report Prepared by: Ian Cooke, Neponset River Watershed Association Libby Larson, Mystic River Watershed Association Carl Pawlowski, Fore River Watershed Association Wendy Roemer, Neponset River Watershed Association Samantha Woods, Weir River Watershed Association Report Prepared for: Executive Office of Environmental Affairs Massachusetts Department of Environmental Protection Bureau of Resource Protection Massachusetts Executive Office of Environmental Affairs Ellen Roy Herzfelder, Secretary Department of Environmental Protection Robert W. Golledge, Jr., Commissioner Bureau of Resource Protection Cynthia Giles, Assistant Commissioner Division of Municipal Services Steven J. McCurdy, Director Division of Watershed Management Glenn Haas, Director Boston Harbor Watersheds Water Quality & Hydrologic Investigations Project Number 2002-01/MWI July 2001 through June 2003 Report Prepared by: Ian Cooke, Neponset River Watershed Association Libby Larson, Mystic River Watershed Association Carl Pawlowski, Fore River Watershed Association Wendy Roemer, Neponset River Watershed Association Samantha Woods, Weir River Watershed -
City of Cambridge Csos, Final Permit, MA0101974, 09/30/2009
Permit No. MA0101974 Page 1 of 8 AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of the Federal Clean Water Act, as amended, 33 U.S.C. §§1251 et seq., and the Massachusetts Clean Waters Act, as amended, Massachusetts General Laws Chapter 21, §§26-53, the City of Cambridge Department of Public Works 147 Hampshire Street Cambridge, MA 02139 is authorized to discharge from: 12 Combined Sewer Overflows (CSOs) listed in Attachments A and B to the receiving waters named Alewife Brook and Charles River, both Class B waters with CSO variances, in accordance with effluent limitations, monitoring requirements, and other conditions set forth herein. This permit shall become effective on the first day of the calendar month following sixty (60) days after the date of signature. This permit and the authorization to discharge expire at midnight, five (5) years from the last day of the month preceding the effective date. This permit supersedes the permit issued on March 26, 1993. This permit consists of 8 pages, Attachments A through E in Part I, and 25 pages in Part II, Standard Conditions. Signed this 30th day of SEPTEMBER, 2009 /S/ SIGNATURE ON FILE _______________________________ ____________________________ Lynne Hamjian, Acting Director Glenn Haas, Director Office of Ecosystem Protection Division of Watershed Management Environmental Protection Agency Department of Environmental Protection Region I Commonwealth of Massachusetts Boston, MA Boston, MA Permit No. MA0101974 Page 2 of 8 Part I. EFFLUENT LIMITATIONS AND OTHER PERMIT CONDITIONS A. Effluent Limitations 1. During wet weather, the permittee is authorized to discharge combined storm water and sanitary wastewater from combined sewer outfalls listed in Attachments A and B, subject to the following effluent limitations and requirements: a. -
Bibliography
BIBLIOGRAPHY Alewife/Mystic River Advocates and Friends of the Mystic River. 1997. Comprehensive Report of the Lower Mystic River Watershed: Shoreline Survey Results and Analysis for Mystic River, Alewife Brook, and Malden River. Alewife/Mystic River Advocates. 1998. Stormwater Monitoring Program: Water Quality Monitoring September 1997 – September 1998 (Draft). With City of Somerville and Massachusetts Department of Fisheries, Wildlife, and Environmental Law Enforcement, Riverways Program. Alewife/Mystic River Advocates. 2001. Stormwater Monitoring Program: Water Quality Monitoring Data November 1999 – November 2000. With City of Somerville and Massachusetts Department of Fisheries, Wildlife, and Environmental Law Enforcement, Riverways Program. Arthur D. Little, Inc. 1998. Post-removal Conditions: Buffer Zone Areas of Debris and Soil Removal (Figure 1). Prepared by Schofi eld Brothers, Inc. Town of Arlington. 1999. Alewife Brook outfalls. Town of Arlington. 2001. Spy Pond watershed restoration project. Grant application to MA Department of Environmental Management, Lake and Pond Watershed Demonstration, Restoration and Protection Program. Bates, R.L. and J.A. Jackson (eds.). 1987. Glossary of Geology. American Geological Institute, Alexandria, VA. Belding, D.L. 1921. A Report upon the Alewife Fisheries of Massachusetts. MA Department of Conservation, Division of Fisheries and Game. Brown, D.W. 2002. Alewife Reservation Mammal Tracking Survey. Prepared for Friends of the Alewife Reservation. Brown, D.W. 2002. Alewife Reservation Migrant and Breeding Bird Survey. Prepared for Friends of the Alewife Reservation. ALEWIFE MASTER PLAN 75 Burtner, J., H. Clish, N. Kimball, and J. Nordgren. 1997. Fish in the City: Challenges Facing the Mystic River Herring Run. Tufts University UEP 255 fi eld project. Prepared for Alewife/Mystic River Advocates. -
Horsley Witten Group Technical Analysis Upper Alewife Brook Basin
+RUVOH\:LWWHQ*URXS 6XVWDLQDEOH(QYLURQPHQWDO6ROXWLRQV 5RXWH$6DQGZLFK0$ 3KRQH)D[ZZZKRUVOH\ZLWWHQFRP 7HFKQLFDO$QDO\VLV 8SSHU$OHZLIH%URRN%DVLQ ,PSDFW6WXG\ )HEUXDU\ 3UHSDUHGIRU (OOHQ0DVV )ULHQGVRI$OHZLIH5HVHUYDWLRQ $OHZLIH%URRN3DUNZD\ %HOPRQW0$ 6SRQVRUHGE\ %HOPRQW/DQG7UXVW &DPEULGJH*UHHQ %HOPRQW&LWL]HQV)RUXP Upper Alewife Brook Watershed Technical Analysis Table of Contents Page 1.0 Purpose 1 2.0 The Study Area 1 3.0 Flooding and Stormwater 2 4.0 Habitat 6 5.0 Water Quality 8 6.0 Smart Growth and Low Impact Development 10 7.0 References 11 LIST OF TABLES Table 1 ± Hydrologic Analysis 3 Table 2 ± Scientific Studies on Wildlife Habitat at the Belmont Uplands 6 Table 3 ± Phosphorus Loading Analysis 9 LIST OF FIGURES Figure 1 ± Mystic River Watershed and Subbasins Figure 2 ± FEMA National Flood Hazard Layer Alewife Subbasin Figure 3 ± Recharge Rates Figure 4 ± Impervious Cover Alewife Subbasin Figure 5 ± Impervious Cover vs. Native Fish Species Figure 6 ± Phosphorus Loading Rates 8 Figure 7 ± Phosphorus Loading Analysis 9 Figure 8 ± Low Impact Development Stormwater BMPs Technical Analysis ± Upper Alewife Brook Watershed 1.0 Purpose This report was prepared to provide the towns of Arlington, Belmont and Cambridge a clear understanding of the hydrologic and ecological considerations associated with continued development of environmentally-sensitive lands associated with the upper Alewife Brook Watershed which includes Little River in Cambridge and several ponds and streams. A specific focus is provided on the proposed development project at the Belmont Uplands site which is characterized by Charles Katuska, PVVS, Chair conservation Commission in Sutton, as a silver maple forest monoculture. The report provides a technical summary of flooding, habitat, water quality, and climate change as they substantially affect the regional subject area. -
Neponset River Watershed Protecting Our Water, Wildlife and Land
!"a$ QÈQÈ Neponset River Watershed Boston Protecting Our Water, Wildlife and Land There’s a lot going on in your watershed! QÂ • Fourteen cities & towns • Over 120 square miles QÂ Dorchester • 330,00+ people Visit us to learn more: QÂQÂ !"d$ ive !"d$ ponset River www.neponset.org Mattapan Neponset r Quincy QÈ ty k quity Bk Unqu e B n e e U Hyde Park re T r T Q} e !"c$ Qæ e n i !"c$ n Q¼ i P QÅ P Milton M o otther Dedham r ver QÒ Riive QÒ t R QÈ Westwood et QÑ s e M n s M o n Dover i p o ill e p l e l N PPl N laan Iq nti Iq tinng gfi P fie P eld u !"c$ l ur !"c$ d B rg Bk ga k at Qi to Medfield Qi or k ry o k y B o o B r k o y r k y B n Ponkapoag l B n Ponkapoag a l l P a Pond i l Pe Pond i m Norwood ec m cu M r un Qã M r e nit Randolph e i !"d$ t B onkapoag Bk Qæ G !"d$ Bk Ponkapoag Bk G P Q¸ k QÑ QÛ QÑ H Canton H Willett a Willett a PondPond ww ees s Reservoir MM Ip Pond ini k ne B e t QÆ B i t QÆ B E i QÉ r e E u ro l e u oo l a q o r h o a e q k t ive o s e k set R Traph st P QÅ Qz ponnse Trap t P QÅ NNeepo QÒ Qi er Meadow QÒ eaver Mea w B Walpole Be k QÏ S Sppr rin ing g k B B g B Iq k ag Qz k poa S sap Ste QÑ ass ee QÑ a p QÆ M H il Qp lll S B Qã Q} Sc k k chho Bk oo r B ol er lM v e Stoughton r M a v QÉ e r e e a ea e v e a B i v d B Sharon i d R o o R w t w QÆ e t B e s B s n k n k o o p p e !"d$ e !"d$ N Lake N Massapoag Legend Foxborough Canoe Launches NeponsetNeponset Reservoir QÅ Reservoir QÅ Ponds/Ocean Qz Streams Q¸Q¸ Parks/Conservation QÇ Towns Qæ 0 0.5 1 2 QÉ Miles IpIp QÆ QÒ QÑ %&l( Qv Qf Qz Q¸ A watershed is the area of land that drains The Watershed includes parts of 14 cities successful campaign to clean up and into a particular river, stream, or pond. -
Mystic River Watershed Stormwater Retrofits Woburn, Massachusetts 30% Concept Plans June 2021
MYSTIC RIVER WATERSHED STORMWATER RETROFITS WOBURN, MASSACHUSETTS 30% CONCEPT PLANS JUNE 2021 Sheet List Table WOBURN Sheet Number Sheet Title 1 COVER 2 GENERAL NOTES 3 EXISTING CONDITIONS 4 DEMO & ESC PLAN 5 SITE PLAN 6 GRADING & DRAINAGE PLAN 7 DETAIL GRADING PLAN 8 STREAM RESTORATION PLAN 9 CONSTRUCTION DETAILS 10 PLANTING DETAILS North WINN ST MASSACHUSETTS SCALE 1" = 150000' PROJECT SHERIDAN ST AREA BURLINGTON WOBURN GENERAL NOTES: 1. THIS PLAN SET IS FOR CONCEPTUAL DEVELOPMENT ONLY AND NOT FOR CONSTRUCTION. 2. SITE INFORMATION: PLAT: 41 LOT: 16 ADDRESS: 75 BEDFORD ROAD ZONING DISTRICT: RESIDENTIAL 1 Plan Set: MYSTIC RIVER WATERSHED SITE STORMWATER RETROFITS WOBURN, MASSACHUSETTS Prepared For: Mystic River Watershed Association 20 Academy St Ste 306 H:\Projects\2021\21008 upper mystic river watershed\Drawings\_Woburn\21008 WOBURN CN.dwg Arlington, MA 02476 North (781) 316-3438 Prepared By: Horsley Witten Group, Inc. WOBURN Sustainable Environmental Solutions SCALE 1" = 20000' SITE www.horsleywitten.com Headquarters SCALE 1" =1000' 112 Water Street, 6th Floor 55 Dorrance Street, Suite 200 90 Route 6A 113 Water Street, R2 Boston, MA 02109 Providence, RI 02906 Sandwich, MA 02563 Exeter, NH 03833 (857) 263-8193 voice (401) 272-1717 voice (508) 833-6600 voice (603) 658-1660 (617) 574-4799 fax (401) 439-8368 fax (508) 833-3150 fax Registration: Project Number: Revisions 21008 1 2 Sheet Number: 3 1 of 10 DRAFT 4 NOT FOR 5 Drawing Number: 6 CONSTRUCTION 7 - 1C last modified: 06/30/21 printed: by ml Rev. Date By Appr. Description GENERAL CONSTRUCTION NOTES: BASIC CONSTRUCTION SEQUENCE: EROSION & SEDIMENT CONTROL NOTES: 1. -
2019 Coastal Massachusetts COASTSWEEP Results
Results of the COASTSWEEP 2019 Cleanups Organization Coordinator Site(s) Town(s) People Pounds Miles Sustainable Practices Karla Cabral Craigville Beach, Covells Beach Barnstable 29 46 0.50 Sustainable Practices Karla Cabral Kalmus Beach Barnstable 9 18 0.50 Town of Barnstable Susan Brinckerhoff Millway Beach Barnstable 23 2 0.50 Town of Barnstable Betsy Wheeler Rendezvous Lane Barnstable 1 10 0.50 Town of Barnstable Robert Parsons Scudders Lane Barnstable 13 50 1 Town of Barnstable Fred Stepanis Sandy Neck Beach Barnstable 37 100 6.00 Sustainable Practices Patrick Otton Town Beach Barnstable 13 40 0.75 Rotary Club of Osterville Anke Rudy Dowes Beach Barnstable 38 50 2.00 Wellfleet Recycling Committee and Sustainable Christine Shreves Duck Harbor Barnstable 11 25 0.25 Practices Salem Sound Coastwatch Margaret Duffy Dane Street Beach Beverly 24 30 0.50 Endicott College Lori Mitchener Endicott College Beach Beverly 2 7 0.25 Salem Sound Coastwatch Margaret Duffy West Beach Beverly 8 13 1.00 Glen Urquhart School Laura Doyle Dane Street Beach Beverly 25 10 0.25 Salem Sound Coastwatch Margaret Duffy McPherson Park Beverly 8 20 0.25 Results of the COASTSWEEP 2019 Cleanups Organization Coordinator Site(s) Town(s) People Pounds Miles Salem Sound Coastwatch Margaret Duffy Sandy Point Beverly 7 60 0.50 Urban Harbors Institute and the School for the Kimberly Starbuck UMass Boston Beach Boston 100 200 2.00 Environment at UMass Boston Tenacre Country Day School Leah Staffier Carson Beach Boston 30 30 0.50 ClearView Healthcare Partners Mara Blumenstein -
Arlington Master Plan DRAFT Interim Report
Arlington Master Plan REVISED Working Paper Series: Natural Resources and Open Space Introduction Arlington’s landscape is defined by natural features that influence the location and intensity of development. Lakes and ponds, brooks, wetlands, and protected open space provide important public health and ecological benefits, as well as recreational opportunities. Activities in Arlington also affect neighboring towns, so local policies and practices relating to water and other natural resources have regional consequences. This master plan element focuses on irreplaceable land and water resources that must be considered in Menotomy Rocks Park trail. decisions about where, what, and how much to build as Arlington continues to evolve. A. GOALS FOR OPEN SPACE AND NATURAL RESOURCES • Ensure that Arlington’s neighborhoods, commercial areas, and infrastructure are developed in harmony with natural resource concerns. • Value, protect, and maintain the Town’s physical beauty, natural habitats, water bodies, parks, and other open spaces. • Use sustainable planning and engineering approaches to improve air and water quality, reduce flooding, and enhance ecological diversity by managing our natural resources. • Mitigate and adapt to climate change. B. KEY FINDINGS • Arlington’s beauty is influenced by many factors – its varied landscape and topography, the presence of water resources along its borders, and its historic architecture. Arlington’s distinctive street trees and urban woodlands also play a critical role in Arlington’s appearance, walkability, and environmental health. Increased investments in tree maintenance and replacement, including enough personnel to carry out a comprehensive tree and streetscape management program, will be important for Arlington’s future quality of life. • Arlington’s ability to address critical environmental challenges will hinge, in part, on the policies it adopts to guide and regulate future development, and in particular along the corridor encompassing Massachusetts Avenue and the Mill Brook. -
Neponset River Greenway Council Meeting AGENDA
Neponset River Greenway Council Meeting Wednesday, November 4, 2015, 7:00 – 9:00 pm St. Brendan’s Church, 589 Gallivan Blvd., Dorchester, MA AGENDA 1. Welcome & Introductions Our new District Manager is Martin Rudi Mayor Walsh is moving (or has just moved) to a house on Butler St.! 2. Greenway Planning and Design – Stella Lensing, DCR ● Segment 1 – Martini to Neponset Valley Pkwy o Opening ceremony successful; is there any more to do? ● Segment 2 – Central Ave to Mattapan Square o Progress over the past month ● Port Norfolk Park o Landscaping proceeding; is there an opening date? ● Segment 3 – Victory Rd to Morrissey Blvd (National Grid / rainbow gas tank) o Planning and permitting status o What can we and DotBike do to get it funded? ● Segment 4 – Tenean Beach to Victory Rd o Strategy for design, funding, working with MassDOT o DotBike is interested in helping get this moving ● Future segments to start planning: o Crossing Blue Hill Ave. It's on the agenda of Boston's new Chief of Streets o Neponset Valley Pkwy to Paul’s Bridge: Start on planning! o Fairmount to Dana Ave Sign alternate route on Walnut St.? City-controlled? o Connecting to Morrissey/UMass-state of design contract? Paul Nutting is working on getting UMass to fix rest of path along their property 3. Greenway Management – Martin Rudi, DCR Neponset Stony Brook District Manager ● Kennedy Playground – Tasks and schedule to complete ● Status of giant billboards near and condos across from Tenean Beach Report on October 8 billboard meeting ● Could we have signs along the trail asking users to be considerate of others (in specific ways)? ● Other questions? 4. -
Newburyport East Sheet 3
Massachusetts Geological Survey, Geologic Map, GM 13-01 Massachusetts Geological Survey Onshore-Offshore Surficial Geologic Map of the Newburyport East and University of Massachusetts, Amherst Northern Half of the Ipswich Quadrangles, Massachusetts, Sheet 3 of 3 2013 Address: 269 Morrill Science Center, 611 North Pleasant Street, Amherst, MA 01003 Phone: 413-545-4814 E-mail: [email protected] WWW: http://www.geo.umass.edu/stategeologist Evolutionary Model Merrimack Embayment Relative Sea-Level Curve References Stage 1: Stage 2: Uncalibrated Radiocarbon Age (103 yr BP) Balco, G., Stone, J.O.H., Porter, S.C., and Caffee, M.W., 2002. Last Glacial Maximum to Glacial Sea-Level Highstand Shallow 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Cosmogenic-nuclide ages for New England coastal moraine, Martha’s Retreat 17 - 16 ka Vineyard and Cape Cod, Massachusetts, USA: Quaternary Science Reviews, v. till Deposition of 21, p. 2127-2135. ~24 - 17 ka offshore 30 Sea level rises rapidly over the isostatically Data Sources The Laurentide Ice Sheet advances through glaciomarine units Barnhardt, W., Andrews, B., Ackerman, S., Baldwin, W., and Hein, C., 2009. Laurentide depressed region as the ice margin retreats further northern Massachusetts and the Gulf of Maine, north. The maximum synglacial marine limit is High resolution geologic mapping of the inner continental shelf: Cape Ann to Salisbury Beach Massachusetts: U.S. Geological Survey Open-File Report reaching its maximum limit at Long Island (NY) Ice Sheet reached at 17–16 ka (Stone and Borns, 1986; Collins, 1989 Kaye and Barghoorn, 1964 Kirwan et al., 2011 20 McIntire and Morgan, 1964 Oldale et al., 1993 2007-1373, 50 p. -
1 August 24, 2020 Dennis Deziel Acting Regional Administrator EPA
August 24, 2020 Dennis Deziel Acting Regional Administrator EPA New England Region 1 Congress Street, Suite 1100 Boston, MA 02114‐2023 RE: Petition for a Determination that Certain Commercial, Industrial, Institutional, and Multi-Family Residential Property Dischargers Contribute to Water Quality Standards Violations in the Neponset River Watershed, Massachusetts, and that NPDES Permitting of Such Properties is Required. Dear Regional Administrator Deziel, As the Regional Administrator of the EPA New England Region (“EPA Region 1”), the Conservation Law Foundation (“CLF”) hereby petitions you for a determination pursuant to 40 C.F.R. § 122.26(f)(2) that discharges of stormwater that are not currently subject to direct permitting by EPA from privately owned commercial, industrial, institutional,1 and multi‐family residential2 real properties of one acre or greater in the Neponset River Watershed (“Contributing Discharges”) contribute to violations of water quality standards in the Neponset River and require permits under the National Pollutant Discharge Elimination System (“NPDES”). 1 For the purposes of this Petition, the “institutional” land use category encompasses properties in the MassGIS “Urban Public/Institutional” land use code that are privately owned. 2 For the purposes of this Petition, the “large multi‐family residential” land use category encompasses properties in the MassGIS “Multi‐Family Residential” land use code that are privately owned and include privately owned, include five or more housing units (excluding those in which 50% or more of the units are restricted at 80% Area Median Income or below), and are not currently subject to regulation under the NPDES permit program in order to restore and protect the water quality of the Neponset River watershed. -
Page 1 !N !N !N !4 !N !N !N !N !N !4 !N !N !N !N !N !N !N !N !N !N !N !Ã !N !N !N !N !N
M Folly Works Brook c Rd C Prospect Hill B R r 1 i d 0 l r x Wawecus Hill n t H i d o o h ig m t D S g w o P P t in R n R w t s rry Norwich Free Academy S o Norwich Falls Pond r s S i n u t t e e n i c b a v c h n n A R S l a t l w h r R r n e a t w o d C W ! Roc s e kwe R r e ll St h o W o S 7 d d t t B L t th M Choate Brook l t P 8 C r a s a t S t h R Brand R S t h o d d o u l Sherman s r o S i d Lewis Pond d St e a t w t R n W c h B t l s i N e B t t i y K d t Greenville r n R H i c t t ou l y t r e a S Yantic River n e g e e 1 r A i Bates Pond 6 u R i 5 P d l a g n A e l w y t c S R g R t v o t e c D o a r B t P t 5 v e e M H R l e S t n d o l h l o B B e h e S wy c i r 4 16 r r c t S 5 d w d n c r t g d H r K o n h t e A Q o e u o S n i u e n o a ! t v v Folwix Brook d S u o s a in r P o o D d A e L l e t t d a l n l d t e D H S S l e w s r R y Greeneville Elementary School S l e e t m t B T d u i i o a o g R T 2 t D r A l h d e l R v y n l A l s i A n d v n pke r v cket T r l e i d etu e A o a R o Sh R g l t e S B i 2 o e M t k n e 165 d St w R S n dge d r n R d kri T S l s t Oa u V il y r r Yantic St ja d S o n H y d W r e Hickory Street School P m R w s e gs i R i t t v C i l un a n n o A e Y a t s e H O t n r R y Miller Brook g o r v t y t n t Preston Veterans Memorial School S e il D d i t S ! m e e D S A S a C D G R I S W O L D t n u d W H Ol r o t d G h N i n r or a d t wich a r Rd t Greene Ave n s ! R e i m n e l o v o o i S i AQUIFER PRO TECTIO N AREAS u P y R l d w l D D k d R e G T Jail Hill E s Teachers Memorial y Bucki