East-West Alley Master Plan

Total Page:16

File Type:pdf, Size:1020Kb

East-West Alley Master Plan STREETSCAPE RE-ORDERED TO BRING TREES, CITY FURNITURE (BENCHES/WASTE RECEPTACLES), AND PROPOSED PROPOSED PROPOSED PROPOSED STREET LIGHTS TO BACK OF CURB. RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL CANTON WALK DEVELOPMENT DEVELOPMENT DEVELOPMENT DEVELOPMENT TREES SPACED APPROX 30’ O.C., WHEN THERE IS GALLERY SPA SUFFICIENT SPACE BEHIND EXISTING CURB BRANDED GATEWAY PROPOSED NINE WEBB STREET RESIDENTIAL DEVELOPMENT 10’ SIDEWALK ON SOUTH SIDE OF WEBB AT NORCROSS STREET ONE-WAY TRAFFIC INTERSECTION WITH CANTON STREET (DIRECTION MAY CHANGE TO WEBB STREET REALIGNED TO ALLOW FOR ACCOMMODATE STREET TREES SPACED APPROXIMATELY 40’ ON PROPOSED WIDENED SIDEWALK AND TO IMPROVE SIGHTLINES FUTURE CENTER RESIDENCE RESIDENTIAL NETCOM DEVELOPMENT) DEVELOPMENT CAPRICIOUS 5’ CURBLESS GREEN OAK DRIVE WALKWAY 5’-6’ BRICK SIDEWALKS BOTH SIDES OF STREET ROSWELL WITH 6” CURB PROPOSED DECORATIVE CROSSWALK THRESHOLD AND HISTORIC INDUSTRIAL STYLE RESIDENTIAL PAVEMENT CHANGE INDICATES SHARED SPACE COTTAGE PEDESTRIAN LIGHTING DEVELOPMENT POSSIBLE PARKING LOT RECONFIGURATION TO HAMILTON FLOWERS COLONIAL STYLE PEDESTRIAN LIGHT FIXTURES ALLOW FOR LANDSCAPE AND LIGHTING TIME-MANAGED DELIVERY ZONE AND SHEAR BLISS SALON PARALLEL PARKING RESIDENCE 10’ TRAVEL LANES (TWO-WAY) ON WEBB STREET STREET CANTON CANTON STREET POLATTY & STRING LIGHTS ANTIQUE MARKET SULLIVAN A CLASSY CLUTTER CREATE “CANOPY” 5’ BRICK SIDEWALK WITH MOUNTABLE CURB ON RESIDENCE OVER ALLEY SOUTH SIDE OF WEBB STREET CEVICHE BURY COMM UTILITIES RESIDENCE 6” CURB ON NORTH SIDE OF WEBB STREET AND REORGANIZE (PARKING MAY BE PHASED IN WITH FUTURE ZEST ELECTRICAL LINES DEVELOPMENT) BRICK WASTE ZEST MANAGEMENT RETAINING WALL NECESSARY TO CONSTRUCT FACILITY WITH TRASH SIDEWALK LITTLE COMPACTOR WEBB STREET ALLEY EAST ALLEY NEW BUS STOP ALL-WAY STOP INTERSECTION TO CALM TRAFFIC STEAK SHELTER AND ENHANCE SAFETY SALT ROSWELL L + L INTERIOR RESIDENCE PROVISIONS HEIRLOOM LISA’S JEWELS STYLING PEDESTRIAN 15’ SHARED VEHICULAR/PEDESTRIAN TRAVEL LANE IRON BED HOME FROM CONNECTION TO THE CHANDLERY HWY 9 WITH GATE HEAVEN ROTH’S CREOLE 2 GEAUX UPHOLSTERY RAIN GARDEN AND PERVIOUS PAVEMENT REDUCES BRANDED GATEWAY RUNOFF AND BEAUTIFIES AREA SYNERGY 1920 GEORGETOWN CHASE VININGS TAYLOR DECORATIVE CROSSWALK GALLERY KINZEL CREATES THRESHOLD 5’-6’ BRICK SIDEWALKS BOTH SIDES OF WEST SERENDIPITY ROUX GALLERY ALLEY WITH 6” CURB GO WITH THE IT’S SO FIX TUTTO DEDICATED PEDICAB/ FLOW MOTORCYCLE PARKING SPACES FABULOUS! PIZZERIA BRICK BANDED THRESHOLD AND PAVEMENT GIFTED! CHANGE INDICATES SHARED SPACE REMOVABLE BOLLARDS ALLOW CANTON TO PERIODICALLY WEST ALLEY PETER BRANDI GALLERY CLOSE FROM WEBB ST TO 50’ LONG, TIME-MANAGED DELIVERY ZONE AND THE DISTRICT ELIZABETH WAY PARALLEL PARKING THE PAINTED MONKEY ELIZABETH WAY BURY COMMUNICATIONS UTILITIES AND VACANT REORGANIZE ELECTRICAL LINES MAC MCGEE RAIN GARDEN ENHANCED WITH PLANTINGS AND MIMOSA BOULEVARD PROTECTED WITH TRADITIONAL STYLE BOLLARDS BRILLIANT HIGHWAY 9 ARCHITECTURALLY APPROPRIATE BRICK WASTE HEART OF MANAGEMENT FACILITY WITH TRASH COMPACTOR ANN JACKSON ROSWELL PARK DEMOLISH EXISTING WALL AND GALLERY EXPAND BRICK SIDEWALK CIRCULAR PLAZA ENCLOSED WITH SEAT WALLS AND ABLE TO BE TEMPORARILY CLOSED ROSWELL AUTOCARE COLONIAL STYLE PEDESTRIAN PASTIS LIGHTING POSSIBLE OWNER-IMPROVED REAR SPACES CANTON STREET BIOCELLS MANAGE RAINWATER RUNOFF AND BEAUTIFY AREA EAST-WEST ALLEY MASTER PLAN NATURALISTIC PLANTINGS FORM EDGE TO DOWNTOWN ROSWELL 10’ TWO-WAY TRAFFIC LANES WITH 60° PARKING DRAFT: MAY 1, 2015 FORMAL STREET TREE PLANTINGS ALONG MIMOSA BOULEVARD WELLS FARGO PERVIOUS PAVEMENT IN ROSWELL MIMOSA BOULEVARD LEGEND PARKING STALLS ASPHALT PEDESTRIAN LIGHT 5’ WALKWAY AT NORTH EDGE OF PARK CAFE TABLE DECORATIVE CROSSWALKS 8’ MERCHANT ZONES IN FRONT BRICK SIDEWALK/ DRIVE BICYCLE RACKS OF BUSINESSES APRON BOLLARD CANTON STREET RAISED AS A MERCHANT ZONES TABLE (SAME ELEVATION AS SIDEWALKS) BETWEEN WEBB ST VEHICLE-RATED PERVIOUS RIGHT OF WAY AND ELIZABETH ST PAVEMENT PROPERTY LINES SIDEWALKS EXPANDED AND GRASSED OR LANDSCAPED MAGNOLIA STREET ROAD NARROWED WHEN AREA PERVIOUS PAVEMENT INSTALLED 0 30 60 N SCALE: 1” = 30’.
Recommended publications
  • Final Report Prepared for Albany, NY Joseph D. Tario Senior Project
    DEMONSTRATION OF ROUNDABOUT LIGHTING BASED ON THE ECOLUMINANCE APPROACH Final Report Prepared for THE NEW YORK STATE ENERGY RESEARCH AND DEVELOPMENT AUTHORITY Albany, NY Joseph D. Tario Senior Project Manager and THE NEW YORK STATE DEPARTMENT OF TRANSPORTATION Albany, NY Humayun Kabir Project Manager Prepared by THE LIGHTING RESEARCH CENTER , RENSSELAER POLYTECHNIC INSTITUTE 21 Union Street Troy, NY 12180 John D. Bullough and Mark S. Rea Principal Investigators Jeremy D. Snyder, Nicholas P. Skinner, Rosa I. Capó, Patricia Rizzo, Ute Besenecker Project Team Members Project Nos. 18233 / C-08-03 August 2012 NOTICE This report was prepared by the Lighting Research Center at Rensselaer Polytechnic Institute in the course of performing work contracted for and sponsored by the New York State Energy Research and Development Authority and the New York State Department of Transportation (hereafter the "Sponsors"). The opinions expressed in this report do not necessarily reflect those of the Sponsors or the State of New York, and reference to any specific product, service, process, or method does not constitute an implied or expressed recommendation or endorsement of it. Further, the Sponsors and the State of New York make no warranties or representations, expressed or implied, as to the fitness for particular purpose or merchantability of any product, apparatus, or service, or the usefulness, completeness, or accuracy of any processes, methods, or other information contained, described, disclosed, or referred to in this report. The Sponsors, the State of New York, and the contractor make no representation that the use of any product, apparatus, process, method, or other information will not infringe privately owned rights and will assume no liability for any loss, injury, or damage resulting from, or occurring in connection with, the use of information contained, described, disclosed, or referred to in this report.
    [Show full text]
  • Draft Alternatives Development and Screening Report
    APPENDIX C Draft Evaluation of Managed-lane Concepts Draft Evaluation of Managed-lane Concepts Little Cottonwood Canyon Environmental Impact Statement S.R. 210 - Wasatch Boulevard to Alta Lead agency: Utah Department of Transportation April 3, 2020 This page is intentionally left blank. Contents 1.0 Introduction ....................................................................................................................................................... 1 1.1 Study Area for Managed Lanes .............................................................................................................. 1 1.2 Traffic Operations ................................................................................................................................... 3 1.3 Roadway Context .................................................................................................................................... 3 2.0 Reversible-lane Concepts ................................................................................................................................. 4 2.1.1 Moveable Barrier ....................................................................................................................... 4 2.1.2 Reversible-lane Control Signals and Signs ............................................................................. 11 2.1.3 Other Reversible-lane Technologies ....................................................................................... 15 3.0 Peak-period Shoulder Lane Concept .............................................................................................................
    [Show full text]
  • Shared Streets and Alleyways – White Paper
    City of Ashland, Ashland Transportation System Plan Shared Streets and Alleyways – White Paper To: Jim Olson, City of Ashland Cc: Project Management Team From: Adrian Witte and Drew Meisel, Alta Planning + Design Date: February 2, 2011 Re: Task 7.1.O White Paper: “Shared Streets and Alleyways” - DRAFT Direction to the Planning Commission and Transportation Commission Five sets of white papers are being produced to present information on tools, opportunities, and potential strategies that could help Ashland become a nationwide leader as a green transportation community. Each white paper will present general information regarding a topic and then provide ideas on where and how that tool, strategy, and/or policy could be used within Ashland. You will have the opportunity to review the content of each white paper and share your thoughts, concerns, questions, and ideas in a joint Planning Commission/Transportation Commission meeting. Based on discussions at the meeting, the material in the white paper will be: 1) Revised and incorporated into the alternatives analysis for the draft TSP; or 2) Eliminated from consideration and excluded from the alternatives analysis. The overall intent of the white paper series is to explore opportunities and discuss the many possibilities for Ashland. Shared Streets Introduction Shared Streets aim to provide a better balance of the needs of all road users to improve safety, comfort, and livability. They are similar to European concepts such as the Dutch based ‘Woonerf’ and the United Kingdom’s ‘Home Zone’, with some distinct differences. This balance is accomplished through integration rather than segregation of users. By eschewing many of the traditional roadway treatments such as curbs, signs, and pavement markings, the distinction between modes is blurred.
    [Show full text]
  • Smart Crosswalk™ Automatic Activation Bollards
    SPEC Sheet #3000 Features/Benefits: Aesthetically pleasing Optional audible sounds Smart Crosswalk™ Automatic Activation Easily installed on sidewalk Simple control panel installations Bollards 12 VDC operation (down to 9 VDC) Automatic Activation Series — Bollards Internally illuminated courtesy light LightGuard Systems Part Number: LGS-T3A Directional detecting infrared sensors Description: Automatic Pedestrian Detection Bollards Application Notes: Infrared sensors are housed inside the Bollards and are typically preset by our factory. However, adjustments to the alignment of the sensor modules may be changed in the field. The infrared light beams are projected to the respective receiver module. The Bollard system is directionally sensitive and is activated only when a pedestrian enters into the crosswalk zone not when exiting. A pair of Bollards are placed at each end of the crosswalk, usually four bollards per crosswalk. When pedestrians enter into a crosswalk zone they pass between the Bollards and the Smart Crosswalk™ system is automatically activated. Each Bollard has a 24/7 LED courtesy light making the Bollard visible at night or during inclement weather. In order to capture the most pedestrians crossing the street, it is recommended that the bollards be placed a few feet wider than the crosswalk. General Performance Specifications Parameter Value Maximum separation 60 Feet Power consumption 2.5 Watts Operating temperature -20° to 80°C Operating voltage 9 VDC to 15 VDC Color White (custom colors available) Courtesy light color Amber Size 42” Tall, 8” Diameter © 2016 LightGuard Systems®, Inc. All Rights Reserved. 2292 Airport Blvd., Santa Rosa, CA 95403 | Phone (707) 542-4547 | Fax (707) 525-6333 SPEC Sheet #3000 Bollard Installation Guidelines INSTALLATION STEPS Step 1 Prior to installing Bollards, the proposed site should be inspected several times to observe the everyday habits of local citizens who utilize the crosswalk.
    [Show full text]
  • Primer on Impact Protection for Critical Transportation Infrastructure
    Primer on Impact Protection for Critical Transportation Infrastructure December 2018 FHWA-HIF-18-054 Notice This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in this document. The U.S. Government does not endorse products or manufacturers. Trademarks or manufacturers’ names appear in this report only because they are considered essential to the objective of the document. They are included for informational purposes only and are not intended to reflect a preference, approval, or endorsement of any one product or entity. Quality Assurance Statement The Federal Highway Administration (FHWA) provides high-quality information to serve Government, industry, and the public in a manner that promotes public understanding. Standards and policies are used to ensure and maximize the quality, objectivity, utility, and integrity of its information. FHWA periodically reviews quality issues and adjusts its programs and processes to ensure continuous quality improvement. Cover image source: Poulin/123rf.com TECHNICAL REPORT DOCUMENTATION PAGE 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. FHWA-HIF-18-054 4. Title and Subtitle 5. Report Date Primer on Impact Protection for Critical Transportation December 2018 Infrastructure 6. Performing Organization Code: V-335 7. Author(s) 8. Performing Organization Report No. John Wojtowicz, CPP; Nathan B. Grace* DOT-VNTSC-FHWA-18-17 9. Performing Organization Name and Address 10. Work Unit No. U.S. Department of Transportation 11. Contract or Grant No. John A. Volpe National Transportation Systems Center HW22A1 55 Broadway Cambridge, MA 02142-1093 12.
    [Show full text]
  • Shared Space: Operational Assessment
    Designing the Future Shared Space: Operational Assessment Report for Department for Transport October 2010 Document Control Project Title: Shared Space: Operational Assessment MVA Project Number: C3783100 Document Type: Report Directory & File Name: \\Londonbdc\Tesm\Tep\Projects\London & Southern\C37831 - Shared Space\Reporting\Data Collection And Analysis\Quantitativedatacollectionv13.Doc Document Approval Primary Author: Fiona Shore Other Author(s): Kayleigh Uthayakumar Reviewer(s): Stuart Reid, Steve Lowe Formatted by: Sally Watts Distribution Issue Date Distribution Comments 1-9 28/05/2010 Internal Internal Reviews 10 8/6/2010 DfT, Phil Jones Draft external report 13 7/10/2010 DfT, Phil Jones Incorporating client comments This report, and information or advice which it contains, is provided by MVA Consultancy Ltd solely for internal use and reliance by its Client in performance of MVA Consultancy Ltd’s duties and liabilities under its contract with the Client. Any advice, opinions, or recommendations within this report should be read and relied upon only in the context of the report as a whole. The advice and opinions in this report are based upon the information made available to MVA Consultancy Ltd at the date of this report and on current UK standards, codes, technology and construction practices as at the date of this report. Following final delivery of this report to the Client, MVA Consultancy Ltd will have no further obligations or duty to advise the Client on any matters, including development affecting the information or advice provided in this report. This report has been prepared by MVA Consultancy Ltd in their professional capacity as Consultants. The contents of the report do not, in any way, purport to include any manner of legal advice or opinion.
    [Show full text]
  • Detail Sheet Energy Absorbing Bollard (EAB) - Permanent
    Detail Sheet Energy Absorbing Bollard (EAB) - Permanent Product summary Status May be used following a site-specific risk assessment Category Permanent Bollard Test Level Test Level 0; 1600kg at 50km/h (AS3845:19999 - superseded) Supplier Roadside Services and Solutions Pty Ltd Description The Energy Absorbing Bollard (EAB; previously named OmniStop bollard) is a non-gating energy absorbing bollard designed for low speed environments. Introduction and purpose Figure 1. Energy Absorbing Bollard This detail sheet is intended to supplement VicRoads Road Design Note 06-04 - Accepted Safety Barrier Products. Please Summary Conditions for Use refer to RDN 06-04 for the current VicRoads acceptance status, information on the product assessment process and general Accepted Energy Absorbing Bollard, with high grade configuration carbon hollow bar (thick walled tube) which is acceptance conditions. inserted into a foam cartridge. The technical details within this document have been extracted Variants from information submitted to VicRoads by the Supplier. Deflection N/A VicRoads requirements take precedence over the product manual. Where a departure from these requirements is Product manual Roadside Services & Solutions Energy required, users should understand the risks and document their reviewed Absorbing Bollard engineering decisions. ASBAP issue Not accepted by ASBAP For more detailed product information, refer to the individual Refer VicRoads conditions for use (below). product manual or contact the System Supplier. Technical information The Energy Absorbing Bollard should be designed, installed and maintained in accordance with the following VicRoads conditions for use. Detail Sheet Page 1 of 3 Third Edition June 2019 Energy Absorbing Bollard (EAB) - Permanent VicRoads Conditions for Use Tested design requirements Vehicle Point of Redirection Minimum Post/Pin Dynamic Working Containment Speed mass (m)* length of Spacing deflection width Notes level (km/h) (kg) Leading Trailing barrier (m) (m)* (m) (m) TL-01 50 16002 N/A N/A N/A N/A N/A N/A Note 1.
    [Show full text]
  • Albert Dock 26 36 29 Bollard Bollard Bollards 31 Bollard Slipway 5 27 29
    *=H@I )AN=@H=,HO,? *=H@ )>AHJ,? *=H@ *=H@I *=H@I ALL CLASS ONE OPERATIVES ENGAGED IN TEMPORARY TRAFFIC MANAGEMENT OPERATIONS ARE LANTRA APPROVED AND ACCREDITED TO SECTOR SCHEME 12 +-),418- CHAPTER 8 T.S.M DETAILS DETAIL A ) Prescribed sign to Diagram 610 above and behind cones Running lane(s) Three only close spaced 750mm Hard or 1m high traffic cones Shoulder 45° !# Verge Notes: !! 1) During darkness, a single warning light to BS EN 12352:2006 should be provided. 2) Traffic cones should conform to diagram 7101.1 and to BS EN 13422. !$ DETAIL B Close spaced traffic cones, max. spacing 1.2m ! between cone centres for Type A works and 3m for Type B works, on motorways 1m high cones are recommended for the initial closures of the right hand lane(s) even if 750mm cones are used elsewhere. N.B. Road Danger Lamps complying with Regulation 55 should be provided between the cones at 9m spacing during darkness DETAIL C1 + .* 9m $ Single/Dual carriageway 40mph or less - 450mm traffic cones. Single/Dual carriageway 50mph or more - 750mm traffic cones. ' Notes: 1) During darkness, warning lights to BS EN 12352:2006 should be provided in accordance with Table A1.3 (Appendix 1). *=H@I 2) For relaxation to Detail C1 see Table A1.3 (Appendix 1). # & $ ' Pedestrian Walkway DRAWING DETAILS 56-8-,4-2)+- % WORKSITE # ! MASS BARRIER % 69-42)+- % ' ! Pedestrian Walkway PEDESTRIAN LIGHT HEAD TRAFFIC LIGHT HEAD BASE AND +-),418- DIRECTION PEDESTRIAN LIGHT HEAD BASE AND DIRECTION *=H@ crossing not A1 in use crossingROAD not A2 CLOSEDin use crossing A3 in use 0JA 5EFM=O NOTES : - % & " +56167612)+- 20 ! " DRAWING STATUS : FOR REVIEW REVISION: 1 ! Date Revision Rev by App by % +-)9); 05/02/20 Alteration to footway SP SP 22/07/21 Alterations to site layout SP 20 SP $= # Class One Traffic Management Ltd.
    [Show full text]
  • Fire Master Plans for Commercial & Residential Development
    Orange County Fire Authority Community Risk Reduction 1 Fire Authority Road, Building A, Irvine, CA 92602 www.ocfa.org 714-573-6100 Fire Master Plans for Commercial & Residential Development Guideline B-09 Serving the Cities of Aliso Viejo • Buena Park • Cypress • Dana Point • Garden Grove • Irvine • Laguna Hills • Laguna Niguel • Laguna Woods Lake Forest • La Palma • Los Alamitos • Mission Viejo • Rancho Santa Margarita • San Clemente • San Juan Capistrano Seal Beach • Santa Ana • Stanton • Tustin • Villa Park • Westminster • Yorba Linda • and Unincorporated Areas of Orange County Fire Master Plans for Commercial & Residential Development: B-09 February 23, 2021 Fire Master Plans for Commercial & Residential Development TABLE OF CONTENTS PURPOSE ....................................................................................................................... 2 SCOPE ............................................................................................................................ 2 Definitions................................................................................................................................ 2 SECTION 1: PLAN SUBMITTAL REQUIREMENTS ...................................................... 4 SECTION 2: FIRE ACCESS ROADWAYS ..................................................................... 5 Loading ................................................................................................................................... 5 Number Required ...................................................................................................................
    [Show full text]
  • Shared Space and Street Design Emerging Best Practice for Reconciling People, Places and Traffic
    Special Future of Urban Space and Humanity City Planning Institute of Japan, 25 Jun. 2010 Issue Shared Space and Street Design Emerging best practice for reconciling people, places and traffic Ben Hamilton-Baillie Director, Hamilton-Baillie Associates. Bristol, UK The growing relevance of public space for the economic vitality of towns and cities has prompted renewed efforts to improve street design, and on ways to integrate traffic with civic activities. Pioneering work in a number of European countries including the United Kingdom is challenging many long-standing assumptions surrounding road safety, design speed and the segregation of traffic from pedestrian movement. The principles of “shared space” provide important opportunities for planners, urban designers and traffic engineers in Japan and elsewhere to redefine professionals boundaries and responsibilities, and to establish a new streetscape vocabulary based on low-speed contextual design and place-making. This article reviews the background to these changes, and considers the implications of successful pioneering projects in the United Kingdom. Streets are complicated places. They have to serve a range of markets, whether they wished to or not. Today, for the first time, functions, principally those associated with movement and traffic individuals can obtain all their needs from out-of-town circulation, and those associated with interaction, exchange, and superstores, or from the internet. They can even maintain their other social and civic activities. Reconciling the different social networks on the internet, if they so wish. Physical markets functions of streets has been central to urban and transport policy are becoming functionally redundant. The only reason village, throughout the developed world for the past century.
    [Show full text]
  • Chapter 5: Cycle Lanes
    Consultation Draft 5 Cycle Lanes Design Objectives • Create a 2.0m wide space for cyclists to travel in one direction at up to 25mph. • Provide sufficient width in a cycle lane to overtake other cyclists without leaving the cycle lane. • Reduce the speed /flow / mix of motor traffic to a level where cyclists feel safe using the carriageway by introducing speed limits and weight/height/width restrictions to exclude larger vehicles. • Minimise stopping and starting to smooth the flow of cyclists along the route. • Enable two-way cycling on most streets by providing for contraflow on one-way traffic systems. • Eliminate unlawful footway cycling by making the carriageway the most attractive and convenient place to cycle. • Create attractive high quality public realm areas/streets where all modes can share a common surface at low speeds. Design Principles Greater separation of cyclists from other modes is required with greater speed and volume of motor traffic, and on gradients where cycle speeds can be unusually fast or slow. Speed/flow criteria for provision of cycle lanes Cycle lanes offer a sense of route continuity and can be used on all roads with speed limits up to 40mph and flows up to 10,000 vpd. They help to define space for cyclists within roads. They do not however offer any sort of protection from passing vehicles and are generally preferred on roads with average speeds of 30mph or less, and without significant HGV traffic. Where space is restricted and there are fewer than 5,000 vpd, advisory cycle lanes may be provided by removing the centre lane to give a single two-way carriageway.
    [Show full text]
  • Standard Drawings (PDF)
    City of Kingsburg 2 0 0 9 Improvement Standards D-1 Curb Inlet D-2 Aluminum Marker D-3 Inlet Throat Frame D-4 Type 'A' Manhole D-5 Cast Iron Manhole Frame and Cover D-6 Drainage Basin D-7 Sidewalk Drain D-8 Thru Drain Detail for Medians D-9 Silt Fence D-10 Inlet Protection - Type I D-11 Stabilized Construction Entrance D-12 Inlet Protection - Type II Company Name E-1 Street Light - Major Street with Base, Pull Box, and PVC Conduit E-2 Street Light - Local Street with Base, No Pull Box, and PVC Conduit E-3 Street Light - Concrete Pull boxes E-4 Street Light - Connection Diagram E-5 Street Light - Layout E-6 Street Light - Placement Divided Arterials Streets E-7 Street Light - Placement Collector Street E-8 Street Light - Placement Local Streets E-9 Street Light - Placement Cul-de-sac Street E-10 Street Light - Placement Arterial Intersection E-11 Street Light - Foundation Wire Way Detail E-12 Street Light - Pole Numbering E-13 Street Light - Wiring E-14 Street Light and Signal - Combination Wiring E-15 Decorative Lighting Company Name L-1 Vine on Block Wall L-2 Tree Planting Detail L-3 Shrub Planting Detail L-4 Landscape Gate Valve L-5 Irrigation Sleeve L-6 Irrigation Trenching Detail L-7 Pop Up Rotor Head L-8 Irrigation Controller L-9 Root Watering System L-10 Tree Bubbler in Root Watering System L-11 Pop Up Spray Head L-12 Remote Control Valve-Angle L-13 Remote Control Valve-Globe L-14 Solar Irrigation Controller L-15 Backflow Preventer Cage M-1 Six (6) Inch Masonry Wall M-2 Four (4) Inch Masonry Wall M-3 Control Survey Monument - A M-4
    [Show full text]