A1 in : Morpeth to Ellingham Morpeth to Ellingham 6.4 Environmental Statement

A1 in Northumberland: Morpeth[Scheme to Ellingham Name] [Scheme Number TR100xx] 1.3 IntroductionScheme Number: to the Application TR010041 APFP Regulation 5(2)(q) Planning Act 2008 6.4 EnvironmentalInfrastructure Planning (Applications:Statement Prescribed Forms– Appendix and Procedure) 16.10 Cumulative Study Area SensitivityRegulations 2009 Test

APFP Regulation 5(2)(a)

Planning Act 2008

Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

June 2020

Planning Inspectorate Scheme Ref: TR010041 Application Document Ref: TR010041/APP/6.4

Volume [x]

A1 in Northumberland: Morpeth to Ellingham Morpeth to Ellingham 6.4 Environmental Statement

Infrastructure Planning

Planning Act 2008

The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 20[xx]

Environmental Statement - Appendix

Regulation Reference: APFP Regulation 5(2)(a) Planning Inspectorate Scheme TR010041 Reference Application Document Reference TR010041/APP/6.4 Author: A1 in Northumberland: Morpeth to Ellingham Project Team, Highways

Version Date Status of Version Rev 0 June 2020 Application Issue

Planning Inspectorate Scheme Ref: TR010041 Application Document Ref: TR010041/APP/6.4

A1 in Northumberland: Morpeth to Ellingham 6.4 Environmental Statement Appendix 16.10: Cumulative Study Area Sensitivity Test

Application Information STAGE 1 STAGE 2 PROGRESS TO STAGE 3/4? Development certainty: Certain (Consented and started Construction date, if Approx. Distance construction) Planning Planning Development Number of applicable Traffic Scale and nature Planning Local Planning from Scheme EIA Site Environmental Likely (Consented, not started Included in Development Application Application Predominant Housing Grid Information of development Reasoning for inclusion / Application Site Location Development Description Planning Application Link to Planning Application Order Limits or Req Area Information PINS Tier (1-3) construction or construction status short list? Type Submission Decision Use Class, if Units, if (N.B A2E construction Reference available likely to have a exclusion in short list Ref. Authority Status Affected Road (Y/N) (ha) available (Y/N) unknown) (Y/N) Date Issue Date applicable applicable period 2021-2023) (Y/N) significant effect Network Unknown (not-consented and not started construction) Unlikely – unique circumstance Westroad Garage Demolition of existing buildings and erection of 10 residential units with associated https://publicaccess.northumberland. Easting: The number of Environmental information Road access (amended site location plan and red line boundary 29.08.2018) Refused - gov.uk/online- 4.6 km west of the Construction date 412918 dwellings to be available. 18/02671/FUL Longframlington NE65 Residential NCC 27/07/2018 25/02/2019 appeal C3 10 applications/applicationDetails.do?ac N 0.29 Y N 1 Unknown Y Order Limits unknown Northing: provided is 10 or No construction information 8HX dismissed tiveTab=dates&keyVal=PCH02JQSI2 600904 more available, so worst-case assumed 600 Land North & East if Demolition of Indoor Riding Arena and Development of 26 Dwellings – Amended https://publicaccess.northumberland. Site is over 1 ha Easting: Environmental information Lisleswood Old Park 17.08.2018 gov.uk/online- 2.3 km north west of and the number of Construction date 416703 available. 18/02250/FUL Road Swarland Residential NCC 26/06/2018 17/10/2018 Permitted C3 26 applications/applicationDetails.do?ke the Order Limits, 340 N 2.35 Y Y 1 dwellings to be Likely Y unknown Northing: No construction information Northumberland yVal=PAVTQ5QSHDV00&activeTab m west of the ARN provided is 10 or 603247 available, so worst-case assumed =summary more Site is over 1 ha Land south west of the Change of use to residential (C3 use by erecting approximately 10 no. Detached dwellings https://publicaccess.northumberland. Easting: Environmental information and the number of Old Tweed Mill gov.uk/online- 2.7 km north west of Construction date 416363 available. 17/00500/OUT Residential NCC 07/03/2017 31/05/2019 Permitted C3 9 N 1.20 Y N 1 dwellings to be Likely Y Springwood Swarland applications/simpleSearchResults.do the Order Limits unknown Northing: No construction information provided is 10 or Northumberland ?action=firstPage 603416 available, so worst-case assumed more Land North of Proposed construction of eleven detached houses of traditional design with associated Site is over 1 ha https://publicaccess.northumberland. Easting: Environmental information Fairfields access and parking and the number of gov.uk/online- 4.65 km west of the Construction date 412898 available. 16/04150/FUL Longframlington Residential NCC 06/12/2016 10/08/2017 Permitted C3 11 N 1.70 Y N 1 dwellings to be Likely Y applications/simpleSearchResults.do Order Limits unknown Northing: No construction information Northumberland (near provided is 10 or ?action=firstPage 601345 available, so worst-case assumed embleton hall) more Land south of Outline planning permission with all matters reserved except for access for the https://publicaccess.northumberland. Easting: Environmental information mereburn house, low construction of up to 9 no. residential units gov.uk/online- 2.3 km north of the Construction date 417081 available. 16/04129/OUT wood, swarland, NE65 Residential NCC 06/12/2016 13/04/2017 Permitted C3 9 applications/applicationDetails.do?ac N 1.50 Y N 1 Site is 1 ha or more Likely Y Order Limits unknown Northing: No construction information 9PB tiveTab=summary&keyVal=OG9TGD 603254 available, so worst-case assumed QSKXK00 Land north of Cairn Proposed erection of 26 dwelling houses and associated infrastructure including open https://publicaccess.northumberland. Site is over 1 ha Easting: Environmental information View, Fenwick Park, space and connection to existing highway gov.uk/online- Construction appears to and the number of 4.6 km west of the 412750 Transport available. No precise construction 16/02973/FUL Longframlington, Residential NCC 15/10/2016 18/01/2017 Permitted C3 26 applications/applicationDetails.do?ke N have commenced from 1.63 Y 1 dwellings to be Certain Y Order Limits Northing: Statement information available so worst- Northumberland, NE65 yVal=OCAU8YQSJHU00&activeTab aerial imagery provided is 10 or 601189 case assumed 8TD =summary more North End Farm, Construction of 9 detached dwellings https://publicaccess.northumberland. Easting: Environmental information Longframlington, gov.uk/online- 4.5 km west of the Construction date 412990 available. 16/00745/FUL Morpeth, Residential NCC 09/03/2016 02/03/2017 Permitted C3 9 N 1.20 Y N 1 Likely Likely Y applications/simpleSearchResults.do Order Limits unknown Northing: No construction information Northumberland, NE65 ?action=firstPage 601779 available, so worst-case assumed 8DZ Site is over 1 ha Swarland Park Demolition of existing indoor riding arena and outbuildings and erection of 15 no. https://publicaccess.northumberland. Easting: Environmental information and the number of Equestrian Centre, Old residential units with associated garages and alterations to existing private access road gov.uk/online- 2.3 km north west of Construction date 416665 available. 15/02656/FUL Residential NCC 07/01/2016 15/12/2016 Permitted C3 15 N 2.53 Y N 1 dwellings to be Likely Y Park Road, Swarland, applications/simpleSearchResults.do the Order Limits unknown Northing: No construction information provided is 10 or Morpeth, NE68 9HT ?action=firstPage 603191 available, so worst-case assumed more Potland Burn, West Application for 143 no. Dwellings incorporating new site access and internal access https://publicaccess.northumberland. Site is over 1 ha Easting: Environmental information road, provision of SUDS, open space and landscaping gov.uk/online- 0.64 km east of the and the number of Construction date 425677 available. 18/00779/FUL Residential NCC 13/03/2018 Unknown Registered C3 143 applications/applicationDetails.do?ac ARN, 7.2 km east of N 6.81 Y Y 1 dwellings to be Unknown Y unknown Northing: No construction information tiveTab=summary&keyVal=P4VE47Q the Order Limits provided is 10 or 588027 available, so worst-case assumed SMO600 more Site is over 1 ha Land west of Village Development of 22 dwellings including 4 three bedroomed affordable homes, new https://publicaccess.northumberland. Easting: Environmental information and the number of Hall, Acklington Village, access and landscaping gov.uk/online- 5 km east of the Construction date 422549 available. 17/01670/FUL Residential NCC 11/05/2017 04/04/2019 Permitted C3 24 N 2.04 Y N 1 dwellings to be Likely Y Acklington, applications/simpleSearchResults.do Order Limits unknown Northing: No construction information provided is 10 or Northumberland ?action=firstPage 601978 available, so worst-case assumed more Land south of A196, Re-Plan of 271 houses (substitution of house types and addition of 42 houses in https://publicaccess.northumberland. Site is over 1 ha Easting: stobhill, Morpeth - relation to the existing development of 396 houses, access, landscaping and associated gov.uk/online- Construction appears to and the number of Environmental information 4.1 km south east of 421223 17/04652/FUL Barratt Homes, South infrastructure. Residential NCC 09/01/2018 03/07/2018 Permitted C3 271 applications/applicationDetails.do?ke N have commenced from 17.78 Y Y 1 dwellings to be Certain Y available. Construction the Order Limits Northing: Fields, Hepscott, yVal=P1D5MMQSLCZ00&activeTab aerial imagery provided is 10 or commenced 584839 Northumberland =summary more Linden Hall, Proposed nine hole extension of existing golf course (as amended 23.02.2017) https://publicaccess.northumberland. Easting: Environmental information 2.6 km west of the Longhorsley, Morpeth, gov.uk/online- Construction date 414483 Site is over 1ha or available. 16/04109/FUL Recreational NCC 07/11/2016 22/05/2017 Permitted D2 N/A Order Limits, 700 m N 25.40 Y N 1 Likely Y Northumberland, NE65 applications/simpleSearchResults.do unknown Northing: more No construction information south of the ARN 8XF ?action=firstPage 596622 available, so worst-case assumed Land east of Normandy Approval of reserved matters for access, appearance, landscaping, layout and scale of https://publicaccess.northumberland. Easting: The number of Environmental information Terrace, East Road, outline permission 12/03472/OUT – proposed residential development for approx 12 no. gov.uk/online- 3.3 km west of the Construction date 415089 dwellings to be available. 16/00626/REM Residential NCC 07/03/2016 07/07/2017 Permitted C3 12 N 0.38 Y N 1 Likely Y Longhorsley, Morpeth, dwellings applications/simpleSearchResults.do Order Limits unknown Northing: provided is 10 or No construction information Northumberland ?action=firstPage 594822 more available, so worst-case assumed Land North And East Conversion of Grade II listed East Farm Barns into 2 No. dwellings, change of use of https://publicaccess.northumberland. Site is over 1 ha 4.4 km south east of Easting: Environmental information Of East Farm former shop into cafe, refurbishment of existing flat above Cafe (including new window gov.uk/online- and the number of Awaiting the Order Limits, 1 Construction date 422593 Transport available. 18/00168/FUL Pegswood Village to side) and proposal for 28No. additional dwellings. Demolish Lane End garage and Residential NCC 01/02/2018 Unknown C3 31 applications/applicationDetails.do?ac N 1.13 Y 1 dwellings to be Unknown Y decision km north east of the unknown Northing: Statement No construction information Pegswood Lindisville bungalow tiveTab=summary&keyVal=P2NG8E provided is 10 or ARN 587498 available, so worst-case assumed Northumberland QSLOP00 more Land North East Of Detailed planning application for the erection of 61 no. 2, 3 and 4 bedroom two-storey https://publicaccess.northumberland. Easting: Site is 1 ha or more, Environmental information Pegswood First School dwellings with associated works. gov.uk/online- 4.6 km from the Construction date 422860 Number of dwelling available. No construction 19/02747/FUL Butchers Lane Residential NCC 19/07/2019 11/11/2019 Permitted C3 61 applications/applicationDetails.do?ke N 1.83ha Y Y 1 Likely Y Order Limits unknown Northing: proposed is 10 or information available, so worst- Pegswood yVal=PVLXU3QS0IS00&activeTab=s 587856 more case assumed Northumberland ummary Land South of West Hybrid planning application comprising: Full planning permission for a holiday park Chevington Farm comprising the installation of up to 275 hard standing bases for static caravans; 200 all https://publicaccess.northumberland. Easting: Environmental information Cottages West weather pitches for touring units and tents associated car parking and toilet/shower gov.uk/online- 4.3 km east of the Construction date 424123 available. 17/04330/FUL Chevington block, main reception and amenity building, outdoor play area, workshop; internal Mixed-use NCC 30/11/2017 20/01/2020 Permitted Sui Generis N/A applications/applicationDetails.do?ac N 103.60 Y Y 1 Site is 1 ha or more Likely Y Order Limits unknown Northing: No construction information Northumberland, NE61 access roads; footpaths; landscaping; water based leisure uses. Outline planning tiveTab=summary&keyVal=P04Y0IQ 596048 available, so worst-case assumed 5BB permission for a further 475 hard standing bases for holiday homes, a 9 hole golf SKUS00 course and cafe, with all matters reserved Former Longhirst Hall Increase of 5 apartments in bedroom block from 15 to 20 in relation to application https://publicaccess.northumberland. Easting: 1,439 No environmental information John Dobson Drive 17/01618/FUL gov.uk/online- 4 km east of the Construction date 422399 sq/m Floorspace is 1,000 17/04184/FUL Residential NCC 23/11/2017 18/01/2018 Permitted C3 20 N N N 1 Likely N available. No construction Longhirst NE61 3LL applications/simpleSearchResults.do Order Limits unknown Northing: floorsp sq/m or more information available. ?action=firstPage 589032 ace Land North East of Proposed erection of 118 houses, including associated access and infrastructure https://publicaccess.northumberland. Site is over 1 ha Easting: Environmental information Hebron Avenue (Revised description) gov.uk/online- and the number of 3.7 km east of the Construction date 422092 available. 17/02177/FUL Pegswood Village Residential NCC 22/06/2017 28/06/2018 Permitted C3 125 applications/applicationDetails.do?ke N 7.43 Y Y 1 dwellings to be Likely Y Order Limits unknown Northing: No construction information Pegswood yVal=ORNB75QSHMD00&activeTab provided is 10 or 587648 available, so worst-case assumed Northumberland =summary more West Chevington Farm Demolition of dilapidated modern farm buildings and creation of 9 no. new dwellings by https://publicaccess.northumberland. gov.uk/online- Easting: Environmental information West Chevington conversion and alteration of existing buildings, new build sections and new garaging 4.3 km east of the Construction date 422890 available. 15/02908/FUL Residential NCC 11/09/2015 02/12/2015 Permitted C3 9 applications/applicationDetails.do?ac N 1.00 Y N 1 Site is 1 ha or more Likely Y Northumberland NE61 and associated sewage treatment plant Order Limits unknown Northing: No construction information 5BB tiveTab=summary&keyVal=NU1NWN QSKQT00 597247 available, so worst-case assumed Northumberland Close, Construction of 22 new dwellings comprising 6x 2 bed, 6x 3 bed houses for rent, and https://publicaccess.northumberland. Easting: The number of Environmental information Ashington, NE63 8PQ 10x 2 bed bungalows for sale gov.uk/online- 7.8km east of the Construction date 426057 dwellings to be available. 17/04048/FUL Residential NCC 07/11/2017 19/03/2018 Permitted C3 22 applications/applicationDetails.do?ac N 0.68 Y N 1 Likely Y Order Limits unknown Northing: provided is 10 or No construction information tiveTab=summary&keyVal=OZ04KT 587867 more available, so worst-case assumed QSKDR00 Land South Of Grange Outline Planning Permission for up to 167 residential dwellings with associated https://publicaccess.northumberland. Site is over 1 ha Refused - Easting: Environmental information Court Grange Road infrastructure and areas of public open space (with all matters reserved except access) gov.uk/online- 5.2 km east of the and the number of appeal Construction date 424416 available. 17/04618/OUT Widdrington Station Residential NCC 09/01/2018 02/10/2019 C3 165 applications/applicationDetails.do?ac Order Limits, 550 m N 8.52 Y Y 1 dwellings to be Unknown Y status unknown Northing: No construction information Northumberland tiveTab=summary&keyVal=P19QFB east of the ARN provided is 10 or unknown 593562 available, so worst-case assumed QSLBL00 more Land north east of Drainage, engineering works and building to produce hydro-electric power (EIA https://publicaccess.northumberland. Easting: Environmental information Keepers Cottage Development) (Amended Red Line Boundary and Plans 21.12.18) (Amended Proposal gov.uk/online- EIA development as 4.1 km north east of Construction date 420981 Transport available. 18/03897/FUL Acklington Title 03.04.2019) Light Industrial NCC 09/11/2018 05/04/2019 Permitted B1 c N/A applications/applicationDetails.do?ac Y 1.96 Y - Full ES 1 the site is 1 ha or Likely Y the Order Limits unknown Northing: Statement No construction information Northumberland tiveTab=summary&keyVal=PHIPTBQ more 603313 available, so worst-case assumed SK1R00 Land At South East Proposed new general purpose farm building https://publicaccess.northumberland. Easting: Corner Of Chevington gov.uk/online- No environmental information 4.5 km east of the Construction date 422452 N 18/03276/FUL Wood West Other' NCC 03/10/2018 18/03/019 Permitted Other N/A applications/applicationDetails.do?ac N 1.20 N 1 Site is 1 ha or more Likely N available. No construction Order Limits unknown Northing: Chevington tiveTab=summary&keyVal=PEY4BQ information available 599081 Northumberland QSJ0T00 56 Station Road Residential development (use class C3) for twenty dwellings with associated https://publicaccess.northumberland. Easting: Number of Environmental information Stannington Morpeth landscaping and access. gov.uk/online- 1.1 km east of the Construction date 421869 dwellings proposed available. 18/04038/FUL Northumberland NE61 Residential NCC 16/11/2018 Unknown Registered C3 20 applications/applicationDetails.do?ac N 0.8ha Y N 1 Unknown Y ARN unknown Northing: to be provided is 10 No construction information 6NH tiveTab=summary&keyVal=PI8PTRQ 581585 or more available, so worst-case assumed SKAK00 Land At South Of North Proposed anaerobic digestion plant, linked to existing grain storage and processing https://publicaccess.northumberland. Easting: Environmental information East Grains Longhirst facility gov.uk/online- Awaiting 5 km east of the Construction date 423374 Transport available. 18/04533/FUL Northumberland Industrial NCC 25/02/2019 Unknown Other N/A applications/applicationDetails.do?ac N 3.91 Y 1 Site is 1 ha or more Unknown Y decision Order Limits unknown Northing: Statement No construction information tiveTab=summary&keyVal=PKDY9V 588612 available, so worst-case assumed QSL4500 5016 Full planning application for 327no. dwellings | Land At Willow Burn Whinney Hill Farm https://publicaccess.northumberland. Easting: Environmental information Land north of Cottages Choppington Northumberland NE62 5RD Number of dwelling Awaiting gov.uk/online- 4.5 km south east of Construction date 425562 available. 16/04411/FUL Gate Residential NCC 01/12/2016 Unknown Unknown 327 N 18.80 Y Y 1 proposed is 10 or Unknown Y decision applications/simpleSearchResults.do the Order Limits unknown Northing: No construction information more ?action=firstPage 584533 available, so worst-case assumed

Land South Of Bluebell Construction of 159 dwellings, forming phase 1B of the development of the former St https://publicaccess.northumberland. Easting: Site is 1 ha or more, Environmental information 480 m from the ARN, Court East Georges Hospital site in Morpeth. gov.uk/online- Construction date 420491 Number of dwelling available. No construction 19/00904/FUL Residential NCC 15/03/2019 N/A Registered C3 159 2.7 km from the N 7.3 Y Y 1 Unknown Y Cottingwood Morpeth applications/simpleSearchResults.do unknown Northing: proposed is 10 or information available, so worst- Order Limits Northumberland ?action=firstPage 586866 more case assumed Land North Of 30 Erection of 10 no. single storey, 2 bedroom dwellings with associated car parking and https://publicaccess.northumberland. Easting: Site is 1 ha or more, Environmental information Longhirst Village landscaping. gov.uk/online- 1.5 km from the ARN, Construction date 422420 Number of dwelling available. No construction 19/00991/FUL Longhirst Village Residential NCC 25/03/2019 N/A Registered C3 10 applications/applicationDetails.do?ac 4.2 km from the N 1.38 Y N 1 Unknown Y unknown Northing: proposed is 10 or information available, so worst- Longhirst tiveTab=summary&keyVal=PORZDE Order Limits 589406 more case assumed Northumberland QSMTH00 Land North West Of Change of use of land for the siting of up to 60 static caravans, along with associated https://publicaccess.northumberland. Easting: Environmental information 1.4 km from the ARN, Springwood Coast infrastructure and hard and soft landscaping. 60 static gov.uk/online- Construction date 416128 available. No construction 19/01687/FUL Leisure NCC 28/05/2019 N/A Registered C1 2.7 km from the N 2.5 Y Y 1 Site is 1 ha or more Unknown Y View Swarland caravans applications/simpleSearchResults.do unknown Northing: information available, so worst- Order Limits Northumberland ?action=firstPage 603497 case assumed Percy Wood Golf Club Demolition of existing golf club house and associated buildings, and development of up Site is over 1 ha And Country Retreat to16 dwellings with all matters reserved apart from access. https://publicaccess.northumberland. Easting: Environmental information 2.5 km from the and the number of Coast View Swarland gov.uk/online- Construction date 416138 available. No construction 19/04108/OUT Residential NCC 07/10/2019 Unknown Registered C3 16 Order Limits, 69 0m N 0.76 Y Y 1 dwellings to be Unknown Y Morpeth applications/simpleSearchResults.do unknown Northing: information available, so worst- from the ARN provided is 10 or Northumberland NE65 ?action=firstPage 603230 case assumed more 9JW Land South Of Proposed new residential development of 41 dwellings with associated parking access https://publicaccess.northumberland. Environmental information Application Easting: Number of dwelling Deneburn Rothbury and landscaping (as amended by plans received 16/03/17) gov.uk/online- 0.89 km from the available. Construction to be Refused, 412488 proposed is 10 or 16/04426/FUL Road Longframlington Residential NCC 01/10/2016 27/04/2017 C3 41 applications/applicationDetails.do?ke ARN, 4.94 km from N Under Construction 1.67 Y Y 1 Certain Y complete by 2021, potential for Appeal Northing: more, Site is 1 ha or Northumberland NE65 yVal=OHGSWBQSLGH00&activeTa the Order Limits construction to overlap so worst- Allowed 600585 more 8AJ b=summary case assumed A1 in Northumberland: Morpeth to Ellingham 6.4 Environmental Statement Appendix 16.10: Cumulative Study Area Sensitivity Test

Proposed mitigation applicable to the Scheme Application Reference ‘Other development' brief description Assessment of cumulative impact with the Scheme Cumulative significant effect including any apportionment AIR QUALITY 19/02747/FUL Detailed planning application for the Construction: Construction: Measures outlined in the Outline CEMP Construction: Unlikely to have a significant cumulative air quality effect erection of 61no. 2, 3 and 4 bedroom two- - The Order Limits are over 4.5 km to the west, there would be no cumulative construction dust impacts. would be implemented for the Scheme. storey dwellings with associated works. - Number of construction vehicles as a result of this development are unlikely to substantially add to Operation: Unlikely to have a significant cumulative air quality effect Scheme construction traffic impacts. Operation: Measures outlined in the Outline CEMP would be implemented for the Scheme. Operation: - The cumulative influence of this development is accounted for within the traffic model data.

19/00904/FUL Construction of 159 dwellings, forming Construction: Construction: Measures outlined in the Outline CEMP Construction: Unlikely to have a significant cumulative air quality effect phase 1B of the development of the former - The Order Limits are over 3 km to the north, there would be no cumulative construction dust impacts. would be implemented for the Scheme. St Georges Hospital site in Morpeth. - Number of construction vehicles as a result of this development are unlikely to substantially add to Operation: Unlikely to have a significant cumulative air quality effect Scheme construction traffic impacts. Operation: Measures outlined in the Outline CEMP would be implemented for the Scheme. Operation: - The cumulative influence of this development is accounted for within the traffic model data.

19/01687/FUL Change of use of land for the siting of up to Construction: Construction: Measures outlined in the Outline CEMP Construction: Unlikely to have a significant cumulative air quality effect 60 static caravans, along with associated - The Order Limits are over 1 km to the east, there would be no cumulative construction dust impacts. would be implemented for the Scheme. infrastructure and hard and soft - The number of construction vehicles as a result of this development are unlikely to substantially add to Operation: Unlikely to have a significant cumulative air quality effect landscaping. Scheme construction traffic impacts. Operation: Measures outlined in the Outline CEMP would be implemented for the Scheme. Operation: - Given the nature and scale of the development any additional traffic generated by the development is unlikely to result in noticeable cumulative impacts.

19/04108/OUT Demolition of existing golf club house and Construction: Construction: Measures outlined in the Outline CEMP Construction: Unlikely to have a significant cumulative air quality effect associated buildings, and development of - The Order Limits are over 1 km to the east, there would be no cumulative construction dust impacts. would be implemented for the Scheme. up to16 dwellings with all matters reserved - The number of construction vehicles as a result of this development are unlikely to substantially add to Operation: Unlikely to have a significant cumulative air quality effect apart from access. Scheme construction traffic impacts. Operation: Measures outlined in the Outline CEMP would be implemented for the Scheme. Operation: - Given the nature and scale of the development any additional traffic generated by the development is unlikely to result in noticeable cumulative impacts.

16/04426/FUL Proposed new residential development of Construction: Construction: Measures outlined in the Outline CEMP Construction: Unlikely to have a significant cumulative air quality effect 41 dwellings with associated parking - The Order Limits are over 4 km to the east, there would be no cumulative construction dust impacts. would be implemented for the Scheme. access and landscaping (as amended by - The number of construction vehicles as a result of this development are unlikely to substantially add to Operation: Unlikely to have a significant cumulative air quality effect plans received 16/03/17) Scheme construction traffic impacts. Operation: Measures outlined in the Outline CEMP would be implemented for the Scheme. Operation: - Although the development is likely to add traffic to the A697, the impact is likely to be neutralised by the expected decrease of over 1,000 AADT on this road with the Scheme.

CULTURAL HERITAGE No cumulative impacts identified for this topic for the Cumulative Study Area Sensitivity Test

LANDSCAPE AND VISUAL 18/02671/FUL Demolition of existing buildings and Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising erection of 10 residential units with noticeable construction activity occurring in two separate locations within neighbouring local landscape would be implemented for the Scheme. on local landscape character and on associated views, these are not associated access (amended site location character areas. Views from receptors would typically be affected by one or other of the physically considered to be substantial, and no significant cumulative landscape or plan and red line boundary 29.08.2018) separate construction sites and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. would be implemented for the Scheme. Operation: The development site is physically remote from the A1 corridor and is anticipated to result in a Operation: Given the location of the proposed development within larger settlement associated with Longframlington, with a perceptible change in land use and the Longframlington village there would be no intervisibility between the presence of more housing within the village, and the local landscape character area. Scheme and proposed development. No cumulative landscape or visual effects are anticipated. 16/04129/OUT Outline planning permission with all matters Only sequential cumulative views, no static cumulative views are anticipated. These would be transient Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising reserved except for access for the views, glimpsed when travelling at speed along the tree lined A1 road corridor with intermittent horizon would be implemented for the Scheme. on local landscape character and on associated views, these are not construction of up to 9 no. Residential units views to the north west and Swarland. considered to be substantial, and no significant cumulative landscape or Operation: Measures outlined in the Outline CEMP visual effects are anticipated. Construction: If the construction phase coincides with the Scheme construction phase, there would be would be implemented for the Scheme. noticeable construction activity occurring in two separate locations within neighbouring local landscape Operation: Given the location of the proposed development on the character areas. Views from receptors would typically be affected by one or other of the physically boundary of Swarland village there would be no intervisibility between the separate construction sites and significant cumulative effects would not arise. Only sequential cumulative Scheme and proposed development. No cumulative landscape or visual views, no static cumulative views are anticipated. These would be transient views, glimpsed when effects are anticipated. travelling at speed along the tree lined A1 road corridor with intermittent horizon views to the north west and Swarland.

Operation: The development site is at an elevated location within the A1 corridor and is anticipated to result in a larger settlement associated with Swarland, on the south eastern boundary, with a perceptible change in land use and the presence of more built development around the village and within the local landscape character area. It is part of a cluster of developments, infilling an area on the boundary of Swarland.

15/02656/FUL Demolition of existing indoor riding arena Only sequential cumulative views, no static cumulative views are anticipated. These would be transient Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising and outbuildings and erection of 15 no. views, glimpsed when travelling at speed along the tree lined A1 road corridor with intermittent horizon would be implemented for the Scheme. on local landscape character and on associated views, these are not Residential units with associated garages views to the north west and Swarland. considered to be substantial, and no significant cumulative landscape or and alterations to existing private access Operation: Measures outlined in the Outline CEMP visual effects are anticipated. road Construction: If the construction phase coincides with the Scheme construction phase, there would be would be implemented for the Scheme. noticeable construction activity occurring in two separate locations within neighbouring local landscape Operation: Given the location of the proposed development on the character areas. Views from receptors would typically be affected by one or other of the physically boundary of Swarland village there would be no intervisibility between the separate construction sites and significant cumulative effects would not arise. Scheme and proposed development. No cumulative landscape or visual effects are anticipated. Operation: The development site is at an elevated location within the A1 corridor and is anticipated to result in a larger settlement associated with Swarland, on the south eastern boundary, with a perceptible change in land use and the presence of more built development around the village and within the local landscape character area. It is part of a cluster of developments, infilling an area on the boundary of Swarland.

17/01670/FUL Development of 22 dwellings including 4 Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising three bedroomed affordable homes, new noticeable construction activity occurring in two separate locations within neighbouring local landscape would be implemented for the Scheme. on local landscape character and on associated views, these are not access and landscaping character areas. Views from receptors would typically be affected by one or other of the physically considered to be substantial, and no significant cumulative landscape or separate construction sites and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. would be implemented for the Scheme. Operation: The development site is physically remote from the A1 corridor (over 4.5 km distance) due to Operation: Given the location of the proposed development on the north the local topography and tree cover. The proposed development is anticipated to result in a larger western edge of Acklington there would be no intervisibility between the settlement associated with Acklington, with a perceptible change in land use and the presence of more Scheme and proposed development due to intervening tree and hedgerow housing north of the village and the local landscape character area. cover. No cumulative landscape or visual effects are anticipated.

17/04652/FUL Re-Plan of 271 houses (substitution of Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising house types and addition of 42 houses in noticeable construction activity occurring in two separate locations within neighbouring local landscape would be implemented for the Scheme. on local landscape character and on associated views, these are not relation to the existing development of 396 character areas. Views from receptors would typically be affected by one or other of the physically considered to be substantial, and no significant cumulative landscape or houses, access, landscaping and separate construction sites and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. associated infrastructure. would be implemented for the Scheme. Operation: The development site is physically remote from the A1 corridor (over 4.5 km distance) due to Operation: Given the location of the proposed development on the south the built environment of Morpeth, local topography and tree cover. The proposed development is eastern edge of Morpeth there would be no intervisibility between the anticipated to result in a larger settlement associated with Morpeth, with a perceptible change in land use Scheme and proposed development due to the built environment of and the presence of more housing south east of the town, and the local landscape character area. Morpeth, and intervening tree and hedgerow cover. No cumulative landscape or visual effects are anticipated.

16/00626/REM Approval of reserved matters for access, Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising appearance, landscaping, layout and scale noticeable construction activity occurring in two locations within the 38b Lowland Rolling Farmland - would be implemented for the Scheme. on local landscape character and on associated views, these are not of outline permission 12/03472/OUT – Longhorsley local landscape character area. Views from receptors would typically be affected by one or considered to be substantial, and no significant cumulative landscape or proposed residential development for other of the physically separate construction sites and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. approx. 12 no. Dwellings would be implemented for the Scheme. Operation: The development site is physically remote from the A1 corridor and is anticipated to result in a Operation: Given the location of the proposed development on the larger settlement associated with Longhorsley, with a perceptible change in land use and the presence of eastern edge of Longhorsley there would be no intervisibility between the more housing on the eastern edge the village and the local landscape character area. Scheme and proposed development due to the intervening tree and hedgerow cover. No cumulative landscape or visual effects are anticipated. 18/00168/FUL Conversion of Grade II listed East Farm Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising Barns into 2No. dwellings, change of use of noticeable construction activity occurring in two neighbouring local landscape character areas. Views would be implemented for the Scheme. on local landscape character and on associated views, these are not former shop into cafe, refurbishment of from receptors would typically be affected by one or other of the physically separate construction sites considered to be substantial, and no significant cumulative landscape or existing flat above Cafe (including new and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. window to side) and proposal for 28No. would be implemented for the Scheme. additional dwellings. Demolish Lane End Operation: The development site is within Pegswood. There is no anticipated intervisibility, nor any Operation: Given the location of the proposed development within garage and Lindisville bungalow shared landscape / townscape characteristics. Significant cumulative effects would not arise. Pegswood there would be no intervisibility between the Scheme and proposed development due to the built environment of Pegswood. No cumulative landscape or visual effects are anticipated. 19/02747/FUL Detailed planning application for the Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: No cumulative landscape or visual effects are anticipated. erection of 61no. 2, 3 and 4 bedroom two- noticeable construction activity occurring in two neighbouring local landscape character areas. Views would be implemented for the Scheme. storey dwellings with associated works. from receptors would typically be affected by one or other of the physically separate construction sites Operation: Given the location of the proposed development within and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP Pegswood there would be no intervisibility between the Scheme and would be implemented for the Scheme. proposed development. No cumulative landscape or visual effects are Operation: The development site is within Pegswood. There is no anticipated intervisibility, nor any anticipated. shared landscape / townscape characteristics. Significant cumulative effects would not arise.

17/04330/FUL Hybrid planning application comprising: Full Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising planning permission for a holiday park noticeable construction activity occurring in two neighbouring local landscape character areas. Views would be implemented for the Scheme. on local landscape character and on associated views, these are not comprising the installation of up to 275 hard from receptors would typically be affected by one or other of the physically separate construction sites considered to be substantial, and no significant cumulative landscape or standing bases for static caravans; 200 all and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. weather pitches for touring units and tents would be implemented for the Scheme. associated car parking and toilet/shower Operation: The development site is physically remote from the A1 corridor due to the local topography Operation: Given the location of the proposed development near block, main reception and amenity building, and tree cover. The proposed development is anticipated to result in a holiday park at West Chevington Widdrington there would be no intervisibility between the Scheme and outdoor play area, workshop; internal former open cast site within the 39a Coastal Farmland - Coastal Coalfields local landscape character proposed development due to the local topography and tree cover. No access roads; footpaths; landscaping; area. cumulative landscape or visual effects are anticipated. water based leisure uses. Outline planning permission for a further 475 hard standing bases for holiday homes, a 9 hole golf course and cafe, with all matters reserved

17/02177/FUL Proposed erection of 118 houses, including Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising associated access and infrastructure noticeable construction activity occurring in two neighbouring local landscape character areas. Views would be implemented for the Scheme. on local landscape character and on associated views, these are not (Revised description) from receptors would typically be affected by one or other of the physically separate construction sites considered to be substantial, and no significant cumulative landscape or and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. would be implemented for the Scheme. Operation: The development site is physically remote from the A1 corridor due to the local topography Operation: Given the location of the proposed development within and tree cover. The proposed development is anticipated to result in a larger settlement associated with Pegswood there would be no intervisibility between the Scheme and Pegswood, with a perceptible change in land use along the north western edge of the settlement within proposed development due to the intervening tree cover and local the 39a Coastal Farmland - Coastal Coalfields local landscape character area. topography. No cumulative landscape or visual effects are anticipated.

17/04048/FUL Construction of 22 new dwellings Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising comprising 6x 2 bed, 6x 3 bed houses for noticeable construction activity occurring in two locations within the 42a Urban & Urban Fringe - would be implemented for the Scheme. on local landscape character and on associated views, these are not rent, and 10x 2 bed bungalows for sale Ashington Blyth & Cramlington local landscape character area. Views from receptors would typically be considered to be substantial, and no significant cumulative landscape or affected by one or other of the physically separate construction sites and significant cumulative effects Operation: Measures outlined in the Outline CEMP visual effects are anticipated. would not arise. would be implemented for the Scheme. Operation: Given the location of the proposed development within Operation: The development site is physically remote from the A1 corridor (over 5 km distance) due to Ashington there would be no intervisibility between the Scheme and the local topography, built development and tree cover. The proposed development is within Ashington , proposed development due to intervening tree and hedgerow cover. No with a perceptible change in land use and the presence of more housing within the town and the local cumulative landscape or visual effects are anticipated. landscape character area.

18/03897/FUL Drainage, engineering works and building Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising to produce hydro-electric power (EIA noticeable construction activity occurring in two separate locations within neighbouring local landscape would be implemented for the Scheme. on local landscape character and on associated views, these are not Development) (Amended Red Line character areas. Views from receptors would typically be affected by one or other of the physically considered to be substantial, and no significant cumulative landscape or Boundary and Plans 21.12.18) separate construction sites and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. would be implemented for the Scheme. Operation: The development site is physically remote from the A1 corridor (over 3.5 km distance) due to Operation: Given the location of the proposed development there would the local topography and tree cover. be no intervisibility between the Scheme and proposed development due to local topography, intervening tree and hedgerow cover. No cumulative landscape or visual effects are anticipated. 18/04038/FUL Residential development (use class C3) for Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising twenty dwellings with associated Construction: If the construction phase coincides with the Scheme construction phase, there would be would be implemented for the Scheme. on local landscape character and on associated views, these are not landscaping and access. noticeable construction activity occurring in two separate locations within neighbouring local landscape considered to be substantial, and no significant cumulative landscape or character areas. Views from receptors would typically be affected by one or other of the physically Operation: Measures outlined in the Outline CEMP visual effects are anticipated. separate construction sites and significant cumulative effects would not arise. would be implemented for the Scheme. Operation: Given the location of the proposed development on the south Operation: The development site is physically remote from the Scheme works corridor (over 7 km east of Morpeth there would be no intervisibility between the Scheme and distance) due to the built environment of Morpeth, local topography and tree cover. The proposed proposed development due to the built environment of Morpeth, and development is anticipated to result in a larger settlement associated with the hamlet of Stannington intervening tree and hedgerow cover. No cumulative landscape or visual Station, with a perceptible change in land use and the presence of more housing in the village, and the effects are anticipated. local landscape character area.

18/04533/FUL Proposed anaerobic digestion plant, linked Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising to existing grain storage and processing noticeable construction activity occurring in two neighbouring local landscape character areas. Views would be implemented for the Scheme. on local landscape character and on associated views, these are not facility from receptors would typically be affected by one or other of the physically separate construction sites considered to be substantial, and no significant cumulative landscape or and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. would be implemented for the Scheme. Operation: The development site is north east of Pegswood. There is no anticipated intervisibility, nor Operation: Given the location of the proposed development north east of any shared landscape / townscape characteristics with the proposed Scheme. Significant cumulative Pegswood there would be no intervisibility between the Scheme and effects would not arise. proposed development due to the built environment of Pegswood. No cumulative landscape or visual effects are anticipated.

16/04411/FUL Full planning application for 327no. Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising dwellings | Land At Willow Burn Whinney noticeable construction activity occurring in two separate locations within neighbouring local landscape would be implemented for the Scheme. on local landscape character and on associated views, these are not Hill Farm Cottages Choppington character areas. Views from receptors would typically be affected by one or other of the physically considered to be substantial, and no significant cumulative landscape or Northumberland NE62 5RD separate construction sites and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. would be implemented for the Scheme. Operation: The development site is physically remote from the A1 corridor (over 7 km distance) due to Operation: Given the location of the proposed development on the south the local topography and tree cover. The proposed development is anticipated to result in a larger of Guide Post there would be no intervisibility between the Scheme and settlement associated with Guide Post / Choppington, with a perceptible change in land use and the proposed development due to intervening tree and hedgerow cover. No presence of more housing between the two settlements, and the local landscape character area. cumulative landscape or visual effects are anticipated.

. 19/00904/FUL Construction of 159 dwellings, forming Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: No cumulative landscape or visual effects are anticipated. phase 1B of the development of the former noticeable construction activity occurring simultaneously in neighbouring local landscape character would be implemented for the Scheme. St Georges Hospital site in Morpeth. areas. Views from receptors would typically be affected by one or other of the physically separate Operation: Given the location of the proposed development within construction sites and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP Morpeth there would be no intervisibility between the Scheme and would be implemented for the Scheme. proposed development due to the built environment of Morpeth. No Operation: The development site is physically remote from the A1 corridor due to the local topography cumulative landscape or visual effects are anticipated. and tree cover. The proposed development is anticipated to result in a larger settlement associated with Morpeth, with a perceptible change in land use along the newly constructed Morpeth Northern Bypass, and the local landscape character area.

19/01687/FUL Change of use of land for the siting of up to There is no intervisibility between the Scheme and the proposed development within the settlement of Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising 60 static caravans, along with associated Swarland. would be implemented for the Scheme. on local landscape character and on associated views, these are not infrastructure and hard and soft considered to be substantial, and no significant cumulative landscape or landscaping. Construction: If the construction phase coincides with the Scheme construction phase, there would be Operation: Measures outlined in the Outline CEMP visual effects are anticipated. noticeable construction activity occurring in two separate locations within neighbouring local landscape would be implemented for the Scheme. character areas. Views from receptors would typically be affected by one or other of the physically Operation: Given the location of the proposed development within separate construction sites and significant cumulative effects would not arise. Swarland village there would be no intervisibility between the Scheme and proposed development. No cumulative landscape or visual effects are Operation: The development site is physically remote from the A1 corridor and is anticipated to result in a anticipated. larger settlement associated with Swarland, with a perceptible change in land use and the presence of more housing within the village and the local landscape character area.

19/04108/OUT Demolition of existing golf club house and There is no intervisibility between the Scheme and the proposed development within the settlement of Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising associated buildings, and development of Swarland. would be implemented for the Scheme. on local landscape character and on associated views, these are not up to16 dwellings with all matters reserved considered to be substantial, and no significant cumulative landscape or apart from access. Construction: If the construction phase coincides with the Scheme construction phase, there would be Operation: Measures outlined in the Outline CEMP visual effects are anticipated. noticeable construction activity occurring in two separate locations within neighbouring local landscape would be implemented for the Scheme. character areas. Views from receptors would typically be affected by one or other of the physically Operation: Given the location of the proposed development within separate construction sites and significant cumulative effects would not arise. Swarland village there would be no intervisibility between the Scheme and proposed development. No cumulative landscape or visual effects are Operation: The development site is physically remote from the A1 corridor and is anticipated to result in a anticipated. change of use associated with a parcel of land at Swarland. 16/04426/FUL Proposed new residential development of Construction: If the construction phase coincides with the Scheme construction phase, there would be Construction: Measures outlined in the Outline CEMP Construction: Whilst cumulative impacts have been identified as arising 41 dwellings with associated parking noticeable construction activity occurring in two separate locations within neighbouring local landscape would be implemented for the Scheme. on local landscape character and on associated views, these are not access and landscaping (as amended by character areas. Views from receptors would typically be affected by one or other of the physically considered to be substantial, and no significant cumulative landscape or plans received 16/03/17) separate construction sites and significant cumulative effects would not arise. Operation: Measures outlined in the Outline CEMP visual effects are anticipated. would be implemented for the Scheme. Operation: The development site is physically remote from the A1 corridor due to the local topography Operation: Given the location of the proposed development within and tree cover. The proposed development is anticipated to result in a larger settlement associated with Longframlington village there would be no intervisibility between the Longframlington, with a perceptible change in land use and the presence of more housing within the Scheme and proposed development. No cumulative landscape or visual village and the local landscape character area. effects are anticipated. BIODIVERSITY 18/02671/FUL Demolition of existing buildings and Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated erection of 10 residential units with undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. associated access (amended site location for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated plan and red line boundary 29/08/2018) Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

18/02250/FUL Demolition of Indoor Riding Arena and Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated Development of 26 Dwellings – Amended undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. 17/08/2018 for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

18/02250/FUL Demolition of Indoor Riding Arena and Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated Development of 26 Dwellings - Amended undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. 17 August 2018 for each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

17/00500/OUT Change of use to residential (C3 use by Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated erecting approximately 10 no. Detached undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. dwellings for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

16/04150/FUL Proposed construction of eleven detached Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated houses of traditional design with associated undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. access and parking for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

18/00779/FUL Application for 143no. dwellings Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated incorporating new site access and internal undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. access road, provision of SUDS, open for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated space and landscaping. Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

17/04652/FUL Re-Plan of 271 houses (substitution of Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated house types and addition of 42 houses in undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. relation to the existing development of 396 for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated houses, access, landscaping and Operation: Measures outlined in the Outline CEMP associated infrastructure. Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated. 16/04109/FUL Proposed nine hole extension of existing Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated golf course (as amended 23/02/2017) undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

16/04109/FUL Proposed nine hole extension of existing Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated golf course (as amended 23 February undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. 2017) for each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

16/00626/REM Approval of reserved matters for access, No ecological information available. However, the following assessment has been made on professional Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated appearance, landscaping, layout and scale judgement. would be implemented for the Scheme. of outline permission 12/03472/OUT – Operation: No potential significant cumulative effects anticipated proposed residential development for Construction: Due to the scale and location of the development, and in relation to the ecological surveys Operation: Measures outlined in the Outline CEMP approx. 12 no. Dwellings undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. for each receptor, no potential significant cumulative impacts are anticipated.

Operation: Due to the scale and location of the development, and in relation to the ecological surveys undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

19/02747/FUL Detailed planning application for the Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated erection of 61no. 2, 3 and 4 bedroom two- undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. storey dwellings with associated works. for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

18/00168/FUL Conversion of Grade II listed East Farm Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated Barns into 2No. dwellings, change of use of undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. former shop into cafe, refurbishment of for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated existing flat above Cafe (including new Operation: Measures outlined in the Outline CEMP window to side) and proposal for 28No. Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. additional dwellings. Demolish Lane End undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme garage and Lindisville bungalow for each receptor, no potential significant cumulative impacts are anticipated.

17/02177/FUL Proposed erection of 118 houses, including Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated associated access and infrastructure undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. (Revised description) for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

17/04618/OUT Outline Planning Permission for up to 167 Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated residential dwellings with associated undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. infrastructure and areas of public open for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated space (with all matters reserved except Operation: Measures outlined in the Outline CEMP access) Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

18/04038/FUL Residential development (use class C3) for Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated twenty dwellings with associated undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. landscaping and access. for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated. 18/03897/FUL Drainage, engineering works and building Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated to produce hydro-electric power (EIA undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. Development) (Amended Red Line for each receptor, no potential significant cumulative impacts are anticipated. Operation: Risk of additive adverse cumulative effects where works on Boundary and Plans 21.12.18) Operation: Measures outlined in the Outline CEMP concurrent schemes impact the water quality of the . The Operation: Potential slight adverse effects to the River Coquet (River Coquet and Coquet Valley would be implemented for the Scheme. schemes have the potential to result in a permanent cumulative effect. Woodlands SSSI) as a result of water abstraction. Potential for cumulative impacts when combined with This effect extends to the aquatic fauna and flora of the River Coquet. the impacts of air quality as a result of the Scheme (River Coquet and Coquet Valley Woodlands SSSI). However, the cumulative effect is not anticipated to be significant.

18/04533/FUL Proposed anaerobic digestion plant, linked Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP to existing grain storage and processing undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. Construction: No potential significant cumulative effects anticipated facility for each receptor, no potential significant cumulative impacts are anticipated. Operation: Measures outlined in the Outline CEMP Operation: No potential significant cumulative effects anticipated Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

15/02908/FUL Demolition of dilapidated modern farm Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated buildings and creation of 9 no. new undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. dwellings by conversion and alteration of for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated existing buildings, new build sections and Operation: Measures outlined in the Outline CEMP new garaging and associated sewage Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. treatment plant undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

16/04411/FUL Full planning application for 327no. Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated dwellings | Land At Willow Burn Whinney undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. Hill Farm Cottages Choppington for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated Northumberland NE62 5RD Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

19/00904/FUL Construction of 159 dwellings, forming Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated phase 1B of the development of the former undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. St Georges Hospital site in Morpeth. for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

19/00991/FUL Erection of 10no. single storey, 2 bedroom Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated dwellings with associated car parking and undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. landscaping. for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

16/04426/FUL Proposed new residential development of Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated 41 dwellings with associated parking undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. access and landscaping (as amended by for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated plans received 16/03/17) Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

19/01687/FUL Change of use of land for the siting of up to Construction: Due to the scale and location of the development, and in relation to the ecological surveys Construction: Measures outlined in the Outline CEMP Construction: No potential significant cumulative effects anticipated 60 static caravans, along with associated undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme would be implemented for the Scheme. infrastructure and hard and soft for each receptor, no potential significant cumulative impacts are anticipated. Operation: No potential significant cumulative effects anticipated landscaping. Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the ecological surveys would be implemented for the Scheme. undertaken for the Scheme and the mitigation/compensation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

GEOLOGY AND SOILS No cumulative impacts identified for this topic for the Cumulative Study Area Sensitivity Test MATERIAL RESOURCES 18/02671/FUL Westroad Garage Rothbury Road Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Longframlington NE65 8HX Demolition of assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. existing buildings and erection of 10 each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. residential units with associated access Operation: Measures outlined in the Outline CEMP (amended site location plan and red line Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. boundary 29.08.2018) assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

18/02250/FUL Land North & East if Lisleswood Old Park Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Road Swarland Northumberland: assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. Demolition of Indoor Riding Arena and each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. Development of 26 Dwellings – Amended Operation: Measures outlined in the Outline CEMP 17.08.2018 Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

17/00500/OUT Land south west of the Old Tweed Mill Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Springwood Swarland Northumberland: assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. Change of use to residential (C3 use by each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. erecting approximately 10 no. Detached Operation: Measures outlined in the Outline CEMP dwellings Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated. 18/02250/FUL Demolition of Indoor Riding Arena and Construction: Should the construction of the Scheme coincide with the procurement, construction and/or Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated following the Development of 26 Dwellings - Amended operation of the development, cumulative adverse impacts have the potential to arise from the would be implemented for the Scheme. application of good practice materials and waste management techniques. 17 August 2018 consumption of materials and waste generation / disposal. At the time of writing this chapter, it is reasonable to assert that both the design and construction of the development would utilise good practice Operation: Measures outlined in the Outline CEMP Operation: No significant cumulative effects anticipated. materials and waste management techniques that accord with both planning requirements and industry would be implemented for the Scheme. recognised principles for resource efficiency / circular economy. Subject to full confirmation of this assertion, based on the fact that good and best practice measures would also be adopted on the Scheme, and considering the size / nature of the developments assessed, any cumulative impacts would not be expected to give rise to significant adverse effects. The assertions made on the management techniques to be applied to the development would need to be tested with actual data before a conclusive assessment result can be attained.

Operation: In relation to the material resources assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

18/00779/FUL Potland Burn, West Ashington: Construction: During construction of the Scheme, cumulative adverse impacts would arise from the Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Application for 143 no. Dwellings consumption of materials and waste generation / disposal, where the procurement and construction would be implemented for the Scheme. incorporating new site access and internal programme for the residential development overlaps. At the time of writing this chapter, it is presumed Operation: No significant cumulative effects anticipated. access road, provision of SUDS, open that both the design and construction of the 143 no. residential developments and associated access Operation: Measures outlined in the Outline CEMP space and landscaping roads will utilise good best practice materials and waste mitigation and enhancement techniques, that would be implemented for the Scheme. accord with the highest tiers of the Waste Hierarchy and circular economy principles. Accordingly, taking into account the good and best practice approaches also adopted on the Scheme, and the size / nature of the residential development, cumulative impacts and resultant adverse effects are not considered to be significant.

Operation: Should the operation of the Scheme coincide with the construction or operation of the 143 residential units, the magnitude of impact on landfill capacity may give rise to cumulative effects through the generation and disposal of municipal waste. However, whilst no significant materials consumption or waste generation is anticipated from the Scheme during operation, some cumulative effects are anticipated. 17/04652/FUL Land south of A196, stobhill, Morpeth - Construction: During construction of the Scheme, Scheme cumulative adverse impacts would arise Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Barratt Homes, South Fields, Hepscott, from the consumption of materials and waste generation / disposal, where the procurement and would be implemented for the Scheme. Northumberland: Re-Plan of 271 houses construction programme for the residential development overlaps. At the time of writing this chapter, it is Operation: No significant cumulative effects anticipated. (substitution of house types and addition of presumed that both the design and construction of the 271 no. residential developments and associated Operation: Measures outlined in the Outline CEMP 42 houses in relation to the existing access roads will utilise good best practice materials and waste mitigation and enhancement techniques, would be implemented for the Scheme. development of 396 houses, access, that accord with the highest tiers of the Waste Hierarchy and circular economy principles. Accordingly, landscaping and associated infrastructure. taking into account the good and best practice approaches also adopted on the Scheme and the size / nature of the residential development, cumulative impacts and resultant adverse effects are not considered to be significant.

Operation: Should the operation of the Scheme coincide with the construction or operation of the 271 residential units, the magnitude of impact on landfill capacity may give rise to cumulative effects through the generation and disposal of municipal waste. However, whilst no significant materials consumption or waste generation is anticipated from the Scheme during operation, some cumulative effects are anticipated. 16/00745/FUL North End Farm, Longframlington, Construction: During construction of the Scheme, cumulative adverse impacts would arise from the Construction: Measures outlined in the Outline CEMP Morpeth, Northumberland, NE65 8DZ: consumption of materials and waste generation / disposal, where the procurement and construction would be implemented for the Scheme. Construction: No significant cumulative effects anticipated. Construction of 9 detached dwellings programme for the residential development overlaps. At the time of writing this chapter, it is presumed that both the design and construction of the 9 no. residential developments and associated access roads Operation: Measures outlined in the Outline CEMP Operation: No significant cumulative effects anticipated. will utilise good best practice materials and waste mitigation and enhancement techniques, that accord would be implemented for the Scheme. with the highest tiers of the Waste Hierarchy and circular economy principles. Accordingly, taking into account the good and best practice approaches also adopted on the Scheme, and the size / nature of the residential development, cumulative impacts and resultant adverse effects are not considered to be significant.

Operation: Should the operation of the Scheme coincide with the construction or operation of the 9 residential units, the magnitude of impact on landfill capacity is unlikely to give rise to cumulative effects through the generation and disposal of municipal waste. However, as no significant materials consumption or waste generation is anticipated from the Scheme during operation, no cumulative effects are anticipated.

16/04109/FUL Linden Hall, Longhorsley, Morpeth, Construction: During construction of the Scheme cumulative adverse impacts would arise from the Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Northumberland, NE65 8XF: Proposed consumption of materials and waste generation / disposal, where the procurement and construction would be implemented for the Scheme. nine hole extension of existing golf course programme for the recreational development overlaps. At the time of writing this chapter, it is presumed Operation: No significant cumulative effects anticipated. (as amended 23.02.2017) that both the design and construction of the golf course developments and associated access roads will Operation: Measures outlined in the Outline CEMP utilise good best practice materials and waste mitigation and enhancement techniques, that accord with would be implemented for the Scheme. the highest tiers of the Waste Hierarchy and circular economy principles. Accordingly, taking into account the good and best practice approaches also adopted on the Scheme and the size / nature of the recreational development, cumulative impacts and resultant adverse effects are not considered to be significant.

Operation: Should the operation of the Scheme coincide with the construction or operation of the recreational development, the magnitude of impact on landfill capacity is unlikely to give rise to cumulative effects through the generation and disposal of municipal waste. However, as no significant materials consumption or waste generation is anticipated from the Scheme during operation, no cumulative effects are anticipated.

16/04109/FUL Proposed nine hole extension of existing Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated following the golf course (as amended 23 February assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. application of good practice materials and waste management techniques. 2017) each receptor, no potential significant cumulative impacts are anticipated. Operation: Measures outlined in the Outline CEMP Operation: As no significant effects from materials consumption and Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. waste generation are anticipated from the Scheme during operation, no assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for cumulative significant effects with the stated development are anticipated. each receptor, no potential significant cumulative impacts are anticipated.

19/02747/FUL Land North East Of Pegswood First Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. School Butchers Lane Pegswood assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. Northumberland: Detailed planning each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. application for the erection of 61no. 2, 3 Operation: Measures outlined in the Outline CEMP and 4 bedroom two-storey dwellings with Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. associated works. assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

17/02177/FUL Land North East of Hebron Avenue Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Pegswood Village Pegswood assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. Northumberland: Proposed erection of each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. 118 houses, including associated access Operation: Measures outlined in the Outline CEMP and infrastructure (Revised description) Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated.

17/04618/OUT Land South Of Grange Court Grange Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Road Widdrington Station assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. Construction: No significant cumulative effects anticipated. Northumberland: Outline Planning each receptor, no potential significant cumulative impacts are anticipated. Permission for up to 167 residential Operation: Measures outlined in the Outline CEMP Operation: No significant cumulative effects anticipated. dwellings with associated infrastructure and Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. areas of public open space (with all matters assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for reserved except access) each receptor, no potential significant cumulative impacts are anticipated.

18/03897/FUL Land north east of Keepers Cottage Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Acklington Northumberland: Drainage, assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. engineering works and building to produce each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. hydro-electric power (EIA Development) Operation: Measures outlined in the Outline CEMP (Amended Red Line Boundary and Plans Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. 21.12.18) assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated. 18/04038/FUL 56 Station Road Stannington Morpeth Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Northumberland NE61 6NH: Residential assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. development (use class C3) for twenty each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. dwellings with associated landscaping and Operation: Measures outlined in the Outline CEMP access. Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated. 18/04533/FUL Land At South Of North East Grains Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Longhirst Northumberland: Proposed assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. anaerobic digestion plant, linked to existing each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. grain storage and processing facility Operation: Measures outlined in the Outline CEMP Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated. 16/04411/FUL 5016 Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Land north of Scotland Gate: Full assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. planning application for 327no. each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. dwellings | Land At Willow Burn Whinney Operation: Measures outlined in the Outline CEMP Hill Farm Cottages Choppington Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. Northumberland NE62 5RD assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated. 19/00904/FUL Land South Of Bluebell Court East Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Cottingwood Morpeth Northumberland: assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. Construction: No significant cumulative effects anticipated. Construction of 159 dwellings, forming each receptor, no potential significant cumulative impacts are anticipated. phase 1B of the development of the former Operation: Measures outlined in the Outline CEMP Operation: No significant cumulative effects anticipated. St Georges Hospital site in Morpeth. Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated. 19/00991/FUL Land North Of 30 Longhirst Village Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Longhirst Village Longhirst assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. Northumberland: Erection of 10no. single each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. storey, 2 bedroom dwellings with Operation: Measures outlined in the Outline CEMP associated car parking and landscaping. Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated. 19/01687/FUL Land North West Of Springwood Coast Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. View Swarland Northumberland: Change assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. of use of land for the siting of up to 60 static each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. caravans, along with associated Operation: Measures outlined in the Outline CEMP infrastructure and hard and soft Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. landscaping. assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for each receptor, no potential significant cumulative impacts are anticipated. 19/04108/OUT Percy Wood Golf Club And Country Construction: Due to the scale and location of the development, and in relation to the material resources Construction: Measures outlined in the Outline CEMP Construction: No significant cumulative effects anticipated. Retreat Coast View Swarland Morpeth assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for would be implemented for the Scheme. Northumberland NE65 9JW: Demolition of each receptor, no potential significant cumulative impacts are anticipated. Operation: No significant cumulative effects anticipated. existing golf club house and associated Operation: Measures outlined in the Outline CEMP buildings, and development of up to16 Operation: Due to the scale and location of the development, and in relation to the material resources would be implemented for the Scheme. dwellings with all matters reserved apart assessment undertaken for the Scheme and the mitigation measures proposed as part of the Scheme for from access. each receptor, no potential significant cumulative impacts are anticipated.

NOISE AND VIBRATION No cumulative impacts identified for this topic for the Cumulative Study Area Sensitivity Test

POPULATION AND HUMAN HEALTH 18/02250/FUL Demolition of Indoor Riding Arena and Population Construction: Measures outlined in the Outline CEMP Population Development of 26 Dwellings - Amended Construction: There is likely to be a positive socio-economic effect associated with direct temporary would be implemented for the Scheme. Construction: There is considered to be the potential for a cumulative 17 August 2018 construction employment generated. In addition, multiple effects are anticipated during the construction effect associated with direct, indirect and induced employment stage, both in terms of the sourcing of local supplies (indirect employment across wider supply chains), Operation: Measures outlined in the Outline CEMP opportunities. The significance of this effect would depend on the and local spend by on-site workers (induced employment). would be implemented for the Scheme. construction period of the development. However, the cumulative effect is not anticipated to be significant. Operation: No impacts predicted during operation. Operation: No significant cumulative effects are anticipated. Human health No predicted cumulative impacts as development lies outside of the Study Area for health effects. Human Health N/A 16/04109/FUL Proposed nine hole extension of existing Screened out - No impacts on population and human health are predicted due to the scale, location and Construction: N/A Construction: N/A golf course (as amended 23/02/2017) nature of development which is being proposed. Operation: N/A Operation: N/A

ROAD DRAINAGE AND THE WATER ENVIRONMENT No cumulative impacts identified for this topic for the Cumulative Study Area Sensitivity Test

A1 in Northumberland: Morpeth to Ellingham Morpeth to Ellingham 6.4 Environmental Statement

© Crown copyright 2020. You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence: visit www.nationalarchives.gov.uk /doc/open-government-licence/ write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email [email protected].

This document is also available on our website at www.gov.uk /highways

If you have any enquiries about this document [email protected] or call 0300 470 4580*.

*Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls. These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored.

Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363

Planning Inspectorate Scheme Ref: TR010041 Application Document Ref: TR010041/APP/6.4