SC)BHA

sL/AH/ MOEF/0249 I 2OL7 -LA

16th October 2017

To, The Director (IA)-III, Ministry of Environment, Forest & Climate Change, Indira Paryavaran Bhavan, Jorbagh Road, New Delhi -110003

Sub: Request for Validity Extension of Environmental Clearance for Integrated Complex "Sobha City" located at Sy. No. 277,218,534 to 544 and 546 to 556, Village: Puzhakkal, Guruvayyur Road, District: , by M/s Sobha Limited.

Ref: EC No. 2l - 71312007-IA.III daled 17,04.2008.

Dear Sir, This is with reference to the subject mentioned above. We wish to state that we were granted the Environmental Clearance for the Integrated Complex "Sobha City" by lvloEF&CC vide ref. The validity of the Environmental Clearance thus granted had been expired on 16.04.2013 after which construction on the site was stopped. Now we would like to continue with construction of the project at site. So, we wish to apply for the validity extension of the same. Hence, we are herewith submitting the updated Form1, FormlA and Conceptual Plan along with the necessary annexures for your kind perusal.

Kindly, consider our case and issue the validity extension of Environment Clearance at your earliest. Yours truly,

For M/s. Sotrha-timited. 4td\ or\@u,

soBHA LIMITED (foTmeTIy SoBHA DEVELoPERS LTD ) soBHA crry puzHAKKAL. cuRUvAyuR RoAD. THR ssuR 580 551. PHoNE otat-Tlagtt,;, FA^ 0487 2l8e77l

REGD & CORPORATE OFFlCE:'SOBHA" 5AR]APUR I'IAMTHAHALLI OUIER RING ROAD (ORR), DEVAMBISANAHALL . BELLANDUR POST +9180 BANGALoRE . 560 L0l. IND|A I clN L4520tKAt995plc0 8475lTEL +9 80-493200001FAX 49120444 **sobhacom

EC Validity Extension of SOBHA CITY PROJECT

At Village: PUZHAKKAL, District: THRISSUR, KERALA

For

M/s SOBHA LIMITED Sobha City, Puzhakkal PO, Thrissur, 680553

Prepared By

GRASS ROOTS RESEARCH & CREATION (P) LTD. (An ISO 9001:2008 Certified Co.: Accredited by QCI / NABET: Approved by MoEF&CC, GoI) F-374-375, Sector-63, Noida, U.P. Ph.: 0120- 4044630, Telefax: 0120- 2406519 Email: [email protected], [email protected] Website: http://www.grc-india.com GRC INDIA TRAINING & ANALYTICAL LABORATORY (Recognized by NABL & Approved by MoEF&CC, GoI) A unit of GRC India EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

FORM 1

(I) Basic Information

S. No. Item Details

1. Name of the project/s Validity Extension of “Sobha City” Project 2. S. No. in the schedule 8 (b) 3. Proposed EC accorded Plot area = 2,29,535.91 m2 (56.72 capacity/area/length/tonnage to acres) be handled/command area/lease EC accorded Built-up Area = 3,24,665.28 m2 area/number of wells to be drilled 4. New/Expansion/Modernization Extension of EC Validity 5. Existing Capacity/Area etc. EC accorded :3,24,665.28 m2 Constructed Built Up Area: 2,23,106.812 m2 6. Category of Project i.e. ‘A’ or ‘B’ Category- A 7. Does it attract the general No condition? If yes, please specify. 8. Does it attract the specific No condition? If yes, please specify. 9. Location Plot/Survey/Khasra No. Sy. No. 217, 218, 534 to 544, 546 to 556

Village Puzhakkal Tehsil District Thrissur State Kerala 10. Nearest railway station/airport The nearest railway station is along with distance in kms. Railway station at a distance of approx 1.5 km. The nearest Airport Cochin International Airport is about 49 km away from the site. (Source of information:- Google Image) 11. Nearest Town, city, District Thrissur City is approx. 4.0 km in SE Direction Headquarters along with distance in Kms. 12. Village Panchayats, Zilla Adat Panchayat, PO,Thrissur. Parishad, Municipal Phone:0487-2307302 Corporation, Local body (complete postal addresses with Kolazy Grama Panchayat, Thiroor, M G Kavu telephone nos. to be given). PO, Thrissur-680581 Phone: 0487-2200271

M/S. SOBHA LIMITED 1 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

13. Name of applicant M/s Sobha Limited 14. Registered Address M/s Sobha Limited Sobha City, Puzhakkal PO, Thrissur, 680553 15. Address for correspondence : Mr. Nisanth M. N. Name (Area Head) Designation

(Owner/Partner/CEO)

M/s Sobha Limited, Sobha City, Puzhakkal PO Address Thrissur

Pin Code 680553 E-mail [email protected] Telephone No. 0487-2389770/71/72 Fax No. 0487-2389773 16. Details of Alternative Sites No examined, if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves No approval/ clearance under: if yes, details of the same and their status to be given. (a)The forest (Conservation) act, 1980? (b) The wildlife (Protection) act, 1972? (C) The C.R.Z Notification, 1991? 22. Whether there is any No Government Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation No pending against the project and

M/S. SOBHA LIMITED 2 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes There will be permanent change in land use, land use, land cover or topography land cover or topography including increase in including increase in intensity of intensity of land use. land use (with respect to local land Master plan is enclosed as Annexure 5. use plan) 1.2 Clearance of existing land, Yes Minimum trees, shrubs, herbs and grass at site vegetation and buildings? were cleared during the construction phase. 1.3 Creation of new land uses? No The project site is well developed according to the master plan of the city. 1.4 Pre-construction investigations e.g. No Pre-construction soil investigations have been bore houses, soil testing? carried out for the site. 1.5 Construction works? Yes All construction activities have been confined within the project premises; The construction basically involve foundation, framed structure using RCC, walls made of fly ash blocks, plastering, flooring, painting and solar energy to light up common areas. 1.6 Demolition works? No No demolition works involved. 1.7 Temporary sites used for Yes All the construction activity including construction works or housing of stocking of raw materials has been confined construction workers? within the project site only. Temporary labour hutments are proposed. Mobile toilets have been developed at site and same will be used

M/S. SOBHA LIMITED 3 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

for extension phase. 1.8 Above ground buildings, structures Yes Excavation has been carried out for foundation or earthworks including linear of buildings and basements. The excavated structures, cut and fill or excavations soil will be used in backfilling and other area development activities. 1.9 Underground works including Yes Underground works and excavation was mining or tunneling? carried out for foundation of buildings and basements. 1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No No Production/Manufacturing process processes? involved as the project is an Integrated Complex with residential, villas, commercial, convention, hospital and hotel. 1.14 Facilities for storage of goods or Yes Temporary stores or sheds are provided for materials? storage of construction materials. 1.15 Facilities for treatment or disposal of Yes Solid Waste solid waste or liquid effluents? About 6,200 Kg/ day of solid wastes likely to be generated in project are of domestic in nature. Waste Quantity Disposal (kg/day) Method Organic 3100 To Organic Waste Converter Inorganic 3100 To Authorised Vendor for Recycling

Liquid effluents: The wastewater generated during the operation phase will be treated in STP of 2000 KLD capacity and the treated sewage will be reused for toilet flushing (362 KLD), horticulture/gardening (650 KLD), 33 KLD for vehicle washing. 1.16 Facilities for long term housing of No Local laborers have been hired from nearby operational workers? areas during construction phase. So, there is no need to create permanent facilities for long-

M/S. SOBHA LIMITED 4 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

term housing of operational workers. Same will be followed for extension phase 1.17 New road, rail or sea traffic during No Not Applicable construction or operation? 1.18 New road, rail, air waterborne or No Not Applicable other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No There is no need for diversion or closure of transport routes or infrastructure existing traffic routes. leading to changes in traffic movements? 1.20 New or diverted transmission lines or No There is no any a new/diverted transmission pipelines? line or pipelines around the project. 1.21 Impoundment, damming, culverting, No No impoundment, damming, culverting, realignment or other changes to the realignment or other changes to the hydrology hydrology of watercourses or of surface watercourses is proposed. aquifers? 1.22 Stream crossings? No There are no streams crossing in the project site. 1.23 Abstraction or transfers of water No During construction phase, water has been form ground or surface waters? provided by State Water Supply Board. Source of water during the operation phase is met through artificial lake provided within the premises with proper treatment. 1.24 Changes in water bodies or the land No Not Applicable surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes During the construction phase, about 20-24 for construction, operation or trucks were used per week. Adequate parking decommissioning? space within the project site for loading and unloading of materials has been provided. 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes During Operation phase, there will be a temporarily or permanently? permanent influx of 13,030 people due to the adequate infrastructure facility.

M/S. SOBHA LIMITED 5 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

1.29 Introduction of alien species? No Not Applicable 1.30 Loss of native species or genetic No There will be no significant impact on the diversity? native species or genetic diversity. 1.31 Any other actions? No Not Applicable.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate S. No. Information/checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The land measures to around 22.92 ha and agricultural land (ha) used for mixed use development. 2.2 Water (expected source & competing Yes During construction phase, water requirement users) unit: KLD is met through State Water Supply Board. During operation phase, about 1301.5 KLD of water demand is being met through Artificial Lake provided within the premises after proper Treatment confirming to IS 10500:2012 Drinking Water Quality Standards. The source water of Artificial Lake is Rain Water. Lake volume calculations are given in Form IA and Conceptual Plan. Source Quantity Source Competing Users Startup water 940 KLD Artificial Nil requirement Lake from Artificial Lake Treated 362 Recycling Nil waste water of waste (for Toilet water flushing) Treated 650 KLD Recycling Nil waste water of waste (for water Landscaping) 2.3 Minerals (MT) No Not Applicable. 2.4 Construction material – stone, Yes As per estimation, the construction materials aggregates, sand / soil (expected will be: Sand, Coarse aggregate, Fine source – MT) aggregate Cement, Steel Bricks.

M/S. SOBHA LIMITED 6 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

The materials for construction have been arranged through selected suppliers. Same also will be managed for extension phase. 2.5 Forests and timber (source – MT) Yes Wood shall be used for frame of doors. However recyclable doors shall be used. 2.6 Energy including electricity and fuels Yes The total power demand during the (source, competing users) Unit: fuel operational phase is estimated to be 24.49 (MT), energy (MW) MVA for the project. Power is being supplied by KPTCL (Kerala Power Transmission Corporation Limited). Power backup for the project will be through 15 no. of DG sets of total capacity 20,563 kVA (9 X 2 MVA + 1 X 750 KVA + 3 X 500 KVA + 1 X 250 KVA + 1 X 63 KVA) 2.7 Any other natural resources (use No Not Applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approximate quantities/rates, wherever possible) with S. No. Information/Checklist Yes/No source of information data confirmation 3.1 Use of substances or materials, Yes HSD for D.G. sets with sulphur content which are hazardous (as per MSIHC <0.05%. rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or No Suitable drainage and waste management affect disease vectors (e.g. insect or measures have been adopted in construction water borne diseases) and same also be followed for operational phase part of the project. There will be no stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. Good housekeeping and hygienic measures are being followed during construction and

M/S. SOBHA LIMITED 7 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

operation phase to avoid any cause which can lead to occurrence of diseases. 3.3 Affect the welfare of people e.g. by Yes Socio-economic standard of people will changing living conditions? improve due to increased employment opportunities provided by this project. This will lead to better quality of life and will also set a standard for future developments in the area. 3.4 Vulnerable groups of people who No Impacts of this type are not expected. could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details thereof (with approximate quantities/rates, wherever possible) with S. No. Information/Checklist Yes/No source of information data confirmation 4.1 Spoil, overburden or mine wastes No Not Applicable 4.2 Municipal waste (domestic and or Yes Solid waste generated during the construction commercial wastes) phase was handed over to local municipality. Solid waste of 6200 Kg/day is likely to be generated in project during operational phase.

Waste Quantity Disposal (kg/day) Method Organic 3100 Treated in Organic Waste Converter Inorganic 3100 Handed over to Authorised Vendor for Recycling 4.3 Hazardous wastes (as per Hazardous Yes The hazardous wastes generated the project is Waste Management Rules) used oil from DG sets, which is classified as per The Hazardous Waste Category 5.1 as per

M/S. SOBHA LIMITED 8 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

The Hazardous Wastes (Management & Handling) Rules, 2016. Used oil from DG sets is being stored in HDPE drums in isolated covered facility and is being handed over to KSPCB authorized recyclers. 4.4 Other industrial process wastes No Not applicable 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge from Yes Sludge generated has been reused as manure effluent treatment in landscaping after suitable treatment. 4.7 Construction or demolition wastes Yes The construction waste is consist of excess earth and construction debris along with cement bags, steel in bits and pieces, insulating and packaging materials etc. Recyclable waste construction materials are being sold to recyclers. The construction debris has been used for road leveling and excess is disposed at designated places in tune with the local norms. 4.8 Redundant machinery or equipment No Not Applicable 4.9 Contaminated soils or other materials No Not Applicable 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate quantities/rates, wherever possible) with S. No. Information/Checklist Yes/No source of information data confirmation 5.1 Emissions from combustion of fossil Yes The project does not envisage any major air fuels from stationary or mobile pollution sources except operation of DG sets sources during power failure and vehicular traffic. 5.2 Emissions from production processes No Not Applicable. No production processes involved. Hence, there are no such emissions. 5.3 Emissions from materials handling No That was restricted to the construction phase including storage or transport and within the project site only. 5.4 Emissions from construction Yes That was restricted to the construction phase activities including plant and and the construction site only. equipment. 5.5 Dust or odours from handling of Yes Dust is anticipated during loading and

M/S. SOBHA LIMITED 9 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

materials including construction unloading of construction material and materials, sewage and waste. excavation of upper earth surface. These were however being temporary in nature, which were controlled by providing water sprinklers. Tarpaulin cover had been provided on stored loose materials to reduce the dust emission. There is no source of odors in the project. 5.6 Emissions from incineration of waste No No incineration of wastes is proposed. 5.7 Emissions from burning of waste in No Not Applicable. Open burning of open air (e.g. slash materials, biomass/other material is prohibited on site. construction debris) 5.8 Emissions from any other sources No Not applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/ rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment e.g. Yes Source of noise in the operational phase is engines, ventilation plant, crushers from backup DG sets (which are in operation only during power failure), DG sets will be provided with proper acoustic enclosures. The noise levels outside the DG and pump room will be maintained within the stipulated CPCB / KSPCB norms both during the day and night time. 6.2 From industrial or similar processes No Not Applicable 6.3 From construction or demolition Yes Due to various construction activities, there were short-term noise impacts in the immediate vicinity of the project site. The construction activities included the following noise generating activities:  Concreting, mixing & operation of DG sets.  Construction plant and heavy vehicle movement. 6.4 From blasting or piling No No blasting or mechanized piling was done. 6.5 From construction or operational Yes Some amount noise is generated from traffic

M/S. SOBHA LIMITED 10 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

vehicular movement in the construction and operational phase by the project. That was temporary and mitigated with green belt and PUC vehicle are only being operated. 6.6 From lighting or cooling systems No Not Applicable 6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate quantities/rates, wherever possible) with S. No. Information/Checklist Yes/No source of information data confirmation 7.1 From handling, storage, use or No The used oil from DG sets has been carefully spillage of hazardous materials stored in HDPE drums at isolated storage, and periodically sold to KSPCB (Kerala State Pollution Control Board) authorized recyclers. All precautions are being taken to avoid spillage from storage as per The Hazardous Wastes (Management & Handling) Rules, 2016. 7.2 From discharge of sewage or other No Wastewater generated in the operational phase effluents to water or the land is treated in a STP of capacity 2000 KLD & 1 (expected mode and place of no. of ETP of capacity 15 KLD respectively. Discharge) The treated sewage is being reused for toilet flushing, cooling and horticulture. 7.3 By deposition of pollutants emitted No The DG sets are provided with stacks of to air into the land or into water. adequate height. Hence dispersion is being achieved and avoids deposition of pollutants in significant concentrations at any single location. 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term build up No Not applicable of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

M/S. SOBHA LIMITED 11 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Sl. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc Yes HSD will be used for D.G. Sets and is stored from storage, handling, use or appropriately, taking utmost care with respect production of hazardous substances to fire prevention & control measures and is being handed over to KSPCB authorized recyclers. 8.2 From any other causes No Not applicable 8.3 Could the project be affected by Yes The project falls under seismic active Zone III natural disasters causing indicating moderate damage risk zone. The environmental damage (e.g. floods, buildings are designed as earthquake resistant earthquakes, landslides, cloudburst and comply with the required IS etc)? specifications.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting. Yes Appropriate infrastructure like roads, power utilities, ancillary development or supply, waste management and sullage development treatment are developed within the project stimulated by the project which site. Development of the area will be as per could have impact on the the approved Master/ Development Plan. environment e.g.: • Supporting infrastructure (roads, power supply, waste or sullage treatment, etc.)

• Housing development Yes Integrated Complex.

• Extractive industries No Not applicable

• Supply industries No

• Other No 9.2 Lead to after-use of the site, which No Not anticipated could have an impact on the environment

M/S. SOBHA LIMITED 12 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

9.3 Set a precedent for later Yes The project is being providing good developments infrastructure and better life style and set an example for later developments in the areas. 9.4 Have cumulative effects due to No Not applicable proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity

Name/ Aerial distance (within 15 km) S. No. Areas Identity Proposed project location boundary 1 Areas protected under international Yes The project site is located at conventions, national or local Thrissur & the water body is legislation for their ecological, abutting the site within 15 km. landscape, cultural or other related radius from the site. value 2 Areas which are important or Puzhakkal River & Adjacent to the project site. sensitive for ecological reasons - River Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important Nil --- or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or Nil --- underground waters 5 State, National boundaries Nil --- 6 Routes or facilities used by the NH-544 or 47 Approx 9.0 Km in ESE public for access to recreation or direction. other tourist, pilgrim areas 7 Defense installations Nil No defense installation lies around the project site. 8 Densely populated or built-up area Thrissur Project Lies in Thrissur City 9 Areas occupied by sensitive man- Ashwini Hospital, Approx 4.0 Km in ESE made land uses (hospitals, schools, Thrissur direction. places of worship, community facilities) Chandra Memorial Approx 1.25 Km in NNE Higher Secondary direction. School,

M/S. SOBHA LIMITED 13 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Amala Institute of Approx 1.75 Km in NNW Medical Science, direction. Amala

St. Mary Church, Approx 1.0 Km in West Ambakkad direction.

Muthuvara Approx 0.6 Km in West Mahadeva Temple direction. 10 Areas containing important, high Puzhakkal River & Adjacent to the project site. quality or scarce resources. Thanikkudam River (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution Nil --- or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard Earthquakes The site falls under the Zone III which could cause the project to as per the Seismic Zone Map of present environmental problems India and is thus prone to (earthquakes, subsidence, landslides, moderate damage risk zone. erosion, flooding or extreme or Adequate measures have been adverse climatic conditions) taken during the construction of the project.

M/S. SOBHA LIMITED 14 EC validity Extension of "Sobha City" Proiect FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

''l hereby give underlaking that the data and inlbrmation given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be at our risk and cost.

Date: 16. I 0.201 7 Place: Kerala

.{) :{ -.-- 9------=J Nisanth M N Area Head M/s Sobha Limited Sobha City, Puzhakkal PO, Thrissur, Kerala

NOTE: 1. The Projects involving clearance under Coastal Regulation Zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z. and the recommendations of the state Coastal Zone management Authority. Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z. Notification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km ofthe National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the proj ect proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-d-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon." 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/ Environmental Clearance, subsequent clarifications, as may be required from time to time, paflicipation in the EAC Meeting on behalf of the project

M/s. SOBHA LIMITED EC validity Extension of "Sobha City" Project FORM-I At Village: Puzhakkal, Guruvalyur Road, District: Thrissur, Kerala

proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support ofhis claim ofbeing an authorized signatory for the specific project".

M/S. SOBHA LIMITED

EC Validity Extension of SOBHA CITY PROJECT

At Village: PUZHAKKAL, District: THRISSUR, KERALA

For

M/s SOBHA LIMITED Sobha City, Puzhakkal PO, Thrissur, 680553

Prepared By

GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified Co.: Accredited by QCI / NABET: Approved by MoEF&CC, GoI) F-374-375, Sector-63, Noida, U.P. Ph.: 0120- 4044630, Telefax: 0120- 2406519 Email: [email protected], [email protected] Website: http://www.grc-india.com GRC INDIA TRAINING & ANALYTICAL LABORATORY (Recognized by NABL & Approved by MoEF&CC, GoI) A unit of GRC India

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

FORM 1 A CHECK LIST OF ENVIRONMENTAL IMPACTS

(Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring program).

SECTION 1- LAND ENVIRONMENT

(Attach panoramic view of the project site and the vicinity)

1.1 Will the existing land use get significantly altered from the project that is consistent with the surroundings? (Proposed land use must conform to the approved Master Plan/Development Plan of the area. Change of land use, if any and the statutory approval from the competent authority are submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans.  No The project site falls under the master plan of Thrissur and is earmarked for mixed use development. Environmental Clearance has already been obtained to the project vide letter no. 21-713/2007-IA.III dated 17/04/2008. The construction of the project is yet to be completed, but due to the expiry of Environmental Clearance validity on 16th April, 2013, the project proponent had stopped the work and applied for the extension of Environmental Clearance validity, so that the construction work would be completed. The Environmental Clearance has been granted for an built up area of 3,24,665.28 sqm out of which 2,23,106.812 sqm has been completed till the expiry of Environmental Clearance.

Google earth image & Toposheet showing project site & surroundings within 500 m, 10 km & 15 km respectively is attached as Annexure I(a) & I(b).

1.2 List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc.

 LAND REQUIREMENT The Sobha City will be developed on total plot area measuring 2, 29,535.91 m2 (56.72 acres). The detailed area statement is provided below:

16

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Table1: Salient Features

SL. NO. PARTICULARS DETAILS 1. Total Site Area 2, 29,535.91 Sq. m (or 56.72 acres). 2. Total Built Up Area 3,24,665.28 Sq. m 3. Type of the project and Mixed Use Development No. of units  Residential Apartments  Villas (25 nos.)  Hotel (107 Rooms.)  Hospital (200 Beds)  Office Building  Shopping Mall  Convention  Business & Health Centre  Club House 4. Total Landscape Area 80,440.71 Sq. m 5. Parking Proposed  Car – 3631 No’s  Two Wheeler – 780 No’s  Visitors - 84

 WATER REQUIREMENT The water requirement is being met from artificial lake. The total water requirement is approx. 1,301.5 KLD. The fresh water demand is approx.940 KLD and flushing demand is 362 KLD.

 POWER REQUIREMENT The power is being supplied by KPTCL (Kerala Power Transmission Corporation Limited). The total electrical load for the project is approx. 24.49 MVA for the project.

 CONNECTIVITY The nearest railway station is Amala Nagar Railway Station at a distance of approx 1.5 km towards NW direction. The nearest Airport Cochin International Airport is about 49.0 km towards SE direction away from the site. The national highway, NH - 554 is about 9.0 km towards ESE direction from the project site.

 PARKING FACILITIES Adequate provision has been made for car/vehicles parking at the project. There is also being adequate provision for visitors parking so as not to disturb the traffic and allow smooth movement at the site.

17

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Parking Proposed:

For Cars = 3631 For Two Wheeler = 780 For Visitors = 84

1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use and disturbance to the local ecology).

 The project being a well-planned activity results in organized open spaces and green areas. The project is so developed that about 80,440.71 m2 i.e. (35.04% of net plot area) is designated for landscaping including the green areas. The biodiversity in the area has been increased due to the green areas. The project has an overall positive impact on the existing land use and not causes any disturbance to the local ecology.

1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Detail of soil type slope analysis, vulnerability to subsidence, seismicity etc. may be given).

 The main reasons for erosion are overexploitation of groundwater, unstable slopes, landslides etc. However, the site area is less prone to erosions. The project involves construction of Integrated Complex Project. The development of green areas reduces the chances of erosion.

Slope Analysis: From the topographical map, it has been observed that the site has a gentle slope.

Seismo-Tectonic Appraisal of the Area: Bureau of Indian Standards (BIS) has prepared a seismic zoning map of India based on tectonic features and records of past earthquakes. The project site is located in Zone-III as per the seismic map and is prone to moderate intensity earthquake. Earthquake resistant building has been constructed as per Indian standards. 1.5 Will the proposal involve alteration of natural drainage system? (Give details on a contour map showing the natural drainage near the proposed project site).

 The project involves construction of hard paved areas and hence the quantity of run off increases due to reduced infiltration. The runoff is being managed through a well designed storm water network and is being used for artificial recharge of lake and underground aquifers. Changes to the drainage pattern and run-off are mitigated by pavements designed to allow infiltration of water, such as paving with open joints, in addition to construction

18

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

of brick paved open jointed storm drains etc. which are utilized to recharge the underground aquifers.

1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc?)

 There were no deep excavations. All top soil excavated was used for landscaping. Required quantity of soil was stacked at site for back filling. Surplus earth was dumped in the low lying areas as defined by the Government. All necessary arrangements are being made to avoid spreading of dust.

1.7 Give details regarding water supply, waste handling etc during the construction period.

 WATER SUPPLY DURING CONSTRUCTION PHASE

During the construction phase, the main water requirement is for the development of the site for construction of complex involving cut and fill operation, leveling of ground surface, planting of trees; construction of infrastructures involving earthwork, laying the foundations, superstructure development , built-up service provisions, finishing, road construction etc; and domestic water requirements of construction workers and other staffs on-site as well as other requirements such as operation and maintenance of construction equipments, vehicles, etc. It is estimated that the water demand during construction phase of integrated complex project is approximately 5600 KLD which was met from state water supply board.

 WASTE MANAGEMENT DURING CONSTRUCTION PHASE

The generation of waste material is inevitable during the construction phase of development. Waste is generated at different stages of construction process. During construction phase, a considerable quantity (~90%) of waste generated at the project site shall be inert waste, mainly comprising of clay, sand, gravel, wood, brick, concrete, concrete block, asphalts, pipes, conduits, steel waste and perhaps some hazardous waste (mainly “used oil” from the contractor’s DG sets). Other miscellaneous materials that arise as waste include glass, plastic materials, general refuse, scrap metals, cardboard, plastics and sewage wastes from the construction worker’s housing.

19

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

A major portion of these waste (particularly the construction debris) are normally reused as filler at the same site after completion of the excavation work. Recyclable wastes are disposed of through scrap dealers/ recyclers.

Solid Waste

Construction Waste

Construction waste, Empty

Broken Bricks, Cement Excavated Soil

Waste Plaster Bags

Top soil conserved for Sold to local vendor Recycled through local landscaping, balance vendor used in re-filling

Figure 1: Solid Waste Management Scheme (Construction Phase)

The project maximized the reuse of recyclable waste, safe disposal of non-renewable waste from the site and proper disposal of hazardous waste to reduce the impact to insignificant level.

1.8 Will the low lying areas & wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity).

 No, low lying areas or wetlands are not found in the immediate vicinity of the project site.

1.9 Whether construction debris & waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction laborers and the means of disposal).

 No health hazards are expected during the construction phase. The laborers were being provided with face masks to minimize dust inhalation.

20

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

A significant portion of the construction waste and wood scrap generated were used on the site. The remaining waste was transported to a government approved dumping site.

The quantity of domestic waste generated is very little, as mostly local laborers were employed. However, the wastes generated was collected and disposed by an authorized agency.

SECTION 2- WATER ENVIRONMENT

2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement be met? State the sources & quantities and furnish a water balance statement. The water requirement in operational phase is being met from artificial lake. The total water requirement is approx. 1,301.5. The fresh water demand is approx.940 KLD. The daily water requirement calculation is given below in Table 2:

Table 2: Water Demand Calculations

` Type of Unit No. of Persons No. of Litres/ Total (in Litres) Development Units / Flat Occupant Person/ /Villa s Day a b c d e f (d x e) DomestiFlushing c 1 Residential Nos 1080 6 6480 150 6,80,0002,92,000 Apartments 2 Villas Nos 25 6 150 150 15,750 6,750 3 Hotel Room 107 2 300 180 48,600 5,400 * Staff 4 Office 1000 45 30,000 15,000 5 Shopping Mall 2700 Staff Nos 250 250 45 7,500 3,750 Visitors Nos 2050 2050 15 20,500 10,250 Food court Nos 400 400 70 24,000 4,000 6 Hospital Beds 200 200 450 81,000 9,000 7 Convention Nos 2000 15 20,000 10,000 Centre 8 Club House Nos 400 400 45 12,000 6,000 Total Consumption 13,230 9,39,350 3,62,150

21

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

≈9,40,0 ≈ 00 362,000 Say ltr/day 13,01,500 Water Requirement Per Year = 47,50,47,500 Litres Water Recovered from STP = 13,20,57,000 Litres Water Requirement for 12 Months = 34,29,90,500 Litres

Table 3: Waste Water Calculations

Domestic Water Requirement (Residential + Commercial 1301.5 KLD + Amenities + Hospital)  Freshwater 940 KLD  Flushing 362 KLD STP capacity 2000 KLD

Hospital Water Requirement 90 KLD Sullage Generated 13.5 KLD (@ 15% of Domestic water) ETP capacity** 15 KLD

22

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

FRESH WATER @ 80% SULLAGE GENERATED (940 KLD) (1114 KLD) STP CAPACITY 2000 KLD

@ 100%

FLUSHING 362 KLD @ 95% (362 KLD) 1058 KLD

HORTICULTURE 650 KLD (650KLD)

Vehicle Washing 33 KLD (33 KLD)

Recycled Water Discharge Sewer/ Irrigation 13 KLD Purpose Fresh Water (13 KLD) Sullage

 Demand for horticulture purpose will be reduced to 50% during rainy season.

Figure 2: Water Balance Diagram

The domestic water balance diagram for Hospital Water Requirement is shown below in figure 3

23

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

FRESH WATER @ 15% EFFLUENT (90 KLD) GENERATED (13.5 KLD) ETP CAPACITY 15

EXTERNAL DRAIN 11 @ 80 % (11 KLD) =11

Fresh Water Sullage Recycled Water

Figure 3: Water Balance Diagram

Wastewater generation & treatment:

It is expected that the project has generate a total of approx. 1114 wastewater from operational phase. The wastewater is being treated in onsite STP of 2000 KLD capacity generating 1058 KLD of recoverable water. Waste water generated from Hospital (13.5 KLD) will be treated in an ETP of 15 KLD capacity proposed within the project premises. Treated effluent will be discharged to external sewer line.

2.2 What is the capacity (dependable flow or yield) of the proposed source of water? The proposed project is dependent on meeting its fresh water demand 940 KLD from Artificial Lake. The quality of water required is as per IS (“Specification for Drinking Water”) as per Table 3. 2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, Biological characteristics with class of water quality).

The water requirement is being met from artificial lake with prior treatment conforming to IS 10500: 2012 Drinking Water Quality Standards.

2.4 How much of water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage)

24

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

It is expected that the project generates a total of approx. 1114 wastewater during operational phase. The wastewater is being treated in onsite STP of 2000 KLD capacity generating 1058 KLD of recoverable water. Waste water generated from Hospital (13.5 KLD) will be treated in ETP of 15 KLD capacity provided within the project premises. Treated effluent will be discharged to external sewer line.

2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption).

No, there is no any diversion of water from other users. Rise in water demand is a local phenomenon but the project has limited regional impact on water reserves. Project is only involved spatial shifting of water demand within the region.

2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity)

It is expected that the project generates a total of approx. 1114 wastewater from the project. The wastewater is being treated in onsite STP of 2000 KLD capacity generating 1058 KLD of recoverable water. Waste water generated from Hospital (13.5 KLD) will be treated in an ETP of 15 KLD capacity provided within the project premises. Treated effluent will be discharged to external sewer line. This wastewater generated is being treated in well-designed sewage treatment plant based of extended aeration and SBR Technology.

2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created.

Rain Water Harvesting

Volume From Balance Average S. Average Volume in Months Rainfall Demand** No Rainfall Lake Ist Intensity Intensity Year 1 JUN 714.2 106.54 31.5 75.04 2 JUL 665.2 99.23 31.5 142.77 3 AUG 412.3 61.5 31.5 172.78 4 SEPT 226.5 33.79 31.5 175.06 5 OCT 318.8 47.56 31.5 189.03 6 NOV 99.5 14.84 31.5 172.37 7 DEC 18.9 2.82 31.5 143.69 8 JAN 2.3 0 31.5 112.19 9 FEB 4.5 0 31.5 80.69

25

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

10 MAR 8.5 0 31.5 49.19 11 APR 76.7 11.44 31.5 29.13 12 MAY 189.3 28.24 31.5 25.87 Note: All volumes are in Million Litres

2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way?

The project includes paved areas as well as unpaved areas and thus the runoff from the project site is expected to be limited due to sufficient infiltration. The quality of the run off is expected to improve. The runoff will not cause flooding or water logging. The runoff is finally discharged into the rainwater harvesting structures and is being used to recharge the artificial lake and aquifers.

2.9 What are the impacts of the proposal on the ground water? (will there be tapping of ground water; give the details of ground water table, recharging capacity and approvals obtained from competent authority, if any)

Not Applicable, Since there is no tapping of ground water. The source of water is being met through Artificial lake provided within the premises.

2.10 What precaution/measure is taken to prevent the run- off from construction activities pollution land & aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts)

Water demand is being fulfilled through artificial lake. No adverse impact is expected, as efforts have been made to recharge the aquifers using rain water harvesting. Treated wastewater is being used for landscaping, flushing and vehicle washing purposes. The following management measures are suggested to protect the water quality during the construction phase.

 Avoid excavation during monsoon season.  Care has been taken to avoid soil erosion.  Community toilets have been constructed on the site during construction phase and the wastewater has been channelized to the septic tank in order to prevent wastewater from entering the water bodies.  To prevent surface and ground water contamination by oil/grease, leak proof containers had been used for storage and transportation of oil/grease. The floors of oil/grease handling area had been kept effectively impervious.

26

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Collection and settling of storm water, prohibition of equipment wash downs, and prevention of soil loss and toxic release from the construction site are being adhered to minimize water pollution.  All stacking and loading areas had been provided with proper garland drains equipped with baffles to prevent runoff from the site.

2.11 How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels).

Most of the storm water produced on site has been harvested for artificial lake recharge. Thus proper management of this resource is a must to ensure that it is free of contamination. A detailed Storm Water Management Plan had been developed which consider the sources of storm water. The plan had incorporate best management practices which included the following:

 Regular inspection and cleaning of storm drains.  Installation of clarifiers or Oil/Water separators system of adequate capacity around parking areas and garages as per requirement.  Cover waste storage areas.  Avoid application of pesticides and herbicides before wet season.  Conducting routine inspections to ensure cleanliness.  Preparation of spill response plans, particularly for fuel and oil storage areas.  Provision of slit traps in storm water drains.  Good housekeeping in the above areas.

2.12 Will the deployment of construction laborers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation).

 No, mostly local laborers had been and will be employed during the construction phase and thus negligible quantities of wastes will be generated. Community toilets had been provided and the wastewater generated is send to septic tanks.

2.13 What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology & facilities for recycling and disposal).

 Water demand during the construction phase is met through City municipal watrer supply board. The sewage generated from the labor camp will be channelized to the septic tanks.  During operational phase sewage generated is being treated in a well-designed sewage treatment plant. The sewage generated from the project has been treated

27

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

to a level of BOD < 10 mg/l and is being used for flushing, horticulture and recreational purposes within the project site.

2.14 Give details of dust plumbing system if treated waste used for flushing of toilets or any other use.

Treated wastewater is being used for flushing purposes, horticulture and vehicle washing. Separation of grey and black water- Separation of grey and black water is being done by the use of dual plumbing line. Treatment- The treated wastewater meets with CPCB standards for discharge. The grey and black water has been piped in separate line and there is proper treatment for re use for flushing, gardening etc.

3. VEGETATION

3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with its unique features, if any).

There is no additional pressure from the project on the surrounding ecosystem. Furthermore the plantation of Green Belt by the project proponent has enhanced the biodiversity of the region. Hence, no ecological threat is anticipated. The main species of plants found in the study area are Table 5:- List of Plants

Types of trees planted i) On the periphery of site: Combination of  Cassia Marginata  Neem Tree  Cochlospermum Religiosum  Dillenia Pentagyna  Plumeria Lutea  Golden Shower Tree (Cassia fistula) - 250 Nos. ii) Parks and gardens Flowering Plants like  Golden Shower Tree (Cassia fistula)  Acacia Auriculiformis  Cerbera  Cananga Ylang- Ylang iii) Along roads and pedestrian movements - 425 Nos.  Singapore Cherry  Neem (Azadiracta Indica)  Dabobia Rosia (Light pink) iv) In public areas

28

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Scented Shrubs  Gardenia jasminoides  Calliandra brevi pes  Panjat

3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project).

The site does not support any ecologically threatened vegetation. A multilayered peripheral greenbelt of native plant species has been developed, which enhance the aesthetic value of the region and also provide an excellent habitat for various faunal groups.

3.3 What are the measures proposed to be taken to minimize the likely impacts on important site – features (Give details of proposal for tree plantation, landscaping creation of water bodies etc along with a layout plan to an appropriate scale?)

Out of the total plot area a total of 35.04 % of the net plot area had been earmarked for landscape development. The implementation for development of greenery is of immense importance, as it not only acts as pollution sink but also enhances the visual appearance of the developed site. The species to be grown on the site will be fast growing native species having broad leaf base so that a permanent landscape is created in a short period. The effective plantation will also stabilize the soil and reduce any nuisance during windstorm. Besides this, the visual aesthetics of the proposed site will be enhanced by developing lawn with local ornamental plants in the open spaces.

4.0 FAUNA

4.1 Is there likely to be any displacement of fauna both terrestrial and aquatic or creation of barriers for their movement? Provide the details.

Not Applicable.

4.2 Any direct or indirect impacts on the avifauna of the area? Provide details.

The project has no any direct or indirect impacts on the avifauna of the area. However, planting of fruit bearing trees in the greenbelt is an attraction to the local bird population.

4.3 Impacts Prescribe measures such as corridors, fish ladders etc to mitigate adverse on fauna.

29

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Not applicable.

5. AIR ENVIRONMENT

5.1 Will the project increase atmospheric concentration of gases & result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed construction). The project is a mixed use development. The major source of air pollution is only expected from D.G’s and vehicular movement within the site during the operational phase. However, routine ambient air quality monitoring was conducted to assess the impact of the air pollution sources (D.G’s and vehicular traffic) on air environment. The proposed project also provides sufficient number of car parking so as to ease from increase in traffic generation and to avoid traffic congestion. Hence, the proposed project will not increase atmospheric concentration of gases & heat islands are not expected.

5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters. The generation of dust is expected to be high during the construction stage due to the construction activities. Smoke will be emitted from vehicles plying to and fro from the site. However, an impact on generation of dust and smoke reduces gradually as the project progresses. No odour is expected both during the construction and operational stage. The treatment of the sewage during the operational phase is done such that, the treated sewage is odorless. Overall, these impacts are reversible, marginal, and temporary in nature. Hazardous gases are not expected and are considered insignificant.

5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry and exit to the project site. The layout plan of the site has developed an internal road network in such a manner that it integrates the whole project in an interesting composition to built masses and open spaces with a pedestrian dominated movement pattern. Entry point to the project has been worked out keeping in view of the desired movement of vehicles on the main approach road and road network around the site. Main entry to the proposed project is planned from south direction of the project site. An adequately wide driveway to cater the two-way traffic has been planned

30

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Parking Proposed and Provided: For Cars = 3631 For Two Wheeler = 780 For Visitors = 84

5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc, with areas under each category.  The layout plan of the site has developed an internal road network in such a manner that it integrates the whole project in an interesting composition to built masses and open spaces with a pedestrian dominated movement pattern. Entry point to the project has been worked out keeping in view of the desired movement of vehicles on the main approach road and road network around the site. Main entry to the proposed project is planned from south direction of the project site. An adequately wide driveway to cater the two-way traffic has been planned

5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above.

The proposed project will not result in significant generation of traffic noise and vibration due to the following:

 Provision of wide roads for smooth flow of traffic and Greenbelt along the roads.  Due to well established car parking system.

5.6 What will be the impact of D.G. sets and other equipment on noise levels and vibration in ambient air quality around the project site? Provide details.

During operation, vehicular movement and operation of DG sets are the major sources of noise pollution. But both these activities- DG set and vehicular movement have no any significant impact on the people residing in the area. The DG sets are provided with proper acoustic arrangements to control the noise generated from the rooms where they are enclosed. The noise level outside the room is maintained within the stipulated norms both during the day and night time.. It is envisaged that the movement of the motor vehicles is restricted to designated carriageways only.

Impacts on Air Quality due to DG Sets: • Impacts on ambient air during operation phase are due to emissions from the stacks attached to backup DG sets only during grid power failure.

Mitigation Measures for Impacts of DG Sets on Ambient Air Quality: • Back up DG sets complies with the applicable emission norms. • Adequate stack height for DG sets has been provided as per norms. • Back up DG sets are used only during power failure.

31

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

• Monitoring of emissions from DG sets and ambient air quality has been and will be carried out as per norms.

Noise Control Measures for DG sets: • DG sets are installed in the basement to minimize the impact on ambient noise. • Adequate exhaust mufflers have been provided as per norms to limit the noise.

6. AESTHETICS

6.1 Will the proposed construction in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents? The site lies in an urbanized settlement and is well planned. Thus, no obstruction of view or scenic beauty or landscape is anticipated. Furthermore, the construction is planned in such a way that the organized open spaces and landscaped areas have rendered the project site aesthetically appealing.

6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account? No impacts anticipated.

6.3. Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out.

The project is strictly following the Area Building Regulation of NBC. All norms on Ground Coverage, FAR, Height, Setbacks, Fire Safety Requirements, Structural Design and other parameters has been strictly adhered to.

6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered? No anthropological or archaeological sites or artifacts are found near the site area.

7. SOCIO-ECONOMIC ASPECTS

7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details.  No such changes anticipated. Construction phase: Since local labourers were engaged during construction phase, alteration to the existing demographic profile of the area is not anticipated.

32

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Operation phase: The changing demography in the area is another impact that needs attention. The project is mainly lead to spatial redistribution of local population and hence no considerable influx of population is envisaged from the Project.

7.2 Give details of the existing social infrastructure around the proposed project.

Being a developing urban locality, it is adequately equipped with all essential facilities.

Water Supply: There is an availability of city municipal water supply, but the project has created an artificial lake, rain water harvesting system which suffice the water demand for the entire project.

Solid waste: The solid waste generated is segregated as organic and inorganic wastes. Organic wastes are treated in organic waste converter within the premises and inorganic wastes are handed over to local municipal. Power Supply: Power supply network infrastructure adequately exists around the project area. The demand in the area is met through KPTCL (Kerala Power Transmission Corporation Limited). Education: The project area is having adequate infrastructure facilities for education. Number of Educational institutions exists in the area. A number of pre-primary, high schools, International school viz., Kendriya Vidyalaya Puranattukara, The Nest International Preschool, Amrita Speech and hearing improvement school, Hari Sri Vidya Nidhi School, Devamatha CMI Public School etc. exist in the vicinity. Health: Different types of health facilities including hospitals, dispensaries, polyclinics, nursing homes etc. are available in closed vicinity of the project area. The project area is in advantageous position in terms of healthcare infrastructure because of its proximity to various hospitals like , Elite Hospital, Saroja Multi Speciality Hospital, Metropolitan hospital, Unity hospital etc. Economic Aspects: The project area is witnessing a fast growth in the economic activities. The surrounding areas to the project site comprise of various social, commercial, Industrial and educational infrastructures which have already come up in the area. This will enhance the economic status

33

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala of the project area. Well-positioned infrastructure of the proposed project is one of the dictating factors for the promoters to set this project in the area. Aesthetic Aspects: The landscape concepts of the project surrounding area have evolved a system of open spaces, which have the potential to develop into a landscape with distinctive visual qualities, fulfilling the required ecological and recreational functions. The location and alignment of existing landscape features have been used to structure the development of the area. Communication and Transportation: The project area is well connected to the road network from all sides. Bus based public transport system is also the primary mode of transportation of the people in the project area. The continual improvement, taking place in the project area w.r.t traffic and transportation will bring beneficial impact to the floating population in the future.

7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed?

The proposed project will not result in adverse effects/impacts on local communities, disturbance to sacred sites or the other cultural values.

8. BUILDING MATERIALS

8.1 May involve the use of building materials with high embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency)

Embodied energy is the energy consumed by all of the processes associated with the production of a building, from the acquisition of natural resources to product delivery. The building materials used will be of high-embodied energy.  Also, the materials used for construction of the building are of non-combustible in nature.  Non-combustible material are only used for the construction/ erection of false ceiling including all fixtures and used for its suspension/ erection etc. and of low flame rating.

8.2 Transport and handling of materials during construction may results in pollution, noise and public nuisance. What measures are taken to minimize the impacts?

34

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Adequate mitigation measures were adopted. Construction equipment with idling control technologies were used earlier and will be used in future also. Regular maintenance of the equipment was carried out. The construction activities had been carried out during the daytime only. The workers exposed to high noise generating equipment had been provided with earplugs and earmuffs.

8.3 Are recycled materials used in roads and structures? State the extent of savings achieved?

Any construction waste generated on-site like topsoil, sand and gravel will be reused as filler. Moreover, broken bricks will be used as the filling material for the construction of internal roads. Quantity of construction debris will be reused /recycled for back filling /sub base work for roads & pavements within the project site.

8.4 Give detail of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project.

 The collection, transportation and disposal of the solid waste generated during the operation phase of the project is being done as per the Municipal Solid Wastes (Management & Handling) Rules, 2016 (MSW Rules) of CPCB. Following steps are adopted:  The solid wastes are segregated into Organic and In-organic wastes at the source itself and collected through network of bins from each floors. The organic waste are treated in organic waste converter and used as manure for greenery development in same land. Inorganic waste is handed over to authorized recyclers.  Care has been taken such that the collection vehicles are well maintained and equipped with air and noise pollution control mechanism. During transportation of waste, they are covered to avoid littering. The management is using the services of the authorized agency for solid waste disposal and management during its operational phase.

9. ENERGY CONSERVATION 9.1 Give details of the power requirements, source and supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption?

 The total power requirement for the project is 24.49 MVA for the project which is sourced from the KPTCL (Kerala Power Transmission Corporation Limited). Power backup for lighting & power with 20,563 MVA DG sets has been provided.

Effective measures have been incorporated to minimize the energy consumption in the following manners:  Maximum utilization of solar light

35

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Energy efficient lamps  Natural ventilation of buildings  Energy efficient appliances such as CFL lighting has been used for street lighting

9.2 What type and capacity of power backup do you plan to provide?

There is a total 15 no. of DG sets of 20,563 kVA (9 X 2 MVA + 1 X 750 KVA + 3 X 500 KVA + 1 X 250 KVA + 1 X 63 KVA each) capacity for power back up. The DG sets are well equipped with acoustic enclosure to minimize noise generation and adequate stack height as per CPCB norms.

9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation?

Only specified glasses by relevant consultants were used for appropriate applications.

9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project.

Pergolas, projections, façade elements, metal louvers have been provided for sun shading to reduce the heat influx into the building and thus reduce the air conditioning loads.

9.5 Does the layout of street & building maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details.

Solar light applications have been provided for Street Lighting, Common Area and External Lighting within the project site.

9.6 Is the shading effectively used to reduce cooling / heating lands? What principles have been used to maximize the shading of walls on the East and the West and the Roof? How much energy saving has been effected?

Green area and open areas are so spaced that a reduction in temperature is achieved.

9.7 Do the structures use energy-efficient space conditioning, lightening and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lightening intensity and air conditioning load assumption? Are you using CFC and HCFC free chillers? Provide specifications.

All chillers for air conditioners are CFC & HCFC free. Well-designed building structures allow natural light to enter. Measures prescribed in Energy Conservation

36

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Building Code 2007 were adopted to reduce the heat influx by walls, roofs and openings. Only prescribed quality of glasses was used.

9.8 What are the likely effects of the building activity in altering the micro- climates? Provide a self assessment on likely impacts of the proposed construction on creation of heat island & inversion effects?

Heat emissions from the construction may be from the following sources:  Heat absorbed from the paved and concrete structures  Heat generated from equipment/appliances  Heat increase due to influx of people etc. in the project. However, the heat generated is not significant and dissipated in the lush greens and open areas provided within the project area.

9.9 What are the thermal characteristics of the building envelope? (a) Roof (b) external walls and (c) fenestration? Give details of the material used and the U value or the R values of the individual components.

 The roof tops- All buildings were planned for water proofing and thermal insulation.  External wall- External opening have regular door windows with slightly tinted glass. Regular walls have some cladding / fixture paints.

Table 6: Material specification used in the project Sl. Material Thickness Thermal R-Value* No. (mm) Conductivity (m2K/W (W/m.K) 1. Cement Plaster 20 0.740 0.027 2. Brick Masonry 230 0.700 0.328 3. POP 10 0.430 0.023 4. Outside Film -- -- 0.050 5. Inside Film -- -- 0.100 6. Brick Tiles 50 0.790 0.063 7. PCC 40 0.930 0.063 8. Brick Ball 120 0.710 0.171 9. RCC 150 0.930 0.161 10 Polyurethane 50 0.040 1.200

9.10 What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans. Suitable Fire extinguisher has been provided in basement car park area, D.G. room, Electrical room, Pump room and lobby in every floor. Adequate discharge of pump details are provided for all buildings

37

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Areas No. of Sprinklers Heat Detector Smoke Detector Wet Riser 237B-CLUB HOUSE 2 Provided in Provided in Pantry Provided in all Floors Ground Floor & Electrical Rooms LAKE FRONT 6 Provided in Provided in Kitchen Provided in all Bed APARTMENT every Floors Rooms and Living Area LAKE FRONT 3 Provided in Provided in Kitchen Provided in all Bed APARTMENT every Floors Rooms and Living Area LAKE SIDE 6 Provided in Provided in Kitchen Provided in all Bed APARTMENT every Floors Rooms and Living Area 37F-CONVENTION 3 Provided in Provided in Ground Provided in All Floors every Floors Floor, First & except in Basement Second Floor Floor 237G- COMMERCIAL 9 Provided in Provided in every Provided in every every Floors Floors Floors

 Fire Fighting System a) Fire Detection and Warning Automatic fire detection and alarm facilities are provided to warn occupants early of the existence of fire. b) Fire lifts Fire lifts has been provided with a minimum capacity of 8 passengers and fully automated with emergency switch at ground level. c) Automatic Sprinklers Automatic Sprinklers has been installed in:  Basements.  On all floors of the residential and commercial building  Kitchens.

9.11 If you are using glass as wall materials, provide details and specifications including emissivity and thermal characteristics.

Glass of low emissivity with solar control will be used for lower energy consumption.

9.12 What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration.

The rate of air infiltration into the buildings is negligible, as it is not centrally air conditioned. . 9.13 To what extent the non–conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used.

38

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Solar panels and solar powered street lights with infrared scanners are being used.

10. ENVIRONMENT MANAGEMENT PLAN

The Environment Management Plan (EMP) consists of all mitigation measures for each component of the environment due to the activities increased during the construction, operation and the entire life cycle to minimize adverse environmental impacts resulting from the activities of the project. It also delineate the environmental monitoring plan for compliance of various environmental regulations. It states the steps to be taken in case of emergency such as accidents at the sites including fire. The detailed EMP for the project is given below.

10.1 Environmental Management Plan

The Environment Management Plan (EMP) is a site specific plan developed to ensure that the project is implemented in an environmental sustainable manner where all contractors and subcontractors, including consultants, understand the potential environmental risks arising from the project and take appropriate actions to properly manage that risk. EMP also ensures that the project implementation is carried out in accordance with the design by taking appropriate mitigation actions to reduce adverse environmental impacts during its life cycle. The plan outlines existing and potential problems that may adversely impact the environment and recommends corrective measures where required. Also, the plan outlines roles and responsibility of the key personnel and contractors who is the incharge of the responsibilities to manage the project site.

10.1.1 The EMP is generally

 Prepared in accordance with rules and requirements of the MoEFCC and CPCB/ SPCB  To ensure that the component of facility are operated in accordance with the design  A process that confirms proper operation through supervision and monitoring  A system that addresses public complaints during construction and operation of the facilities and  A plan that ensures remedial measures is implemented immediately.

The key benefits of the EMP are that it offers means of managing its environmental performance thereby allowing it to contribute to improved environmental quality. The other benefits include cost control and improved relations with the stakeholders.

EMP includes four major elements:

39

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Commitment & Policy: The management is striving to provide and implement the Environmental Management Plan that incorporates all issues related to air, water, land and noise.  Planning: This includes identification of environmental impacts, legal requirements and setting environmental objectives.  Implementation: This comprises of resources available to the developers, accountability of contractors, training of operational staff associated with environmental control facilities and documentation of measures to be taken.  Measurement & Evaluation: This includes monitoring, counteractive actions and record keeping.

It is decided that as part of the EMP, a monitoring committee has been formed by M/s. Sobha Limited comprising of the site in-charge/coordinator, environmental group representative and project implementation team representative. The committee’s role is to ensure proper operation and management of the EMP including the regulatory compliance.

The components of the environmental management plan, potential impacts arising, out of the project and remediation measures are summarized below:

40

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Table 7: Summary of potential impacts and remedial measures

S. Environmental Potential Potential Source of Controls Impact Remedial Measures No. components Impacts Impact Through EMP Evaluation & Design 1 Ground Water Ground Water Construction Phase  Soak No significant Quality Contamination  Wastewater generated Pit has been impact as from temporary labor provided. majority of tents. labors would be locally deployed Operation Phase  Propone No negative STP is completely of impervious  Discharge from the nt provided the impact on ground structure. project STP to treat the water quality discharge from envisaged. Not the project. significant. 2. Ground Water Ground Water Construction Phase  Controlled No significant Quantity Depletion  Use of treated water use of water impact on ground from State Water during water quantity Supply Board for construction envisaged. construction activity. Operation Phase  Rain water No significant  Artificial Lake water harvesting impact on is the main source of scheme. surface/ground water in operational water quantity phase  Black and envisaged. Grey water treatment and reuse.

41

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Storm water collection for water harvesting.

 Awareness Campaign to reduce the water consumption 3. Surface Water Surface water Construction Phase  Silt traps No off site Quality contamination  Surface runoff from and other impact envisaged site during measures such as no surface construction activity. as additional on water receiving site diversion body is present in ditches are the core zone. constructed to control surface run-off during site development Operation Phase  Domestic No off site Excess of water will be  Discharge of excess water is being impact envisaged discharged into the surface water domestic wastewater treated in STP body only after the proper to surface water treatment. CPCB standards for body/land. discharge of waste water into the surface water body will be followed. 4. Air Quality Dust Emissions Construction Phase  Suitable Not significant During construction phase the 42

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 All heavy control because dust contractors were advised to construction activities measures are generation is facilitate masks for the labors. adopted for temporary and Water sprinkling was practised for subsiding the settle fast due to suppression of dust during SPM level in dust suppression construction phase. the air as per techniques (water air pollution sprinkling) control plan. practised. Emissions of Construction Phase  Rapid on-site Not significant. Regular monitoring of emissions SPM, SO2, NO2  Operation of construction and control measures are taken to and CO construction and improved reduce the emission levels. equipment and maintenance of vehicles during site equipment development.

 Running D.G. sets (back up) Operation Phase  Use of ultra Not significant  Power generation by low sulphur DG sets are used DG Sets during power diesel if as power back-up failure available (approx 4 hours)  Use of clean  Emission from fuel if No significant vehicular traffic in use available increase in noise  Providing level is expected Construction Phase Footpath and from the pedestrian project’s  Operation of ways within activities. construction the site for the There are no  Use of Personal Protective equipment and vehicle residents sensitive Equipment (PPE) like 43

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

movements during  Green belt has receptors located earmuffs and earplugs site development. been within the during construction  Running DG sets (for developed vicinity of site. activities. power back up) with specific species to help to reduce SPM level  Use of equipment fitted with silencers  Proper maintenance of equipment  Provision of noise shields near the heavy construction operations and acoustic enclosures for DG sets Construction activity was limited to day time hours only 5 Noise Environment

44

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Operation Phase  Green Belt No significant Development impact due to  Noise from  Development suitable width vehicular movement of silence of Greenbelt. zones to check  Noise from DG sets the traffic operation movement

DG set rooms are well equipped with acoustic enclosures 6. Land Soil Construction Phase  No significant Environment contamination Construction impact.  Disposal of debris has been Impact is local, construction debris collected and as waste suitably used generated has on site as per been reused for the solid waste filling of low management lying areas etc. plan for construction phase Operation Phase  The solid Since solid waste waste is  Dumping of generated is handled by the municipal solid managed by an authorized waste on land. authorized agency, waste agency. dumping is not

45

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Waste oil generated  Collecti allowed. Not from D.G. sets on, significant. segregation, transportation Negligible and disposal impact. will be done as per MSW Management Rule, 2016 by the authorized agency  Waste oil generated has been sold to authorized recyclers 7. Biological Displacement of Construction Phase  No Negligible Environment Flora and Fauna  Site Development Important impact. (Flora and on site during construction species of trees Fauna) are identified.

Operation Phase  Suitable green Beneficial belts has been impact.  Increase in green developed as covered area per landscaping plan in and around the site using

46

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

local flora

8. Socio-Economic Population Construction Phase  Reside No negative Environment displacement ntial zone as impact. and loss of  Construction per the Master income activities leading to Plan. relocation Operation Phase  Project Beneficial has provided impact  Site operation employment opportunities to the local people in terms of labor during construction and service personnel (guards, securities, gardeners etc) during operations

 Providi ng quality- Integrated infrastructure. 47

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

9. Traffic Pattern Increase of Construction Phase  Heavy No negative vehicular traffic Vehicular impact  Heavy Vehicular movement is movement during restricted to construction daytime only and adequate parking facility has been provided Operation Phase  Vehicul No major ar movement significant  Traffic due to has been impact project once the regulated project is inside the operational premises with adequate roads and parking lots in the project.

48

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

10.2 ENVIRONMENT MANAGEMENT PLAN

An environmental management plan (EMP) has been made to mitigate the predicted adverse environmental impacts during construction and operation phase of the project and these are discussed in later subsections.

10.2.1 EMP for Air Environment

Construction Phase

To mitigate the impacts of SPM (dust) during the construction phase of the project, the following measures are recommended for implementation:

 A dust control plan  Procedural changes to construction activities

Dust Control Plan

The most cost-effective dust suppressant is water because water is easily available on construction site. Water can be applied using water trucks, handled sprayers and automatic sprinkler systems. Furthermore, incoming loads could be covered to avoid loss of material in transport, especially if material is transported off-site.

Procedural Changes to Construction Activities

Idle time reduction: Construction equipment is commonly left idle while the operators are on break or waiting for the completion of another task. Emission from idle equipment tends to be high, since catalytic converters cools down, thus reducing the efficiency of hydrocarbon and carbon monoxide oxidation. Existing idle control technologies comprises of power saving mode, which automatically off the engine at preset time and reduces emissions, without intervention from the operators.

Improved Maintenance: Significant emission reductions have been achieved through regular equipment maintenance. Contractors have been asked to provide maintenance records for their fleet as part of the contract bid, and at regular intervals throughout the life of the contract. Incentive provisions were established to encourage contractors to comply with regular maintenance requirements.

Reduction of On-Site Construction Time: Rapid on-site construction reduces the duration of traffic interference and therefore, reduces emissions from traffic delay.

49

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Operation Phase

To mitigate the impacts of pollutants from DG sets and vehicular traffic during the operational phase of the project, following measures are recommended for implementation:  DG set emission control measures  Vehicular emission controls and alternatives  Greenbelt development

Diesel Generator Set Emission Control Measures

Adequate stack height has been maintain to disperse the criteria air pollutants generated from the operation of DG sets to dilute the pollutants concentration within the immediate vicinity. Hence no additional emission control measures have been suggested.

Vehicle Emission Controls and Alternatives

Use of clean Fuel by vehicles on-site: Low sulphur diesel is being used as clean fuel (if available locally). This reduces the emissions on-site and in areas from where these vehicles pass. Footpaths and Pedestrian ways: Adequate footpaths and pedestrian ways have been provided at the site to encourage non-polluting methods of transportation.

Greenbelt Development

Increased vegetation in the form of greenbelt is one of the preferred method to mitigate air and noise pollution. Plants serve as a sink for pollutants, act as a barrier to break the wind speed as well as allow the dust and other particulates to settle on the leaves. It also helps to reduce the noise level at large extent. The following table indicates various species of the greenbelt which are used to act as a barrier. Table 8: Trees that can be used as barrier for Air Pollution

Types of trees planted i) On the periphery of site: Combination of  Cassia Marginata  Neem Tree  Cochlospermum Religiosum  Dillenia Pentagyna  Plumeria Lutea  Golden Shower Tree (Cassia fistula) - 250 Nos. ii) Parks and gardens Flowering Plants like 50

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Golden Shower Tree (Cassia fistula)  Acacia Auriculiformis  Cerbera  Cananga Ylang- Ylang iii) Along roads and pedestrian movements - 425 Nos.  Singapore Cherry  Neem (Azadiracta Indica)  Dabobia Rosia (Light pink) iv) In public areas Scented Shrubs  Gardenia jasminoides  Calliandra brevi pes  Panjat

10.2.2 EMP FOR NOISE ENVIRONMENT

Construction Phase

To mitigate the impacts of noise from construction equipment during the construction phase on the site, the following measures were and will be recommended for implementation.

Time of Operation: Noisy construction equipment would not be allowed to use. Job Rotation and Hearing Protection: Workers employed in high noise areas will be rotated. Hearing protection such as earplugs/muffs will be provided to those working very close to the noise generating machinery.

Operation Phase

To mitigate the impacts of noise from diesel generator sets during operational phase, the following measures are adopted:  Adoption of Noise emission control technologies  Greenbelt development

Noise Emission Control Technologies

DG sets are housed in a suitable acoustic enclosure so that noise level at a distance of 1 m does not exceed 25 dB(A) at 75% load, as per CPCB standards or is meeting the local standard (whichever is higher). It has been made ensured that the manufacturer provides acoustic enclosure as an integral part along with the diesel generators sets. Further, enclosure of the services area with 4 m high wall to reduce noise levels and

51

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

ensure that noise is at a permissible limit for resident of the site and surrounding receptors.

Greenbelt Development

Types of trees planted i) On the periphery of site: Combination of  Cassia Marginata  Neem Tree  Cochlospermum Religiosum  Dillenia Pentagyna  Plumeria Lutea  Golden Shower Tree (Cassia fistula) - 250 Nos. ii) Parks and gardens Flowering Plants like  Golden Shower Tree (Cassia fistula)  Acacia Auriculiformis  Cerbera  Cananga Ylang- Ylang iii) Along roads and pedestrian movements - 425 Nos.  Singapore Cherry  Neem (Azadiracta Indica)  Dabobia Rosia (Light pink) iv) In public areas Scented Shrubs  Gardenia jasminoides  Calliandra brevi pes  Panjat

10.2.3 EMP FOR WATER ENVIRONMENT

Construction Phase

To prevent degradation and to maintain the quality of the water source, adequate control measures have been made. To check the surface run-off as well as uncontrolled flow of water into any water body check dams with silt basins were proposed. The following management measures were suggested to protect the water source being polluted during the construction phase:

 Avoid excavation during monsoon season  Care was taken to avoid soil erosion

52

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Common toilets were constructed on site during construction phase and the waste water had been channelized to the septic tanks in order to prevent waste water to enter into the water bodies  To prevent surface and ground water contamination by oil and grease, leak-proof containers were used for storage and transportation of oil and grease. The floors of oil and grease handling area were kept effectively impervious. Any wash off from the oil and grease handling area or workshop had been drained through imperious drains  Collection and settling of storm water, prohibition of equipment wash downs and prevention of soil loss and toxic release from the construction site are necessary measure are taken to minimize water pollution  All stacking and loading area had been provided with proper garland drains, equipped with baffles, to prevent run off from the site, to enter into any water body

Operation Phase In the operation phase of the project, water conservation and development measures has been taken, including all possible potential for rain water harvesting. Following measures has been adopted:

 Water source development  minimizing water consumption  Promoting reuse of water after treatment and development of closed loop systems for different water streams.

Water Source Development

Water source development has been practiced by installation of scientifically designed Rain Water Harvesting system. Rainwater harvesting promotes self-sufficiency and fosters an appreciation for water as a resource.

Minimizing Water Consumption

Consumption of fresh water has been minimized by combination of water saving devices and other domestic water conservation measures. Further, to ensure ongoing water conservation, an awareness program was introduced for the residents. The following section discusses the specific measures, which is being implemented:

Domestic and Commercial Usage

 Use of water efficient plumbing fixtures (ultra flow toilets and urinals, low flow sinks, water efficient dishwashers and washing machines). Water efficient plumbing fixtures uses less water with no marked reduction in quality and service 53

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Leak detection and repair techniques  Re-circulation of swimming pool overspill after treatment  Sweep with a broom and pan where possible, rather than hose down for external areas  Meter water usage: Implies measurement and verification methods. Monitoring of water uses is a precursor for management

Horticulture  Drip irrigation system has been used for the lawns and other green area. Drip irrigation can save 15-40% of the water, compared with other watering techniques  Plants with similar water requirements have been grouped on common zones to match precipitation heads and emitters.  Use of low-angle sprinklers for lawn areas.  Select controllers with adjustable watering schedules and moisture sensors to account for seasonal variations and calibrate them during commissioning.  Place 3 to 5 inches of mulch on planting beds to minimize evaporation.

Promoting Reuse of Water after Treatment and Development of Closed Loop Systems

To promote reuse of waste water and development of closed loop system for waste water segregation. Two wastewater schemes are adopted, namely: 1) Storm Water Harvest 2) Waste water recycling.

Storm water harvest as discussed in earlier, has been utilized for artificial lake and recharge of ground water sources; and waste water has been reused on site after treatment.

Treated wastewater is being used for landscaping, flushing and vehicle washing purposes. Following section discuss the scheme of wastewater treatment.

Wastewater Treatment Scheme

Proponent has treated the wastewater from the project in well-designed sewage treatment plant.

Storm Water Management

Most of the storm water produced on site has been harvested for artificial lake and for ground water recharge. Thus proper management of this resource is a must to ensure that it is free from contamination. Contamination of Strom Water is possible from the following sources:

54

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Diesel and oil spills in the diesel power generator and fuel storage area  Waste spills in the solid / hazardous waste storage area  Oil spills and leaks in vehicle parking lots  Silts from soil erosion in gardens  Spillage of sludge from sludge drying area of sewage treatment plant

A detailed storm water management plan has been developed which is consider the possible impacts from above sources. The plan incorporated best management practices which included the following:  Regular inspection and cleaning of storm drains  Clarifiers or oil / separators have been installed in all the parking areas. Oil / grease separators installed around parking areas and garages are sized according to peak flow guidelines. Both clarifiers and oil / water separators are periodically pumped in order to keep discharges within limits  Covered waste storage areas  Avoid application of pesticides and herbicides before wet season  Secondary containment and dykes in fuel / oil storage facilities  Conducting routine inspection to ensure cleanliness  Provision of slit traps in storm water drains  Good housekeeping in the above areas

10.2.4 EMP FOR LAND ENVIRONMENT Construction Phase

The waste generated from construction activity includes construction debris, biomass from land clearing activities, waste from the temporary make shift tents for the labors and hazardous waste. Following section discuss the management of each type of waste. Besides waste generation, management of the topsoil is an important area for which management measures are required.

Construction Debris

Construction debris is bulky and heavy and re-utilization and recycling is an important strategy for management of such waste. As concrete and masonry constitute the majority of waste generated, recycling of this waste by conversion to aggregate can offer benefits of reduced landfill space and reduced extraction of raw material for new construction activity. This is particularly applicable to the project site as the construction is to be completed in a phased manner.

Mixed debris with high gypsum, plaster, were not used as fill, as they are highly susceptible to contamination, and was send to designated solid waste landfill site.

55

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Metal scrap from structural steel, piping, concrete reinforcement and sheet metal work had been removed from the site by construction contractors. A significant portion of wood scrap had been reused on site. Recyclable wastes such as plastics, glass fiber insulation, roofing etc. were sold to recyclers.

Hazardous waste

Construction sites are sources of many toxic substances such as paints, solvents wood preservatives, pesticides, adhesives and sealants. Hazardous waste generated during construction phase had been stored in sealed containers and disposed off as per the Hazardous Wastes Management and Handling Act, Amendment Rules (MoEFCC, 2003).

Some management practices were developed are:

 Herbicides and pesticide were not be over applied (small-scale applications) and not applied prior to rain  Paintbrushes and equipment for water and oil based paints had been cleaned within a contained area and was not be allowed to contaminate site soils, water courses or drainage systems  Provision of adequate hazardous waste storage facilities. Hazardous waste collection containers were located as per safety norms and designated hazardous waste storage areas was away from storm drains or watercourses  Segregation of potentially hazardous waste from non-hazardous construction site debris  Well labeled all hazardous waste containers with the waste being stored and the date of generation  Instruct employees and subcontractors in identification of hazardous and solid waste

Even with careful management, some of these substances are released into air, soil and water and many are hazardous to workers. With these reasons, the best choice is to avoid their use as much as possible by using low-toxicity substitutes and low VOC (volatile organic compound) materials.

Waste from Temporary Makes Shift Tents for Labors

Wastes generated from temporary make shift labor tents was mainly comprise of household domestic waste, which were managed by the contractor of the site. The wastewater generated had been channelized to the septic tank.

56

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Top Soil Management

To minimize disruption of soil and for conservation of top soil, the contractor keep the top soil cover separately and stockpile it. After the construction activity is over, top soil had been utilized for landscaping activity. Other measures, which are followed to prevent soil erosion and contamination include:

 Maximize use of organic fertilizer for landscaping and green belt development  To prevent soil contamination by oil/grease, leaf proof containers were used for storage and transportation of oil/grease and wash off from the oil/grease handling area was drained through impervious drains and treated appropriately before disposal.  Removal of as little vegetation as possible during the development and re vegetation of bare areas after the project.  Working in a small area at a point of time (phase wise construction)  Construction of erosion prevention troughs/ berms.

Operational Phase

The philosophy of solid waste management at the project site has to encouraging the four R’s of waste i.e. Reduction, Reuse, Recycling and Recovery (materials & energy). Regular public awareness meetings will be conducted to involve the residents in the proper segregation and storage techniques.

The Environmental Management Plan for the solid waste focuses on three major components during the life cycle of the waste management system i.e., collection and transportation, treatment or disposal and closure and post-closure care of treatment/disposal facility.

Collection and Transportation  During the collection stage, the bio-degradable and non-recyclable/non- biodegradable waste has been stored and collected separately. Only the non- recyclable and non-biodegradable waste has been transported to the waste disposal site. The segregation, transportation and disposal of wastes are done by the authorized agency that take care of the waste management of the integrated complex during the operational phase of the project

 To minimize littering and odours, waste has been stored in well-designed containers/ bins that are located at strategic locations to minimize disturbance in traffic flow

57

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 Care has been taken such that the collection vehicles are well maintained and generate minimum noise and emissions. During transportation of the waste, it is covered to avoid littering.

Waste from the Integrated Complex

Segregation at Source

Inorganic & Organic Inert/Constr House hold and recyclable uction other wastes

Segregation at Site

Recyclabl Non- Treatment e Recyclabe &

Rejects

Recycling Disposal Treatment industry

Figure 4:WASTE MANAGEMENT FLOW DIAGRAM

Disposal With regards to the disposal/ treatment of waste, the management has taken the services of the authorized agency for waste management and disposal of the same on the project site during its operational phase.

58

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

10.2.5 EMP FOR ECOLOGICAL ENVIRONMENT

Construction activity changes the natural environment. But integrated complex also creates a built environment for its inhabitants. The project requires the implementation of following choices exclusively or in combination.

Construction Stage

 Restriction of construction activities to defined project areas, which are ecologically sensitive  Restrictions on location of temporary labor tents and offices for project staff near the project area to avoid human induced secondary additional impacts on the flora and fauna species  Cutting, uprooting, coppicing of trees or small trees if present in and around the project site for cooking, burning or heating purposes by the labors were and will be prohibited and suitable alternatives for this purpose had been made  Along with the construction work, the peripheral green belt were developed with suggested native plant species, as they were grow to a full-fledged covered at the time of completion

Operation Stage Improvement of the current ecology of the project site has entailed the following measures:  Plantation and Landscaping  Green Belt Development  Park and Avenue Plantation The section below summarizes the techniques to be applied to achieve the above objectives

Plantation and landscaping

Selection of the plant species has been done on the basis of their adaptability to the existing geographical conditions and the vegetation composition of the forest type of the region earlier found or currently observed.

Green Belt Development Plan

The plantation matrix adopted for the green belt development includes pit of 0.3m x 0.3m size with a spacing of 2m x 2m. In addition, earth filling and manure are also required for the proper nutritional balance and nourishment of the sapling.

59

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Multi-layered plantation comprising of medium height trees (7 m to 10 m) and shrubs (5 m height) are planted for the green belt. In addition creepers are planted along the boundary wall to enhance its insulation capacity.

Selection of Plant Species for Green Belt Development

The selection of plant species for the development depends on various factors such as climate, elevation and soil. The plants exhibit the following desirable characteristics in order to be selected for plantation

1. The species should be fast growing and providing optimum penetrability 2. The species should be wind-firm and deep rooted 3. The species should form a dense canopy 4. As far as possible, the species should be indigenous and locally available 5. Species tolerance to air pollutants like SPM, SO2 and NOx should be preferred 6. The species should be permeable to help create air turbulence and mixing within the belt 7. There should be no large gaps for the air to spill through 8. Trees with high foliage density, leaves with larger leaf area and hairy on both the surfaces 9. Ability to withstand conditions like inundation and drought 10. Soil improving plants (Nitrogen fixing rapidly decomposable leaf litter) 11. Attractive appearance with good flowering and fruit bearing 12. Bird and insect attracting tree species 13. Sustainable green cover with minimal maintenance

Parks and Avenue Plantation  Parks and gardens maintained for recreational and ornamental purposes not only improve the quality of existing ecology at the project site but also to improve the aesthetic value.  Avenue Plantation

1. Trees with colonial canopy with attractive flowering 2. Trees with branching at 7 feet and above 3. Trees with medium spreading branches to avoid obstruction to the traffic 4. Fruit trees to be avoided because children may obstruct traffic and general movement of public

60

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

10.2.6 EMP for Socio-Economic Environment

The social management plan has been designed to take proactive steps and adopt best practices, which are sensitive to the socio-cultural setting of the region. The social Management Plan for the project focuses on the following components:

 Income Generation Opportunity During Construction and Operation Phase

The project is providing employment opportunity during construction and operation phase. There is also a wide economic impact in terms of generating opportunities for secondary occupation within and around the project area. The main principles considered for employment and income generation opportunities are out lined below:

 Employment strategy are provide for preferential employment of local people  Conditions of employment addresses issues like minimum wages and medical care for the workers

Contractors are required to abide to employment priority towards locals and abide by the labor laws regarding standards on employee terms and conditions.

 Improved Working Environment for Employees

The project is providing safe and improved working conditions for the workers employed at the facility during construction and operation phase. With the ambience and facilities provided, the project also provides a new experience in living and recreations. Following measures has been taken to improve the working environment of the area:

 Less use of chemicals and biological agents with hazard potential  Developing a proper interface between the work and the human resource through a system of skill improvement  Provision of facilities for nature care and recreation e.g. indoor games facilities  Measures to reduce the incidence of work related injuries, fatalities and diseases  Maintenance and beautifications of the complex and the surrounding roads

10.2.7 EMP FOR ENERGY CONSERVATION

Energy conservation program are implemented through measures taken both on energy demand and supply. Energy conservations have been applied in different stages of the project. Followings are the selected criteria in which these measures are implemented.  Shading by Plantation

61

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Usually east and west oriented windows and walls receive about than the north and south windows during summer month. Plantation of fast growing leafy vegetation in the east and west side of the building which reduces the incidence of sunlight and thereby reduce the heat gain. Plantation of deciduous trees is preferred considering the need of increased incidence of sunlight during winter season.  Insulation Well-planned insulation is incorporated in design.  Maximum use of Daylight. a. Ground surface of the open spaces are used to reflect daylight into the building. b. Planned siting of vegetation to reduce the glare of the sunlight, and thereby make it suitable for eyes. c. High reflectance ceiling and walls to help light to penetrate deep into the room. d. Windows are located close to ceiling to avoid strong brightness ratio. e. Optimum but mandatory use of skylights is there.  Planned use of Artificial lighting a. Artificial lighting with different colors is avoided to reduce the hazing effect to eyes. b. Artificial light, colour of which is close to day light are chosen. c. Indirect electrical lighting is used to mimic the directional aspects of daylight. d. Use of CFL in basement & common areas.

10.3 ENVIRONMENTAL MANAGEMENT SYSTEM AND MONITORING PLAN

For the effective and consistent functioning of the project, an Environmental Management System (EMS) has been established at the site. The EMS includes the following:  An Environmental Management Cell  Environmental Monitoring  Personnel Training  Regular Environmental Audits and Correction measures  Documentation – standards operation procedures Environmental Management Plan and other records

10.3.1 ENVIRONMENTAL MANAGEMENT CELL

Apart from having an Environmental Management Plan, it is also to have a permanent organizational set up charged with the task of ensuring its effective implementation of mitigation measures and to conduct environmental monitoring. The major duties and responsibilities of Environmental Management Cell are as given below:

 To implement the environmental management plan

62

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

 To assure regulatory compliance with all relevant rules and regulations  To ensure regular operation and maintenance of pollution control devices  To minimize environmental impact of operations as by strict adherence to the EMP  To initiate environmental monitoring as per approved schedule  Review and interpretation of monitored results and corrective measures in case monitored results are above the specified limit  Maintain documentation of good environmental practices and applicable environmental laws for a ready reference  Maintain environmental related records  Coordination with regulatory agencies, external consultants, monitoring laboratories  Maintenance of log of public complaints and the action taken.

Hierarchical Structure of Environmental Management Cell

Normal activities of the EMP cell have been supervised by a dedicated person who report to the site manager / coordinator of the Integrated Complex. The hierarchical structure of Environmental Management Cell is given in following Fig 5

FIG. 5 ENVIRONMENT MANAGEMENT CELL STRUCTURE

63

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

10.3.2 ENVIRONMENTAL MONITORING

The purpose of environmental monitoring is to evaluate the effectiveness of implementation of Environmental Management Plan (EMP) by periodic monitoring. The important environmental parameters within the impact area are selected so that any adverse affects are detected and time action can be taken.

The project proponent will monitor ambient air Quality, and Quantity, and Soil Quality in accordance with an approved monitoring schedule. A suggested monitoring protocol, based on the predicted impact is given in Table 1.4.

Table 7: Suggested monitoring program for the project

Type Locations Parameters Period and Frequency

1. Ambient Air Project Site Criteria Pollutants: Quarterly Quality SO2, NOx, SPM, RSPM, CO Project site Quarterly DG Flue Gas Criteria Pollutants: PM, SO2 & NO2

DG Noise dB (A) levels 3. Ambient Project site dB (A) levels Quarterly Noise

5. Soil quality In the site Organic matter, Quarterly C.H., N, Alkalinity, Acidity, heavy metals and trace metal, Alkalinity, Acidity.

10.3.3 Awareness and Training

Training and human resource development is an important link to achieve sustainable operation of the facility and environment management. For successful functioning of the project, relevant EMP has been communicated with:

Residents, Visitors and Contractors

64

EC validity Extension of “Sobha City” Project FORM-IA At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Residents must be made aware of the importance of waste segregation and disposal, water and energy conservation. The awareness is provided by periodic Integrated Society meetings. They have been informed of their duties.

10.3.4 Environmental Audits and Corrective Action Plans

To assess whether the implemented EMP is adequate, periodic environmental audits has been conducted by the project proponent’s Environmental division. These audits are followed by Correction Action Plan (CAP) to correct various issues identified during the audits.

65

EC Validity Extension of SOBHA CITY PROJECT

At Village: PUZHAKKAL, District: THRISSUR, KERALA

For

M/s SOBHA LIMITED Sobha City, Puzhakkal PO, Thrissur, 680553

Prepared By

GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified Co.: Accredited by QCI / NABET: Approved by MoEF&CC, GoI) F-374-375, Sector-63, Noida, U.P. Ph.: 0120- 4044630, Telefax: 0120- 2406519 Email: [email protected], [email protected] Website: http://www.grc-india.com GRC INDIA TRAINING & ANALYTICAL LABORATORY (Recognized by NABL & Approved by MoEF&CC, GoI) A unit of GRC India CONTENTS

S.NO. DESCRIPTION PAGE NO.

1. INTRODUCTION 67

2. SITE LOCATION AND SURROUNDINGS 67

3. CONNECTIVITY 68

4. AREA STATEMENT 69

5. POPULATION DENSITY 69

6. WATER REQUIREMENT 70

7. WASTEWATER GENERATION & TREATMENT 71

8. SEWAGE TREATMENT TECHNOLOGY 73

9. RAIN WATER HARVESTING 81

10. VEHICLE PARKING FACILITIES 82

11. POWER REQUIREMENT 82

12. SOLID WASTE GENERATION 82

13. GREEN AREA 86

14. DETAILS OF CONSTRUCTION MATERIALS 86

15. LIST OF MACHINERY USED DURING 87 CONSTRUCTION EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

INTRODUCTION

The project is an Integrated Complex “Sobha City” developed by M/s Sobha Limited. The promoters are recognized as a trailblazer in the Real Estate Industry. Having key personals, who have vast experience in planning and construction of Residential, Commercial and Institutional projects. The group is developing Integrated Complex project which is located at Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala on a land admeasuring 56.72 acre. Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala. Environmental Clearance has been obtained vide letter no. 21-713/2007-IA.III dated 17/04/2008 for plot area 2, 29, 535.91 m2 (56.72 acres) and built up area of 3, 24, 665.28 m2. Consent to Establish has been obtained vide letter no. PCB/HO/TSR/ICE/52/2008 dated 18.04.2008 for 3 Years. The first renewal of CTE vide letter no. PCB/HO/TSR/ICE/03/2012 dated 03.08.2012 for 2 Years and the second renewal of CTE vide letter no. PCB/HO/TSR/ICE-R/06/2015 dated 17.07.2015 for 2 years till 31/03/2017 has also been obtained and attached as Annexure II. M/s Sobha Limited is planning for extension of Environmental Clearance Validity for Integrated Complex “Sobha City” Project. The Environmental Clearance had been granted for an built up area of 3, 24,665.28 m2 out of which 2,23,106.812 m2 has been completed till the expiry of Environmental Clearance on 16th April, 2013. The project proponent had stopped the work due to the lapse of EC Validity.

Essential Facilities:  Residential Apartments (1080 nos.)  Villas (25 nos.)  Hotel (107 Rooms.)  Hospital (200 Beds)  Office Building  Shopping Mall  Convention  Business & Health Centre  Club House

SITE LOCATION AND SURROUNDINGS

The project site is located at Sy. No- 217, 218, 534 to 544, 546 to 556, Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala. The geographical Co-ordinates of project site are 10°33'0.00"N & 76° 10'55.0"E. Google earth image & Toposheet showing project site & surroundings within 500 m, 10 km & 15 km respectively is attached as Annexure I(a) & I(b).

67

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Following figure depicts the location map of the project site:

PROJECT SITE

LOCATION MAP

CONNECTIVITY

The area has good infrastructure facilities. The nearest railway station is Amala Nagar Railway Station at a distance of approx 1.5 km towards NW direction. The nearest Airport Cochin International Airport is about 49 km towards SE direction away from the site. The national highway, NH - 544 is about 9.0 km towards ESE direction from the project site.

PROJECT COST

The total project cost of the project will be 749.85 Crores.

68

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

AREA STATEMENT

The project is being developed on total plot area measuring 2,29,535.91 m2 (or 56.72 acres). The detailed area statement is provided below: Table1: Area Statement S. No. Particulars Area Covered (In Sqm) 1. Total Plot Area 2,29,535.91 2. Total Built Up Area 3,24,665.28 3. Built Up Area constructed as on 16th 2,28,899.59 April, 2013. (After obtaining EC from MoEF&CC) 4. Common Green Area 8,336.46 5. Area of Main Roads 47,712.07 6. Area of Greenery on Road Shoulder 7,885

POPULATION DENSITY The total population of the project will be 13,230 persons that include residents, patients, staff & visitors. The detailed population breakup for existing and expansion phase of the project is given below in the Table 2: Table 2: Population Break up S. Type of Unit No. of Persons/ No. of No. Development Units Flat/Villa Occupants a b c d 1 Residential Nos 1080 6 6480 Apartments 2 Villas Nos 25 6 150 3 Hotel Room* 107 2 300 Staff 4 Office 1000 5 Shopping Mall 2700 Staff Nos 250 250 Visitors Nos 2050 2050 Food court Nos 400 400 6 Hospital Beds 200 200 7 Convention Centre Nos 2000

8 Club House Nos 400 400 Total no. of Occupants 13230

69

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

WATER REQUIREMENT

The water requirement is being met from artificial lake. The total domestic water requirement is 1,301.5 KLD. The fresh water demand will be approx.940 KLD. The daily water requirement calculation is given below in Table 3 & 4:

Table 3: Comparative Details of Water & Recovered Water from STP ` Type of Unit No. of Persons No. of Litres/ Total (in Litres) Development Units / Flat Occupant Person/ /Villa s Day a b c d e f (d x e) Domestic Flushing 1 Residential Nos 1080 6 6480 150 6,80,000 2,92,000 Apartments 2 Villas Nos 25 6 150 150 15,750 6,750 3 Hotel Room 107 2 300 180 48,600 5,400 * Staff 4 Office 1000 45 30,000 15,000 5 Shopping Mall 2700 Staff Nos 250 250 45 7,500 3,750 Visitors Nos 2050 2050 15 20,500 10,250 Food court Nos 400 400 70 24,000 4,000 6 Hospital Beds 200 200 450 81,000 9,000 7 Convention Nos 2000 15 20,000 10,000 Centre 8 Club House Nos 400 400 45 12,000 6,000 Total Consumption 13,230 939.35 3,62,150 ≈ ≈9,40,000 362,000 Say ltr/day 13,01,500 Water Requirement Per Year = 47,50,47,500 Litres Water Recovered from STP = 13,20,57,000 Litres Water Requirement for 12 Months = 34,29,90,500 Litres

70

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Table 4: Wastewater Calculations

Domestic Water Requirement (Residential + Commercial 1301.5 KLD + Amenities + Hospital)  Freshwater 940 KLD  Flushing 362 KLD STP capacity 2000 KLD

The domestic water balance diagram for Residential + Commercial + Amenities is shown below in Figure 1.

Hospital Water Requirement 90 KLD Sullage Generated 13.5 KLD (@ 15% of Domestic water) ETP capacity** 15 KLD

71

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

FRESH WATER @ 80% SULLAGE GENERATED (940 KLD) (1114 KLD) STP CAPACITY 2000 KL

@ 100%

FLUSHING 362 KLD (362 KLD) 1058 KLD

HORTICULTURE 650 KLD (650KLD)

Vehicle Washing 33 KLD (33 KLD)

Recycled Water Discharge Sewer/ Irrigation 13 KLD Purpose Fresh Water (13 KLD) Sullage water

 Demand for horticulture purpose will be reduced to 50% during rainy season.

Figure 1: Water Balance Diagram

The domestic water balance diagram for Hospital Water Requirement is shown below in figure 2

72

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

@ 15% EFFLUENT FRESH WATER GENERATED (90 KLD) (13.5 KLD) ETP CAPACITY 15 KLD

EXTERNAL DRAIN 11 KLD @ 80 % (11 KLD) =11 KLD

Fresh Water Sullage Recycled Water

Figure 1: Water Balance Diagram

Wastewater generation & treatment:

It is expected that the project will generate a total of approx. 1114 KLD of wastewater from operational phase. The wastewater will be treated in onsite STP of 2000 KL capacity generating 1058 KLD of recoverable water. Waste water generated from Hospital (13.5 KLD) will be treated in an ETP of 15 KLD capacity to be provided within the project premises. Treated effluent will be discharged to external sewer line.

SEWAGE TREATMENT TECHNOLOGY (EXTENDED AERATION ACTIVATED SLUDGE PROCESS)

SEWAGE TREATMENT PLANT

Sewage Treatment plant is provided for treating all wastewater generated due to domestic activities in the complexes. This facility is installed not only for complying the legal requirement of Pollution Control Board, but also to ensure that the treated water is utilized for gardening and flushing activities. The treatment Process / system is designed on the principle of Activated Sludge process, which ensures the aerobic decomposition of organic matter in presence of active microbial growth in the aeration tank, with Ultra filtration.

73

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

PROCESS DESIGN BASIS

This design note is for the purpose of explaining the design philosophy of our MEMBRANE BIO REACTOR based sewage treatment system. The source of waste water is from the toilets, kitchens, wash basins and showers etc., from the entire building. The waste water is entirely domestic in nature. This note covers the proposed facility for collection treatment and disposal of these domestic effluents.

Basis of Design Expected Treated Sewage Quality

PH 7 -8.5 BOD, mg/l 250 COD, mg/l 400 (Biodegradable) TSS, mg/l 250 Oil & grease, mg/l < 10

Typical treated sewage qualities from MBR unit are as follow (maximum values):

PH 7-8 BOD < 5 mg/l COD < 20 mg/l Turbidity < 1 NTU Suspended solids Nil

Description of treatment scheme

DOMESTIC SEWAGE TREATMENT PLANT SCHEME - (proposed)

The following treatment scheme is based on the quantity and quality of waste waters and KSPCB requirements. It is proposed to treat the waste water in a membrane bioreactor mediated high rate aeration system without any need for tertiary filtration and disinfection.

The treatment process includes the following:  Bar Screen  Collection and equalization  Aeration with membrane bio-reactor  Filter press for sludge  Final treated water sump

74

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

DESCRIPTION OF TREATMENT UNITS BAR SCREEN A bar screen made of MS material epoxy painted with 8 to 10 mm openings has been incorporated in a channel on the incoming sewage line. This screen is for the purpose of arresting solid particles, trash and solids of larger than 8 mm size and preventing them from passing through into the succeeding treatment stages.

Screen chamber size (in mm) : 500 wide x 1000mm long x 750mm deep Type of screen : Coarse screen MS construction with MS rods placed at 6 to 8 mm etc. with MS hand rake all epoxy painted. Fine Screen : Ms Construction with mesh size of 2-3mm is a must for MBR systems

OIL AND GREASE TRAP

After screening, the sewage passes through an Oil & Grease trap where the free floating oil & grease is separated by gravity and floats to the surface. Clear sewage then passes under the baffle wall to the next unit. The oil & grease separated is removed manually from the tank from time to time.

Chamber size (in mm): with baffle - 500 mm x 1000 mm x 750 mm

COLLECTION AND EQUALISATION TANK Sewage generation is not uniform and maximum quantity comes out during morning and evening hours. The flow may be zero during afternoon and mid night. To optimize the size of the plant, the plant is designed for continuous operation and hence there is a need to provide a buffer tank to store sewage during its peak hour generation and supply the same during lean or no flow hours. Hence our plant is provided with a good capacity of buffer tank called as "EQUALISATION TANK". Screened and de-greased sewage is then passed into the equalization tank to homogenize the sewage qual1ty and also even out flow fluctuations and feed sewage of uniform quality at constant rate to subsequent treatment units. Air mixing is also provided to mix the contents of the equalization tank. A coarse bubble aeration grid or ejector system is provided to mix the contents of the equalization tank and also to avoid septic conditions in the tank.

Tank size (in M): 3m depth x 18m x 18m Detention time: 8 hrs. 800 m3

Mixing! Primary aeration:  After above treatment, raw effluent is fed into Aeration and MBR tank. 75

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

RAW EFFLUENT TRANSFER PUMPS

The mixed and equalized raw effluent is pumped at a flow rate calculated by  Total volume of effluent per day divided by 20 hrs  Giving the average flow rate per hour  The transfer pump is then selected for the average flow with an overdesign of 50% at a head of 8 - 10 Meters.

Consider that the suction height is tank depth + free board. 2.5m + 0.5m = 3m, Discharge head from outlet of pump into MBR Aeration tank: distance of Aeration tank – 1m + free Board - 0.5m + depth of discharge 1.5m.

The maximum head will be - 4 to 5.0m total head, and from all causes into the aeration tank. Pump selection is made from standard Manufacturer's curves for a total head of 8-10 MWC or calculated average flow + 50% at 8-10 MWC.

Type Bank/submerged type Capacity Average Hourly flow rate + 50% TDH 8 -10 M Temp Ambient Solids 10 mm maximum. PH 6.0 to 8.0

AERATION TANK AND MEMBRANE BIOREACTOR In this tank Oxygen is given for aeration, in order to reduce BOO and COD. This is done by pumping in air. The air containing oxygen is used by the bacteria to consume the organic matter and convert it to carbon dioxide and water. This water is passed through hollow fibre. UF membranes, which are stacked/arranged in rows and tiers to give the desired flow. The average hourly flow rate of the system is calculated and the modules are assembled in a frame as required. The MBR module also replaces the clarifier, disinfection and tertiary filtration stages, thus requiring no further treatment.

In MBR tank, MLSS (mixed liquor suspended solids) in the range of 15000 to 18000 mg/l or more are maintained. The high amount of bacteria gives better and complete removal of organic matter from the raw effluent in relatively small area. Oxygen required for the bacteria are supplied through the blower is also used for scouring of membranes other than supplying oxygen to bacteria.

76

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

The filtration is carried out by the suction pump directly sucking permeate water. The permeate water produced is clear and devoid of bacteria and viruses to the minimum levels. The aeration tank is designed for a holding period of 8 hours. The aeration is calculated on the BOD load and aeration tank volume. The membranes are assembled in a frame. The number of modules is determined based on the desired flow rate of the system.

Tank Dimensions (in M): to suit 6 to 8 hrs of detention time based on the calculated hourly flow rate of the system.

Detention Time: 8 hrs maximum 800 m3 Size: 3m depth x 18m x18m MBR module: Designed according to the desired flux rate. Module dimensioning:

Flux : 15 to 35 L/ (m2 x h) Energy Consumption : 0.05 to 0.1 Kg/ (Kg x d) MLSS : 4 to 3 g/l Surplus sludge production : 0.3 Kg TS/Kg BOD.

Ultra-flo module U860

Size : 1500 mm long, 200mm dia (5' x 8" dia) Fibre size : 2 mm OD Filtration area : 600 sqft /membrane (60 M2) Flow rate : Domestic Sewage 1m3/hr Air consumption : 2m3/hr.

The average hourly flow rate divided by the flow rate per membrane (flux rate- flow rate in Itrs/hr x surface area) gives the number of membranes modules required for that flow rate.

Example: 2000 KLD Average now rate /hr= 2000,000 divided by 20 = 100 m3/hr. Module selection Assume a flow rate of 18 ltrs/hour per square meter of surface area. 18 ltrs x 56 sq mtrs ; 1008 ltrs/hr. Therefore 100,000 divided by 1008 gives 99.2 modules. 100nos of MU8 modules are arranged in a frame for MBR in units of 20 (i.e. 5 units of 20 each)

77

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

G. AERATORS (for collection tank and aeration tank)

Aerators can be the roots type air blowers with diffusers or the submerged aerators. The air capacity is designed based on the oxygen required in the aeration tank: 2 kgs of 02 per Kg of BOD. The DO content is kept at a minimum of 1.5 ppm in the aeration tank.

TREATED EFFLUENT SUCTION PUMPS Suction is applied to the header provided on top of the MBR module. The water is sucked from the outside through the hollow fibre membrane surfaces into the final treated water tank. The filtered effluent is pumped at the calculated average hourly flow rate of the system

Type : Bank Type Capacity : As per selection of transfer pumps already shown TDH : 15m Temp : Ambient Solids : 10 mm Maximum PH : 6.0 to 8.0

CLEANING SYSTEM

As the membranes are continuously under operation, they are polluted with organic or inorganic substances. Hence, chemical cleaning is carried out once in two to three months for removing substances polluting and dogging the membranes. Normal cleaners used are sodium hypo chloride and citric acid.

Chemical storage tank size: Chemical cleaning pump:

SLUDGE DISPOSAL

The biomass in the aeration tank stabilizes BOD in waste water by consuming the organic matter in the waste water. Microorganism population increases in the aeration tank with the help of the MBR promote new growth and activity without lag time. Hence no re-circulation of the sludge for maintenance of MLSS levels is required in the process. The sludge from the bottom of the clarifier is periodically transferred to a filter press for cake making and disposal. The water removed is returned to the collection tank.

78

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

FINAL TREATED WATER TANK

The water sucked from the membranes is of very high quality with respect to BOD, COD and suspended solids, and is stored in a final treated water tank for further use. Tank dimensions (in mm) : 3m depth x 18m x 18m Detention period : 8 hrs or as required.

ADVANTAGES OF MBR MBR (Membrane Bio Reactor) is the latest technology in wastewater treatment with many advantages as listed below:

Gives superior quality of treated water

The quality of treated water in case of MBR is much superior than conventional biological systems. As the membrane acts as a physical barrier, it does not allow any sludge particles and to great extent bacteria and viruses to pass through it. Microorganisms like coliform or cryptosporidium can be easily removed in MBR. This increases the reliability of the system is multifold.

Does not require further tertiary treatment

Conventional biological systems require further costlier tertiary treatment to match the performance of the MBR system. This may include coagulation, filtration, chlorination, adsorption, UV treatment etc.

Requires less space

MBR requires much less space when compared to conventional activated sludge process. Biological reaction in MBR can be carried out under the condition of 4 to 5 times of MLSS compared to conventional activated sludge process. It means the aeration tank volume is less than of that of a conventional design. Combining this with other features mentioned above results into very compact design requiring less space than conventional design.

Chemical free treatment

As conventional treatment systems require disinfections with chlorine, it needs to be removed completely before applying on to gardens or for green belt development. Otherwise, high amount of residual chlorine may damage the plants. Also, disinfection with any disinfectant does not remove organisms, it only inactivates them. The effect depends on the amount of

79

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

disinfectant used, the quality of filtration applied, the retention time available for oxidation and the existence or non-existence of other competing reaction partners (scavenging). As MBR acts like a physical barrier, it does completely remove bacteria and viruses up to a degree of 4-7 log removal (104 to 107 times reduction), independent of type or life form of organism. Hence, MBR does not require any other chemical disinfection.

The MBR module surfaces are kept clean by the action of the aerator which serves to clean and dislodge the solids accumulated on the filter surface. The membrane surfaces require cleaning for removing deposit formation only In the case of waters with high dissolved solid content. Even this cleaning is required once in two or three months.

Plant room and operating space are reduced.

80

EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

RAIN WATER HARVESTING

Volume From Balance Average S. Average Volume in Months Rainfall Demand** No Rainfall Lake Ist Intensity Intensity Year 1 JUN 714.2 106.54 31.5 75.04 2 JUL 665.2 99.23 31.5 142.77 3 AUG 412.3 61.5 31.5 172.78 4 SEPT 226.5 33.79 31.5 175.06 5 OCT 318.8 47.56 31.5 189.03 6 NOV 99.5 14.84 31.5 172.37 7 DEC 18.9 2.82 31.5 143.69 8 JAN 2.3 0 31.5 112.19 9 FEB 4.5 0 31.5 80.69 10 MAR 8.5 0 31.5 49.19 11 APR 76.7 11.44 31.5 29.13 12 MAY 189.3 28.24 31.5 25.87 Note: All volumes are in Million Litres

M/S. SOBHA LIMITED 81 EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

VEHICLE PARKING FACILITIES

Adequate provisions are made for car/vehicle parking at the project site. There shall also be additional parking for visitors so as not to disturb the traffic and allow smooth movement at the site.

Parking Proposed:

For Cars = 3631 For Two Wheeler = 780 For Visitors = 84

POWER REQUIREMENT

The power is being supplied by Kerala PTCL (Kerala Power Transmission Corporation Limited). The total electrical load for the project will be approx. 24.49 MVA for the project.

Detail of D.G Sets There is a provision of total 15 no. of DG sets of 20.563 MVA (9 X 2 MVA + 1 X 750 KVA + 3 X 500 KVA + 1 X 250 KVA + 1 X 63 KVA each) capacity for power back up. The DG sets are well equipped with acoustic enclosure to minimize noise generation and adequate stack height as per CPCB norms.

SOLID WASTE GENERATION

Solid waste was and being generated during the construction as well as operation phase. The solid waste expected to be generated during the construction phase had been comprise of excavated materials, used bags, bricks, concrete, MS rods, tiles, wood etc. The following steps are followed for the management solid waste:  Construction yards for storage of construction materials.  The excavated material such as topsoil and stones are stacked for reuse during later stages of construction  Excavated top soil was stored in temporary constructed soil bank and was reused for landscaping of the project.  Remaining soil shall be utilized for refilling / road work / rising of site level at locations / selling to outside vendors for construction of roads etc.

M/S. SOBHA LIMITED 82 EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

Solid Waste

Construction Waste

Construction waste, Empty Cement Excavated Soil Broken Bricks, Waste Plaster Bags

Recycled Top soil conserved for Sold to local vendor through local landscaping, balance vendor used in re-filling

Figure 5: Solid Waste Management Scheme

During the operation phase, total quantity of solid waste is approx. 6200 kg/day. Following arrangements are made at the site in accordance to Municipal Solid Waste (Management and Handling) Rules, 2016.

Table 6: Details of Solid Waste generation

Bio Degradable 3,100 kg/day Solid waste 6,200 kg/day generated Non-Bio Degradable 3,100 kg/day

An external agency is appointed for management of solid waste of the project.

 Collection and Segregation of waste 1. The local vendors are hired to provide separate colored bins for dry recyclables and Bio-Degradable waste.

M/S. SOBHA LIMITED 83 EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

2. For waste collection, adequate number of colored bins (Green, Blue & dark Grey bins – separate for Bio-degradable and Non Bio-degradable) are provided at the strategic locations of the area. 3. Litter bin are also provided in open areas like parks etc.

 Treatment of waste  Bio-Degradable wastes 1. Bio-Degradable waste is subjected to organic waste converter and the compost is being used as manure. 2. STP sludge is being used for horticultural purposes as manure. 3. Horticultural waste is being composted and used for gardening purposes.  Recyclable wastes i. Grass Recycling – The cropped grass are spread on the green area. It acts as manure after decomposition. ii. Recyclable wastes like paper, plastic, metals etc. are being sold off to recyclers.

 Disposal Recyclable and non-recyclable wastes are being disposed through a local approved agency. Solid waste management scheme is depicted in the following figure:

Figure 6: Solid Waste Management Scheme (Operation Phase)

M/S. SOBHA LIMITED 84 EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

ORGANIC WASTE CONVERTER

A waste converter is a machine used for the treatment and recycling of solid and liquid refuse material. A converter is a self-contained system capable of performing the following functions: pasteurization of organic waste; sterilization of pathogenic or biohazard waste; grinding and pulverization of refuse into unrecognizable output; trash compaction; dehydration.

Benefits of organic waste converter:

1. Large quantity of solid waste is converted to fertilizer in a very short period 2. Fertilizers can be sold as compost to farmers, or used for gardening 3. Machine requires less space and the efficiency is high 4. Manpower and maintenance is very less 5. This is one of the latest techniques of managing solid waste.

M/S. SOBHA LIMITED 85 EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

GREEN AREA

Total green area measures 80440.71 m2 i.e. (35.0% of net plot area) which is developed as green belt and lawns (organized green) within the project premises.

Diverse variety of local species of Evergreen and Deciduous trees is planted. Table 7:- List of Plants Types of trees planted i) On the periphery of site: Combination of  Cassia Marginata  Neem Tree  Cochlospermum Religiosum  Dillenia Pentagyna  Plumeria Lutea  Golden Shower Tree (Cassia fistula) - 250 Nos. ii) Parks and gardens Flowering Plants like  Golden Shower Tree (Cassia fistula)  Acacia Auriculiformis  Cerbera  Cananga Ylang- Ylang iii) Along roads and pedestrian movements - 425 Nos.  Singapore Cherry  Neem (Azadiracta Indica)  Dabobia Rosia (Light pink) iv) In public areas Scented Shrubs  Gardenia jasminoides  Calliandra brevi pes  Panjat

DETAILS OF CONSTRUCTION MATERIALS

List of building materials used at site is as follows: 1. Coarse sand 2. Crazy (white marble) in grey cement 3. Fine sand 4. P.V.C. conduit

M/S. SOBHA LIMITED 86 EC validity Extension of “Sobha City” Project CONCEPTUAL PLAN At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala

5. Stone aggregate 6. Indo-Asian MCBs 7. Stone for masonry work 8. PVC overhead water tanks 9. Stone for under floor soling 10. 2 1/2'’ thick red colour paver tiles 11. Cement 12. ‘B’ class GI pipe (ISI marked) 13. Reinforcement steel 14. PVC waste water lines 15. Plywood & steel shuttering 16. S.W. sewer line up to main sewer 17. 5mm thick plane glass 18. Joinery hardware- ISI marked 19. 3mm thick ground glass in toilets 20. Pipe scaffolding (cup lock system)

MATERIALS USED FOR CONSTRUCTION & THEIR U VALUES

Type of Construction U values (in W/m2deg C) Brick: Plastered both sides 114mm 3.24 Solid un-plastered 228mm 2.67 Plastered both sides 228mm 2.44 Concrete, Ordinary, Dense: Plastered both 3.24 sides 152mm 200mm Concrete Hollow Blocks 0.80 150mm Concrete Hollow Blocks 1.15 Concrete on Ground or Hardcore Fill 1.13 + Grano, Terrazzo or Tile Finish 1.13 + Wood Block Finish 0.85 Double Glazing 20mm Space 2.67

LIST OF MACHINERY USED DURING CONSTRUCTION

(i) Dumper : Used for mud and material handling (ii) Concrete mixer with hopper : For RCC work (iii) Excavator : Used for digging and earth work (iv) Concrete Batching Plant : Used for concrete mixing (v) Cranes : For lifting and moving of materials. (vi) Road roller : For compacting the earth (vii) Bulldozer : For dismantling

M/S. SOBHA LIMITED 87 ~w;

P Project Site

Buffer Boundary

...... MajorRoad

SOURCE : Satellite Image

"Sobha City" Village-Puzhakkal Guruvayyur Road Distt.-Thrissur,Kerla

500 Meters Buffer Map of the Study Area

02$0100150200250 -=:J-====--=:::J Meters ~w;

Project Site

~15kmBuffer ~10kmBuffer

Buffer Boundary

"Sobha City" Village-Puzhakkal Guruvayyur Road Distt.-Thrissur,Kerla

Eco Sensitive Buffer Map of Study Area

o 1.25 2.5 7. 5 ..-==- ....c===~km FLL E NO. - PCB{HOfTSRIICEJ118}2008

KO."l"

KERALA STATE POLLUTION CONTROL BOARD

CONSENT TO ESTABLISH

ISSUED UNDER

Section 25 of the Water (Prevention & Control of Pollution) Act, 197 4 and Section 21 of the Air (Prevention & Control of Pollution) Act, 1981

TO

Consent No. PCB/ HO/ TSR/ ICE/ S2 / 2008

VSobha Developers ltd. Sobha City PU:lhakkal Padam PU:lhakkal P.O. Thrissur 680 553

Date of issue: 18.04.2008 VaLidity upto: 17.04.2011

• Copy to: 1. The Chief Environmental Engineer·l. Regional Office. F.rnakulam Z. The Environmental Engineer, District Office. Thrissur 3. The Secretary. Kolazhy Grama Pallchayat. Thrissur 4. The Secretary. Adat Grama Panchayat, Thrissur 3. Stock File 2

1. GENERAL

, VALI DI TY 17.64. 2011

Sobha Developers ltd. , HaDe and Address of SObha City the establis~nt Puzhakkal Padam Puzhakkal P.O. Thrlssur 680 553 Telephone ; 6487- 2389719 , Corr-unication Fax ; 6487- 2389173 e-aail;Regional offlce.sobhacityf$obha.co . in Sri. J.C. Shanaa, Member of Management C~1ttee , OCcupJer deta1ls Power of At t orney HOlder: Sri. P. RamakriShnan Regional Director

218 , 217, 537, 538, 539, 536, 535, , Survey HUliber 534, 543, 544, 545, 546, 542, 54B, 541 , 553, 552, 541, 550, 548, 549, 554, 555,556,551. 6 Village Kuttur Puzhakkal , TlIluk Thrissur 8 District Thrissur , GrilJla Panchayat Kolazhy & Adat " ClItegory '" " Scale urge n Atlnual Fee reqllJred liS. 8 hkh " Fee 1"flI1 tted liS. 24 lIIkh " Capital InvestDent liS. 152 crore 1S Water consumption 131B . I,day

Development of townsh1p involving constrllction of flat s, villas, 16 ACTIV I TY hospitals, shoppin8 .all, cillb etc. and installation of OG

2. GENERAl CONDITIONS

2.1. This consent is granted subject 10 the power of the Board to review and make variation in all or any althe conditions.

2.2. This consent, unless withdrawn earlier and subject to Condition no. 2.1, shall be valid for 3 years Irom the date 01 issue. At 1M end of lhe validity period if the construction is in progress, the same shall be gal renewed. If the construction is 1'10\ started in the consent period, the applicant shall apply afresh for consent to establish.

2.3. The applicant shall comply with the instructions that the Board may Issue Irom time to time regarding preven ~ on afld conlrol 01 air. water. land and sound pollution.

2.4 The date of commissioning shall be intimated, alleast one month in advance. to the Head Office f District OUice of the Board at Thrissur.

2.5. Consent to Operate {Authorisation shall be obtained by the builder betore commissioning the township under the Water{Prevention and COntrol of Pollution} Act t974, the Air {Prevention and Control of Pollution} ACl1981 and the EMironment (Protection) Act. 1986 for a period of six years. Maintenance Contract with Penormance Guararltee for the STP and the ETP shall be entered into between the COrlserltee and the consultanV authorisee of the consultant for the said period. The application for 'consent to operate' shall be accompanied by (i) an undertaking on Rs. SOl· stamp paper by the builder thai all facilities required as per the 'consent to establish· has been duly installed and are functional (ii) a certificate by the consultant to the same effect {i ii} copy of maintenance contract and (iv) copy of penormance guarantee.

2.6. A minimum set back 01 3 m shall be provided between the boundary and the building structures and the set back shall be utilised for the development of green bell.

3 . CONDITIONS AS PER Water (Prevention & Control of Pollution) Act

3.1. The sewage treatment plant shall be set up beyond 30 m from the nearby reSidences/other establishments and water bodies.

3.2. Sewage treatment plant as per the proposal submitted aM cO rlsisting 01 the following treatment units shall be constructed and made functional before commissioning.

1. Bar screen chamber 2. Oil & grease trap 3 CollectiOn/equalization tank. •• Aeration tank and MBR 5 Filter press 6. Soak pit , b) Additional facilities required if any to achieve the following treated effluent standards shall also be made along with.

00 pH 6.5 - 8.5 (ii) Suspended SOlids 20 mg/l, max (iii) BOD (2~CI3 days) 3 mgll, max

(iv) Oil & Grease 1 mg~ , mex 3.3. The dewatered sludge along Wlth screenings, scum and garbage shall be subjected 10 anaerobic digestion in a bio gas plant

3.4. Arrangements shall be made lor reuse 01 treated eltluenl lor nushing, gardenmg, car wash etc. Water meier shall be provided lor measuring the qU1\n!ity of trea led water recycled.

3.5. Excess treated effluent. if any aNel reuse. shall be discharged into soak pits with concrete bottom. hooey combed brick wall or perforated rings side and 100 em thICk

2 mm sand envelope around.

3.6. There Shall be easy access to each end every effluenllreatment unit an(llhe recycling facility lor inspection. Manhole shall be provided prior to soak pit to facilitate ciflucnt sampling. Lighting arrangements shall be provided in the eHluent treatment area. recycling area and bacJ<;yard.

3.7. Energy meter shall be installed exclusively for the eifluenl treatment and reuse system and shall be maintained properly.

3.B. Water meter shall be fixed to record consumption of water. Separate meters should be fixed if cess at differential rates is claimed lor use of water suctl as coo!inglboilcr feed . domestic. process where the ellluenl is easily biodegradable and I or nOltoxiC and process where the effluent is nOl easily biodegradable and I or loxk:.

3.9. Arrangements shall be provided for rainwa ter harvesting, A minimum distance of 2{) m shall be kept between the rain water storage tank and the soak pit.

3.10. Natural drainage pattern 01 the area shall be protected.

4. CONDITIONS AS PER Air (Prevention" Control of Pollution) Act

4.1. DG sets shall be installed with appropriate acoustic enclosure. chimney 01 minimum height 0.2.J KVA m above roof level of the build ing and shall be placed atJeast

.J KVA/2 m beyond the neighborlng residences. institutions and worship places. , 4.2. Wa ter sprinklers shall be provided to suppress spreading 01 dust outside the premises during the constlllC1ion phase. Suspended particulate matter at the boundary of the premises Shall not c)(Ceoo 200 microgram per cubic metre.

4.3. There shall nol be any fugitive emission from the premises.

4.5. All operations likely to produce dust or noise shall be carried out WIth appropnate enclosure.

4.6 DebriS dunng construction shall be transponed with proper cover atter welting 10 prevent spreading 01 dust during lransponatioo.

4.7. II operations are planned to be done with backup power. the oenerator shall have adequate capacity to run all the associated poIlutKNl control deviCes.

5. CONDmONS AS PER Bla-Medlcal Waste (Management and Handling) Rul".

5.1. The bIo - medICal waste shall oot be milled WIth other waste.

5.2 Bio - medical waste shall be segregated Into conlllinersibags atttle point 01 oenerauon as required in the rules.

5.3. The bio-medical waste containers /bags shall have on them prominently visible. wash proof labels indicating whether ~ is biohazard Of cytOtoXic hazard. as required In Schedule III 01 the Rules.

5.4. The bio-medical waste shall bedisposed through IMAGE or anyothercommoo faCility approved by the Board.

5.5. The liquid bio - medical waste shalt be treated In \he effluent treatment plant consiSting of the followmg units.

1. Bar screen chamber 2. oil & grease tmp 3. COllection/equalization lank. •• Aeration tank ancl Membrane bioreactor s. Filler press 6. Soak Pit 5.6. The characteristics 01 the 1feated eilluent shall conlorm to the tolerance limits stipulated In 3.2.(b).

5.7. Treated effluent Shall be diSC/"larged Into a soak pit WIth concrete bottom, hone~ combed briCk wall or perforated rings side and 100 cm thick 2 mm sand enveiope Clround.

s.a. The effluent1featment plant shall be set up beyond 25 m Irom Ihe nearby residences and

other establiShments and shall be awa~ from nearby wa ter bodies. 6 6. C ONDITIONS AS PER J !u ~.ardo u~ Wn~l c~ (Mnnagement and Handling) Rille." 6.1. Any hazardous waste generated shall be stored and disposed safely. 6.2. The guidelines and criteria lor handling hazardous wastes specified by the Cenlral Pollution Control Board from time \0 lime shan be followed. 6.3. The Authorisation under the Aules is sutljecl lD conditions as may be specified In

the Rules Irom ~me \0 time under the Environment (Protection) Act. 1986.

6.4. The person authorised shaJll'lOt renl, lend. sell or !Tanslar the hazardous wastes WllholIl obtaining prior pennisslon 01 the Slate Pollution Control Board.

6.5. Any unauthorised change in personnel, eQuipment and working COndItions as mentioned in lhe application by the person authorised ShaU conSIJlute a breach of this authorisallOfl.

6.6. Facilities must be established, tested pelioOicall)r and maintained \0 minimize the possibility 01 a lire, explosion or any unplanned sudden or non-sudden release 01 hazardous waste to air, SOil or surface waler Which could threaten human health or environment

6 ,7. The authorisee must develop, implement and mair'ltaln Md keep uptodate, a cOr'ltlnger'ICY plan designed to minimize hazard to human health or the enVlfonment from hres, explosions or any unplanfled sudoen release of hazardous wasle to air, soil or water.

7. ADDITIONAL CONDITIONS 7.1. Minimum 30% of the total land area lor the project shall be set aparl as buffer area. Suitable species of trees end curtain plants shall be planled and maintained within and eking Ihe periphery of the premises, forming a green bell 10 Improve Ihe environment.

7.2. Excavation and piling operation shall be done Without causing damage to the nearby buildings and without causing nuisance to the neighbours.

7.3. Construction debris. mud discharges etc from the constru<;lion site shall be disposed safely end the details 01 disposal olttle same shall be Intimated to the Board's otlice In advance.

7.4. Proper precautiOnary measures shall be provided during construction phase to minimize disturbance due to excavation, piling, IransporlatlOn of materials etc.

7,5. Sanitary faCIlities shall be provided to the wor1

7.6. Solid wastes shall be collected with due segregation and disposed of! through own andlor the Corporation lacility. Bio degradable waste shall be treated in blO gas plant.

7.7. Facit~ies for sale stomge of hazardous chemicals as per Hazaltlous Chemicals Rules 7 shall be prOVided.

7.8. A sign board showing the name of the project and activities Involved should be displayed al the main entrance 01 the sile.

7.9. Used lead ackl batteries, If any, shall be disposed as per the Ballerles (Management and Hanclllog) Aules 2001 .

7.10. Revised drawing showing the locatiOn 01 sewage trea tment plant, elfluenllreatment planllorliquid wasle from hospital, soak poll, DG sets and rain walerl'larveslll'lgtank as required under the above conditions shall De submitted \0 this office and the District africa ol lhe Board at Thrissur before starting construcUon works and got approved by the Board. failing whiCh this consent WIll automatically get rovalidatect.

7.11 . ErlVironmental clearance from the Ministry 01 Erwironmenl and Forests. Governmental Indoa shall be obtained prior to commencement of cons1ruction aClMties.

Sdl­ CHAIRMAN

DATE: 18.04.2008

FORWARDED WITH THE APPROVAL OF CHAIRMAN

~ ENVIRONMENTAL ENGINEER · 2 /

I- L NO • PCBfHOfTSR/ICE·RJ1606812011

It Ell" L ..

KERALA STATE POLLUTION CONTROL BOARD

INTEGRATED CONSENT TO ESTABLISH-Renewal

ISSUED UNDER

The Water (Prevention & Control of Pollution) Act. 1974 The Air (Prevention & Control of Pollution) Act. 1981 The EnVironment (Protection) Act. 1986

TO

Sn Unnikrishnan Arca Head Sobha Developers Ltd., Shobha City Puzhakkal Thrissur - 680 553

Consent No. PCB/HOfTSRlICEI 03f2012

Oale of issue 03.082012 Valid it)" 31.03.2014

Copy 10. 1. The Chl8f Environmental Engineer. Regional Office, Ernakulam 2 The Environmental Engineer, Dislrict Office, Thnssur 3. The Secretary. Kolazhy Grama Panc.hayal. Thnssur 4. The Secreta"" Adal Grama Pancheyal. Thnssur 5. Stock File 1. GENERAL

1 I VALIDITY 31.03.2014 I

Sobha Developers Ltd .• Name and Address of Shobha City 2 the establishment Puzhakkal Thnssur - 680 553 I I Telephone 0487 . 2389996 Fax 0487 - 2389996 13 Commumcat,on l e- mail §Ql;lh~rQ!JQ.@so1)_ba.co_in Website Sn. Unmkrishnan, • Occupier details Area Head

[ 5 ISurvey Number List attached as Annexure- I •6 Village Kuttoor,Puzhakkal 7 tTaluk Thrissur 8 I District Thrissur

Kolazhy Grama Panchayal and 9 Local body Adal Grama Panchayat

10 Category Orange

11 Scale Large

12 Annual fee Rs 41akh 13 Fee remitted Rs. 15.00,000/-

1. Capilallnveslment Rs 494 crore

15 Water consumption 1103 m3/day

16 Effluent Generation 101476 ml/day

17 Date of application 12.04.2011 "- Development of Township involving : construction of flats, viltc:lS, shopping mall, 18 ACTIVITY Iclub house& installation of DG sets Total bUilt up area - 229495.83m2 J 2. GENERAL CONDITIONS

2 1 T'.a consent IS granted subject to the power of the Board to review and make vanatlOn

In aU or any of the conditions

22. This consent. unless withdrawn ear1ler and subject to ConditIOn no 2 1, shall be v

2.3. The applicant shall comply with the instructions that the Board may Issue from I.Ime to lime regarding prevention and control of air, water, land and sound pollution.

2.4 The date of commlsslonmg of the project shall be .nlnnalad at least one month In advance to the Distnct Office of Ihe Board at Thnssur

2.5. Consent to Operate under the Water (Pre'lenhon and Control of Pollution) Acl1974 and the Air (Prevention and Control of Pollution) Act 1981 shall be obtained by the bUIlder before commissIOning the project

2_6 A minimum set back as per Municipahly BUilding Rule shall be provided between the boundary and the building and the set back can be utilised for the development of green belt

27 Sewage Ireatment plants (4 STPs) of capacity 200 KLD 250KLD.250KlD and 320 KLO shall be sel up beyond a mimmum distance of 23m. 24m. 24m & 26m

respectively. from the nearest residence I educational institutIOns I hospllaV place of worshipl public offlCesf similar establishments etc. excludmg Industries. DG sets of capacity 125 kVA(4 nos). 62 kVA & 50 kVA shall be placed al a mlntmum distance of 8m. 6m & 5m respectively from nearest residence! other establishments_

3. CONDITIONS AS PER The Water !Prevcntion & Controt of Polluti o n) Ac t, 197 4

3_1 Sanitary facilitles to construction workeno shaH ~ provided and maintalned_ Safe disposal of solid waste and wasle water shall be ensured during construction phase.

3.2 InbUlIt facilities shall be provided for reuse of treated effluent for~. gardemng. "oar & vehicle wash etc. Water meter shall be provided for measuring the quantity of treated water recycled_ Excess of treated effluent. if

3.3 810 gas plants shall be provided for treatment of bro degradable garbage. Screenings and sludge from effluent treatment faCIlities shall also be fed Into the biogas plant. Filter press can be avoided 4 3.4 Slurry from blogas plants shall be fed into septic lank.

35 Effluent treatment plants consisting of the treatment units as proposed by you and modifications In 3.2 to 34 above along with additional facllilies required if any to achieve the following standards for trealed effluent shall be provided, before commissioning the project

. Char.)ctcrislics Unit Soak pit Floorwashlng Igardenlng/other rouse purpOSBS

1. pH 5.5-9.0 6.5-8.5 +-- 2 Suspended solids mg/t 20 100

BOD. (3 day at 27'C) mgn 3 3. 30 4 Oil & Grease +mgll 10 1 3.6 No effluent shall be discharged outside the premises. Storm water alone shall be lei out

3 7 There shall be easy access to each and every effluenllreatment unit and the recycling facihty for inspection. Manhole shall be provided prior to soak pit to facilitate sampling of eHluent. Lighting arrangements shall be provided in the effluent treatment area, recycling area and backyard_

3.8 Energy meter shaH be installed exclusively for the effluent treatment and reuse system and shall be maintained properly.

3.9 Arrangements shall be provided for ra in water harvesting and for utilisation of harvested rain water The rain waterharvesling tank shall be at least 20 m away from the soak pit for disposal of trealed effluent.

3.10 If operations are planned to be done with backup power, the generator shall have adequate capacity to run all the associated pollution control devices.

3.11 Natural drainage of the area shall be protected.

312 Water meier shall be fixed to record consumption of water

4. CONDITIONS AS PER The Air (prevention & Control o f Pol lution) Act, 1981

4.1 The DG sets shall be acoustically protected. The minimum height of chimneys for venting emissions from OG sets shall be as specified below_ -

5 SI CapaCity Minimum height of stack No InkVA above roof tevel 'm' ,,, 25 2 62 2 3 50 15

4 2 The sound Jevel measured al 1 m outside the boundary of IhD Qrem ses shall tOt exceed Ihe ambient sound level applicable to Ihe adjOining area

43 All operations likely to produce dust or noise sha!! be carri ed out with appropriate enclosure

4 4 Watl.lf spnnklers shall be prOlllded 10 suppress l!p~ead(ng of dust outside the premises dunng the construction phase. Suspended panlculale matter at the boundary of Ihe premises shall not exceed 200 microgram per cubic metre

5. AD DI TI ONAL COND ITIONS

5 1 Minimum 30% of the total land area for the project shall be set apart as buffer area. SUItable SpeCies of trees and curtain plants shal be planted and maintained within and along the penphery of Ihe premises, forming green belt to Improve the environment 5 2 Proper precautionary measures shall be provided dunng construct on phase to rrr'lirrnze disturbance to neighbors and neighbormg properties due to excavation, piling, transportation of materials etc. 5.3 The construction debris and mud discharges etc from the construction site shall be disposed safely 5.4 Non-biodegradable wastes shall be collected with due segregalion and disposed off safely through own facility or through the local body.

5 5 Arrangements shall be provided for proper management of e-w

58 Used lead acid ballerlCS. If any shall be dISposed as. per the Batlery (Management and H3ndllng) Rules.

5.7 The conditions of Ihe EnVIronmental clearance No 21 -71312007-IA- III dated 17.04.2008 shan be fully complied wdh by the project aulhoritJes 58 The draWing showmg location of the proposed buildings, effluent treatment plants. soakpits for disposal oftrealed effluent, DG sets and other structures shall be as shown in the drawing approved by the Board: No change or alteration on Iheresha·l be made WithOut pnor clearance from this offICe. 5.9 Adequate fIre protecllon eqUipment in accordance with the fire safety regulations shall be established I installed at salient places and for enslIring thl;! same. necessary certifICate from Fire & Rescue ServICes Department reg.:lrdmg fIfe safety shall be obtained The unit shall have valid certificate from the Fire & Rescue ServiceS Department dUring its operation

5 10 A sIgn board shOWing the name of the prOject and activities Involved lihall be displayed at

lhe main entranc~ )f the sIte

Date' 03 .08 2012

{Office seal) _.--- _..... _-- I:Q...., ... - ...... ~- .. ~,- ,- \1;"'" .... -­ ,_ ...... _... ".

"" .... -""~, -- -\ "'i~---;--- r}' ...... "" ... -. -...... 'l ..... I"'"'" ...... ( '1'"\ ~)~ ' "".,.--, ', ..-~ ~ . .. .. - ...... / \ , ~--- ~ -\ ... '/, ' -'_\ • . , , " y .,­... ,,>OJ.,, /'.'.,' / .- '--- ..... _"'" ...... _- -...... "..._­ ...... /' ,-~ ,'."'''''''...... ,." '. '-"'''''' j~~.... -I,bl 1>' v£ !.I.N' lH ~·~Il ..... ,...... , .", "oW ... " '" "' ""' , , ' '/ 1.-J )Anr.t..,

I~ ... , , ....

• S.T.P. DG & TRANSFORMER YARD

...... • SURVEY l\'UMBERS •

~--;;;. _. - SL N,',o'-- ~-r.,=;-;-',",sI".'JR~V-,-I,-"o. '_ 1 : 21711,2,3.4,5 2 ~_' ~1~112,~ 3 534J3A.5,7 -l 4 1 535/ 1.2,3 ~6 53611,23 ~ ~ 53711 7 _~f-'5",3",8/~1",2",,3,-~_ 8 5391P 9 ___ 5~40~/~1~2~~~~~~ 10 5411]234' , , 54211 ,2.~,4 r-u-- -~ 12 5431 J,2,3,4,5,6 54",P 13-

14 5~5Jl,~ _ . 15 54611,23 t")6 - 547/1,2,3 17 548/1.2 ' 549/P , 18 I . 550/1.2,3 -19.. - 20 I 55211,2,3,4,5 .- 21 ,_ 553/1.2 22 555/1 23 I 55412 24 555/1 25 555/2,3 4 5,6 26 556/1 1

I S0=b~c<' =... ~ q,,,?~Q~\<...~ if! General: 04 71- 2312910, 231815), 2318154, 2318155 Chillrm.!ln: 2318150 Membe r Secretary: 2318151 e-mail: [email protected] FAX: 2318152 web: www.k.eralapcb.nlc.ln KERALA STATE POLLUTION CONTROL BOARD c ce,m ~ (T\) 0 CTUO 0 m III eJl m' ce, m6fT) m1 (D) lom 6fT) C 6T1J 0 ro o..i5 Paltorn P.O., Thiruvnnanthapuram - 695 004 n.J§ o n.n. 63., ~'ktI lrumnmn.J l(1)o - 695 004

File No. PCB/HO/TSR/ICE-R/16068/11 Date: 17.07.2015

INTEGRATED CONSENT TO ESTABLISH - RENEWAL Consent No: PCB/HO/TSR/ICE-R/06/2015

Ref: - 1. Your application dated 17.03.14 2. Consent No. PCB/HO/TSR/ICE/03/2012 dated 03.08.2012 valid upto 31.03.2014 The 'Integrated Consent to Establish' issued vide reference 2 to Sobha Developers Ltd, Sobha City, Puzhakkal, Thris5ur-680553 is hereby ren ewed upto 31.0 3.20 17. The copy of consent cited under ref. 2 attached herewith is part of this renewal order and this order is subject to the conditions stipulated therein with the following modifications / additions. t. General

1 Validity 31.03.2017

12 Annual fee ~ 320000/-

13 Fee rem itted ~ 960000/-

14 Capital Investment ~ 385,12,63,222/- 15 Water consumption 545000 I/d 16 Effluent generation 490000 lid 17 Date of application 17.03.2014

Construction of flats, villas, mall with bui lt up area - 173401.18 m 2 (Other than the completed built up area of 18 Activity 56094.65 m' ) DG sets - 50 kVA (1 no), 500 kVA (6 nos) and 1010 kVA (3 nos)

19 Date of enquiry 29.04.2014 & 28.04.2015 , , , I'

, I 2

II Condition No.2 is modified as follows: 2.1 Th is consent is granted as Integrated Consent to Establish (Renewal) for the construction of remaining facilities other than the completed ones, specified in the previous consent, subject to t he power of Board to review and make variation in any of t he conditions . 2.2 This co nsent, unless withdrawn earlier and subject to Condition no. 2.1, shall be valid upto 31.03.2017. If the co nstruction is not completed within the validity period consent shall be got renewed. The application for renewal shall be submitted on third month before the date of expiry of the consent t hrough krocmms.nic,in 2.7 Sewage Treatment Plants (STPs) (STP2 of capacity 160 KLD, STP3 of capacity 190 KLD and 5TP4 of capacity 250 KLD) shall be set up beyond a minimum distance of 10 log Q metre, where Q is the sewage inflow in m 3/day, from the nearest residence/ other establishments. D. G. sets shall be placed at a minimum distance of Y(kVA/2) meter From nearest residence/worship places/ other In stitutions (kVA is the ca pacity of D G set).

III Condition No.3 is modified as follows: 3.2 Th e treated effluent shall be reused For flushing and ba lance shall be discharged into land for irrigation / percolation.

3.5 Th e characteristics of treated effluent shall conform to the following tolerance limits:

Tolerance limit land for 51. No. Characteristics Unit Reuse for percolation flushing / Reuse for irrigation 1. pH - 6.5- 8.5 5.S - 9.0 2. Suspended solids mg/I, max 20 100 3. BOD, (3 day at 27°C) mgtl, max 3 30 4. Oil & Grease mg/I, max 1 10

3.8 Time of Day meter shall be installed exclusively for t he effluent . trea tment, and reuse system and shall be maintained properly. -.

2 J

IV Condition Nos. 4 is modified as follows: 4.1 The DG sets shall be acoustically protected. The minimum height of ch imney for venting emissions from DG set shall be 0.2 vkVA metre above roof level of the highest nearby building, where kVA is the capacit y of the D G set. If the DG sets are placed altogether in a single cabin, the total capacity of all the DG sets shall be considered for determining the chimney height. IV Additional conditions: 5.9. Adequate fire safety measures shall be provided in accordance with the fire safety regulations.

5.11. Renewable sources of energy namely solar energy shall be utilized.

5.12. Water & energy conservation measures shall be provided. Ground water recha rge facility shall be provided.

5.13 e- waste shall be segregated, safely stored and disposed to registered recyclers.

All other conditi ns in the Integrated Consent to Establi sh under reference remain unchanged.

For and on behalf of the KERALA STATE POLLUTION CONTROL BOARD

MEMBER SECRETARY To The Area Head

~ bha Developers Ltd, Sobha City, Puzhakkal, Thrissur-680553 Copy to: 1. Th e Environmental Engineer, District Office, Thrissur 2. Stock File

J No. 21-713/2007-lA.I1I Government of India Ministry of Environment & Forests

Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110 003.

Dated: 17'b April, 2008 ~hobha Developers Ltd., $abba City, Pu:a:hakkal, Padam, Guruvayyur Road, Thrissur - 680 553 (Keralal

Subject: Construetion of QSobha City" at Sy. No. 218, 217, 534 to 544, 546 to 556, Kolazhy/Adat Panchayat, Puzhakkal, Guruvayyur Road, , Kerala by M/s. Sobha City - Environmental Clearance - Reg. Dear Sirs,

This has reference to your application NO'. NIL, dated NIL and subsequent letter dated 05.02.2008 seeking prior Environmental Clearance for the above project under the EIA Notification, 2006. The proposal has been appraised as per prescribed prOCl.-.:Iure in the lights of provisions under the EIA Notification, 2006 on the basis of the mandatory documents enclosed with the application vi"., the QUestionnaire, EtA. EM? and the additional clarifications furnished in response to the observations of the Expert Appraisal Committee constituted by the competent authority in its meetings held on 19th - 22nd November. 2007 and 13,h _ 14'" March. 2008 and awarded 'Silver" grading to the project.

2 . It is, interalia, noted that the project involves eonslrUction of an integrated complcx comprises of residential multi-storied apartments, commercial complex, hotel, convention centre and hospilal on a plot area of 2,29,535.91 Sq. mts. The total built-up area proposed is 3,24,665.28 Sq.m. It is proposed to construct 1080 residential apartmcnts, 25 villas, 107 rooms hotel, offit;e building, shopping mall. 200 bed hospital, convention, business & health cenlre and club house. The total water rcquircment is 1301.5 KLD (fresh water - 940 KLDI. The capacity of STP proposed is 2000 KLD lin 2 stages). Treatcd waste watcr to be used for flushing of toilcts - 362 KLD, gardening - 650 KLD and balance - 33 KLD for ve hicle washing. The total :solid waste generation will be 6200 kg /day Total power requirement proposed is 24.49 MVA. TOlal Parking spaces proposed arc 3631 CarS & 780 two wheelers + visitors car parking· 84. The total cost of the project is Rs. 749.85 Crores.

• 3. The Expert Commillce after due conaiderations of the relevant documents submItted by the project proponent and additional clarifications furnIshed III response to its observations have accorded environmental clearance as per the provisions of EnVIronmental Impact Assessment Notification - 2006 and its subsequent amendments, subject to strict compliance of the terms and conditions as follows: PART A - SPECIFIC CONDITIONS L Construction Phase

'Consent for Establishment" shall be obtained from Kerala State (" Pol1u1\on Control Board under A,r and Water Act and a copy shall be submitted to the MinlsLIy before SUITt of any conslnlction work at the sIte.

(ii) All required Sllnilary and hygienic measures should be in place before startmg constructIOn activities and to be maintained throughout the constructIOn phasc.

(iiil A First Aid Room \\~ll be provided in tne project botn during construction and operation of the project.

(IV) Adcquute drinking WHter and sanitary facilities should be prOVIded for construction workers a t the SlIe. Provision should be made for mobile toilets. The Sllfe dispos.... 1 of wastewater and solid wastes generated durmg tne constrUction phase should be ensured.

(V) All the topsoil excavated during construction activities should be stored for usc in horticulture/landscape development witnin the proje<:t sIte.

(vii Di:;posnl of muck during cOn struclion phRse should not create any advcrse efreel on the neighbouring communities and be disposed takmg the necessary precautions far general safely and health aspects of people, only in approved sites witn the approval of competent authority.

(vii) Soil and ground water samples will be t.esu:d to ascertain that there is no threat to ground water quality by leaching of heavy metals and other toxic contaminants.

(viii) Construction spoils, including blluminaus matenal and other hazardous malcr181s, must nOt be allowed to contwmnate watercourses and the dump sites for such material must be secured so that they should not leach into the ground water .

• 2 {ix] Any hazardous wa$le generated during

(x] The diescl generator set!:! to be used during construction phase should be low sulphur die!;cl type and should conform to Environment (Protection] Rules prescribed for a ir and noise emission standards.

(xi] The diesel reqUIred for opo:ratmg DC sets shall be stored in underground tank!:! and if required. clear.I.IlCC from Chic( Controller of Explo!;lIves shall be taken.

(xi i] Vehicles hired for bringing construction matcrial to the sue should be in good condItion and should have a pollution check certificate and should

(xiii) Ambient noisc levcls should conform to rcsidentiol S[(Indords both during day and nIght. Incremental pollution loads on the ambient air and noise quality should be closely monitored during construction phase. Adequate ml!asures should be made to reduce ambient air and noise level during construction phase. so as to

(xiv) Fly ash should be used as bUilding material in the construction as per the provisions or Fly Ash Notifieanon of Septemhcr, 1999 and amended as on 27'" August, 2003. (The above

(xv] Ready mixed concrctc mUSI be used in building construction.

(xvi) Storm water control ond itl! re-u!IC as per CCWB and SIS standards for various applications.

(xviii Water demand during construction should be reduced by use of pre-mixed concrete, cunng ugents and olher hcst practices referred.

(xviii) Pennission to drm' ground water shall be obtained from lhe

(xix] Separation of grey and black walcr should be done by the use of dual plumbing line for separntion of grey and black water.

J (xx) Fixtures for showers. toilct nushmg nnd drinking should be of low now either by use of aerators or pressure reducing devices or sensor based control.

(xxii Use of glass may be reduced by uplO 40% to reduce the electricity consumption and load on aireonditioning. If necessMY. usc high quality double glass with special reflective coating in windows.

(xxii) Roof should mcct prescriptivc requirement as per Energy Conservation Building Code by using appropriate thennal insulnuon mntcna! \0 fulfill requirement.

(xxiii) Opaque " 'all should meet prescriptIVe requirement as per Energy Conservation Bullding Code which is proposed to be mandatory for all aircondittom:d spaces while it is aspirational for non-aireondilioned spaces by usc of appropriate thennal insulation mmenal to fulfill requirement.

(xxivl The approvlIl of the competent authonty shall be obtained for stn.u;:tural safely of the buildings due to earthquake, adequacy of fire fighting equlpments. etc. as per Nauonal Building Code mcludmg proteclion measures from hghu:ning etc.

(xxv) Regulnr supeTVlsion of the above and other measures for monllonng should be m place all through the construction phase. 50 as to aVOid disturbance to the surroundings.

(xxvi) Under the proviSions of EnVironment (Protection) Ac t, 1986, legal action shall be mitinted agmnsl the prOJecl proponent If 11 was found that construction of the project has been started without obtammg environmental clearance.

i) The Installation of the Sewnge Treatment Plant (STP) should be certified by an independent expert and a report in this regard should be submitted 10 the Ministry before the project is commissioned for operation. Trcated nffiuent emanatmg from STP shall be recycled/re\lscd to the maximum extent possible. Treatment of 100% grey water by decell1mliscd treatment should be done. Discharge of unused trented affiuent shall conform to the nonns and standards of the Kerala State Pollution Control Board. Necessary mensures should be made to mitigate Ihe odour problem from STP. iii The solid waste generated should be properly collected and segregated. Wet gllrbagl: should be composlCd and dry I inert solid waste should be disposed off to the approved sites for land fIlling after recovering recyclable materiaL

iiil Diesel power generating sets proposed as sOurCe of back up power for elevators and common area illummation during operation phase should be of enclosed type and conform to rules made under the Environment (protectionl Act, 1986. The height of stack of DG sets should be equal to the height needed for the combined capacity of all propO"'ed DG sets. Usc low sulphur diesel. The location of the DG sets may be dedded with in consultation with Kerala State Pollution Control Board.

iv) Noise should be controlled to ensure thaI it does not exceed the prescribed standards. During night time the noise levels measured at the boundary of the building shall be restricted to the permissible levels to comply with the prevalent regulations. vi The green belt of the adequate width and density preferably with local spedes along ule periphery of the plot shall be raised so as to provide protection against particulates and noise. vii Weep holes in the compound walls shall be provided to ensure natural drainage of ram water in the catchment area during the monsoon period. viii Rain water harvesting for roof run- off and surface run- off, as plan submitted should be implemented. Before recharging the surface run off, pre-treatment must be done to remove suspended matter, oil and grease. The borewell for rainwater recharging should be kept at least 5 mts. above the highest ground water table. viii) The ground water level and its quality should be monitored regularly in consultation ,,~th Central Ground Water Authority. ixl Traffic congestion ncar the entry and exit ]Joints from the roads adjoining the proposed project site must be avoided. Parking should be fully internalized and no public spacc should be u tilized. xl A Report on the energy conservation measures confirming to energy conservation norms fin alise by Bureau of Energy Efficiency should be prepared incorporating details about building materials & technology, R & U Factors etc and submit to the Mmistry in three momhs time. xii Energy conservation measures like installation of CFL.sJTFLs for the lighting the areas outside the building should be imegral part of the project design and should be in place before project commlSSlOntng. Use CF"Ls and TF"Ls should be properly collected and disposed off/sent for recycling as per the prevailing , guidelines/rules of the regulatory authority to avoid mercury contaminatIOn. Usc of solar panels may be done to the extent possible. xiiI Adequate melUlures should be taken to prevent odour problem from solid waste processing plant and STP.

Xlii) The building should have adequate dIStance between them to allow movcment of fresh aIr and passage of natural light, air and ventilation.

PART - B. GENERAL CONDITIONS i) The enVironmental safegua:rds contamcd III the EIA Report should be Implemented in leiter and SplTll. iiI ProvisIon should be made for supply of kerosene or cooklllg gas and pressure cooker to the labourers dunngconslrUction phase. iiil Six monthly monitoring reports should be submitted to the Ministry and it's Regional Office, Bangalore.

4. Officials from the RegIOnal Offiee of MOEI', Bangalore who v.ould be momtonng the ImplementatIOn of enVironmental safeguards should be given full cooperation, facilities and documents I data by the project proponents during their mSJ)Cction. A complete SCI of rul the documents submitted to MoEF should be forwordcd to the CCF, Rcgional office of MOEF, Bangalore.

5. In the case of any chflnge(s1 III the scope of the project, the project would reqUIre a fresh appraisal by thIS Ministry.

6. The Mimstry reserves the right to add additional safeguard measures suhsc{]ucntly, if found ncees5.'Iry, and to take action including revoking of the environment clearance under the provisions of the Environmental (ProtectIOn) Act , 1986, tQ ensure effe(;Live implementatiQn of the suggestcd safeguard measures m a Lime bound and satisfactory manner.

7. All other statutory clcamnces such as the approvals fQr storage of diesel from ChIef Controller of ExplQslVes, Fire Departmcnt, Civil AVlLltion Department, Forest Conscrvauon Ac:t, 1980 and Wildlife (Prote(;tion) ACt, 1972 etc. shall be obtained, as applicable by project proponents frQm the respective competent authorities.

8. These supulauons would be cnforced among others under the proVisions of WfHer (PreventIon and ContrQl Qf Pollution) Act, 1974, the , Air (Prevention and control of Pollution) act 1981, lhe EnVironment (Protection) Act, 1986, the Public Liablhty (Insurance) Act, 1991 and EIA Notification, 2006_

9 . EnVironmental clearance IS subject to fi nal order of the Hon'ble Supreme Court of IndIO III lhe matler of Goa Foundation Vs. Union of India III Writ Petition (CIVIl) No.'l60 of 2004 as may be nppllcoble to thlls project.

10. Any appeal against thIs EnVIronmental Clearance shall he " 'I lh the NatIonal Environmen t Appcllnte Authority, if preferred, withm a pc:riod of 30 days as prescribed under Section II of the National Environment Appellate Act, 1997. ~qwgz (Bharat Bhushan) Olrc ctor (lAl ~ Copy \0: 17.0'< . w--><' (1) The Secn:tary. Dep:lrlfficnl of EnVIronment, Government of Kerala, Thirovananlhapurnm. (21 The Member Secretary, Kerala Slate Pollution Control Board, Plamaodu Junction, Pattom PlLlllce, P.O. ThirovananlhlLpurnm ·695 004. 131 The CCF, Regional Office, Mlmstry of En" lronment & Forests{SZ), Kcndl'lya Sadan. IVlh floor. E&F wlllgS, 17'" Main Road, Koramangalo II Block. Bangalorc - 560 034. (4) 11\ • Division, Momtormg Cell, MOEF, New Deih, • 11 0003. (5) Guard file. / (Bharat Bhuahan) Director [lAl

, V' rT/~'f) /) (j \/' (JC,)t, ii

! i \,

! I'\) '.' j ',. '~ "

~n (() J oj (O'ru)'lco 61/5 :) 0 cu51 C£i (0)1, (0).,1 g.gJ c'6 (0):) Qj.3> £{;)' ~:31

, "j r-'- - <6I3CfawruJ) (nSI.63.©S@2>0) (PIN,680 001) mm:JoJlcu)'2:Jc05k6i () '. i ! ' !

1,.,

.1...

.' ~ .' ( \ e :15 DVo/- 'T/ l< {" A Du RGAL Tt?R .5 PV7 Lily) J i .'

l .I 1\,,/) (-)\Je..r>/Ae. POe.S ~ QycJ QI), C"uC·)·j,\, (,n'(\',I)' .

, I.~, > ',()J lY)l ~ t5 0.1 crm/ ~ g ~.::> Cp (J) f7f"7rrs) ~) c--Q/ "') ')::;~ c() " .<'1 (.'i c;:I~ Er) Cui v~ {-Ie IJn(n Rooc/ BCtf) (;C~ [Oye.. h .. C),Y1r,¥)

;'~,;! ,\ i '\) ,,:)11"6;) wi:, nn ) 0 trt1 0 ~ nmJ:> .:> otJ1 ~:> C.) ~ "lSI fu r-r6 ) ~2:> rucP c,):> Q, rc-6 &-1 d _~'~\.,1 !\~v

1 11 ; I, .. 1.6':1\ 1:r "

, ..... -.... ,'

':? :; IN" ,~.- ... -- .... ~.

i C:"."p 0c:sJ , \ ! ; I' , !' I " , :1 'I I ,'I

i I "

( I

:1

'I 1 ;,1;1 ' ! ,I

·1\ -. ; i \ i lLi '.I ·,11

, I 2

:' '

28,3,20066)[JJ

Ii' II,");

,

L I

2.

3. " .i! 1 :: . ;,

I J J "I" . , ',.". :5000/- 1.. ,;'.'; "'iTf kkA])u RfAL-roRS PVi f-..,ltnII"Ej) /\!(1··13 'eel !""'(~ (.j\le..hUe. poes DJo.idef1 che.rwIL~ll (;':Joc)B6 Ii '(J) ".;l &g (3v:vOO')l ~ c.:; 'l. ~ ) J ce (7')~) <,~ <02J () 2J;. q) J' 3,[bO;!( Encodv~ We.ht)(Ay' R0CLdJ C)Cl00cdo re "----(})'YY) ::Ule-J'J"{\) ,r~ ro6 otf)')<::),ttVo ~tntr.>')~') SlJ ~ ~ °.::2<.0,_> "rl '-'1- CI en ":2 Y?.b Sp C)",-6 Re:1cI . - / \ (L /\ (.\ /\(\ 1/

.-. '.:,: ,t"" 'f I;: ....

: ',\ I ... J.b \ d 1"'1 \

,',:: ~'):\'i:?Lf.j;-J~:~I.~ , "'ilf:?i"..

) > ':sLJ ("::Ll5v ~ " ,.-

'i,

i i .; ., ~ i . I, -.. (, , ,

61 (!?:1c] 0 /cLl OJ 1. :)C\l)", (ffi i rii,;.;ct:Yi' .) a51W161cm" CQ)mrCT1.J &~ (). ®?tIr, ... 9 a; (())~)

Sl.!1 <2} ~)(o 0 Clll (I) IN.' ::,1: I i ,I,;, )

,/::;;:..,

\ , \\ \\~~)"

!. --' "\.

3, ...... T T ( f<- k A 1)V /(E'R L To 1<.05 PVr LI fc:>1 TED 1,-( D·· f ,j'

.<::;(,'- Fj\jl:~/JLH... poes G.o.-yc\eh chel)t}o; C,·· "/'.{: . '.f (~~')r'{n'·oJ"....' 8ti?, (5C)J<::>q)/..:;!) rg.,-=::.J) G (/'lC7C¥) C\A) cQ\ () C:,;}(-6 . gr!Oof< L:':r)CQ/IJe... \-fe..nnUY QC>Q~ '[3Q'ialoie <)..----{;))"rO

{~ \-a.LJ::) fYI) ro,,~~ c::7t5) ':>c::.:Jml t) c:::l ~ J

. . ,.,- -'. ;,' f ;' • ',' •• < "

. ,")

C._" ,,""",<'!!vl ,... ------­ ",,,/":f<~'''/' .• "c">

. ,:"

" , ,

01 Dr', "",(1,<';11

I' '.

" < ,", !

! \' )/l !

\\; 1. Q0(gmwou)''' c\.lD<88.... 6mro (g@;}Dffi).... ~/ C _,-e-- <;,.\~; 2. ;,

""(~, / C)OO /. ) ./TfKf

,. ,i(i ('-..) V C.1l U e.. PO e.S ~ Q"I cA ef) ch e..n ('J> i C·":) C')'.,,) \.)f..

_.~~) ';'::'J0.J e~ ~~l ~.)_:::.:J:) Y> (i).) '. :1. '. ( . :: (',' () Sik<"k C::hCC{\\Je.. \-4e..nnU,( R-Oqc\ 1>Qt")~c,.\ti-lr::. c,J§Y"YY)

,:;-;.~l e-..\ ::;"\~ In'" ~ I1S) T::;ItY\J 0 <::J V\S'QS:) )<::.lJ) ~ J Sl ry{, ':0,,), '2');, (y( JL.f 6 en C:J) ~ ':.d ') 'JJrr& Rek{.

"",, ,". 'f~;(~"tW~~~~:Jre'r _,0'" • "'-<>'.

5

n.illg;Q~" ((J)j@~cB ((J)8812>,BJ')" .u.flcp]800 oJl(g~~U sl C58UoeITrO"

,(D)8Qm)o ccJl.6.3 . .oJ1CQ{80o) (PIN. 680026) m@B138») C.JJ(O;5:f!CnJ'

Qd9>cr3 d9>~QJSo 61 C6T002cJaJ(Q)163cm'-' OJCWg{1" ~g;Q!JCTD~ rm,s~~.~c3

.' (())~~Jbcf6)u .nJlCW~00 Qfltg~2Jt sltg(3w((}(O)u (oJl.6.3 . nJ1Cl)}:JC0 0 )

mYAQJ'J81 (lip'J;Yln;' )\'PIN.680 026). CffiO(ol<2CTU:)00 <2o:)cuSl«18 (ID:)QCTUo 'v'~ 0 .

Qcfh08 c0-'3JClJSo 31 Q3&:lcom:>16.3crrt QJ

caJbSl VALASAJ VETTIKKADUREALTORS PVT. LIMITED. l'.i() 11, ..

RegllilV\.'Clit Avenue, Poes Garden, Chennai- 600 oxe)

Encalvc. Ilcnnur Road, Bangalore= 560 043, o..{j)® o.f)8.!:JOU(()!O;ltD{)

(ID:)Qffi)o cr3 8CTl1ml GID'J~rul 6) C81O().l

Jml6.3crrf OJ

NAL LayOut, East End Road, 4th T-Block, JayaNagar, Bangalolc -

560 041 o.Q')ffi)oJleJ:)CIlJcom:>la:m (o)8!2C1lJo Mr. (Wltfb6ffi"OC£( Ij £bci.~

cam! ml (3 hY'\;)C;-tc, P. fl 51 ®O ffiJ rom:>l6.3 em" OJ CQ) m)'"CT\.) 2. (; ml C'l[ o2(

1. . ,'I .1 I 2.

II 3.

'.1'

F,\.t::C;Y!!~·'f!!!;(\~:T" I1 ~•

,.~4'r~, ,/'7 \

! 'I

1 I, I ,i ! ",(f)ClTl((): .. !;\rCt,j" ()(/)~'93(OJ1())8Y)~;awYO) m'Yln:)(u l(~l, (.

cU<~IC(M()' i)' < il Cc}iffi3 CIT) l<)o(l)[(I)j' ()JnOtfMm mr,hO:r;:C. I. 1 . I. 'j , '.' (' tJ 7< m)61]1' ():'nklii(U,) l<)oGDJ:lffi 534-::/o0J:)0·1\o ?t19(J;l((l)((\} )",/, "." , .\ . \ ?Jlf066Y3{~I(()(; 1995cti5 3653-0 , 2<)offiCmJ" OJol;(fl) ~fl tiT<.;,I:;) \ I i : 1 JJ4 - JoOl:X i\o ?29 s:l3(l))((JO 2,3?'(l16Ko 0]Cfo6ffi3 F!j)m'6 I~) ~)') (doH) .1.: II. ; ' 'I .. I . i 3 - JoCDUnI' OJ ClD8(f() sl 6T.l.l2 cf6)u 526 - JoOJJQJJo 27 5 22 n;}(od !

jK.~5-o, 7·. ;,r;)(cnf' CtlnDcm sl 6TlJ3cE£)u 534-:)o()J:)8.)\c :"ij~1?(i.'i{fil

'i) 8 OJ ()Jc) ;Ii Ii (i()/:! v:ll m'6 J 9 9 5 a:fo J 6 57.- 0, B <) 0 CD Cfrl1' OJ nO d») (ki:1 nJ2(f£t 534-<)oOL)QJJo 237Cl3ctJ)cOO 2400J6)(O Q]Cfo6Gl3g:fjCvD 199',(;:(\

(i''iO-o(/)((nl;JUYXCJo QJf!..lo <8Qn::!Sl cruO:)c>Jffim)6)~ <8oJG:nm:3

'. j

; i 7

11. I I )6G13gi(b6 1- :)omCmJ2t9..J003 emio'" CllJ6m3l 6)6)t9..CllCRlo 6)C}L9J I :JCD3l5oJlsJ3 OJ03C1Dcm3o cgQn.:Jsl ffilO9n.Jmcmml6)oR ()J0lniJ(3~1P i j

,CO)cJI CcG) (D) (fUJ9 em CCTIDJcmmlam @(ol,ro3CTDcm 3Q 'J {)'6 em 3·

Jocf)ccnJ OJn.D8cm sl6TlJ3,ro'-' 552-90OJ9£4So 87Q3<:mC?50 900J6;(o

:rc 3Bg:ilc08 1995mB 5818- 9o(T)CmJ9

)00)(013<6>9<003 emlo" OJJ6'6Tfl 6)6)<6>OJ(JOo 6)OJ.!ff ctml(T)3@oJl

" ? OJCOam)CID3o slcw:J6)cW CTDJ:JCID(CJD)J I nJaflnJ30~C<6>cwo.flCd3JCW I j ))lcc5 ID2(olm2cmcm~QJ

2<)oOJ:)E[So 83Q2CCDaID 85016)0 OJCRl&:ml@laID 1995aID 5817 - :Jom

u )j~)(J)9(oc Q,~QJo 3-Jomc.mJ38Jcoo3 emio OJ96m31 6)6)80JUoo . ij i ll':lt mfCi(D2 8oJL3:l3 ClJ<03CYDcm3o slCWJ(T)3Q9(SO>o CGraOJ8:)(f() g}~}(0)3o ~:;kOJ:)6)qq oJ

:(S">;3(TI)cm32:)d3J3CYD3· oJ§l&1QIn..D<6>©1mB 26JP1§3 ffi1d3'(0W)3ClT> i(J):)m51 GllhDc'3Q:)(T)6)&:I§ CCDJ~J0 R.D.O. nJcEb)am mlcmJo !(DIS 30/9SID1, KDIS6676/951D1, n.{j)crrfl mc.ffiJ3d3.l§:JCDfi C6T0m3QcuSl glCO)(n.J

" .' . / ./ " / 4)( / ,// (./ cm::l6)~ CGlocm10§OJ3tfba3 tg.nJc3ffi3CYD QJaDcB)@3o mroOJ 'TUu6n; m151sJ n,(j)~p CBIclOJ8:)cr06ffi3©3o ,f)Jsl

(ffi(jOJ8~w6)&:I§ OJni)8em££/' 1.73.30.820d3.lCQ)3o, ;::: .. :)oCTJ(CT)j,~

u ~~ u cBj ~ co m (JIO 01 8 ~ (fa 6) &:13 OJ nD cB) vu d3)) 31.? (). () () 0 d}'(O);5 0 ,

.3- ~om(0lI38!)(aar cmaOltfb~(06)n::l§ OJaDtfbcr3cfl))" 33,42,OOOd3JC(2)2o

83>sl §:lr5emmJmcmCnJ8~(oo 2,37,92,820d3> O.nQJ cDlUlllFDJl '}i2 tBQ~sl tfbCllloi1 @.(O)lm~c03 6tm6"B'13aS (0)"/(16 cmcml(-a 18J (lCT() 3,

, " I ! co 6m:) \TIJ10 (()~ 11.1 @ ::) 6) s> o.J 0 (Q) ;5 0 ,I : ) (co. J 0') :) co 0

1.

'-' 2. 23&X01P0 n.Q3~ cg~:)auo ~ 3. (snJOu3

'. '~~"

"-~ / / /\7 gDGfUg) x: nCWcWg) o(W~ ~cf(Q)EPev ,;'11 "CillCW81 &,(U9"S'g.>CfU o(J)o@t§W8>CV

. C 8) g) vC(J' L,M U3 2'B' co IDe; coo 8Jg;C<5& lJi3 cW 8J 'c 83 &>'0' '0> LiV3t.,s~C{;

, !SW2

C)CD0.l.'c)) 'C(OJg)L(Q~rueta 'C@(9'6'cm)mJCru9S'6' muu2Q)c(Q)CSlC(Q) gITlL@'B

u"ro o8fD(Q)JCv 8CJ)L(QID)CJ)r"cmw LSF\}'58> 08l'B'gD€ill9

~JB(Jj0W 0210Q))rD'€1'C9C9 oe(O)(Q)mwus~ SCge§'&' CJ"fO '2cw

n n C\9 0 C) -,,' G'0' C t'': (, (Q) CQ.lQ) C 10 G.'1l C!.:> (9 Q)) C '€1' ro ew C!.:> (9 e> C'B' t}D ew 0 v w \p CO!.:> ,. ~. '": : CQ)(9CffjPl8) GWIDLCQ.lQ)CDf"VGcmD !.?lV'(8) GOO'8)gDtm9CQl9 OeWUillCW ,~-: .~ 'II .. L f:r(::p gm U) P !Jill 02CD Uill cw f? lffi ru (9 0 <5 C e; CfP <9 (9 Qf.l r& (JV fD 0 e(ill 00 ;.::: II.;·'.. ' •. • .. ':', f: sf~' FY (9 Q!) C '6' ro c crrw e; S @ LS t'6' eSC (QID) 8J )CQ,lj) (Q) crew (O)'{j}1JD i.• ' \' . (().)'o') O(o5)C1':) o2WLCillQ)Wf"Ucmw LSFJle:>ID Oe~lli29CQJ.9 ~Y0'(JUfD L:. t· .'i "" }~ "I : ~U9(;(Q)uJ)2roc0B'!JD8 2wCillQ) 2s IJ(9(Q)C800 0 ~g@JC9QJ) C'6' ro CIJ sGl 1':~! . of:f'G'IOC9 oQJ)fD'&C9C9 €.W0B'g:>(Q) Gv8)[{))S(Q)

1.'\ () \ () . \1- CD UO 20 C (ill \9 C (0) nO (j G CW ID LCD ~ L

:'. 'l,.. Sf) G'U' IU e.ID) S(ge~Em9CQ..\9 CU1J8lLW ga>LCQ.lQ)WruC U(W l):j h,u'G8l 1.' .$ :('. : : CCU)i')l~D gill[fgQ89CQ.l9 O(Q)!Y"(U) gDili29(O)V[V "otOO'lj)r'QJ IclC9L(Q)QID)

" " . t,. '1 o Pfi! [189 \(J) rv ,.,fa C (ill 02 aD CO) onJJ t:i S @ 0 20lli29 Qf) C 'B' ru C Q) C 'B' !SD Qlfl)

t. I (, I': ;, , \

, \

tl'\It.

·1' , ~ ;\ ,

10

f21 :J O~ , 'c(rra <1:-1JI enfl dl:I cr3 ml

o OJ ffij3 01 ffi OJ 01 m1 cO) Q (oJ ,0,:) CO ~2 i8i?

", , . ~a3

Q6)Q 6)'(T(j)fB:,leJ3o r6leJW°5)6~ c6J3S1ca0S6BI3

o 8(8@O @6)eJcm a5l6ffi36)@ <82&:181 6lO)6\mg;!')o tm . I cru.oooJmOJ')o0 <)

~ mrm Q Q:J rofi (g 6nJ 6rw..~ 6.> &l S 2 mrml mfl ('01 cE£) 2 em;5 . 0 I " () ,0, \iii aii) I. §2 (g em OJ (g (0

cmami m.(6) Q~2 6m alcOO CGl~)(t» (O)d ' .. '.

8@,jo (gQ c;::J 81 mlJJ 8 oJm(8Q8 6iO) 6ffi3<2@8 m 81" <0,86) Cd erDa 0

@(lj® nloJ(fuo Q3cm«i3cEb)3§§ cr5l<0>3c(109)wca;)3o QQ3oCD(cmo

(g :) &:l 81 ~ cru ml £6)" ~ (Uf'O) co OJ :) 131 CIDJ 2:5 ~ OJ) :) ca 3m)'l g;;:; CD 0

OJoS)cf),g:3(l6JS m22:JQl nJ§CQ)o QJ:J6B133(fficuJ1m3o 6)OJ0(lClJJ:J§o

(lln.D

(g Q &l 51 09> illr crfl CQ).3 6) S ~ S Q (TUO:) OJ ,e.,:) era mrm1 m 2~ 04) ~j :J i tiS 0611 8@3 0 6D.J crup 6) &I§ am col,e, ~)(ol 8§1

, ~//

, .~ 1. roomgQ]o!1l" Clmacm" ""'~c8 £/ ... - . yr 1 2, 23

3, c2nJ~)(J'd /~// ".,

II

B,CrlICr5ICW36) S C8nJ (dlC8Qj(Q)u 8,)U CdCl () 3(mc0)1endo (8 el ri:J ~;) .i)/l) \]\ . 0

....., 1'1:.(1; {,,] ££) . ®Owl~D00J~ClOOCd3§§emCl6m. 6lO)6BDtB@:) 6lm6(\f3~}36)(;

~3 S3 0 6DJ:)0 (J)6l3l3i(8@:) (8Q c£:i sl cruo:) nJ m(8 Q:) (8 ~0 @ (,3,:], ()J 01 n2ju806m crSl(Q)QCnJ8:)00 l5~nJ01aS/CD51m'O 8~Sd(O)m'O CllnOct))\R) g? S :} crUD :) OJ

226ffi Cl co51 31iill. o.(j3(O)u ffi)QCOJClJ2o OJnD8@lc03 (gelcl.'!S1 d:MnmS/,Hf

6Yll) 6613 u3 Q ~ QJ 18 Q Cl 18 Q &:l s1 ffilD Cl nJ m 0 Q J QJ rg Q ~J n.(j) 6) (1(\1 ~I OJ,3 'J

6111:) I"UJ5 em (8 CD) Cl ?Xl Qtem1 rg CD) :) m oSl:t S 18 Q :) OJ Cd 2em «)) : )J))) (ui)

(GIS,> CW (0)1 m U 6ro) 6~ § 30 C8 Cd c£:i sl ffilO Cl nJ en (lJ 3 0 6f.lJ ~HlliJ CD)

6) n"::! 31 (18) 3 em em3 Q:) <0'3 em 3. rr5l CW3o 6)QJ03CTll:).§o ClJo.Dc£ncmffi" ;~

1,69.82, 820~ cW30 o.n8J ml@] (Q)141l(OI

Q 28{lJ),p cl3 @(2 &:l :) £:9 20 Cn!:) 6T11 Q{S cmml coB @01 J 8, :) «j 0 m1 CJ?m co:l<±.4 3 0

. \

1.

. j , 2. Q3d3- .1

3. !8 nJ :::> em rC) :

l.2 i :1 : "1 i - -f ffi) !JA mfl -3:130 em:) 6) ~ 0.4) ~:93a.D 2CfD m):) 8Ri1

6fO)6ffiJg;{1am 2 ,3m(cru;3~:)cB(g;)" CSOJ/iYY:flCW;3 0 Ie reI 6/)U8',;: r') ("(0 , ((J)JffilJcD (6Tll06m1fl6.>E] 18-8-20066.>0 9t2751- Jomc,CTll0cD51 ((DCJl)

6).!2J£6)u C()JJ))0092~ CYDo6lJJm5lam ('()lan3o oJqlw 1,00,00,000

<£hCQ)3o ffilJ,e;)l 1,37,92,820816)~ 51 C?DJ,)6I01il6)PI

u 22,09,20066)(;U 912762-00mccru 6)SJ.lr££r (0..18000130 @lo30f10J

Q3'82(1J(03o !g!Jam [oJ £h 0<0 0 (1Jlcml6) ~s 28.13 (1)@';cn::"1)-1

>6'fO)600cmm" 81§l !g6TlJ0fIDJo (1Jm5l§3~ctD0,a3rrn3. 6iO){)Oll(mcfl>;" : i < oJ3ctD3Gill;0f Cffi902tEb> n.Q)(ffiu £bas1 ofl§2<8 oJco3§§©0i)

. , S PAN Card No. AACCV 2126 K 0310

<8Q&1S\ ffi}D~cUm

"'..y ..•. '., .•...... ", ,. i (

u () J(ill (m;1( :

,

eo ..,. '" N I I I i J.I J '.

1.

2. , I 3. i ~.v"'\ ,I \

, ,I 1 :~

II

I I 01 I OJ:.J ,t);)~(nnlD(l~ ,:: .... I Uf), i i 1 ", I ,,\ ~ ni,[·"'---,,J(!~·'!a?!;i~ I 'I! I i \ (Ol,) fll ) {(Jlm"r all,) (.)Ol) i :1; I i'ii I~ "I r,,-,j bf 1 j:ri f~ !~ i {')()':(lf ,,_1 /))111)',": " ';.",\.'2 '.- i< C'i" , 12 \ l I I !.!;d.:::J!QW. ()')~Jt1)iG)00 ldl,:,) Iii,,, i·" 1 :i Ie ! iii I ir;' G nJcill)6)m8cm'" Q3'1'9m. ~3<1:JmTofl:j~Vf1''' ,", 6)~:) roJt»o O. 2825 6),U} .0::_; O'j(tft) 6) ,i' J.~{ (lr," .~l, :~f" '.

199!»6>ill 328,- :)(~m!mJ~(J~:)pfnJrJi'" ..Ql.2iQ6' '."':{":r';~1'" , Gl 33.100 6)Q{)d),usc:rk08()),~', :(OJ~d),a(r(J::

0;103()"l)181)(lJ ! I~i I/f'): l(f)" '.1;1,' '~lfll.\r:: ].1 (j)(T1) o?!u ,,{OCtO" ,Il.:' (of n :!,'11 ),f)): "n. -; ..

1.

2, n{)3~Cl,r l2~ocruO 3. /rti//

I.' ..... r" r 1 - i --I I I I i \99~,6){~J jb:,O .')o(l)(\l):')(l .... ~(iji"" I 0 I 6)nJCQ6nil 1;')I.;\(i'lltll.II.', ;) •• 1, ~ OJJ.1:)(m!)J~22J d'J.rlll(;)t)iiij {mdt,; ".;.; e In (Q105)mfdbl02Dm3 m:.>un(/)!i I} 0 ;) ,':,() In ~ '" 0 .... '" N'" n.Jrof1m~()v (tHi)1\, 2D(i)~\ .. , I 'TOI:;',i!.).-) .. ! ('; '" " ,. , a 6'HlDCOrm o O . ItS30 6) nf)J\.?sdkcici·,,'),,\'. '.i('Y'

k, «l (.J;lollanw I I') ',11"11'(:, :.. ,';,', I ..', (03118m)(nfMll In?/rn~m,, I . 38.5006)«(uUf n.(1)(fr1" d1:)6YnJ((:'"'["i):",,.,:;, ':t;')~ I I' . i \!,~" 0 I 19956)QJ S818 _ :)omgl.u~W~)fo((jro)ll:)8 ~ 8,1co 6ffi3:) .§"'Q m OJ,o, G}OJ 0 ,1,1'1.: .) .'.J :; :"i! -i''" ~; :.;: .", e <0 10 N 26~ o"l.m>: C '"10 "0 a ~()lrol$ Glm{)con 5 2 (;)rn)(~'\'1";' ~£.:,~ ,~" : ~:W'/: (Q Q.ffi)" «f@<3. nJJ~jom~Qj" ~J,d1S'~(7:\. 6)'~:;:)(o:t1,<\ o .~ ~6 0 6) r..O.a,'"'s (fla.m 6) ,,:] § (m :J ,"1, ,yen 2 !.ldcr'3Crui3b) OJ 100:1 /r~:J We

I-HH-+-+------"--_._._--"._-_._._.__ ."" "--"- 19Q5t)"H1J :',6 I t ~ :)t)(TJ(~ll.;~)(J YHrIlCI;\}: ;:(, ,'; [1.' ii;;'!' i r, j ~jC06rffiO.~.:r~m OJ.D.. 6)n.;():;,:r:)~·," ',":),IH I~() ~6~ o"l.(f\)(36)(lJ (miJIiPJH;l~r},1'i d!l"'iJ.11i,ln.1;": ~ 8 : ," ..... 18 r - N CIl'@Jo1ro'S 6)

. ':· .. \"j.+.Ci.::-·-:;···-:;::-=.·.,-7,,·.'ii'.·... ""'""'~-ii ___m_0-i~_Olll_'"-,8,-:.s.,CJ'3_--c7 _____. ___ " _____ "_ .<, «~;;;'1!l'...,·"ti.i';:. I rrSl wam rid --"" .. ,., i" ·'lJ~·:· . :,to." i

. nJ~;()V .,1,"

ru!'W ru a<8 (uXl.1runl'6)!l'W" 6)6)(rJQJ g" Q.Hd1gcI.13'.OJ,a, m.wQ.J(J.J,('~' mlqJ/.:l:(n~:!.1" ". -_._---_.,- .

1.

2.

3.

I"

'), ~I ,\ :'.; i ' (~j

2, illI08.J&l3lS' 6lrrJS3'J3S'l IllW)Q.§.")QS" UillB,«) (»~)(;n\I2)I>)I),')"1 rJ i.e ,.,', ,',r I, I,'

"-'lim)", (Bl,(lillOils'3Cl:)(3 ~

\\, ~.? ' 1. //~!, «/" "X' 2, '\

\ /1 J ,- ((.\ 3. •

, .

·"'1 . ~ g:Q(02nJCDHD!06T15 :)O co)JcgJ(W!. COJJYfc13cO cm:J QJ3££)u 51 ('Jl (zq~J, g;qU 51 osl3oocormU (cJl.63.COJJgg,~m) (PIN.680 001) ffiJD:JcJlCOJSl:)co51colm;Fm

1.

2.

3...... : - "", . UV (

f\ . nJ /[email protected] &5 000 I,

VP) y(:;) '-ooR. 8 U( L D £ RS PVT tv (rn IT ED NO : I 3 RcdhQ.v~.:la A Ve.()()e, Poes OtQ.i del') ch~n()al bOO 08-1:, ~ tb'OJcl) ~(gC)JOO)'l..$.C~) Cp ~ ~~()~ f:j- ~C>I , 'B-{I8-Qcl ~

R.e..(tenc(9. -::r B 8-fh mo.! f) N eo.;( J C, fh CyoSS /(')~ IIe.,sh"-..lC{)'Cllr) fur) 8-Qlc~e. " " CJ)"JCJ""J o R· to f)J}

V) e "'D ~ cs";;)·~ nJ). V7J J ~ . riQ·/

!;-.\i !.3 //6}-::) I t Tr ue C~n

.... _...... -- - ·.,3'.15 ....

-;:u ..... ·'.I~

/ bJ:!,1. .&. ,c:;. .. .. ,; . - ,. .., .' t 1< \. u,CIV ......

r .1 - .... .

" <, ."

(~2J3m Jcruu nD '2xrulo(f)u 6)(' )()J;::!J n~:t6) CJ CTr cwJ6fI)lglm2 (gClJ61Tsl

SI ffilO ::J o j en cmml6) ~ 28 .3.? 0 0 6 6) e.I (;5 6TlJ :J en (1)/' <:ti c;[l 6Z3l.f·

()cruQJ~n2jS~6)QJ 1- Jomc.m.r cm"ica30Jmc.nJ ::)(oo cma wl :J (0 0

m.5lmSl.3:J ' §2<8&lJ~6)(tWm Q::J<8CTJ6Jd!oCD nJ8c8§umx8 cmc5@~c8 cm::Je.I~ffiu

. \.~ i. CJ:JlID)~loCf)u nJ:Jm~r6TDc3 (g~ J cruu~( '

2 . C5§JJ~ ))- c::: '.,. 3. C5 ~ J ern U ~:'-"

4 . .... I . ' /' ; 1 '~, ' • I." .J

V8YALt>b R. B UILD£ R.s PVT f.-...IIY)/ TEl) NO: (3 Re.~h a V~y~ ~Ve.l')I)e.. poes C,Q)'de.h ehe.hf) Q I GbO 0 ~-6 "-ffic«) furrJ cn{ &;j ~c:Jc-c:Jl ~da.....=J:)q, (7)~ cvJ~ tpr6 Pl- Q..Of, T:3Ci,o(1UU. ~

R.e.. &eh CO- ,-=r 5, S--H, hJQJ f), f\/ e.Q'/ 19 fh eY6 s~. hJCl \1 es hw Ciya hJ

8 Qn ZJ Q ID"J'e. Cl 0) -::> C) t'(\JQ R · fZr r.J} V)@,<>-

.>

lru e C O ~,

.' .-' ' . . . .' .--; ./ / /--': . ' - . , " , ,

!I] DO ')] :\ flk J

cmo«5l~~J C8oJru5lca5 CIDJ2CTDo CBl02J3c6)) QJcB@mf 28m 8.gdQJ50 , . u 61 cma03nJcmml63cmu rucmrnt 1. (gg;ld 9 cm , cmj@~0 cm:J[;u~cffiu

9_nCQI!Jlclo o n(g~~J 51 (g(]0o(Urm"· ( 0 n .6L

2.

3.

4. OVo / 6 )6 n;1e.-J ~ - ;).5000/ - - V A yA 1--00 R- BUf L])E R 5 pv T ~I MJ T E: 1) N O: (J, ~~ ha.V~""iC;" Avenn e Pc> e.s Cord en e-hennD.f bC>D OF; b "-fJ)tyY) ~.Lf

&s!. C; ~ a-r(Il ~ CSn--=D Cp(J) l!U'1~ OS":l'".'JS! ,y'\J "D R.. . roC"{;)

I{) e ov-(") ~' cs:::e-r) r»'I . VU") ~'I .

.. oJ . ..

...... ~ ' • • • , ~ _ "I'\I " • l'~r

~.

Co py

i" ? " •

'. _ -".

")..t... .. _/c.. _.:;: • (('

~.- . .r-. .~ "" -)r.-....i, I . ''':''_, ':S;- -:.. \ ~ .~ \ U ~ . ~j . :;-_.v-,.. • _ ":' ;: .Y ,

.~,"," ... - ."-

' \ 1 f) , ') 0 n ' I'DO, ,J , ) 0 oC.

'.

u 8>~QJSo 29 @0')nJ(Drml63CT1J cm QJ(Q)CC/ 2 . cgm~ 6rm. cmVI7l 'il"b o OU ' l r0~

em ~ QJ ~ ,fbt .!21l @ ~ ((l 0 oil cg ~ g;!l sl cg (3 ua CITrD)'"' ( nfl.6:l . nJl q,g ~ (a 0 ) p (PThU;XO 02(;) cmaralr.5cnn (go:Je'dJla1l) cm ::J ':lCTUo CBl0PI3,f);) o .l <:3cn"kn r ~ n() u5

1.

2 .

":) J .

4 . <1\/0 ) () ) )

nJ} e-1 &0 r - :J C;; D 00/ - VAyAf...OoR.. BlJtLJ)£R. S PVTUtn fTG D N O :13 Re~h G ve.c .. C{ R venn e.- poe..s ~C\Y d e...h c..h e,iV)Q i 60 0 Ds-6 ~"i) fbrnJ())) 8B ~QSo-rn'\ :::2C~) 4>(T)G'~ ~C\C? ~ A- ~C) I, Bot cyc f( - (Q-ClJ1 ~e~~'- ' c:6~y).,I). CJo')~l .

-=t G;=! Lt '1> en crl :;-G-=f b k (j) Iv) C 1Jtt) .f/oti ~~ tci~ .. .. , .'- .

. ,

\ a5

J :38crD 8-8:JC'LlSo 6J crrra03nJ(tJfO)l63emu OJC:Oj~:nr cgS'ln::JS1 1- Jomrm.J3

8 J «:)(13 3. t2gQ :)01)'-', ~3 83 ffi"J 3 \(j 0 em 9 flJ~cffiu ~3 016Bl3 ~ CD

u 6)aJ)tfb)2Q201 oil<2g:J§:t 6)89031 <2(3(J(Jcarm (o)9Qcruo (nfl.@.

6)89C031) (PIN .680 3(8) nJ3(0)3t:9))9S cr3 6HilnJ(gQJJemu Q8cr3

6T11l ern1 m ffi) U 6 2 cmo 0 ') nJ rorml CO 6l'"B v OJ em ffi) U 4 . (g g)d !) em v au 0 (Tl) ~~ m5lOJ0 8,2;51 VAYALOOR BUILDERS PVT LIMITI::·;O. NO 13,

R egh aveern Avenl1e , Poc:; (rn ro C'n Chcnnfli 60() ox6 (.(j)0D , ~ i -

galore- 560 055. n.(j)cm oJlQJ:J(TlJCO:OnC>Jj CO)9~Cruo R \(j('.Jl

u Cf)r26mc&t J59eaj cfHrucr51 <2gQ:)illl 33 Q3cL:1COTmlQJcm ClJCOJmt rru ]. oJl.CJa!)aml, B-1 , Gra sll1cre Apls, Osborne Road, Ba ngalore -5('()

042 n..(j)emoIlQJ!)ern(())mlaf8 ~m!) Q erno V N. (J(Jl ~lJto !) Qcr3 .8 J COJ

(OJ ml <8 §d !) QJl 4 4 m !) flJu nJ mTID1 ill !) Q,( OJ em ffi.) U 2. C/O !) am CTI)

001 OJ COJ iAcrn n.{J) crr5l OJ

em J 6) 8 nJ 318 eml coB ollOJ ail £6):3 em 1 - J 0 m C.(OJ U OJ n...0 8 cr8

1.

2 .

3 .

u e-. .-! 4. ~~!) au C. __\\­ - \ Th rissu r tJ i:-. l t l" . I~

C: d :. -:l . J '

.. ~ . ~ .., ':,~:. .

\ ~S --'

- .' ~r , . \ "

6

CBJOCW(gmD:Jcm cru6l}t o §Jlcru"c.((J)u 1- :Jo 6T2J3 8i)u 528 - :JoOJ:J~jo

65Q3cmam 69ru6)(() ruCJ06ffi3g;f)@ 1995@ 3012-0, 2 <)om("Cru"

QJn08cr3 sl 6TlJ3££f 530- :J o O1:JQJJo 169Q3cma:m 1720.16)((3 O.JC/i'l

66T3§l<03 1995<03 3283-0, 3 <)offiCm.r rucU)8cm 51 6ill3.ar 530-:Jo

018QJJo 173~3(O)r03 177016)((3 O1C1066T3gl<03 1995<03 3284-0 ,

~ 4-8omcmf OJn.D

2814- 0, 6-:Jomc.mJ OJo.D

75QJ6)(O QJCI06ffi3~(o-o J995@ 3013-0, 7-'Jomcmf run.ncau3 51

6TlJ3,a;f 538-:Joru:JQJJo 67!A2cma:m 71(16)((3 QJCI06BT3@la:m 1995c08

4095" 0, 8-:JuffiCmr run.D8cr3 51 6Tl13Bf 528 - 80QJ:J~ 0 53Q3cmm3

56OJ6)(O O1C106ffi3glr03. 1995<.U8 3009 - 0, 9-:Jomcm.1" OJn.D.e.ci<3 51 C 6TlJ3cffi" 52B-8oru8QJJo 57!A2cmmB 59ru6)(O ruClO6ffi3§1mB 1995mB

3010-0, lO-8'ornC(TlJ° OJnO

True C ~~ .. 1.

2.

3.

4. \ \ , ~ .

'1 I I I

,\'

.,.,' :.

" . ~,.! ' ,. ." . : .... '.;. ...' : : " -.' . .

u. ,

'", . • .t _, , "

7

O1nD8C!3 51 6T1J38J" 5 3 8 -:::)001~ QL\ 0 77Q3cmr08 80016)(0 01~CD3

1995«m 4097-0, 12-oomc.mf OJnDcacr8 sl 6DJ3cOOu 538 - 0oOJOQJSo

81 Q3cm<08 85OJ6)(O O1Cf06m3@l<08 1995<08 4098-0, 13- ~ 0(T)cm_t' I,

OJnDtt:hcr8 81 6ill3<£!))" 548- 0 00.JOQJjo 792 (0) am 10OJ 6) (O OJC!O&m ~ <08 1995<08 5288 -0, 14 -~o m c.mt' O1nDcacrB 81 6TlJ38Jv 545<)0 QJ o !2.lio 109g3cmm3 11 2QJ6)0 QJ C/06BT3~cOO ]995cOO 4955 - 0, 15 - 00

mC.m r OJnDcfM-m Sl 6TlJ3cfl))u 530 - ~ oOJ :JQJJo 165Q3CffiCUO 168OJ6)(""o

QJ c/o 6Bl3§lm3 1995am 3282-0, 16- ')omcmf ClJnD8(;'3 51 6TlJ 3.,g;)~

5 38 - ~001~ QJj o 73 Q3Cffir08 76OJ6JCO (I.J Cta 6BT3glcn3 1995r08 4096-0,

17-0omCffij'-' OlnDcaC!8 sl 6DJ3£b"")'-' 553 - 00 OJOQJjo 39 5Q3cm«58

398Cll6)CO OlClO6crB sl

) 3cOO" 623-0oQJOQJJo 22393cmam 226OJ6)(() OJCf06m3~am 1996r08

_ 6397-0, 19-oom(fl2f QJaDcacrB 81 6TlJ3£6)

6IlJ3cffi" 548-:Jo OJ:J8{So 3g3Cffiam 6QJ6l0 QJCfD6BT3[f1am 1995cn3

5287-0, 21-:JomCmr QJn.f)u3 51 6TlJ2,f);)u 528-,)oOJ ~ ~ 0 61Q3cmm3

64OJ6)CO OJCta6&3glCD3 1995cn3 3011 - 0, 22-oomc.(T)J OJnD~2 T! :13 roo I!};.,' '::0 "( ~ "-_. 1_ Q9roJWocd' nJoc3a"6m<3 (g~')CTU'-' / <:/ ... '/~-:-:\ ____ ~:.~\ :~\ ~ . :. ; .,,",. Q. "J E~. " ._:. , JO;;nr>. ~ . .- \ ",,-,;. r ;.o' ~_i~.~.".· ' ...., I 2. 'c:'\f";IdvOIIO ...... (.,~ )1 ,- '. - . i • ~ . " .. .. -- -& . _.' 3 <8~!)au'"' //-: ,~;,,~;-~.~~

' .. ~ . :~:~ .

.: . , .. , . ,' . -

, " ~ 9, -, \ iXS ·.,-.

6l1J3c9))° 1028- . ~o01~0So 381Q3

5098-0, mLmJ8(D8<0613!3W ~JQJo <8~&:lSl mlO8oJm

(g oJ 0lroB 6JO) $f3~roB 1- 80m [cru2 tfh8 (c) 03

6)QJ.gd cmam315nfl.gd3 QJ<03 emem3o 51 ffilO8oJm

cmaQJd1J8CfO:.J6~aJ)6o C5 :.J~sl ffilO 8 nJmcufl])16loR nJ(()lnJ~m6JQ

- '. .s, (Q) on (J':;, (Q) ffiJJ 8 em L(TO)j (trron (0'0 g;Q (01 r££);5 (Tn em;5:.J 8 rB>;3 an;3 .

23- ~ 0 m [rot OJ nD ra u3 cma C!2) is ClTI) ~ u3 ffiJ 6l)t 0 W ffiJ"'Lcm<' 1-806DJ3 ffiu 597-8oOJ8 Q{So 471Cl3((J) CU6 474OJ6)

1996<.U3 3394-80(DC,CDJ8W8 <00 2,300 6m)6ffi3§l<.U3 2-80m[01J3

88

v o cma0l88CfOQ3~em2o slW86}oR

oJ col oJ ~ c3 6JR Lea (Q) of] Lea (Q) ffiJJ 8 em LmDj COlIDl coB ~col cf1»:3 em OJ) :3

Q8d1J2cm2. 24-!JoCDLml" OlnDd1Jcm 51 6T2l28,,)" 608- !JoQJ8eJjo ]71

~.3emcoB 1740l6)(() OlCf06ffi3~cW 1996cW 4647-0, 25-8om~mf OJill caw SI 6ill3cf'br 620 - ~o QJ!JQJJo 329Cl2cmCD3 332 (lJ6)(O QJ~m3

1996C® 6057-0, 26-!Jom[cnJ OJnDd3>cm sl 6ill3~r 565-80ClJ8Q..[50 r 1. I 2.

3.

4 . ..

T',:- f g/-! . ~S }

" ~ T:,:: .' . /~\: . , ~

. ,

\ o.S

.. ,," · ...

9

243'J3WcoB 247 OJ 6) (O OJCf06Bl3§l@ 19 95@ 7439-0n.(j)em"J m

CC11J:Jw:J06ffi3u3 2~QJo 6TO)6Bl3~c03 J<)OmCCflJ3ca:J0cm emlo"

0l06ffifl 6)6)8,OlCJao 6)0l~ mram6l5clf1~3 O1Cc)3emW3o SlcwOm3

Q:JC

ffi)JD (0) c,(YO)jcmm1<08 @3em3 . 27- 00 ffi c,mt

~cr3 sl 611.J2cfb)" i039-:Jo QJ:J~So 181Q2(O)@ 184QJ@(Q QJao

~ m§1mB 2004mB 6396-0, 28- 00ffiLmJ" QlnDt9>OO sl 6ill38;)'"'

1039-0oOJ00jo 20]Q3cmcoB 204OJ6)(O OJCJa6ffi3@lc08 2004c08 6401 - 0 ,

sl 6Tl13cB5)u 1039-00 OJ:Je.jjo ]97'J3COJ@ 200OJ6)(O OJ CJa6Bl3gl@

2004@ 6400 - o. 29- :J offiGT1.J" OJnJ},aem 51 6nJ3 cB5)u 10 3 9- OoOJ :J QUo

20S'J3emCDB 209016)0 OlUo6GT3§l CUO 2004CUO 6402- 0 o.(j)em'i m

Cffil:Jill 00 6m3 em Q J QJ ° 6Tm 6m3@JcOO 4 - 0 ° m C,mJ 3cfh 0 co cr3 em; 0,3 cfhOO

OJ 0 6ffi3l 6)6) cfhOJ CIao 6) OJ -?J cma m3(5011-3:13 OJ 03 em (0) 3 0 sl (Q) :J m3

( OClaQ3@@(Q)cill(~(Q) , . ~0Jo{u)f.~com5lc08 ~<3la;)3cm

Irue COP'!

1.

2.

3.

4. •

p . .d ,

1

] -111 ( .,.. ".. ,,_. .1

, ,/ .. , ..

- ,

" ".: . . . ~

, i ~ . .

'. to

nJcffiam mkm30 KDIS 6056/95,Dl, 6690f95tDl, 6677/95fDl, 6678/95tDl , 668 1/95/Dl. 6679/95tDL 6028i95IDL 3336/96/DL 6033/951DJ. 5109i95i Dl, 3339i96tDl, 60 34i95/Dl , 6683/95iDl ,33 38/96tDl , 98/96/Dl, 3341/96/

Dl , 10 31Y6/[)1 , 3342/

... oJ 0 (DJ Q cOOl cml § 3 ~ em Q

~.nJc8cOO3on OJ n.D<€h~ 0 CffiO OJ ffi)o6l1lm.rSJ~ n{j) ~p CffiO OJ

6Gl3~ 3o

cf1i)u 5,18 ,30,2 808(Q)3 o , 2 - JomL(DJ 3 8~0mo Cffi00J8 ~cro 6)2l §

U C1J ,,-f)8cr3 ffi 66,39,360cEMW6o .3- ~omCCl1.J 68~(am" CBl(jC1J8~cro

6)2l§ QJn.D

a9,~C/(6)()~a o -' n..Oa9,cm.,s;)J 1,81.71, j ROa9, (('u ;jo, a9,~sl ~r5CQ)m)QAWl

C,oJ8J t'Oo 8,49,71 ,8208 oJl QJ CT5l ®.llcWl-3:l3 I2 Qcl'::i sl 8ffi1CTilm3

u (8QJ6ml cr5l6ffi3ct3m §2 emlm~«Y6

n@§" ~d3J ~S1 mo ill'"n,I corm163CTllCID" Q] Ifu2:I amn1 n@~a oJ am:ill63 COD m51 CO ,

4. "

'I "

,-

I:;:)

\ '

,- ~ .

.'\ ~. ':"r' _.-\ ~ . , .--, ~'.!' I "', .~ I {', " , - - -', ~.~.- . , i i .. ·---~ '"---::--. . \. -.:. .... ~ ) ' .....:--.. ' ....- "'''1 ' . -- QDC~8l 'v ,! ),< ~ 0" ~ " 1i:' A~ti 0\ -f : ~O GZ I ,ZLl : C ~ 06a1l I F n(u)Geta~ 1 ~G ~nSSi~Hl ;?UJ'If t / 1\ f'- _ \ -¥ S)f S3. '1!l aweN ... Geta81 -l - lA &ll9 \.: --( J..I~. t"\~ ~ ~anGW'" 1!'ClJ9$g>Gf" .cooggcooro 'r I j oJ an J 1

GCD 8> L(QJQ)CD ru GonD LS f\? tJ 8> coo 8> go ill29 (QJ9 0 e CD UQ) ClJ) e'€' gm CD

nOL,CID O~CDLCIDClJ)efcIl[v<9 OOC(i'€'<9<9 gD

eJ) G'€' ru G ODD (I S ~ LS f'€' eS GCiliQ) 8> feaD) CO) Gfew ern<€"') 1JU ern'€'')

oem) C (i 0 ~ CD UQ1Q) CD ru C mill LS f\}' Ei ID 0 eW\Sf.} fl99(Q.J9 \Sf.} qj'UV IT)

~W9GCO)(U),erucOO'1JU~e WCiliQ) es e>C9ernG800 0 eShPC9eJ)CS ~ , o t'ft' ru C9 oQj) ru LCD gm L"EB Q) C9 C 0" e; 2Q) Un.l.Q) ro fU9 Qf.) C

rD Q.lill S (,9 e~ill29Cill9 C (U) 8> ~ gmtt§ffi29Cill9 0 CIDLCJU (ill go ffil9 (ill (if\>

oO'e'OO'L61 e'€' ra C9L(Q)e1ID 0 e § Effi9)e> ["ora G CO) 0 eem CO) onD e; s@

o e§ 8.99 Qj) C 'B' IV C 0 C 'B' lSD e.w muuda (!)o ra <9LCID e.w 0 ~ ClJ) CID nO 1.,CID ~

o eJ) G'€' ru Gef.) ru 'B' <9 <9 0 eUD CID 00 G(I 'B' <9 <9 goEill9(QJ9 <~ gf.J 8fl9l.}D LW9roIDEwLCDfWqj' CillCI)u .. QglIIt'nl 'lAd S~gQ1In8

c[OO'lVAVA .. 0C9

Um Qffi) . ecw e(9al L0 LCIDoem Iv C9 0 Eemqj' L0 CID 0 QJ) IT) qj' <9 <9 mill g,lcm em I t ,, 8> go rD O)CWCfU98> LSL'B' oOO'gr.>till9Cill9 oe(U)~ gmumt}DIUYB'

n

/ -~. -:-.,. ..- . -

/

· ._ ,1 L .,-_. .-.,.0 ': ~ ;;0.

. , \ ., cma ~p 6) aD Q g :) c3 cfb) 2 0 (rna w1<8) :) (0 6) Q :) ffi10 OJ 8 :) ({d 6) Q :) @ ~p \ ~ a.rrmaD2~:)82cm2 . OJ<>..O

cmom315OJClJ3o 6Tm6Z3T3CJ3ffi3o alQO':lSl ffilQ:)nJmcmmlm3 Q:)(

OJnD8gflc08 CQ):)6)ctJ):)<03oJlW 8S6Tll ~r<..DSaD86)§~, §clnl'(051<8CQ)~ ,

cmomJ:)CD"Im6)&:Is2mm><8Q1:) <"L.I!)§<8Q!), ..Q}!)c8<8~!), Ol5OJ nD!) CO

<8 Q!) , (J'51'.a3

0 . cfi>;3 sl ggl cfi> cfi> IE @ :) , <8 cfi> (0 @ 15 ~ <"L.I (01 c2t£6)(0 6JT.) m1

g3~ mSnJ518(g~o . eJo~ocrno8_nmfla2:103 ~CWgC.aJcaoco

Q3~ ms <"L.I s18<8@ :). oOJmJ201 cfb)OJo1 crilcm Q L<"L.I8:)(o Q2gw

mSnJ sl ca<8@:) @ cm<8cnJ:)c,'3oicmcml m1CDJ Cl Lcd cS,:)(Cl Cl6~ m s

nJS18al©:) Q6)Q6)(1(J)s,103o m10cm~.£b)3~ 82S1.5)S6IID<8©:)

6T1JOr<..DS(o) 8 <8§~ ~6)~(lT)u ml6m36)§ 6Tm6m3W @cmmQQ:)CQ)l

<86TlJO fll)J 6) &:I s2 cmml CDJl cal cffi2 CTD2. OJnD8§1m8 ~<8CTDQJ<8ca

cffi3~ CT5l83crol 83s1~18

~6) Q ag 3 ca em. ml eJ m1 Q10 ££) 3 em 36) 6l151Eh1 <08 caJ0

6JtD 6Bl3 <8@:) <8 g &:I 51 cruo :) nJ m <8 g b m eJ° ca:) 6) g em.3 0 @<8em

Tru e Cop', \ I i 1.

2.

3.

4 . ,

T -.I . ,.· ~ :', /~ ;.,J '

T l·;J, , .,"dlr .:. . . ; I ~ ,. ~~--. ~ ' . "~.J----- I ~,/. -

...

'. ' ,", . , ,;,.' _v,. " ,. "

" " ~ ' r ...~ ., .

,.-, . ," '." i ' i. f . !, ,:' , f .~ ~ ") • 1 ) (U)CW~ 'v <'" f) <> ,' ,~~. j~rC,~~'; ;. , p..Q 7 A ' /"",A c t' " ',I, ' , (u)CU9~ . Iq' i . " ... \ I <> " ~ '- ~_~ i '\ ~ \ , ' .£ i " '- , ~ .~' ."" . ". \ \ , , '~'.~,:,,, ~! "" ,~ ,; ~nllaCWg) ~.J \ .. • ~ .. i'-: hUi-!I' ." '"T . ~ , 'i' '. ' • -r ' " i ·z

~. c\ / \/ ClDC~~ 2-lCil9<>~Cru <>CJ)o~c.ooC(j 'r '~ . ~6 <> i. j aJ a fll 1

'~UJ)~'B'C E)~ CillUJ)~CS?L0LSR-'C9 ({))lC!1JC fU9 0 ~fDCD ruccmJ.) LSR-'E)g)

o!;0ili29CQl9 oCDL({))(IT)OO gillC(IT)C({))UJ)EQ)fU CE)g)SJOUCD CaDg)L

CaD 8J '-

C \J 8l ra ~ t:) gotill9CQl9 '"'G3' LCD rID '9' LS IV' E) 8l gill @'9' C5'" ro 0 eru co)t:) cw ,-.c

o(Q) E!)-u' ~ t$um C W9 ~ 'c (IT) ~'9' e G3' ro<9 0 eJ) ru '9' <9 <9 G (IT)~'9' es R-' <9

gDC

t"3 cmt}D W9 QJ

o C [U9 0 ~ S E<& S C9 ~ E9 ilil9 Cill9 C 8> 8J ilil9 (W.9 '0QJ9 C (ill 00 ~ e; Ql) C (fND

o C'8' Lm Qill) n C93' L~ R.l)cG' l,'; R-n:; g) 0 E' CD Uill WJ f uC C n C93' nCffi ra 8J

L0 ru g) S (9 e(IT) LCD rill 'B' L,S f':'-' D g) 0 eUJ) LCD 2Q) L0 'B' L0 C 'B' LCD Qill)

5 R-' (9 crum.19 0 2~ 'G' rul Q) 8J C fa (1)1..> 00 2CD LCQ.l.Q) eJ) C 'q> fU C otW t:) S (§ -

S

o ern 5 f" LO C r:; r:; et9 0200' 2D 'B' U" ro 'B' rD 0 C W9 f" 0 2 00' 2D 'B' U" ro

orue§ oewU.Q)(.JJ)e€Wcro oruffi oEWgD'&uuro oscrweOfD<9

o ~ce>gr.>'8' uoro OW9C'9' ·eWJe

LS hY e; g) 0 (ill) ce;o e8 e; 0 eC59'gIYB' L(Q) e'& lSD 00 eC59' gO)(Q) ~e; 0 (ill ID[}J

~ 1

, ' .. ' ••

T' . r· • • 4 #-, ' _, ' '".t9 .. ~1:==\. /3 ~ -_ / .. -

. ;. . .-:~ t, • . . , •

6 .\ ;·SM.?:1 2<) \3 ,"

l4

(T)lce,2CID1 ~2CIDQJ~CQ)CIDu 6DJ~cffilcwl ~. ~~COB memD(l)~06GT3cr8

~ ~ &I sl ce, cru m1 ffi" em cm1 § 3 6TT5". ce, ~ 6TT) 0 Q] oD.a, ci8 ffi" 28,68,000,£7>(12)30 6)OJ03 CTlJ :)§0 OJnDca.c!58,t l,48,02,480cBl CQ)3o .

2ldmo OJoDce, W m " 6 ,09,41,3408

££)u 63 ,60,000<£7, CQ) 30 oJlfl.] mlCJillJmfl '3.fi rcnaJ3 em3 , §2 (cd a3:.:lea ()

• ml (jill..! CQ)1-8:J <3 0 em CD co)l-8:J3 0 em ~ 6) ~ n.4) ~ 3((J) 3em ffi) ~ 8&:ll 8, cfo

8CJ6)6m §2((J)l coB 6m'lWBm 63~§3(t)')em1 (Q1

nJ 21 m;3 on OJ (Q 0: - (t)')\ 0 3 OJ1 fl.] n(J)~r <8 <£7, ~ Sl en ~ QJ"n _w:rrml 63 ffiJ emv 03nJcmm1 630~m510cmml n(J)m>~g1@06nJCIDu CO~nJ

~2cNs1 ru@eJ3~:)(ru() 6>(U)Q]eJd6>2aR" w~6J"6lQ() nmcm ffilO~

u CLl mcow5l m3 cg Q] 6T1il CQ) 60 6TID6m3 §l coB 2,3 Am ecru 6ca. ~ 0ffi cg Q] 6T"T5l

WaD ICICI 6J}J:;)/B.,l6>CW ((J)j@~c3 e6J}J~6Tb..:lD6>Qj 2't-3-20066)Qj

840016- CJomCffiJCJcofl (t)')(ffi 6) D..I"g;-t (;-Jce, CJ @'::!3~ ffi)o6l{Scoflm3 • cr5lem3o CLlglcm 3,00,00,000 ea~n.i cm 3o 18.8.20066)0 91275 1- CJ o

m Grn.J CJ m51 (t)')em 6)&lS,"'r CnJ 8 :) (o Q3 ~ ClU o6lJJcilll(zm cr5lem3o CLl g 1CQ)

1 r c e C[, , 'I

1.

2.

3.

4. . ,~ ­ ..-

./ ./

j , ' • ", j r .. • .• •~ .-. \:;" . .' .{ , ' . \ ', ..... ~ ~. - ", ,! . • '\ ... . .

, " '·~".S4\3 lOr - ,

:......

.- ... . " . ': ' ',. ' .

15

4,00, OO,OOOd:MID2o 6TlJ~cfb)1 ffi)o6lJS 1,49,71,8208 sl 6T2J~1B>16)~

sl C61l.l:)6TQlil6)2J 22.09.20066)eJ 912780- Jomccnt 6).!2.l£l.))u

LnJc£h:JCOOJ3o cm"l03of1eJ ~3!::S'3OJm3o (g~coB CnJca :JCOo oflcm1

6)~s6ffi6cmemlm:Jco5l 6TO)6ffi3CJ3ffiu cal§l (g6TlJ:J(illJo QJm5l36 ~

em J 3 cm3 . <8Q~SI "VA Y/\.LOOR

l3UILDERS PVT UMITED "n(j)CTD ,acrumlco)36l s j'i\N C alJ t'Jll.

(8Q &lSI cruo ::>aJmm6)(]no PAN Card No. f· I , i '

T~ ~ [""if , ,0 :> i\ "/ ~

I\I ~ ___ --- __ " -- \

6 ,~ L,," , ' .~ ~ SA-,I)" ' " , ·';r._". "lS" ,(..-, I? • 16

'Ul 0 S 'Elv r.Jl.-ru-",:·,,1.t'li' '8 ~ '~ 8 '~ "ft} 'liE 0 e e C"l . ftj 21 <€ ~ €l ~ (l 6 g Sl "

'23(iJ)2QJO

I 18!l 61m§;lo ~\1P (7JT3QJ,e,:JCIWm@;lo O[([\)(O ~ C) iil

lll(56)8] nS3-!)Omc.ffil!)(O!)0roro5laJ3 oJlQJ(Ql.gJ 2J;lro~) QJ 8!)Cf(J !j2~ en. ffilOOC]J C6lo 6l1JTO).a Ql m:! £!I'Q_H Olo5J 6lm51~ 6lm51<08 27 @Ij)CTD 8:J6TT.l3 I I I I 0 r-< j99561Qj 32S4-:Jom(;.ru!)(l):J"sOl~ IS) &:l§(u)::J<6>3ffi)3· 2,j0&nx3C;X)j 1149/ I I i Q I I I ! /5:)(1)0 . 1150!2ls:J(f)o I 0 em i I () ~ o 19956)8] 4113-:!omc.mJ:Jw:)(ororo51

L

2. T'.," . " .~ '. CL· ~ l ~. li~\;; ~)~ ~ 2"; f£11;-::;J '

~'

1.' h.ti ::;.~. t!!' ~ .):. t . • ; . , ' i\.. -'" . ~ Cll~~<" ....~: -..:J

-, .' ,: ... ,'·r " ': " ~;.:~ : - ;;~ . '. ~ .:.. .. ::': .J . , , • ".. • J , , , " ':.'

('a.

S4\3,

Jb .; ' · . .~ <,', . ;; 1'1 19956leJ 28 14 -:lownll §lru .e, 6lQJ O J cru:> 8 :> ru () "" M '5 6)n!Xa's6JroB I G 1 1 6)~CJ.e,JCTTJ2 I , , ,I '2 J nlI rru cil61 c:tl 1123/15:)(1)0 (2 3nl1tmi)W::>c"o ilJlcilroB I I I I I I I I I 27.7 :Jol))m)nf n.(j)cm" ofb:>omJcmofbJ cma.) I I I ,I i, I I I I , I I I I , I I I I I I I 199 56l\!.l 31) 13 - ~1 omCCTlJ~IW:J QJ I '

23 riO mJ cill)) C}j 1127 /~::> rtl 0 (!la riO em!) (J):)Cil =1 roB 426> CTU nRu.-..m cm'-' .o~ocm3 (ll)(TJ)~.o..a cma ·) • I 19 956H!J 4095 - Cl om(.mJClw:lcoaJlullroB afIruco14J o SiD.§) :J GTTxmu> '2 :JwnJl(lJ)CTlJ Jel) :J §lru .a Gl ru 0 aCTlJ :J §:J () "" N ru.a :J CI02 J~ ol.mJal6lQJ a:ml6l'Orol"g' m :J eJ-oJ e o <"'0 .., (mcil!3;!m1lroB (milo" ,,:Jrtlo 26 @Ccl3QJcum5lC8T$0" 61 mJoR1mo oJ(l]TtJ)u em!)m. =CTlJ(l]TtJ)1«l6ffi" .oJ . I I I ! 2"locS. 6) 2 ~crmJ)(i 0.46 BO 6>fI...f).o.;·'sO-I c08b",)(r::J£.cm~ I ~ 0 ~ ~ ! I i I Ij I I 1 I I I I .e,J cmJ. i I , I I on 01. en) cil Gl C}j 1 aID 6l111Il roB , o 6lCTTJ- p':Jrtlo lOoJ(lJll))' 6)mJnl\1m- m:J ~r CO"@aI I " o nJ32l;lS0aJro6/l!lJ" -".J . 2/ QaI 6)2 :J IDlUJo 0 ·2<030 1 I 61nDofb"S 61m3I))Qj§ ofb3(1l)J. 23riOm.)ml5> C}j 11 24 / 13:>(1) 0 366)mJoR" n4>(1l)" .a.:JcmacmaJl:J.a.acmJ. I " • •

..'

·.:",9.. '. .. , 1. ..._ . >: .. ':"-"" . ~ 5

,. . . . \

-lj I'll '" j-r-QT' 199561E.! 3009-:)om(CP.J:)(l):)((HDro5l aJB nflQJCOI.;d i I , gJrlm::>QJ.fh::>(1(\!22G§ c;i.ffi.,iilt;)C}J cr,-r.,6TUflJ>Jgl l .1 ei ~ '" I. <0 10 m~Q(n.JmrolI <'\fhl1 la;: ! 1,., 1 !. I - "'I n.J""lm~0' cmy3. 6l""~.:.m il 0 · .'_J.~lgc'O. 6l!:l~ J g 1 I m ~ E.Jv n.J =1 cmo

It) 6lcrunglmV 63iil. n.l(l))lm6Tllli' .nJ . !l'lg<8. '

20046lE.! ~100- ::Jom(m.JO(l)O<0 cumllm8 nflOJCCll~ I 1 g)(Q::J OJ.B,::JCIa!:l3G§ olmlQ!6) <}j aJ10 0''f0l'lll;) gl ' I I m::>efnJ(l))lroE 63Cm' !o::>(f) o 35 22~=lcmo6Tllli ' 1 I IJ I I 0')(1'\.),,31(1'1 nJ(l))IIT):)b!]v @018, nJ(l))lm:)()v .0.1 Cli plB, I IsI I lei : 1~ ! '£ I 6)Q.:h~UJo 0.5870 6)nn.tt.uSOIcu86) ~ aa:n:J.£nd~2 i I ! I I ttl , I 2 amm)cil6l<}j 114 6/1!;::J(f)o : I : I I i I I , I I I j ~; -+l -,' ~i __ rl -+I ------~~ __~~-- I ! i I I , I i I I 199:'i!;)E.J 4097 - :)Qm(m.J::>(J)::>CCI=lcoll ()nnlcol~ , j , ::;: 1 . 1 ", ' g)(Q oru .'l,::J(f

1. Tru e COP'I 2.

3 .

-. -. - . ~ ~. : • ' .

.. ~ ' Jortt: ~ 1 hr J-'~_- ---

' ''' :. , "

~r,.b,". ...l. __ ;,.; - '!"'J- ~~r?i. .. "'~ I:."""'.--d..:i... .~" ._ ""-'- __ .LB ..... ,r ....

~ ...... ---

I , . t • . j -

.--. - - .._. ' . T . T' T . '- - i 19 9 ~ ~llli ·11)9 ~ . ::loffi((TlJ:.lW::l.l=lQ2, cmlr08 roreol n.fJ.a,"s,l1ClJo

If> .... C\J ~ 01. au <8 61 <}j cmo 6lUl\l) 3 gl m 0 ~t .,j =1 cmo 6l1llJl roil I/) - 6lcmlQj 1124/r>JC/Jo 16.840 6)~u ,>4) mi' .a.:J6TT>acmanJ.a.acma.

I 19956leJ 5266 -:Jom(,(TlJ:Jwoco=lrol1 nl1(lJco1~ i 1 ;l)JCU ::l OJ,£l, 0 ((3<1 3"'ID d'l ouc%6l<}j cmoGlUTO>3gl CYY.>cJ i I 01 .,jrom5l61anlco <'Iu03" c4jJ(m" .... :J6iU·'1l·f)(OJJd "'M)" ) I 1 I I 1 I I n 0 '0 o· I j I I I I, , I I I I , I , 19956)\~J 4955· Clom(,(TlJ:) wClco=lrol1 oJlOJ col~ 0 IllJ ('Q :J QJ .a. :J CIa ') a~ 01. auc86) '11 ana 6lUl\l) h 91 ... t"> m:J et..JClJIll>l!l2,OlllmB ana 6llIlll mB 23 @ I €B II) '" - Q~dnu6)O'UCJfflm" 63<1lJ

J.

2.

3.

4. . ,,

... ..

..'

i I, "

b \ as

...... , ,

. . .. .__ ._. - --- I 1 9956)~ 3282 - :)o(~TlJ:)(J):)"'C7lr1))Im8 (1J1(JJ(i)1 gj ell m :) (1J .e. :) (fcj !l J Illill o1.crum6>Qj cma 6TUTUl3 g1 . m:lfJ'oJ <'0 . 6)(1)> :l 0- .<1.I.!1i () d\ . (!) !l :l = 0 It') 0 cnnr GJl?;; .... N e ~ ~ ijl It') '" O . 15~0 61..!).e."solroB61~(o):l.a.amla · ? (!lJallcru136>Qj 1143/1B:)(f.)o 16.500 6lcruaRJo. 143 / 2(3:)(f.)o 23.500 6lcrunRJo .a.;}!>'l 4061CTUnR" nqJem" oEh:)6fI)acm3·) I 0 19956)EJ 4096 - :)omrCJ1J:)(J):lQ2:)=0 0 .4880 6>",'<5>uS01m861,c).§roJ:)<5>JrTna I I I I I I ,I I , \ !Ado3m)(36)(.JJ 112'1/IS:JUJo I I I I I I 01. CTU cO 6) CJd = 6TUTOJ ;; g 1 m :) Q.i' oJ =1 = 6T'1lfl «l8 U"l : .... 10 ... 0 63Cmlr08 lO6)CTUaRlmu m:let 3 em a ~ aC1il ffi> iii Ii) CJd 1124/(3:)(1)0 I 26. 400 6) cn.x1P," n4l rrr." .a,:) 6ma (ffi (0):) .a, a(ffi a . , I, I I

19 9'6)eJ 5017 - :lom(,cru:lw:laororo5l roB nJl ()J ",1~ , (1J (J() 0"1. (T1J cO 6) C]J I !9d ctl :) .a :) !l3 ~ = 6lllllIl~ 11 . ·.1 m:) EJ"aJ roJ1«l8 tOEm1«l8 43 m ~H!r oJ /IJlU)1 (l S. (ffi" 0 0 .... 0 or) r- ..,. 6)C'l1Jci1m" oJroJlll!m!9" a:!lem. m:)EJ"oJroJu ill. ':ll\I dl. ::: - " , ~ I "' I 6) !J:l COllJ) 0 O. 17 4 06) n.D 8;:; 61roB6) OJ.3 CUl:J fi J (ffi J ':l3 mmxS6)C]J 1147,/f!.:l(l)o 276)m,'CW30' 1149/ f!. :l(l)o I I I u 13~3 o ,s,;;Sl !l3C1il~w:JtOamJi1r08 4061CTUm I I I 0 I 04) (ffi- ,s,:J 6malmCUl ~"" a(m 2· I I 1, I I I , l I I I ._-----

L

2.

3 . •

\

1'1: [ !:. .. ~, .

'r' :'

;'~:' :.. " ""'.\" - \ '• ... , , ',

- }

- / . -:

-, 21

19966le.J 6397 . ~om(C11J~(J.)~cororollr08 nfl(1JC01~ I ~::l6TI)(lJlmvC.lJ"'" 6lC.lJ0d!0m. r.Q}~6o..1roro5ln4J§v ~ I I I E , .... ~ I : 0 ,co . ! If''I l ~ I I"" 1!l.J.1Iocil. 6l~~rom) o 0 1170 6),J).e:5r\1r0'66l~s(O)~ I I I I ! 1- I t! () ~ ~ 1 I Ie!c.: I I 1,f)·3CTn 3 I I I , ro 1 \ I ' I 1(~aCT3m)(B6)(}J1124 /b:lwo 2300 mr~ (V~uhtmJ)IetnJ =1 ~J (TI)l roB '"- C'Oc ~ C\l moe51r08 3 ~cmu 6XTUofflcrl' 6lCOa «<@IeB. ilPcoa C n..J(l}mfl630n"" QJ.~jg(a . 1) ) ~ ~)It') lr» ('I O. 1355t)ln,n,e.."s <0 olroB6l~§CVl:l,£hJeroJ. Qa<1llcruro6lQJ 1124 /fD(f)o

I 199561e.J 5287· :lom(m.J:l~ . nJ6 ' ~Hru(U)v t;:)i9~ ' I I I o)9.:)W1UJo 0 17 40 6>o.()6;·"sc5fl~Q)~§(m:J.o.2(nJ2 I I ! !J,{rnmlcil61('), 115 0/i,s :l(f)o I I . '1> i I , ,I I I ! U_:.....l I ~ . ______~

!, I 1 i ; \ ~ 1 19':1 561gJ 31)Il_~lomc.(l1.l:JUJ:J()(lJllJnam (lJl(lJ(~1.gd i I ' I I I I I ! i i l8dm:lOJ,s,:lva2J!1l!1l oi.(fUW61 QJ cmaG111J0l3Ql,1 ", ! 1 .1 Inx:!lernJ(uJo5J' ''6n~nJroruSIGlC11J(o)" ill. ~IOci\ . I I Ili ~ 1 I " I 0 I I I I I6lQ~=o 0. 1190 6)~0.a.vsOlr086l ~~cm~.a.a'ma· !J2allcruro6lQJ 1143/1. 2. 1144il. 2 (!2J<1ll a>!0WDCO I rorollr03 4 26l cru~" o.(j)mi """ 6m3 erocm a,£h aero;;. ) I I 1fua ..

" , dl) Y" ...J r...r- ) '~'\ '. .---\- ~ - \

b \ 54-\3 as . ::l \ 1200 d 6lf!J 5098 . ::Jo m(,mJ::JW::l!cHUrrD lam ni /(l](-;i 1'lJ j I ' i "r - 10' ~C12?(1J.e,::)(JoQdillJ o1. (1"~m6lQJ .1ctmlllCcl6mlr08 Clm1lr08 70.750 6lcruml : n IN,I I ! ~ ! erJ' g'CU3:UlOIVS"lp...(l),3 w!1}ta. ((fJ()U311.HUlUn ~.dll l)v :U. ! 21 ~' &. 6) 2::> (OR))o 1. 16.306:' d') o&."s nl roil 6)&:1 § (l)j::> ! I 1 1 I I I I o&.aITDa i 1 i I 2ammltE6)(}J 1126 i8::J(I)o I 1 I

~ C12? (1J of),:) Cfcl Q dm1 01. cru.:8 6l QJ ctmllo 0, 404061nDof),uS o'Jluil61&J§ OJ):)of),3O'TJ3 23mcruci\61<)J 1124/13:)(1)0 23m <8l'.9w:)C3ctmlllroS U u 77 61 ffi) m <>4)ITD .e,:) GTn 3ITD (0):) .e.arrn a.) " ,, "\' ~C12?(1Jof),? CJil22~ ol. cru<86lQ,J mra 6TUlUlil \71 I I ,i m ~) «1" ,J .1(lJnJITDJ I !~2 rr3rrncn6)Qj llt. 4 /1 ,11 6 4.'2 { ~an8cms(!)~.1 =1 m:) e.r <8l'.9 ro . n{j) 19 3 , "JromSl<>4)§u .nl.2ioci\. 612:)=0 0.4460 61"{),a,°s o ol

I Qa®cruci\61 <)J 1126 /13::1 (/)0 (Qa® <8l'.9 (1)0 4)cm." .a. 0 6lTl aO'TJ OJ) 0 'of), 2O'TJ 2)

~ 1. !a !) oo)~o (f)u nDc3.~r6TDc3 ill~!) mJ~ t , 2 . ill~~~ ~: .,' 3 . ~~~cmu \,,?,' -'/ :

..!' ..';..; ' .. '.J .t · " ~ ...... '," ,' ,

,.

\ ')..s -

," " ...... :. <

.' , ;. , . :'.'-:'./ ...... •

,r T ! _., -1 199 6@2i ,;(; 47 - :)omc.ffij~ (1) ::)(a«mjn

I ' 01. cru c36l Ql crrfO 6rtmDJ glm" er n..J (UfU)l ~' J mfl!lf~ : M u '{JX )(o(oTmlcoo u 366l(T\lo!lu n4jem .a!)6m3em£lll!).aaem~ll

0 I() N e :;;: 1'" III I '" 1 n I I I I 1 ! I ! I , I I 1 ~: I I I I , I I ! I I I I I I I I 1 i 1 I I I 1 I I I I 01 I tnl I 1 () ' \ II I 61 C1 I C G

o o S 200461~ 6396<)omc.cru!)(1)!)«)(OTIl) roO nllruQ\l~ 1 .... N e ~ I~ : :! I~ roro!)ru.fl,~)(IiY.l;W~ d'tmJ<86J<}j Ou 6lcruCI§1

1 I , IJ ! I " , ' I . , ' 1. Q9cm~ oCOu ~.DC3§6TDc3 (g~9cruu/X/ r rue 2. (g§d96TT3 0 L './ ~ / 3. ~8ld9cruu Y' Th:: , .. !} , «J~ , - ~. \ ~- ThriS5'J~. ,; t . , / ' "

..' -.: • •

I 1 I ! Ie 1 !N I i i I I I

,I ; 200461eJ 64oo<'om ( ml?w?ra=1~ ':lJ1rura1 'Xl :>;:;lCD? I T ru.e.?W<:lm@ 6lmx86X}1 mracrorm ;; \11 m ? eJ-,,J rom5l<3G!lilr05 I G)m) B?CI) o ' 1 ..q)C.s, 10.600 m::>eJ',..J ro,t£ lm?et e.i" ~(t. nJ.a~Jo ct.:STil6T2li" I I 1 C I"' ! 1 .aJ.Qigd!. o)Q:)(UlOlo 0 +88lo'n.n""'"so1w36)~§Cl.l)?'&'am) 3 I , 1 ~Jrr8 rroiB6)("1:l IJ2:'/t~:'I(f)o "' \ I I I i 1 (Inr ..:I ) (\j It·.i'! . ... ,.1. ; .. J ..... )."',,,, • c,,• ..~, ·q"'''e:·~; ...... ~ ·",,<'I'C'·-. ',l'.!:.'),Q3#~_ , "'",. o... ,,,/,,,, ... (;~'':~!: ({'" :, '" (1"', \35. 39 36) ·:T.. j(1~ '~m·J d .:,r..-!m :H~_)' .TI(o/«l Q.3'~ (CITv:;I -:o m~"" ! !.>lJ :tJOtB, 612;=)(,, ' C 0'2~306).. n...I~ cr-J~-r~lR'56' vI '( LJ,;c©::> ~ '~:)' i i i i I : i " .-t,... . '11 am; fil1J1U).a Ql m :> eJv oJ ",r.f,) ~.a rrrfl n:1\\ Q.a mil iDf, : I I I I :;; 1"'1 I Cl1l nfflm" '-'';';j@ij'S. 6l<1D:}'iW~ ';!,nq)W" .o.J.aiq<2 I I I I I I 6l£l:)(tllOloO · 04-80 6ld)';;'"S(51,u

, i I m::> eJ a»l CO:l ce. em , a'1~cE£r CHI)) Ill;l ,2 til (UJOJ ill 6( ASwu(nl'" 6) 6) (....J ClJ Q"'1l11 d1 Qcw'" OJ.a. cruu UJOJ 20 O\{a D I rus ~ao 6lrugjl~~:>§"

n.l OJ(!2) ~ ~ (~ 0'1 CDlIlJ3 nQj0" n (") . (") 0 i

6J ([J) "mr 6l6lf n.J OJ o-eJl 2'J 0 CW- GJ.tb crlliJ ~GJ 3 o __-.l " .' 1.

2 .

3. .'.

I " . ... .

•", .be •. _L .. 541?> . .. ~1~...... 2.'i" ,I... " . ._,?4 __ ..c ..

. . ~.

• 015 '

':"'i 1. Q:J

2. ~~06TT81 ' ~ ' 3 · ~m:Jcruu ~ ~'5

4. I8gQ6m:>" ~

I.

arrg,flJn:J6~ 6)m s2<:;12s1 (gaJ)~§ .fb):J s · v1lI!M~ (l)~ Q ~ (Q)GmnJ6TTJ18,)0 <:;1.e, cm

<>(j)m:r ®Oml<08.e,3Q~m ~

f!'-- l.

2.

3.

4.

\ \ , ., • ; I __ - \. \ ...... - \ '-.-~--- \--- --' \ -- ' ,,;. T \ T, " A d I. . ', . , .J r:. '".. ' ~:. j."- l\.. . "" .

P efn . ;-':0 : ~7 21 T nT\ :: : ' ; '_~::~ . K,£B. .:';, :" _\ , "'1' ••

' 1.: . I 1 " . .JJ- .fl . .(7\"'0 "'. C<':>~)-5¥ '" yY>""YYY(\ (V"~ i ' ,

l . •

,.-': -" :-•... : ......

. .

. '. , -

---.-­

22- 9- 2006. ((l6m:)

nlmm5l((l6m:)o ro5JqJ,>anl. COl.I~6<8 an ~f!Ja'£!')" sl nflll! t=\j3Q" :.; i tl! I3crocorm '

(n.Jl.63. COl.If:(gacll) (I' IN .680 00 I ) O'UJ):)n.Jl

- 'r:?: L !lOCllO)~ o(l)b nlOcll&,6Il)cll Cll~'Ocruu 4. '" , , " 2. !l6d'MJlJocll nm~(Jr . ~~ocruu .' ~~/ 5.

,- .. ..

, ,-'._.­ ..'

Goo G10d·. :<' ' ..,. aBC, ~c-N) ~~.,G")J~ ~~!e"' _ :-'I _)'-':S

I

(1m "'t 00/ g 1;'" r-?1" ~

bdb CJ) rN ~(">'D 6'" ...-rt, l1-:? ",." " .. .""

.: ". '. .,' . {~ •

\ .\. \

I \ ,\ lJ.4 " RI-lc;,,,\8VS8R8 ~\/ c(\jUS \'c,,::-- l k \ '\ " ::' ~ 0'6(' ~_,. ,';-)cY0 ~--8,~,S~bl .~ 1..0;;. '"" ' ',' , 'lh)','. I'h..! .;. ~~, . . ", \-) -,;)01 '2> Q\G>1"l P£' ~ f., Cn\ , ( \Jl. \, ,. I; ' r ',:. A'\\-I dOSS, \Q8\.l..G.S\-\ yjRRI"':) . J?,f-) l'vl...., \ .1\' "

, .. ' " y, '-.. <)., E;)cI'0 Q~ ,",-:,\ ~c'<\J<..".Qc tb CO~J( :.J U\lo R, 'HI \ •... V)C":I;'r0~ IS ::lC~'y C~I . u,n.' ,,' ) ,

), " 0" .", ', , ,', . •

., ' ","

"

r \ , ':: ~, ,',

.' . \ .' " , ., ..:. ./ , !) " ,, / / g . 0(' .,., ",~_f ("~'0~"" . I. . '-" \ "_ " \ , - ', ~. : ,. L • . ~ - .... ' l .. ", _ ~_,~ < ,. I • j" ' " ' - ,j ,'. ': ( ",1 , 'J(. • C ) c.> 0 - ) d'e,...S ) ( ...,....,. ':: )" : '... _ n ji __ ...... -/r .ll

:j/ .... . "

.'. .

. "

'.

.. - -- ..... ,..--~ .. :." . ~. . r ..

..

1 ,•\ l ! I ~ . ,

. ,' . . ' . . . ." ,. b I~ I

',.,

3 .. .

Q:J~mWo(f)Un.l:Jro§U6TDro (O).,5gg,aro (o):Jf!.I,acfl))u ~q;l{:J(Qo o.ll~~ ~r Sl .), .' ~l3aacmrnU (nJl.63 . .s:Jlq;l{:J(Qo) (PIN .680 026) mTO(Ql~W6:J ~o :J cu51c03

u u (o):JQcru 0 ml9f!.12cfl)) OJrogtlcru Q8cm 8~OJSo 6] CG'IO 0 8n.lcmrnl63cm .....:

.:. "t~O

...

.,

. ! , • > f dt, U /6 Yc:J oS \e:) cJ5/CDUJ- • ,_. V8~!=)LCX) R DE-VELOPE.RS ~v -\. L \t . \lJ C). I . , . ~ . ., .. R(-;) G:> H8 vEEQ~ ~Y'E ()J \J E. ,~OES G8RDEJ\J, c H~Q\J rv 'f=\\

,i·· .

, .. .. \~\ HLRO.ss, r'O . ~LL.S S \lWr:tR. \'"J , B~('J (j-)~ ·JLO I~ C ... • . ,.J . ~ vDei~~~ CO):Qo\)c) Q.cuc:Q UJ~")~v 10 ' ,. I .J \.t"J (JiD.Q) GJl'l. V!r?' !~) , '(6 \.tI\ ,'./ ,,'.. I L"\ , , , ·;:::r~.

; .. ,i, ~ yyy,...... \ - ..... ,. ~ •. __ . ----r, - .- I \ , -{i. .,. ~' " 'ii' ~l .... ';.

~, , ," . r-r ~ , \ I - .- I " . \i. ~ , J'

: ," i ~. . ..

o I ~O!) J :: 116 S

4

QJ{I))rnt 1 ~agO

\ , L " .

...

! .J , r,

~ =-- -- . ----- =---'-.~~ ..... - .. ----- , : -,', V q~8LCOR DEVEwPE.R6 Pv I' \ 1(: nl '

r

(,ao 01>b c:L-E))::'r0 ( ~:::)(;-<:l)C~~)"rr.), c-",( \, \ "7 , , , '

I!J -1\ \ ( ' P LY':':::', I'0 H U C/,\I \'1,0\,..)\"') ,).

") GJcc"Y) c-::LJ')eJ.J0V~ Cll6 (;If).i=:)0Uo k c.n~) ~ 15'::)(.:0 & . (/,) '_l '- t ClJJ.

l bQo ctaQcrri i6Q,o ~ C0Q ..,. ~ .

a~~G2 l~ . <-_. -- - - .:::=::=.....--

J

( . , ," ~ ( " \ -- I 'J Co 'bfo /'

i ~ . ' -1 t.. _ -- -

- - - 1 '"

-- ~- ~ . ;:

.. ~ -:,,:':::' : -" r ',' , ~,..• ''''''';'~';''~''- .. .. ---_ ...... -. I I

)j(l JillCftSKl 'lJU19o!3'lJCfU o(f)°LftSCDKlCti '1 /.~ . // ~\

09X@UU "L'B' 'E raC(Q) W~Q)3i(Q) oCillC~Kl '51 )U:S(O)fD n:ill9Q)LCillQ)ru~OQlill

(9 JlliWUW UCl9 gD'6'6 n(Q)Cra~ruC9C9 gDSCoo2(Q)2ru (80£ 089Nld)

(l§,Q)C'C"C9t9 Lr') nCQ.lQ)e.o8~ LSQ)C'6'C9 J~ra~1JD L026o~OO(Q)C9 gJ~ill29LQ)~6 ,

l., noo~rac(Q) oQ)2ru8X'6'26 JillCa:§Kl '1> gDQ)C '6'2rw):Cl)OC i [ ' 19R'6~ n&xmro " r ' , . ' nUDt9LC0Jiliru200.ill [9 osro~'6' gD'6'6 n(U)L,83Wry ,00;21000 O(u)6C(Q) , ~5:) gIDumC()8) CC\D8>LQ)eIill (no 089Nld) (oQ)ctmW 't9't.ru) nCillQ)e.o8~ l? ::0.:, ~ gJ ,,~R38JIJD oQ)c @W nOO~IOC(Q) gJ~Qi3i(Q) gll9C8:SKl '£Jlli(O)ro n(Q)rcDt9[SO.1.ill I ;' , , ru2Q)~ 6C: OS lUffr'6' gD'6'6 n(U) c ~~ oo2raoo °CW6C(Q) gIDLmJC08> f i' cKY) 8JLP)QlD.l (no 089' NJd) (oQ)C @W 't9lfu) nCillQ)e.o88l LS n~ ra8lUO I;: i' oQ)C!Culj" "L'B''e'raC(Q) wfQi3)(Q) oCill C~Kl ]lli(O)1U nUDt9LC0.lmru20Qlill [9 f: os fU f1;- 'B'> I!D 'EJ' Ci nCW L,83 gJ ro C5e' 2ra 00 ° CW CiC (Q) gIDl)TU C 0 8l C KD 8lLeJ Qlill t: jl

" (no u1l9NJdj (oQ)ctmUUt9 'U" ) nCQ.lQ)e.o88> t? neElra8>lJD oQ)ccmw ~i

"oof,'raC(D) w~ QJ3 )(Q) JOeElWU ~tJruUW oQ)C'6'bsnR't9 °eJC'6'ru)6CW 1(:II: ":::' I : ~ -.. , I ..::: glC)CQ.\6'2Ei (O)lS.n c(Q)lcw~o umcrw)WOC -t6' ~ gID£OOl nCi3'2ra.9~ i"r; I'''' ,i °C - IT ,,(QDn(U) L~ O Jfucw W~Q)3i(Q) [Jll9fD8>2Ci3'wtucill~ oCilll..m'lJro '(: 1 , j

I. , ~ ~ 1= I~ II· ","' rlt ... 'I: ~.

, !;;~" . ex. '-1""" , , .

.. · ,

6 · . ., ..

.' ., j,

..,

, .: .:

PVT LTD, NO . 13 , RAGHAV EERA AVENUE, POES GAR DEN, CHENNAI, ~ ' . ·l, ..'~ :3. A· 201, BRIGADE REGENCE , 75, 8TH MAIN , NEAR 19TH CROS S,·J:.., . ". ~ .' , MALLESHWARAM, BAN GALORE- 560055 n{j)CTD ofleJ~cru (()m)im8

C8~:)e.ll 44 m:)e.(nJcmrnlm:)e.( OJ(D)m:t 2. CfO~(TID (fol QJ (o:Y.,H.W n{J)crDl S

.~; ClI18 C8 nJ 18 5)'"' n.(j) ~ 3

· ,:~

. ~ .' ~ ~1

1. ..

· i~... : : . ,. " , , " ;

.' : , ~

" '!

'- .·.. ~ : .,' . · , ..:: ' . .

" '. 7 . '" ~

4667-0, 3<:'omc.Q1r qJeill8aB Sl6TlJ3tfD)v 547-:)oQJ~e.tS () 'i99'J2cmmn :': .~ .. .- f 500QJ6)(o 01 C1a6ffi3§1eJ3 ° , 548-~001~e.tSo 1-02-001C1a6ffi3~l eJ~ 0 1995mB .. 5286-0, 4-~omcmr O1eill8aB Sl6TlJ3tfD)v 530- Jo01Je.tSo 37103CO)CUO r 374016)(0 O1C1a6ffi3~mn 1995mn 3315-0, 5-~omc.mr 01n.D8 Ci'6 Sl6TlJ3cgr I . ' . I 530-~001~~0 375<)3@mn 378016)(0 O1C1a~mn 1995mB 3316- 0, 6-~o .' <. ' ,! . ' <. mcmf 01n.D8aB Sl6ru3tfD)v 530-~oODeJjo 379<)3cmm3 382Clio)(O ()1<106OO ...... · ' ," ~am 1995am 3317-0, 7-Jomcml ClJnD8aB Sl61'lJ28i)' ::>3 C' JoODl'JJo

99<),3(mmn 10201~(o ClJCfCl6BT3~mn 1995mn 3266-0, 8 - ~o mCmr ClJ n.D8 oZl

S}6TlIJtfD)v 534-¥liJ~~ 257!J6ffiX08 260016)(0 ClJCJ06t313~ 1995mn 3655

-0, 9-:Jomcmt' O1eillc£naB Sl6ru3tfD)v 534 -:Jo01:J~ 0 203<)acmam 206(16)(0 '-,.>: .!. : I . ... O1c.rcmr3~am 1995am 3642-0, lO-JomCmr O1n.n "O, Ci3 S!6TlJ3tfD)v 534-~0

ClJ:J~o 207<),3(mmn 211016)(0 O1cra6ffi3~mn 1995mn 3643-0, Il-:)offiCcnJ .. -~ O1eill8aB Sl6TlJ3tfD)v 534-~001~Q.{50 213 02cmccm 215ClJ 6) 0. (1J Cla6GT3 , u . ;' ~ccm 1995ccm 3644-0, 12-:Jomccru ClJn.D8aB Sl6TlJ3tfD)u 543-:Jo01:J!2Jjo

55!J3cmmn 58016)(0 O1C1a6ffi3§lam 1995ccm 4701-0, 13-:Jomccnf ClJnDcB,C!3 " ',

1. . !A0<8

. ,':

. ': . : " .., , '-

8 .. , ,

, , -'

.' ' 14 - ~0 mccruv O1 nD8 cr8 Sl6lli3

- Jo01JQ{S o 241Q3croam 244016)(0 O1CJa6ffi3 ~ am 1995am %51 - 0, 16-Jo ::-; v m ccru O1 nD8cr8 Sl6TlJ3a;-r 528 -Jo01 J Q{S0 77Q2cromil 8 Gnl!1)(c) () ICKH,?1l3 ' , ~ j v ~am 1995am 3014-0, 17-Jomccru O1nD8 cr8 Sl6lli3cfD)v ';28-JoODf4.\Ol v 81Q3croam 84016)(0 O1CJa6ffi3gJam 199 5 am 3015 -0, 18- Jomccru O1nD i

8Ci3 Sl6lli3

3016-0, 19-'JomCmr QJnD8Ci3 Sl6lli3<£:nr 534-Jo01J I2.t,-, 2251J2crocai3 "~ "

, "," ,\~ 228016)(0 CiICJa6ffi3gJam1995am 3647-0, 20-JoCDCcruv O1 nD8cr8 Sl6llJ~cfD)v.' ' .. 547 - J 00X)Q{S0 495Q3croam 498 0.J 6)(() O1CJa6ffi3~mil 1995mil ';285 -0 , ;: v 21 <:1 Om ccru OJnD8Ci3 Sl6lli3.f:!ir 545 <)001JQJ5o 1772 (l croam 180OJ6)(() .. v " ' ruOO6ffi3 ~mB 1995am 4972- 0, 22- J omccru 0....! _.D8CJ8 Sl6Tll3

, " ruJeJjo 417Q3cromB 420016)(() O1CJa6ffi3~am 1995mB 2847-0, 23 - Jomc.cru~ , J . '.. . '0' runD8cr8 Sl6Tll3

croam 352016)(0 O1oo6ffi3~mB 1995am 2832- 0, 25 - JoCT1 CCruv O1n,ns,CJ3 .. -"'\

~/' , ,

• {y,' '. .~ ',j . -. j 1, , 1\ , -- ,. ," ( J ·~ 9

.' .

Sl6Tll3,S5r 526-~o01~Q{50 345Q3emr08 348016)(0 O1OO0l.3~m:\ 199<;am

2831-0 mc.cruJUJJ(06T:lT300 Q~eJo c&Q&:lSl m1DJoJmcmml6)oR c&oJrQ'lm3

6fO)6ffi3~crm 1- ~ omc.cru 3cfh ~(o cr8 emi o~ 01 ~6BT3l 6)6) cfh 01 000 6) OJ ~f cmam 3

1 rsofl.3:( O1(03cTDem3o c&Q&:lSl cruDJoJmcmmlm3 QJc.emo CB'raClI8~OOQ3 ~. ~em 3 0 c& Q &:l Sl cruD J oJ m com516) erR oJ caloJ~c3 6Jt5 ::, r ,ill) oflc.8ll' CT'J Pill)

CCTO{SCOTCJ5'lmn ~(Olffi2cmem2QJcfh2 cm2 26 - J om ccru~ OJ nD,fnci3 S-(6T) 13 if7i)~

3396-0, 597-~o01JQ.{50 479Q3emcrm 482016)CO O1OO6m3~crm 1996crm .'

27-Jomccru~ O1nDcS,OO Sl6TIJ2ffi~ 587-Jo01J8.}50 495 Q2em r08 498016)(0 I OJera6m3~crm 1996@ 2192-0 mc.cruJUJJC06m300 Q~eJo 6m)6m3~mB · - 2-Jomccru2cfh~(ocr8 emio" O1J6BT3l 6)6)cS,01OOo 6)OJ ·~f cmam28o.f1-3f '{} .- " :~ ! ;::;: :;. OJC03CTDem3o S{WJrn3 QJC.cmo cmaOJ8JeraQ3~cm3o SlWJ6)oR oJcol lI , "-' 'I' ., ..... ' , oJ~ 13 6JJ) Ccfh CO) o.JlCcS, CO) ffi)J:) em cams cmmlcrm @(Olffi 2 em em;p :', J:r. ;3 em 6 . i <..>n ) 'I II 28-:)ornC.mr OJo.Oce,~ Sl6Tll3

OJOO6DT3 ~l r08 1996ccm 2752- Jo mc.cruJCD'J(oo Cl.J,fUo srr; )Wf3~lr08

3 - :) 0 rn ecru 3 ce, :) co a5 cmio'" OJ:) 6ffi3l 6) 6) ce, OJ era 0 6) OJ.gJ" CffiCl(i} 6B nf1.gJv .

.. ~ : - 1. I .'.

<} .,cU)ce.:s~ g>Cll9J5g>CITu ",00'0 ~CD~Gri OJ .' I I , I f, j)f .i : ! ii .\

. OW)Ce:; eWC(U)l? OeWWJeQ)fD ...ffrlfD~ewQI.W jt"fD{9 oOOfD'EP{9{9 !}WCfD

;; '.". ,ul,lm ~1,.:;c(EI' ErWlWOC-9 \lID!J9Eill9Clli9 ofar-v 00cmcrwlwOC-[6[Z

. gm9 66l g.Q) LE9 ru!.900fD Q){9fDv6v gIDW8616V o)[aCfDoC-68S n06'8fU.9l?

gt)'El'U"'IU nrw')WOC -I f"~UJ)~'9'Cei~(Q)UJ)~<93'L0® \lIDLCQ.l.Q)\(QJj)(Q)clcw

. (U) JUUCW (gi) cli9~rroLQ)ru go C9C(U)l? oe WOOee:;OO C 'EP ruew 0 w)ce:; ,:. ':. ~: : ..;: 1:wccmlj> ()(; (ill ~0fO jf>lJD~~WeID) jf>fDC9 o0)fD'9'C9C9 !}lI'29CfD nOb(Q) ~ ':::T~ ' , I ~ :. gDQ)ceruj)woc - ~ gID~OO9Cill9 Ora~f:) oQ)cmcrrn)WO(; -66£9 gillVOOZ ;! '. "

[email protected] 0C9iD96l \lID(Q)~ei£:6[ o5facfDoc-6£oL:..CtP~fWt? gD'9'UOCD I i ' .. , ~ JW)Woc - 0 £: 'fUJ)e C(;'(jGe WUJ)e CtPl,Q) em gill t)QlQ)}(Ql)1(Q)CrcW(u) 1lJD(U) '9'1 UI9g>~ruL0 r'-' gDC9 C((l)l? oe(Q)OOev0)C'9'fDetm O(Q)lC(i ~wcemLS oe(Q)UJ)

0, eQ) CD J&-lfD '2J ew etm nftr CD C9 00) ru (9' C9 C9 !}lI'29 C fD nO 1o(Q) gD Q) C '9' e rw1 w

() c v 2.ill(5.Y 'J.Q9 Cill.':J U fa 'e'(i () Q) C m C rw') w 0 C - ~ 6 £: £: \lID 9 6 6 [ \lID LE9 Eill9 0) CD Q)C9fD8L!" \lID (Q)2(i~L V O)faCCDOC-L6C; nOO'~IT19t? gD'9'UOfD nrwlWOC-6Z , r ...., ':f.}:': eWJ 2 '9' C l:, ~ rmUJ) E~ LQ) 09 gill LCQ.l.Q) )(Ql)) (ill cf(U) em '9'1UU em '9'') c'D9 ~ fro

LQ)fU ~c..9cCm l? oe(Q)OO~(i0)C'9'rueID) o~)C(i ~wcemt? O~(Q)UJ)~Q)fO ~/ . !,. j: "

". . .;.' 0]

.. 'J ~

I ; ,,

t ; / ~. I , , ' .\ . ,

" .' . ~

11

,\I ..~ ' cmaru,e, C)(fOQ3~CID3o Slw:::> 6)qq nJ rcS1nJ 30 6"WC,e, Wofi(,cB, m; CT tl P CIDCCTm..5 i~ . .' . . " ,.j comflcuo @(01cOOacm(O)aQ~caacma · nJ§lca OJnDca~roB QW :3 6 mle, ·1, .,.., aJlU)3cmro5lm:::>m51 6TlJnD3Q::l(6)&J§ cm.sgg30 R.D.O nJ tOOca crflcm3o

r•• I. ;'., KDIS 6675/95Dl, 6020/95Dl, 6686/95Dl, 4840/95Dl, 6689/95Dl , 4839/ r· I 95DI, 95/961D1, 6030/95DI, 66/95DI , 5591 /95Dl , 6027/95-D1 . 605RI i 95Dl, 4835/95DI, 4838/95-Dl, 6019/95Dl , 6695/95Dl, 6057!9,i D1 ,66841

" 95-Dl, 4840/95D1, 6680/95Dl, 262196D1 ,6681/95Dl ,- ::lomccru38~:::>m5l " ,1 cmam~~1fkID .c. nJca :::>(()o Q6J11laaa51cacom51 nJOffiJ 3 OJ nDca ~ :::>,e;5lm5l

§2~(O)aQ~ce,2cm2· ' CID:::>6)!:9 cmaro)l(O§OJ2ca08 ~.lll0tOO3cm OJrll)8~3o

cmaru au 06TlJ CTu.fl~ n{D ~p cma OJ 8 ~ aa6ffi3~ 30 8 3$l ~Q &J ~'l CTUO ~ nJ -. .'

v :.;.. mcomflm cmaOJca ~(f06)&:f§ OJnDca08,eJr 5,56,22,880.a1Y" 3\) , 2 - ~om

v c.ffiJa8~(Omv cmaOJca~(f06)&:f§ OJ nDca C!3cOO 64,97,520 ce,W30 , ~<)om

OJnDca08cOOv 35,40,000 ce,W20, 4-:)om c.ffiJaca~(Om" cmaOJca~(f06)&:f§ . :.

ccru38~(Om" cmaQJca~(f06)&:f§ QJnDca C!3ces)' 32,76,000 8 W30, 5 - :)0

mc.crua8C)(Om" cmaOJ8C)(f06)&:f§ OJnD808cOO" 57,l1,820ce, CD)~o , 6<:)0

mc.cru3ca~(Omv cmaQJca~(f06)&:I§ QJnDcaC!3cOO'" 60,00,OOOc9>W3o 8 3 Sl

./

L \

!i .. II , ~ :-

,. .~,; .. ' ,, ~:l . 'II

' .'"

.' o(u)G~g, g>ill9o§g>GfU iI)O~CDg,Gf} 1 f)<:< , ~ / v , ,

(Q)(9Csf'EP 0285 d98>~CID C58>tllisCID m~Q)G(Q)C9Cem..,& cUJ)8>tp) ~." , gffiL'EiRX9C& ~rwe;x;'EPIUelID~ ~~ ;0. • •• 1 Ii ; It" ~oo CUJ)8>ty.J ~~009Cill9 0CIDt9'-'(U) gDOO9CIDe)[U" ...o~~'EP f8<9f.)O)emJ • . ; oei9rul9fulruJOcCQ) ofuIxwonJ)(iS(9 o2i:9Emger.>C'EPCO cQ)C'EP~~ mw.x;ffi@'t> -: ~ ,''11 l~..,J , ~j .5 ' 1 . .. :i. ra~ oful XQ)..,~ OQI)G'EPlUCQI)CO'EP<9<9 ofrllxID o&.t;'EPC9(9,,~ Wj (x. l ! oe81£lSl;CQl9 oefDwroc onD [$f\?{)8l ~C08l "OOll}DCW 'EP (ll)@V GIl 1 Ad '~ "" . j . " i i i: ,~ - ... S'd:.J.JOi[ \J i\!! C 'd001 VAVi\ " ~C9'EPCJUCU UDe<93'LQ)COUO ~um'EP!ftro

63 19C (Q) groc w gmQW . eUD e <93' LQ)!J,Q)"em fU" C9 0 eem 'EPlj2) CQ) 000 CO C€P <9<9 i:

cru:Dgl cm em ..,CQlQl9JfoC SC9J JD !SO' COI,CID e<93'tp)fW'EP l? f\?58> oecuw ru ConJ) I: ":.i .' l?R-'58l Oe~ru29 CQl9 gr.>C€P(JUCO'EP~ro 63<9cCQ) Oeem'EP~CO ofcruCfU98> ~L'EP .- 02 C5fPW-> f.JWeW!.S'llillwru ConJ) l?f\? 58> oQ)C'EP rU) 0 eem 0 ru

:', J £<9c(Q) n(Q)roBQ)iEtP~CillBQ) iE tsrumQ)l)O)cctfg~tsOWro10 Cel) " rute> ,.~j ~.~ l5lliill we' fa (')0 ~ os@U ra!JD 20L.CID 'e OJ) eGe'lj2)l5ID CQ) 20L,CID ~ t'J i.f , '. ~CW!SWCE nOOlgr.>OO9[0 ~fD8iOOl!SDCW'EP [$f\?{)8l fil5IDfIQJ)l}DfOUO tf1' ",I r"-" . ',',I, DGG '917'90'9 OQ) C'EP ru;CQ)W (U) em~(9 oGe'Selfl) 02em5ft9 o (U)Cll9C

i.~ . , . . . '. :.:l . t," Ii i, .. i' " (;[

6'

.... "

.. ------'. zijj

~- .

; . .,. ~ jl . .,ClDGfCSlD g)u19Ji~Gt;u)J.fI)'o~m~Gf} 1

l ~ R-'(i 8' 0 2~ t:ill9

GE9 8l © )'ffi) C fU9 C E9 8l tm9SC5e'tp 2 002C5e',.,a:Dra tp) o2raee (QD(9 8(90

CQ81'9'i? r"SW ~?(;0C'6'f"')(;(illLW U'WgJJfDgDC(u)81gD® c8181'6'

, ~r'-'sw ~e t:i0Cce>l")0a:Dtp) lPfDC5e'lPBfwfDO jC~8lce>tpl"SW ooBo

.\.... o C '€I' f"; [j (ill tsJ ~ gJJfOUU'W tr'6' elID JO cra 'c818l '6' 19.rus CD ~ e(; 0 C '6' ru') ;; ,£: I' . , ., .: . (j (C1) t}D lli9 Q)C5e'jO,tQ)rufaJ ~Q) ce'8l j C~8l ce' ce>L~tgef6' iG ~8l0 GC5e'8l~G~ :·m , , I ", . ,' ~ u.DC~81 'cg:81'€P'€PL~l92'6' l}ill2'6'lJD 'C(;8lQ)cUfrOshJ, 'C~8l~C~ I' .. :\ !~. ..;~ j G t:i 8l §' C r'-' G10 8l (OJ.m BS f\P (9 ill ",m crill etill j G a:D 8Il}Ol):V et6 j G~ (9 ce' (Q)

, .~ 5ffiICru9 ~; (EP muue0cC0X9C(ill gm~'€P(JUID 02ro(Q)lC(; ~onD

!?"'U!:'.'i8) orwgJ)tm9CQl9 02fDro~eillQID) o2roooIDce>(9(9 02(Q)(Q)01ums~ ' ..

s (9~ 8J (0' U'-' ID e UD2 '6'C(; eCillCillillCffi ffiI C (;(9e1)C '€I' fDelID C Ei (90 C'6'!SD elID

.'~ . o e 00 gJ C <3 fj (Q)(9cra em> Cill8llSQllD illruC (J(U) 1.9f\P tJ8l COO 8l gDtm9 CQl9 ,;:::j o2WlJID UlJ2'€Pgm u" n0L,(Q) o2wl}IDUlJZtmf1'(9 OOCtJ'9'C9C9 ~'9'UUfD ..S ·/ N ~~ .: : oe~~h?CgeJ)C'9'ruc01U)fjS~ ~CfP ~CCfP') , . ~~.~. OemleEi oeW~01U) ~58l Oe06'~~CDl9 gor~e ;'W9c(Q)(ll)fn: '

I ,. . , :.:.: coo[JD~ e WCQ.lQ) es tJ(9(Q)C8 00 0 eSf'PC9Qf.)C CfP IDC tJsii cff&rtxg OQ/.)fUC€J'C9@

.'.

:': -. .

£f

',. ~

.i

• J ~. '\

------

, -. ::j , 1,

. '·1

. ~ ", . -' I " 14

: .. ~

" ,

".:. @<8CTnOJ<8CO

6) Q oR 3 8 00 afl0 cDle.f

•. ~.' 4 <8Q&:I51 auoJaJm<8QJ me.f8J6)QCTn3o @<8CTnr3lOJffi)o Q2emm'B.oo2~ ,)'.

, , ~ , " ~ , Q6~emJ86CTn6' 6X1106ffi.IJ.§o, 8'J6TDo OJnn.e.,~66Js ~mo OJ'J6ffi:l;ITO ,",j

aDlm20 ~rno QJnOce,~a

QJg1 aJ.§CQ.lo OJ'J6m32cmro51m2o, cDl82ro51 <8ro6lJ8~ 6 0 (8Q&:lSl 8m];;

afl(36)S ~SQcru.oQJce,Jcrarom5lm3~ n.(D~p

(ffiO uSls, J co18 ~coB afl CTn 20 <8 Q &l 51 8 ffiJ afl(JJ);3 6) s tE oj col <8 PJ CDr

<8 Q&l 51 auo 'JaJ m<8 Q 'J 6TO) 6ffi3 (8~ 'J 6TO)6ffi3 ~ 66)5 8 asa ° 6TlJ 'J 0 CD 6ffi3<8 @'J "

(g 8 (0 ~ l5.3aJ (Olr.&fce, (06JT) a51 W Q enJ ce, J(O 0 l5 1nJ (01 o5lcn5! coB ce, as2 cmillf "

QJnDce,08 ~SQauo'JOJ 8'JCf06)&l538<8

. '

"

L · ',"- , ,' ',;

:- ...

. " ", · . ;: .- , ,, ' l " '/' " ,,I. , ..,. l 1/,I ,: I " ii"

, ' I { " 15

...... 6lID600~~ (81)~Sl cfuo~nJm(8!l~ 1)3f!I0 n{j)6)(ID)lal~o 6TlI ~ " DS(U)(8m)J

; \ v ~n.fro51(8W~ m n2fS(8I)~ OJ «) 3em(U)~w~r08 Cffi9 wro51m 6Tm 6m3 ~ 3 °

(81) &fSl crun ~nJmOJ3o 6TlJ ~ CIDJ (0)6) &f.§l«)1

l)a(u)0~wror 6TlJj.e>51cn5'lQI, (81)r08mcffi19(J)~«)60003 (81)~Sl .e,crurm.a,r em (O)CTT5'§ 66m~ (81)r08m(,mf l)aS

',: . .e, cruCT5la:nf em crr51§a~em~,s, aem a .e, ~6TT)o OJ aD ce, 03d:1lr ! 8, 02, 000 v ,s,wao 6)OJoacru~§o OJaD,s,03

OJnD,s,03.a;)V 70, 56,Ooo,e,Wao , ~mo OJnD,s,03.a;)v 3,97,64,340.fh(D)ao

QflErr5b!;!lRn51~acrn3 ' gQ(nJ,s,~o a5lmnRn5lgJao cru~ao ~6)~ ,.' . , ~I r- . ., I . n(j)~acm6em ~~~a8 cfh~6)6TD @ro51r08 ~:;01.3 a8 63 ccl§acmmilo1 , " ; ; I ~ , 'I ITi'I!~! "

, v CTl)(U)~3CTl13' (,nJcoShof!.Jo nJQlm6 afhJ(Oo ;- ro5lo o1JEJ 8,06,:: 8, 220 .e, .. '

1

/

.. ;

.' i - - &. -' , Jf , . ,

', . . I

1. 1 16

.. -', <8Q&lSl mrg~U 6)(U)OJ f!Jnj"6)Qqq'" w,aoni1 g'" ffilO:; "J mmrm1m3

. ~'

(8QJ6TT3)w2o 6lO>6eT3@r03 2, 3, 4, 5, 6 mc.CIll6ca~m.e;'v :g(21 6/El(G)3o Q3mJl :.

m~6)f!J I C I C I 6llJ~l£:),16)aR ~ggJm C6T1.l96lID.fl6)QJ 2 "1 - n.l (1)6)01

840016 mcCIll9

. . . ~ . ":- n.1gl (8ca~51

«),3oJ S1 6llJ~l£:),16)aR ! 51 C.6T1.I96lID.fl6)QJ 22-09-200GoJ8J 91 2781 90mCmr . t 6).!.l.1.e;)2C.nJca~6eT3Ci8.e;)v n.13aJ)3

':' : ,~6UD2' VAYAf-00R DEVELOPERS PVfLTDn.4)an .aomSlDJ66)S

PAN Card No, AACCV 2597 C Cffi98;pD3 ~ Cffi9~(8 cmroo.1l 6 () (l31'()() I , ', " ~ . <:r> em~coocmmw20 (8n.1~ca~r08 6m)6GT3Ci8 ~~~(O20 Q<;f 3 C&nJW118

~r03 6m)6ffi3~r03 1-90mCffiI389

AFrPP i 588J - 9ffi@86CTD3·,

~., /

u L aaalmatfloa)" n1a<3~f6ID<3 alggaau t3' If.i P!, ~:. : • )~. '. ~

-~ • · '., ,

17 -,

'­ "--- - -_ ... ', .. ~ i . J : 0(1 '1l-"n',1I11l0' I ' ~ ' i/l ..,... ; '~ .~ 13 E' OJmJucm3OJl OJ (0 0 e Ii § @ - ~ - . ~ §j~ I ..• I ::; E ~ ~ ~ 6 i ',' I ~ ! 'e ~ ~ i 6 @ 1 '0 ~ ~ ------._- .. -_ .. '.- .- 1 99~6)ru 4(jf)t) ' : )0 fJ)U1H:Hll J 1.\(0';)) r(()c '\ IlIll)I, , _. (()141 (i)) dO

0 ,-;, (]l '] W1§" ml.o, mXJllnJ I) ml:1.rr.ikH <0'.10 () J)')(llll ~ N , ~ " , ~ - ,£),'] S ,fb) d or) e.'Q (1) ~ ) () I ,[). :J (kl ,) ;~ ~ l'l t ';'1 f\~ d• 'J C 6m<()), r)j ml ~ } ~ &lllf! dO " I cm')(oo!, _ 1 ~ " v (()6TTSlroB 40 mOI?JnltUl° 6JCT\)( 1(1- oJDoilw:)01 I 1 I • , -

6lnD,£),"S (nc03 6l~§ (O):J a J-

<]3 olloiJrO 6)<} I 11 301 1 I~ :)(f)o

_ .. _ - - I ------' . " ... ; 1995(i)l!J <1 6 t;1 · :)ommCfllJ:)(U:)(l'l n){»' l({}o~, () 1 flOI ("]_1 i " 'J I 1 ~Q('C\ ~)()J,O, ~ )<.H' ~\69"'~ o1.(n)(ll/,), ~j ,·",) •. 'f1!iH. ~,) ({:.k"l' II 1 0 I g 1 N " I -' ~ I ~ (0)1(03 (() 6m]c03 35 ~3~{UfUjl ',l o ~)J 6) (nx~kr~ . ~ .. ", a '" - - ':-: 1 I I oJroilm:J eJ' m~\rO_ ,,1(>1)lm:)(--' :_ (, '6 . 6) 'J ') ; Olt')) 0 , I I " 1 0.3030 6)nf).f),":'U 1«j~6:aJ _ J', J,I TTl ~_ - '

I !3acill(liJcil6l(lJ ID8/ 1 1'::J(I)o ,' , .. --J

19 956l eJ 5286 - :Jo m(Oll:J CD:J (()

6l.oJ !Xl 6'ffi 6l6l 0il!3 6112 OJ.o. 6l0 J l>3mJ:J ~:) llJ,j),:,:> . ~ . . ~. N OO!Ja~ 01. Oilcil6lQl ((lJ() 6lOIUI _a ';11 :J '" : lm:)0i

~ ffil'9 ro_ ,

6lnD,£),"S 01c03 (iln" ::'CJ) :)'£)' , I n 3- · . : ~ ~;qcillOilcil 6)().J 1141 / :. _ (fJo · :.

--~ . -- _ . --- ....

, ', , '/ l. !J0<8ffilm1o(f)° nl0<'3~r6m<'3 <8p;rpm/ ) , " i

1 j. : I " -" " . "

IX . '.,: " . ' · . ": .

T 19956\1'.1 111 ') ')() m (rn! ') (1) " (;

~ ro :J OJ JJ.:1 (k\ ~1 aPC£:: 1)'1. ql l I. ,',.j 11 ,(; ~\ j Iii( Ii' ,\ I .... M : .. ~ g '" N . . ' '" ' ~45 (1) ::> eJ' nJ . 6)mJ~1mu ,.JCOfi61CT>:i' mr",/. . V' ) (()~') 1<0ti») f.;,)(JI"" 'J i ..... i';l, ~ro. 61 !l :J (lJ1Ul 0 0 . 3900 6) .. j.a.aona· ''',:. 1 b <1 Clil m)(o 61 (li 'I ~ (I r: flo

----- :'; 1995612.1 JJJ 6 -:l omCfTlJJ O):) r" I ~ill :JOI,s,:) 00'.1 aill~ 01. m xi\6l<1I 'd lt)hlT)[ m ~(}i rn')r'l:.1 " t ~: •• '" 0 M : fo- ~ 8 mm1 nJ!l ~1r03 Q.a rrrilroil 10 nJ <011 · ":-.'.: ~ (3(9 ,3 . .. : I ,.Ja~l.1° Wl<' !>liDl :>1 1 , O. J 90 06) nD d-.h"'s olcM (i) "'J.r\(iT';l Jh '

paClilOU(O 61fld JJ ~ ()I

, 19956>2) JJJ7- :JomcmJ:)aJ:J0 ({1Y"i lroil "fl·w" 111fi'-l rU:->1

fni,s,:JOOClam! 01. ffiXll61']j (Uk) 611,' n.O>oln m:Jp. i'~, . Hmm l

0 ~~1c08 'l,aon1c08 41.300 6)( "' : f:!l ....~ ~ ~ '" ~ii\. nJj)~ anlrorn1fiaonu !>J.Cl1 \i' iu>"o,s, Us 01r03 6l~3ro):J .e.aon a.

61 II <1 () I r:: ~)(f)o( ~ " p a Clil mliO <11 · .. -, ; ~mJ ~u n(J)OD J ,£),:~61nJon

1- ~ f ~ , I~ :g : ~ ~pam! 01. cnx36xlJ ({lk) 6TWJ)a \,!l :'Gfr)( n l }1)ikl"k:)6nlir&t 10 I~ j@ onlc08 28 @03nJ =1 <'4Il aU 6) mXTq'lm" "j(iJil I G ~ m:Jonu 1.rt1:;(o. "''1:Jm1.J)01 ' :;

p.26 25 6) 0043,'5 o)('Xi 6)n:- I .~ ;.r0l : ) .. ) , , ~qn,1· ':; . ~ a ctl mJii\ Ql <}j JJ J II (~:1 0) 0 !

------• 0 "

1.

, .' i "

..;,.

, . 1 , . ,.

• 19 '.

c-

19(", ', 6)/"11 ; 6',', ')u{I)(lI)I ''', 'I,' /I / . iIo', 11, ;"

~(U:)()J J:),:)OO~'a~ 01. (\UdJltH)J '{'l.. \ tW' " "\I ";,[;HI~~ . O n I

fool!l.a anl ro3 «l tm'l mil ?-7 @(~3 c. 1 nQ! 0 t"l cml'lll \q1. '" 10 N : 8 In ffi ~crua»1mo 1\ mT!~nl 6)(1 ) r' 1• .\. ) '1 " , ': J(mm" ;,; ',! I ~ • ,l'A :)C (f!tllo n. \/,11(1 (,),,{,.(\,"'., ,; ' .. 1 ,I " " • ' . .'. II :~ , I '.... ; I P3 ail au ro 6) <11 l~ .~': I ... . .' ',' . ,", "- " - J 19 956)1:'.1 .J tj II ;'>. :) u ( J) C.(J lI : )(J) ~)I ') " ' )(I) 111).1 . ,,{hH!.,l'l( ..

~, «l!) 6ll13!) a3!l m OJ.e. 6JOJ 0 ~(nJ!) C, ,. 01 .o,!) (J(J~ 3~~ . cllJ p1. auro 6) <11

p6 ci\ (l'\J ro 6)()J Il J~ ) 1 r,Hno

----'--1I .. , 9956)eJ 36 43 - !) 0 m(ffiI!) 0):1 '" ([,oil mil () (j

  • 1":, )Ill ~ ~1«)!)6ll13!)§a ~m "(\, ·H ""'lJ~..d N In , ~ on '" 8 (l'\J ro 6) <11

    pa ail (l'\J ro 6) <11 IlJ51 ~!) (Jl ',

    19 956J eJ 364 4 - !)om(ffiI :)o):'l

    .e.1 «l !) 6lll'l :) § a ') ill OJ.e. 6) OJ 0 !~).3 :· " !; .e.~) cOOcq 0 ' 3:· ::: W p' . (l'\J ro 6) <11

    panilou«, 6) II 'Jn W )(l)r. ( ",(; «,J)' ·I I}');(1(11i.1 1 ),t} 1(.!

    ;)()U( 'R" nlJ)(I\)( J ),:)bIDJ! II'U\\ ') ,"· ,j " " ;l) __ , __ 1

    9956)1lJ HOO- :lomcml:JOJ:1

    ~JO) :>01 ,{), : )( ~I fA ;~ ?' 1 9] dl ( 11)(1\( , \ 'JI 1:\<1' WIF ' . {~ .\I '1l 1- 1{J11 0 --"1 0 " , I ~ ~ - : t- ~ fmlr03 6Jmilmi1 19,10 0 61 ~, )\18 m "'{I: I.'j f(~ II)(U , '::l '" ~\9anJ =l'.lffi)~" nmnn3,e, :J6ll)~(mmn - __ I , 99 56l1lJ 3654- :lomcrnJ:) OJ ,

    ~ (]A:l OJ ,e, :J rn 'A 3'A 31'21' oi. (I ' lt7' (i\qj mkH;){1({'}).

    ffiOO1J (mufl 'AJmil

    j)(]UCW1m" g!,!(o a~ 1 cnr.nl((l]o61 OJ( 'Fl<\

    ~ . 9!J 56)(!1 J65 J - :.)0 m CU1J:J (0:'1 ('\ ijlin 1«{iJ (1I 1 ( 1I( ~ d' ]J I I ~1«1:l6!lJ3:l,§a 'lm OJ.e, 6) OJ O ;1 O'J') ~ J ("; J,e, :lClO'.l3 ~.1 - < • pi, (luwo,n.' {iI(} f-)l)( ll' 1 ~!1 (1M rm ron1 iii 6TTl1m8 m:leflroB 49, 600 6)ffi)~1 w " 2!2 1i13nJ (0)" mJ:,. cil . ., : ~ ~ .... ~ ~ - i IC'l f.1z~So ~\9• .!l./,!)1gm. 6l '3 :l COlO'l 0 O . ~500 8 "5 , 1 Ii I ~ p1mi161"'l ,§COl:) ,e,aon J. P3 nil (lUW 6)c]1 JUs/ (~ :)l/)o

    I ~1.50061ffiJc¥J· n4l on 3,e,:) 6Tl1a

    ~ " t- s ~ ." ; .. .'

    r .~-,-,---'-' . - ,-- --_.J ;- "r" - r-~- : I ; I ! i I ~16(>f3:)§a "m ( tl'!)' OHlIn,llJ'! "\')() I'i~ :)1"'.!a ?'~,i ,I & [ )1 (nX06)() I ((Jlc)fi)T}(IJI,({';.1l rC:,,)' 11 , 'lY,III!\! 1\;1411(' IIh ll; I : ~_'? l?1 N~ II: ::: ;j, ~"(J)(I 29,500 " ' I"X~'J", .. ,'.,,) ..... ".. "",' ,"

    '. I ~ I ~l:!a;~~~:~~~~n ~I(t, ~".n (T",. cwo 1,1 "'''''1/

    I P 3rid()\)r60'() J II J,; I:: "(J),, I ~ -'-I--+-+-+-+-+-+-+~---- :. ~ .' I t I 995 6){~1 J 0 15 , ::> om(rr1U (I):),.' ,1Jl(Ji1m8 nilru ",l',71 I,'.: 'I ~'I 8 ~1(t) :)f,Q.n : ).')a'.l.nIJl,n"II ): " '(fil'I\IIII'II'If('1.;{?~11 r: ~ ~ : ::::: a, Ji. CnX06.Hlj 'BI061Txm .3cjl ( HO (I O)()l} ('("~l'Ldmo 1('It'll.i' "

    'I ~ N (!:)(J)o 29.500 6'1(1 ". " ,uml6lm:)(1n" ({l~<)d.·I' 1S)(l))::>iffij>.a<;j1m:)!~f .-:l1';)m . "'·.l"(t))(1ln I) 3670,.

    , !»n0..a,"sol ~ (1) :) ..a, 3 (1 n ~. l pa nilcru(061 Qd 11 35/ ~ :)(J)o ______I

    19956) e.J )O I6 ·~ () « () C(/ 1I ~)( l) )(l((J MJiI((k~ ()( kJl(fll,] /

    en ~1(J)o 3 1. 600 (')(l1) (}~ l( f .. i.(lil, •. "," ,n,),/'. "(1J~~31.· ! , : I 1 f,JcolOllr;l(TlI((J)" ~1.':.HQ(l\ " -:1 :-1 (1110'0 03>570 /i)"n'<'>"sl I I / , I blrOO6),;,j§ (l)):M, 3. i pa (1um 61( IIJ,; 1'; :1(J)0 I .\;(nll')OI)(Mn;~\i(()ol i b9.50 cru(W· nf))(1n3 .a.:)61113111lCOl:lA?111l3) I -t o '-.1 I . 199561 P I JrH7 <) o (D(n) i:H I)')';' "l!1Ii1roil nil, ,)(,' J 0 I <') 1S 1·

    ~6rro::> IonS b. onJ (l\),[ () r )1.(1. rj)( Jt C) ?,(l)J:) :_\ :) r 'i.[~ .. ) I~ . ~ o ~ : - S{ 01 . (Glt)(,lnm, ;:;l (Glu(Tll'Olm'I' § .'"- ~ f:iil'.la~ O\)(~6)(lj p.3ffi)1roil @ffi)1<05 3 '1 .400 6)( rur~'lm" ', I(oih.arm"l· :', §o Glj)(o. o')((J) :)ljffi.a

    ~n.n.a.·S (i1r08 III 0' 13 ((J):) ,0, aon ., panil(1U(06)(ld llJ3/1( "3m1:)([)'l!(l(r'KlilnJi3 ?96'1nU(~" ·. 22

    "

    6>:lJ !XH, fr:; Olh)fl\ JI.. H,Uf'\ ( }I.lI, IIH"():

    !.\d~ 01 , mX/,(ilQj rt<1il"OI n'l"i '''''1'1;,1 ',.,1; 1.. 0, ,,'1n-l\

    p " " "" (Qb-"-"I1 5IUJU .Ii<'• .J (u"::lI::Jn..'([J1'(J)In.- t'j)d 6)(TlJ.,X '1m ~ .\J(,).1Jtn:)· ", m lcmu ml?.,m. (n:) r i:. Hlmnlfi'" :" .t ,,'1('/./ 1I"II.lhpl!.

    0.J600 fi)n().(), · :":;rjlmii'))'.;'.l.r, .i·~\ I,, ).,) 1\'" Q3000U(36l<1I 11 .1 / (,: :)(()n

    ,e,1((,):l6m3:l53 Qm (ll,o, 6)nl r)amIO),'j:)O I J),:)«"~a2.'~

    ol m.X[)())Qj ffi10 61U!1Jl,:j li1 W".'DI crnm 1f

    U o"')~~rolm o 0 2 r.; ·,) .. {).c,,"~ nJ(nl~r )),'·I.c), . n.Jcm .!lJ .llocBo . ... (l)):l .a, 3 (IT) 3, . :. !.laoom )(il ol <)1 ;; )', ,\ , ..

    aaCQ};Jnlo a.:n OI(1\ 2Io t)l.(). ( I, )f,I\) )()I,(\,·h"I'.\;l~P?'\ 01 oul1l6)(lj mr(6)TJ« ~.il ~,i1 ,n,)~i ;,J(Oi()ilcJ rn,,()jf(oo

    N ... -- ~!)(J)o 31J !)a~cmo 6)m )(~p(n° n €'In" ~t!T!".,ro , nl(U)l(n ~) p f' 'll.,;no{/I. nVA·V'!:r.. · n ":!gJ\ () ",),,()Jh"'; " 61m3o, ,;:1 5 W):> J), "on 3, '" Q3ailoul1lGlQd IUg/ ('\: 'I ~-.,.

    '.- '3a COla C'J 0 (l! [3 OJ OUJ 0 OJ,{), ,{),:J liTll::> ()J .a,:l (/0'1 3~

    01. OUm6lQd (m'l

    fi:::')(J)n 4 .~ ~ OO ();(JU { ~1(1 : · .. I!lnl1'J )~i· · ({, I ! \l D . Pl )(( \(!

    : ~ ~ n.1CUl(})16HTlJ (u)" !1.i.ctlgal. 6'l<:'l 1~;rfO 0'9 40 OI .'l (),l),"S 01roB6l&l§ (l)):l.a, 3(lT) 3,

    Q anil m J m6)()J II J ~ / 8 J) " ( '.1 a0 n ;) (!) OJ (rWJl{Jil (oil

    41,500 0)OUnR" nJJ) ( lT )3cf)':Jbl l '3111)((\I;; .i<).3UTl3 )

    '. ,

    , , ;.

    '. ' . ~

    ','

    -I

    "', • .'

    " I .. ._- - -

    I'J' I ' ,(,1 I) J ~. II .)" f I \ , '.,' 'Ii ,,'!. ' '" 111/1. I(I'~)' " .

    'J3(Ola n JCJ Q(rHlI"" JjlJ I )J .f\. .fl•• JHIJ"'H.p) )' : N '

    r!~'J' ( I ' . j I ' J ') I . ·.n',~ :tJ . h) '.! , II ")'I ·I\ ~ ',', >\ I I' :'

    §CD):l.e.a ana,

    ':\J nil n \) Iii (i) '11 }C) i 1'; 'HfJr: , .. /-_. . - - - .

    J9 9561QJ 283 1' ) 0 'L(T)J.~lll:": ' ~'k'l' I'M , " , ,; ')armznlo

    ~ a08o'\)106)'1I 11 )'1 ',' . (f)o i ,

    19966) QJ 3396 -:), )lLml :~ (L):) 0~IIJC,'I~ (

    .. Il,)f:;:) «() f JI ,I), (,,, '/1" 1I}f'1 " , l'IJ.n. ) 'ld'J IC I OUI~61'1J (Qll tilOllJ).a Q1 1m Q. t~ ,nJO)l ,4, '91r03 N'" ~ : 63

    p;!JOJ:l OJ .e.:) 00 ~ 3~ oj. nu(O,)H]1 ~Gl ... m~) !ifoJ lmoilnJl) §1m5 (il.,1 ~ roil 45. 292 C< 0 N : ~ M nJ(iJjl 6)m~;' «tf!)(n, 'J 3,.j' ,rnon",qnn" ') !, ', tT (('olti~ i C'1 ~ U O , ~880 6lnO.e. S CJ )61

    :, d OIl ou iO (j) (ll ~JI g:)(J)o ('Ja(Tf):)Q):)(() ,

    ())(l\Hl , ... (D . .. ) ~ .P ')1,1 \ l~nn(m'L()';l(1n.~ , ) .. j ~ 1, 1. .. .. •

    ~m:l O J.e,:l (XJ';q~9? 01. (1l)(/' 6l CJI ,,", 'i1P~':; I Q) N m:l [!J'nJ mmi Io Ii) § 1(00 (.H I D 'mi, f) 9 nT,HT11 amnl '...... , ) 6lffiJ (u). 6lffiJ1l1mo ~.J (c) ~ .. ; m {}ll J.lfill '(If\fL'

    ~~~~~-+~~~4-+-~~------

    J 199 fi 61 (lj 3395 - :lo m cm J:) (J):l(() rouil('Ji\ nn'11f,)1 0 Ii

    nJ 6TTil:l (() OJ .a 61 OJ () affiJ :l .3 :l OJ .a :J (J() ,~ aw (i1. I ffiXl,61'11 aJl1l611J!fJlJgl m:->Pl'n J crnm1 " 1Tl ~ 91 (~n n'l ~:l(()o 54,600 6lcnxfl:nu @"~ "'3nJa1K}i ()"m" (at'll/',! I .' nJcmm" ~ . !J'giO. 6)~:::>anmo 0 . 4 7 6 0 (I), ,.f),"!; d lmocl),\Jl

    garoauro6H}J 114 2/ Po:)(On( 'J ' rf) 'l' • \((\rn!irllri·.~ ,,)

    (i)(T\.)etR" nfDon 3.o. : H. II) :~ ( m ') .n. ~ :I'\.: I

    ~ - : ooM Cl J 'J 1 r: ... , 20046)Q..J 6J99 -:)o

    2!1(l):)nJdh~ (IO')~1'" f)1. (f\)dKIH; / mJ{\ nT'r~.~~!' '(1klm l !

    ',' .~ =l(()6TTillru3 6lon1(03 95_1 9 7 ';l(nx~k '; ' -_) ~ o J cmrnl~m3u ffil9(il, (OOmJrrnDl'b;jonu " ,_t1?

    I; J J, L--L-J_L--L~-J_L-~-L-J_L-~-L~ ______~'

    - L " ~ I~ . ~ _.

    : ]9966H1J 2. 191 <)om(1l1 n ( [l )ll' ~n«1) /rOO (lfl()lfc"/11 ~~I

    ( 1I .f), :) u;, IJ ;<~ 10 "1 In 'I 1(/'" . , I"~ \ -{ ( .[ 'I) ) IIi' ~ N : ~ "- ;1 ' " " I() ~ " ntD ,§l«Jo 0 l'1 T~lmo 1 . ~~ (~E\> ,C., )' ,!\·l!'!';\!.{" f'1\d' !' ~ ! M i " . :. ( mm1 ~1fl!:(j' 9-'.':l1Q(0. D) '1 :) (lT1U: r. ,I ,8fJC ~)',fl.f),"';(jko1

    fJ(m:"'J . OI.i ( l n,~ .

    Cl J nil en)!ll '''') I 11 " 1/ W)(('I · , ,

    (f: 6T)n· ,I :) ,n.~;· ( 1) ( '1 )( " ,

    · '. m :) EO!

    . ..;.

    '. [)

    .,

    " " ;

    . , • .- - ."

    26 .. '

    · , \ L a!!IX}QUUo 4. CRlltl Xm" rA Qa!m~o(f)u o..IQ<3~r6TD<3 /i P,' •••• " . . . 2. 5. .:", ~ . . · .' ..'" " ~. 3. 6. . .. ' .:'

    · "

    . . ~ " ffil :J ,edlb em : . ! ~~. '.

    · :. l. nJ:J ef1Ql~(Ol a(j) s.oo:J §lroll ~6JIl16) 4l.oo

    eJ nl 6) Ql (0) Ill> (l) (l) :J (ll) I) a, 2, alI9 a19 ill sa aa 51 :> 3.00:> s" 00 ill:> 6TD n.l6TD1.oo lB

    · ..~

    , . ' L 4. · ; '

    . '" ~ ~ 2, ~OOJO

    '1 3, ~oo~ 6. I ,

    " -;-,

    , · ; .~

    ·. 'r .'

    ' ..~ · . '

    · "

    , - • ' . •

    .- • Vp) '1 (~) Lo 0 IL T:) /2 ol)C:- rL 1((:: "~ \,

    • OJOO 91:\073

    Ct~:'. i f k.Cll f'. (rr~df r ~~(' \ h;l 37 ( i ~ \ ~) ·Jf :(,('";d .1. Sf '\m r Act t 959 ,'"," "','\'" .<',;,,,, ""'<;"'F,rf(,5.,~,5""G5l01"" , ll"p",ft:~tw,~L.o.J4;;Ji~gl,:J-1h~~ fi'ye~Qh~lkM,~,~l':

    ~':' l\(l \v;, i..; h 1~\i'· : ~'_ " ij r"I,,~ 1\: ", ,:.kHf-C 6~

    J

    22.9.2006 COI';n?;'00.051CO@U)I({'S'\£P0S'l06'f1'5° 6)ffi)o.J'

    nJcmtD!C06m:)O M1

    (nil.6.3.cmJ~cB) (PIN-680 001) (TUOonilcm2::xw1aS1£S)3cm

    \, ~/ 1. ~o

    VA~~LoORi PRaPt:..RT\!::.:S PVT. Ltf'QIT'i:.D \l)o~ 13

    R~~vee'(C\ RVeo u.Q., Poes ~dan,> Cbenr:x::U.~ GYJo'6&

    ~c-rl) a:,O(UQ02:,(;C:>Jo-rQ

    ~;8~ 'R~eO::-d' '15, ~~h '1VJo.ifJ J {\fecJ1 ~~~ :-rJ)oSS/ \"~ ~o:nCH

    ~o R. GUc;;llf)&sr<-:>~ Cbs~jj cQ. \SU::J~ .

    I

    '.' ...... , .. ' 1 .. :- •

    , I

    ./. ----j ~~ .... ~---~ . I

    ",.",,' ).. J""""">"~"'" 2L-?i..j "~., ." y.,., '. '10 ."".,.,... ~ (i'7= G~ ~. Cr"

    i ~:-';:""'~'I'~~' >. . ~ ~~.r-Q ~ (1.0, ...... '-.-> ...... :;; c9-;Q, ~ I~ (5J ~ ') ~ ="'hr-rv'b.

    Cf8-.!:. ca-l "· .:\ .r(' . n .. r><.->O ",' o..0c;'''- )-' (.{ (, -1'-"-' / ~s;::;;) r~D <-~ r,-J/ C'i, U ~ { ~ '1 '''

    'l

    n.{)'2)m)loQ)U 6XU)QJf!l&l6)Qof)' CWJ6TT5l61m3(8OJ6TrllslauoooJcnromSl6)cfu . 0 C':l'. c-:· u u 1 28.3.20066)21 (86Ill:)mcw d'lg16ffi3 OCTP~~?'llicr5l6)eJ J- :)omcmI' l' emi (0:3 Q:) m (oJ caD 00 cmo aJl ca:) 0 o'imntillJ~4Ji-!i'@cg &1:) r.a6)COTQ) ,r . . '-"', ,,' .. -.- ,.. . I, .~'• QO(gm§jlo(l)u nJO~§u6lT)((3 emJ@~<8 cmOQj~«»r .oJlcmO

    I ) i/O /? b £.::; . C)r;'\dE;,\,..-·J ;)5 oerJ/­ v'~::J 8LooR PRoPEP'T\E;S PVT U 1'0\,E.D ru 0', \3 ~1=1i<1="\ \'lw,pW>., Poe£> G=o, c:ben~-G~ m,'

    "l-~ (5:hc<.:,)}~~6c:ue:rQ ~~:::><.e,~c;v.)<::Q)C)~ (:) ~ 0)0 \

    '\.O'15\c:<'l=-ml=-b

    GQDQc

    _.. ,~ ,~') F f1 ~ (~. C' .. ~.- . 'i'rR.~,r·~>,'

    f!/t';'''~:1:''''' "%" i i',~': .

    I . G - .. . c:s , " . I OIDD9J:Hl75

    (8f3CJOCOTIJ)U i

    cm:J~CTlJ 0 CG10 QJ2 ffi OJcB'aiCTlJ" ~.acm· .a~QlSo 61 CGr(l lJd

    ...JCO'fO)l63cm·~ OIQ})tJ.~.r 1. (g§dJcru". cmVrN,)cB ®Jru'),fb)" .oSlCptJ00 ..It) °W& f!) .

    I

    CoI

    ·"1 ' I 1. ovo7 (; J' (/ c;;:lJ\e-ie~J ;150001-

    \j ~(j:j u::::>O R VR 0 (JE R -q b~:S P V T. L\ 1"Jl TG D, 0J 0, I''''') ~roVc:£.'l(A \=j\l<2nt.l...Q, ~oes ~C)} che...D'-£.M - ~q,O o'{,b

    'L---'d)<:'Y<:) c:S't:":7r:::0G~,;\-:':-),;2. ~,C))cy~ ~~"::>'C) Ci~ cuJallC"lc;2,x:\)....:::> ~:, -, ,)(:-

    .p, \~S~. ~e..96eoc..~ I i 5, g\\:J Y.Jc0..n ~ f\) e.0J1 \ cy\.\,) c~o~;(',_ ~esb:::v0-:hC.l.0J, 0.J2).f~~06e - ~O")c:£)\e.>3l:'<\.)cc«)=·l

    OD,:)Qc<\)C'R, ~~.,3J- 'Q,) tiJ &\ .l5l)0,;;) .

    • '\ 1-,' : .' ,"' , ,."" C1 '7. .,..,.; -, I f \\" __ : l'~,,,,,),\~ ,~/~

    ',. . \, _.-' L ,'.', '. ~I.L'!! f' ~?·~'7;·;'i;O·)(.rI..>';,.. ~,~ .r;-,. 'r!

    \ I ' i

    I

    II, , I I , I I

    " "

    " "

    0)0091:1076

    • 4 •

    Q308cuJl<.tJO (U)8QCTUo C519e.J3££) a5g;Q8mr 2carm ca~QjSo 29

    @<02nJCOTIDl63mJCof OJCWg:tt 2. a5&Q:J6fW. . CIDJGG3c3 (o)8eJ.~£6)v

    .s:Jl (2180 0 Clfl(8 ~g;J;r sl (8 G({oCOTQ)u (cJl.6.L<:DilCQ{.:J(c)o) (PIN.680

    (26) cmoca1C59;1r) ,1\()0(u51am cm0Qffi)o CBl0f.!Ja,g;) (g§dC)mJ Qcacr3

    ,"I I Vo

    V8~~LDOR PRCF)\'(:

    R9DCA vee/o' \=) VC='f)ClQ, Po~S GJCf7kY-1lSJ J cbeJJoc~\ -·()Y;O 0', s--~ CDG'CLJc:;) Cl".C>, (')..:0 \(),;'i ,;~,:!.C}, -'I) (,')6)=",) GW CIV~~ 11=) -~) \ , ~\'tf'ck Re'Ce.rx~~1 1 :5, g-+I-:J I'Q~'DJ \\)ecJ7 lq \-h C:Wf:};, l'Cblte.:J~o.01 I \:Ol)ca cf\o) 0 (" - ''--Wc-«) c))\ e_Y::J cY\) (AJY;;:))o.".{, Ctf~

    R ' co ~ ()) e,(Jni ~ Cb)rnj.· cg. V():Jc<75)l .

    . !i .- i . Ii" ,I ., j: .-. 1 Ii

    {/ f\ 1\ , J ---"'-n-vhY>Ol'V\I'V . ;~ ~··Hi. Lr~i .,r

    --~--- .. ' .-

    ~.' ,"

    / ,,::,.J ca.gJQJSo 31 Q2Q:l(Q)())16jm)0 QJCQ)g~r 3, tgnJDcm, (U)J~.acB cm~)0J.affi'

    ..a..flcm:)coo ofl(g~0;t sl (gf3C!OCCJrD)u (oJI.63 . ..a..fl

    u 026) (illOC01(EQJP (Eo~)nJ)l(oD cm~)Q(TDo CB10QJ3cB0 (Eg)2JCTD 2c0,cm

    (\" 'j '0"'))" "', (-r'r'" !') 1"')1) (T»)'" 4 /\ c., " \,", I (.>.' , . I ." en)L , C'>.(j)CTnOJ0cB03ffi01 6l1ill (O)ol@,2,c3 ml6T}t Owmr(~J 4-Jo6D.1:<,f);')' , 2oo3cdO 497- :JoCf)(Cr)!:!(Dn ni',rllcru"il,<]):')d:£JICIlJ 23d9{U)j:)0 Cf}:X'u:,,; I I I • , i

    (0 (ji\ I) ) DJt \!)) :) 0 On (g r.~ &rd" "Ii (): :, «(XO)' , (OJ :) en) 0 ( of] , 63 , Dfl '.2} :; c,'· c ) , ., : .~. (PIN. 680026) CB10QJ2

    ""'emU r-jJ""'m)u (t)(\Ii<)Cl-"'-' ,"' ...... -. r)('"'!J J<)r;:; rT"t'-.r')r\l"J.c:f'IV ("")")a"~'i _ ..- .... r:.::' UO " '-'V <01.) '''0.1" U, ~JrlC.:JJO":O'L ,)LOO LVJ'-'=-0=J ""0 CI(l(:;;.:o,:,1",·

    6)(o)cB03Q361 o.fl(E~@',:t 6lc0,J(Cl.§1 (EI3CfdCOro)" (o)JQCTDo (cJl.63, 6)£jJ~X()?i; ;

    I (PIN. 680 308) CLi2CO)6,UJ):)sn3 6)6)"JGl:!J:)cof 2cfhcr3 6D.llm51cr)8J~

    62 cmao3"Jmrmlco6)l'7:" nlC()) (T(' :) C5gQ0CTD"

    Poes Ga r d en, C11c,,11'1,11-' ,c,(',tJ'"",'\ ii()l~,,,,Ou ''-\j''~rt)n'n

    1.

    oflQJomJrormlafo ((j)OQmJo R, (OoJl (f)(86l1)n2J', (SC)v:}-S 8>ffiI(T)(QiglJ:X!.li

    33 Q2&:lcmmlQE,cni' (1J(Q)q:~r 1. OJI.CJoOCrml, B-1, Grasmere Apb, U"boync

    Road, 'Rangalore-Sfin 042 n(Don OJlQJOffi)COID)lmB ({3):)'.HTt)o

    v.. N, C!010.JCOOQCT3 W)((tl v,ffimSI (.8§]OR.fl 44 ffiOefnJ(Om)lmofli

    , QJWmt' 2, croocrm uJIOJ(()~)ClcrB o{J)OT)IQJcD t8nJcDffi" (,(j)~nmfl

    )'" 6)8))Os2cmm CD)ioo W:X6 °, (o)Oo)S' nJ§l8>mflroB aflC1J0icEbl3CfD

    1- OoffiCmf C1JnD8cm CGfdCQlC2(fmocro mJ6T)J Oro1mfCCD)u 1- ;)0 Gj)J 3±};-t I 532- 0001:) 12t\ 0 4.3.3 C.13 em (Ii) 1\ .1 (1 OJ 6)(0 OJ era 6m3 §l ctm j '9 9 5 ai(

    3457-oom CffiI O()) 0(0 0 Q3Q.J013o, 2- oomcmf QJnD8>cro 51 6illJ8l"

    529 -OoC1J:)Q.Jjo 479Q3cm«r3 482.C1J6)(O C1JCfo6ZmglmB 1995<08 3238 r' i I 3-00mCffil" OJnD8>CrB sl (illJ3cOO' 529-:Jo C1J:JQ.JJo 483!23COJiOf. J! 486016)«) QlC!06ffi3@lcu'O 1995ccm 3239-0, 4-:JoffiC.mf Oln{)£hcrS 51 . I~'

    f'IJ 6ill3ffi" 529 <)0 C1JO Q.L\o 487Cl2cmam 490C1J6)(O C1JC!06m3@)crm 1995@ Ii Ij 3240 -0 n.(J)Cffii ffiCCT:U J (J)~)((H:lZmcr3 Cl3 QJC1J2 0 , 5 - ooffiCmJ" CllnDc0;c0

    Sf 6DJ3ffiu 539-:JoOJ:)~t\O 177'A3(o)C(50 18lC1I6)(O C1JU06ffi3g11ctm 1995CUb 4243-0, sl 6DJ3,:e;r 539-0oQIOR.[)o 183113cmm'B 187Ql6)(o Qlera6Zffi "

    [fl(0'5 1995ctm 4244 - 0, 6-:}o(()c~nJ C1Jo.[,)£hcm 51 ffiI3£bf 540 - C)oC1Ic)l=1JSo

    461Q3cm«58 464C1J6)(o C1Jcro6i61'3§Ica8 1995«58 4428-0, 7-0oCr>Cmr

    ,',I . '7,r L QO(g(T)&Qlouf nX)CiJ,36Tf)C0 i2gxpOl.:i-· _.--'

    QlnD8Ci3 sl 6f2J2£i,-/ :i,10<:or]i:=)C!Jjo 4CS<:':12(wafo 468OJ6)(o OJCIO

    6B'f3 g;fl CUD 1995 CUD 41j ;: 'j , (), g " :) () (lJ Unt' CJJ oD J) em sl 61ll28;)"

    541-:)oOJ:)[l.!So 179<22(15)(0\ lii2(16)((; (}JU(i6GT3@1a:m 1995a:m £1483-0, ,

    9 - Cl 0 to c~nt ClJ nD ,.0, U(,<1 ";01:; ,(n" ", 4 1" :J 0 OJ Cl ~lE 0 187 '22, em CD'S

    J90 OJ 6)(0 OJ CI06B'I3~1(()1: : 'j (} ri ef6 ,11 e 5 -- 0 ,,(f)CTr)", CI)LffiJa(l)~')(a6Zm(J~ I' , ,

    :!'i , "

    , ,;,

    i " : }j (f,) 6(\ IWJ1 (00 1995 (06

    13 -:)0 mcml' (}J CLD8 c/o

    387Cl16)(o OJlfd6Bt3§l(D{) 19~h(J)'3 j:~ 1') -- 0 ».worn mc,cruClUJ~)(o6Gl3cr8

    Q E> QJ Ql3 0, (g Q &:l 51 crt 1'=1 C) ,,,i CD mrml6) o§ (g eLl ceil m3 6m) 6m3 g{l «J8

    ""''Jon f) ....tj l"Y"\\r(\\f' lr'-'.'>:.·,,~n,·v··:·~ '-'(".f •..,.,..,. 1'7'i1;:~("",1:~ ("\r('A('"\3616ln~v'l,"", ~c f\JrC! ~Vo CID()o SI "\..LLJ~'(U',;'\)',.I,!, ,.' '-"'-",':)!') \"'U",LJC;.I)~IVV:A =W'6'-' o

    CTUD Cln.J 0;) n I'>: '((''(\W:.J!(D,CQ) (l)coyvSl6> ..:, ",J ' ;",,~, cruJJemC0T)~\caru)lccf6

    ~)-- 9-/<'>')('):A(j \.) (('\?}() /'\..I1 '\)"'" J\.;j\J/(~:

    1.

    8

    Q,;j,QJo 6Tt»lXffigJ<1J3. 2-:)omC01J38,:)(c' .... .il)'lO" OJ~6Bm 6")6) f'),() /(foo

    6)OJ.gj cmam2csoll-3:J3 OJ0acmcm2o .•... ii)Um2 g~ccmo C8100J8~CfO

    Q3§§{\:j)3o slcwD61ag nJ01nJ~c36JR c.d)"" .', iC8 (Q) Cl\!J~(\))c.(Y(})\

    @0Im2cm

    581<:>-oQl:)euo 26122(0)<0'5 264016)(() ::i(I\)6Gl3gJ<0'5 1996«it3 1411-0,

    16-80mcmf OJnDS,cm 51 6Tll3cE6)° 59i)<)c O1DQ{lo 40722(O)coB 410

    • 016)0 O1OO6ffi3©lroB 1996r032537-o~),::/! mc.cruJw!J06BDd6 ':d3QJo

    6ItJ) 6m3 §la.m 3 - 8 oro (,cru:3 tfb 8(()(1B eml (3' :')!J 6ffi3l 6) 6) tfbOJ CfO 0 6) OJ .'lJ'

    ®Om3f5ofl~3 O1«'2cmcm2o s/CW:)ffi3 ')~~(((J)o cmaOJS,:)CfOg3~«))2o I SlCW!J6)roI nJ01nJ~t86ID C8CWoJlCS,CW en; [lCffi(9\Jlicow5ko3 @0lffi3Cffi ''0 . 6fT) cm;3!~883em3. , 17-:JoffiC.

    OJnDs,w sl6Tll2c:a;)'" 590 - :)oOJ:)QjJo/ . 2~(o)m'3 406QJ6)('o QJCfO

    6Bl3 g{l coB 19 9 6

    6lU.l6ffi3§lcoB 4-0omccru2 c£1l0

    rtrra ffi3f5ofl.g,J;r 0103(11)(0)30 Slcw om2 SL : ~')} 0 C8100J 8,!J ao 22 gw (0) 30 , "':1 '::i 51CW06>oR nJ

    9

    1B 5 Q 3em (\J8 18 8 OJ 6)(d OJ (fo 6\ffi §lcffil 20 0 1\ cffil 6 3 9 7:) Q (rWI21~) \lYJ lei ()

    Q,300 6ID)6\ffi~1cd8 5 - Qomc,mJ38C)(Clm emlo" Cl186rim 6V){»C}J({do

    6) OJ.!if <:t:l1Om3 fBOJl-3d3 QJ (03 ffi)em3 0 slm) 8m3 '2:) (0)) Q (DIYl: ,0<, ere

    Q6~cm20 slCWD6)og oJ01el.J~cB6J:Q (d3;,CW0JlCd3;,(D) CI0J~)CD)((TC.?\(l7fu5I(()t,

    §:!col cal 3ffi)cm dg J ca3 ffi) 6' oJgl ca Cllel. ..(') c£iJ g:fj@ '2 6Jt?l.3;3 CT5l d3, ((5Im? en; .. ctrSlm~)(illl 6Tlln..03QJm6)c£:I§ cmJ@~6:l R.D.D. ,LJi:h)(u3 o51m)]~) r~Dl\

    66R2/951D 1, 66RR/951D 1; 4R17/951D I ; 66R5/9~(r) I. 69()(,j<)5/!; (,(,i)/,

    9 5/D t, 60311951D 1, 484119 SID 1, 6029/951D 1 - c' om(0'-.l2.·C7'?'·)i.~~f

    ~cmJ82ffi)2. CIDJ6>)9 t9))3ffi) OJ.·,·':;,23.Jc mfc)OJ ffi)o6Tllcrv51-3d n.Q)~J

    u nJffiCO'fO)lm" CG1OQl8DCt(6)c£:l,3 0.JoDcf7,cJ6ffi 3,03,46,500('])' ;, .•

    2-:JoffiCmJ3&b8COO)'"' (B1(lQl&bD(f(J6)o::J.3 0...]oS)&buuffi,,," '" 46,41,660(5<2130

    3 - Do m(,CTlJ3 d),8 <0 m'"' (BTaOJ d), 8lf06) c£:I§ OJ n..O d),(f08>,,)" 8 2. 9 4 34 () ct3J

    J CWJo, 4-8oCD(fTlIJcf3,:J I ' ! .t, ! cw30 cB,~sl Ii!(5CWffi)Q2 c:LilI=lJ n:licrQ)J'0LS:l3 ! (gQ&:lsl 8CTlJmlffi3(g0J6ffi1 m161313ci8mo §2cm'lm~m8 ""c'J.:) ... .

    1. cmCTD101ffi3CTD3. @I03oJlblJ ®a6TIDJ' l&t.6>Qsl ~2n"lanml(13l06IQ)r

    QJd3&:la:rrml arrao2oJa:rrmlarraCm3o oJ§ls,OJnD&MJ3 OSQ,{''lsl £1,(I'I(I)lJ::n" em"loO<:nll ofl6)§o~6TCirU)u m)loomcm.o 6)6)cEI,OJCloo em01,{),CQ)?,o

    6) ..Q..]CQ)\mlco[£!»3em 3. Cffi() (\J)[ m:) coB (\J):)6) 8 oJ31 £1,CQ.\l coB Cil:o) col

    £bJ.3em QJnOcfh6)§• "VAYALOOR PROPERTIES. PV.t LJJ,,!Trl':i)'

    04) em 013 g~;; 0

    ®a ..Q..]QCQ)6m3cm ffi)illl

    Q g3 0 ce:, B> S 21 6) (\J) 6) 6)

    6TO)6ffi3ofu:t;)3o (gQ&:lSl ffilOanJmCOlID[m3o QJC(\J)O (§),(Q)On(pJCW cruJQcmC.mIHQ5COlIDQ S3 a9>J,sl ~ SQ (TUDQCll a9>QU06)n':l§,1§'2 93§((J) 30

    c\~ 1. Q

    "

    ~------". "-' J<' O(U)CW~ gxug<>~rv o(J)OW2cooro 'r 1\,,'

    C tJ ?iJ CD I U C ODD LS f\}' (i 8J C § 8J 8f29 CQl9 0 e§ '9' eCO) an 00 go:> L'Bl aL9 (9 \ PUlJPC'B'JatwlOtw gD~~eDe;;(9)i:B&BQill) oeIOL~(Q)(9ttJo Oe(9~~~ lot , ii," . Ls2(EP lSillt'CfPl}D 002c..'B'08JfDu.D8J& 2ffilfice>(JVfD ·t'u.D2WL0tsm

    U:QJ.Q) 2S F3' (9 )00 C rtl9 8J (fW C e; e; u.D fa (9 ~

    ci]8l'O'(Q))(IVCfU9 CE9g)8mSOOLsEce ooEw"cmrat,S.D o8raL'Bl(Ql)(90(9t)

    C0 g)(EP LS ro SCD oo8e; 12) C"B' ruJ ~ aDLCD L(U)2Drow>c(u)8>2D~

    G 818J '€f' LS ro Sill §§eve> C'9' ruJvCIDl;tDo.Loro CB'LO 8fill fD 0

    , c 0 8) '€f' LS ru Sill 00 8v 0 C ee> ruJ t') em U.D QD W u:w tfee> 0Wjb Cfa 'c8i&''€f' U" ['-'Sill OOetH?>C'B' [") vcmtpJ W9eJCB'<.WU~)ro~8 §eJ'B'8J 'C08J(O)«(}' LQJ)LSP<0' c(J8Je;; COO'8J

    IJm~;cEPUJ) 'Ce;8J0CCJUfDS'fD 'cW'Cij8J\pcrv 'ClV8J5cro cra8JCillQ)l:SF\?(9 + (J)lfOdWPJID 'C(0)8JUillJu t& 'c8:(9"{P(Q))cruc£U9S"{P CD!jDe0C(Q)C9Ccm

    )~Q) U.9 '0' U {) m 0 em (ill) C lJ ew L(illQ)W ruc otU) LS FJ' lJ g) 0 eoow> 8.a9 «ll9

    o 2ro 10~;; (; CD 0'i')) 0 Ero (?J) ro (EP (9 (9 0 E(0) ill> mw lJ S 0 S (9 8§ <"e> (JU ro

    ?(Ll) f,,(? c; (i 8CQ)CQ.iD)crBcrn ClJ(9Qf)C'€f'rD0W C(i(90C'EP un Q.W oe 00 ') C\9 ?) C 0 (i (l))(9craew C(J)8JLCQlQ)(J) rorocmw LS !\?(i8) CW 8JgDtill9

    oPculSwU_UG''B'Q(Dill ,PI.,(Q) OG'WUIDUDG'lfuru-(9 o8c(ifD

    II

    ,,

    (T)Qrt0,~6)Glcm3o @<8cm 81OJffi)o Gl3em

    8cmffi3o QQ30 Q:Jcemo

    Gl3@§(o)~cEh3(fD3, 6)OJo3mJ~§o OJQ[)S'§361S g:QCDo n::w;13dCli) cm1m3o mmo OJuDcEh§3

    ~QQ~ gl nJ§ CWo OJ~6B!33 em cml m3 0 ml

    (8 Q n':l sl a, mJ ml CD) 26) S ~ S Q cmo ~ 0.J

    (8 (0 6lJ

    (8!() CJJl,a, ~ 0 018:::J (j(j Q 3 W em ~ 6m'.', 6!'0) 6Bl3 <8 § :J cEh3S306D..l~o(f)67Jl3(g§~ (gQ21s1 cmo:JnJ(T)6)Q.:J C28,0§ r<:,'.; ,0

    806m rr51WQCnJ8:::J

    ~ S Q. cruD :::J OJ r£h:J Cia 6) 21 S (3 r£h <2 CO) :J 6) 6) 8, OJ (fO 0 6) OJ d?£) ;; ,f:', (~ ()J:' '. ;

    ~6l13:::JWl.§l~, n.mem" CTDQ(Q)QJ3o QJnD<.0J@lc03

    6rt))OO!3crD QJQJC5 Q:J C5 Qci:::l sl cmo~nJ mo QJ£?J<8Q:) o{j)6)\Ii))83;) H~()

    6DJ:J (illS (0) (8 (Q) :J 812 nJ" (0)1 (8 em :J ill n2:i" 5 (8 ~:D OJ (0 (\ em (()) J CQ) :.,; cvt

    ®0ememlmu 6TO)6Gl3©2o <2Qci:::lSl CTUD:JnJmOJ2o 6l1J:)(lli,ll0)t,;)o'L.;1

    01m3cmem3Q:::J83Cffi3, m183em1 Q2emQJ:)cmem'·· 6Tll:Jrr:1jl(ml~~~

    ,( '(

    1,

    r

    'b' ,

    J3

    <8 Q «Yo m c.ffiJ 8 (j) ~)(o 6m3 ((8 ml6ffi3 em.B,) U em

    OJn..D

    COlan m3 till (01 c£fi) .3 an (0) 8 ,£}, 3{Tn 3. (g 2 m3 CD (coJ :=q ,B'C.'

    0 cmuQJ,f <8 '&'8.m <82 ci'::I sl .&, ffiJ cr5l (0) eml::-~ ') @,39.'l aT " rum n O~ ro' 00 @C.n..J

    CfD Q 8RTI

    6m'J6ffi3§lm'6 1-Qom(CTlJ3

    U u (g 2 Q:l sl ((310 Qj.3 cE£) 8 cro 6) CW OJ Qj 6::J 6) 'A (l,r CQ)'; 6ml \.' "ijJ CiT

    CTllil Q 0..1 mcorml m 2 (g OJ 6l'lil(Q) 30 GfO) 6m3 ©1 m3 2,3.4,5 m emJ 2cD,') (;) 81; tgOJ6T"li1CQ)3 o Q3m.DmQ6)QJ ICICI 6illQIB,U (())ol@,;YZ (6nnrllOliln,(1; ':1

    u 3- 7-20066)QJ 840040- Qom(;.lTI.nmfl cmcm 6) -'l.l8l [oJ cB,:J (0 ~,36~

    \I,! 1. 20(2Q)~lo[J)u nJ::x3§"'6fDc3 C'5gQOOU'" \p(

    14

    35,65,0608 sl 611Da:116)oR sl C6f.lJ:}61IDn6)QJ 22.09. 2~) 0 6 6) {:II

    9 1 2 7 7 8 - :} 0 m Cmt 6) ill ~ u CoJ .a :} (0 OJ 2 0

    CBl9 2J 3 ££) c:4TJ em 3 c6J ~ sl of] § 3 <8 o.J {(13 ~ CD) :} cfj':3 (TY) :3 .:, '~'j (\'j :<1 . ~ , . ,', "VAYALOOR PROPERTIES PVI. LIMITED" o..(j)ffi) t0lCT2JO):CQ)36)S

    PAN Card No, AACCV 2GOOA crne ca2aD2. (8Q&lslcruoooJmcmm16H@ PAN Card No. AAEFA S923C-c. 2,3,4 cn(mI3S PAN Card No, ACNPJ 7971-0, PAN Card No AFFPP 1588 J-o, PAN Card No. ABNPV 7397 R-oCl3l9~6CT1]J

    1. Q:}OO)WoW'"' oJ!X3a'"'6J1)(8 (ZG;G!)auo/1>/ "

    l. __ ··

    ;"1

    IS

    I I I , I 0.3500 6) .. '),n.o;·sOlm'36)ri':1.~(m I I I I I I I I. I I !_':qOi:SIT'lJc'66)(11 6:)%. (";:>4 I ! ,I I I I I I , I I i I I 199561l!J 3240<)om((1lI:lW I I ~II, @rlCOlO()j "" 0 CIb ~ 3 "J'l 0"1. m)(~(j)(?-J pr. \': (~'r:,~ ~-?'! I 0 8 1 I iI I, I ,8 r-- 0 i (·l_l(?~n~lnw1a1g <.:!,anrt 1:.r.~J(f J(\ 4.3.;:>.:>() f,~, II)q:.n/li' I I N~ :!t'!o (JlJ .' I lEt) oJ a:J5l cgm 1'1- ffi10 <3. wr .Q.l.21gm, 6)~L}0iD).) I '" I-I" = I I i 0.3500 6)n{)",,-sol

    L

    • •

    ., it I':! , "1

    16 ! ~j,

    , J99%)I2J <12-13 0, t1;~I1t\ on.{))cfo"kn(·:': ! 0 oIIClJ0lYA 32,:)()Om)\!f12o j2.:;O'i/" o 1 8 Ie-.. ('l £',:)('1fD;{C!T;(I)':lo ..--dl(Xl~-~pJ,r '),,(/', e 10:; ~ ({I '" 0'1. (n)(3 f») <)J ~-~2(i)~lCl n,~~! i ,. .Ie]) i·1'.', \" , 54.600 6)(llxlt'kn" !11J,:03oJ(ol')/((J';;' !.!.Li'l}(di, 6)G:)(~)l))O 0.2210 61(',fh_" ""3(TT)3 ~303(mdl6)CJJ G~,2

    19956) EJ 4428 -<)omccnJ:)(D~)(c)(lJrm I(!}\~ 01/':)J (j I Ilj o Vi, gf?§J:J 6fT) 6) (DIU) Cll rf:») 6) OJ 03 (')":!J:J ~J: ,( :'J d.'., ~:) ti62a ?~~'" " e Qi.')~t "()':.lCl.{ 1'3::'i(j)n cCO 30 C18&l{o)" 6)~lm<> nJCW6ffiu (G::j,')\ ,dmYhll:)pr ),'" .2J. ~q':D. 6) ~:-:I(DH:n.o o. 4 ~13 0 6)0 D(f"'. ':. -.'I?II. ',i '< l'i~: ID I ""3(TT)3· I I , ~303m)c36)(lj 6';2 i i i i~ I I ! Ij- 1-1 -1 -1199!J6)L~ 44:;() ')o-,nCCIlJ')(l):;{cIWI( ,':! :ti.:,·!,·' I 01 I ! Is I' I IgQCLl ~ OJ .e,:' CIO('13 ""~' 01. m)(36"_~ ' .. '" ;,,;D ,:;:: 8 1 I I r- C\ NI ""I.J®1<2

    I I! 1199S6>ru4485-:)om(:.ru:)U):)CO(7jTun!:<~ ·:~~f1~·l~7~i-~~ I o I I lsi I \ eJdrn~ OJ"":JCJa>l3~ Ol.(Tuctl61CJj fiIYc:' 'HJ;, \.; I" '(tt:, 81 I!:::/ C\ I : IN I"'/"'m\4lMl m0e," 1300:.031.250 6>m,'(\';>" ""(!"",,,' W("''' \ N'" 1 1-"" CG@ ctl . (GTd03nJWlW,] (ffi(J6Hlli .. "D. !A1~:" .. c·. I!-:'.,L,,·V)'J:·,) I I I 'It I I I 0.4930 6)Qf)",,"sr51Ml6)d:]§((j)0<)'3':''fCi I "i I I I I ! I I I~:J(liIlT\llil6Jl)j 652 lLLJ,JJJ.! .. 1.,). . , . ,:;,. 1. ,

    , I

    • •

    r' 1-' 'I ..I ~,~-" --'- ~I'·i "'-J'·~-9-5··(5)··'-8J·'" ·-·]'2-J-2··-.··C)·o'm'c·cru······",·W'·",·(·o···,··or·····05; 1':

    nJ~:)0()Jr& 6)OJ0302CTTlJlgloJM1<2 I I I 8 o 'f'.{ .oJ.Q1r":) ")'n<1,,:1),, I I 0.6360 6)nD.e~sOlam6)2J.§CDJ:>.&a~ "'J I I Q2m(J\)06l()d 650 I I 19956)Qj 32! 3 - !)o()(~.nj~)(D:){~(0l0) i(';'J:'-~)!1r:;~;:n ~T;' i I o..J6n5:)(() OJ 8> (BYe) O1.a:J 00 Q2@2} ,./!, ... li.i(~(iH]i I . o @(03(TD.a~n oJ(o!1<8m\9lam 63(TI)" ,'nil)" 52.150 , I .... S ~ () 6)m)cw'Kn'" @C03o.JcOln.}]63on'-' roBc(: ,,)(tiTt'ri' n! ::1 :1~loN .~ N '" (.:I! g <3. 6) Q. 9 CUfU) 0 O. 6 3 6 0 ~ .... () ,J " '<1/0;1 ;;'\ ,:,'j :-', I : aJJ" ,fl,2 CTTl 2 I i ~AaDmJ(6)()d 650 ..... ___-:;-., ...... __ ...... ,., •. , .. 19956)E.1 3214-:)o0)CCTlJ:)(l):)(O(lJrtD1J.>T1 ()llD.!(c\! '1; ! nJ6mD(O()J&). 6)()J03mJ'JS'JCltJ'"). ~;"")'J:D1' o 0;' m)dl61'1J WGl2(fll.agloJaDl,g(1)'9irri' ,;",:.' ..._ 80 ~ -;;; ffl!)Wo 5] amffiJa:m:ol61ar.i' 6XTUopla/ m02"J@ , N !!l W190. ill00 doJ com5lm ::>81" ."-L d1 Q'b 6, 'D aHtT;c 0.6360 6lo!).e."solr086l&J§M:>.e.3(Tn;;. !.l~(Jkru&6l(}j 650 _. ___, __~ .. I 19956J1tJ 3215-ClomLffiJClWCl0((ml'!3<>1r0m512j:&(1Ii' OJ!1I'o 01.3460 (5)..n ,a"S 01am6)&;3(O)",a :i(TI) ;1. Q3cr3mJd\6l(lJ 654/2 ai'''tXlJ3!J2r QO)(lld:h 6)(11()rlUlJ:.J,~J(~~,r):":J(I,! o Q3~ o'.m)cS6l(lJ @Gl3=3Q' ol("n""T>~l1;lIlldJo nLQ'gcil. 6)Q::>,mmo onoo, c a 6l .t),aCTTl d' Gl !.lammJro6l(}j 651

    I'D

    T r 199G6H2J 1·111·- :)<)m(O"iJ :)(J):_)(.W~. &'3<").a dl!A\TXiJ.Q, I5)O.K\1(nr),:P 0)", ".; ,', '9 ~ (ff," 0 a () , .. ~ (, 8 @(3acm .• glnJ1ll16>CO,'fl

    :.:~,"-~,': i I[ I~II I II co II cr:rroS:J.:r II e' ~ I ~ C!? I oi.m)(86)f::H @0 rl(m.l~71","J(Q'!6 "", (,Ij:, .,_,' 11 .." ! i ~ ! i i - i 5 06xTuofflcrf PJ?03nJcuj' «31.0{j __ , ,:,:. ,«, ;;;)i~:;' ::"'1;; (I; ;' d'lg6l. 6>,,8=0 \,3'0 \0 "'"c,,,: .," i I t gl I . I I I aamffil<86>'1l 654(2 o 1996 25 36 ~om(ffiJ:J(l)J (,(HUlW'/(;\" :,.,1,' :_.'; ()"" I I 8 .e.3oa c'i:\ Q.rDCl] ,A. mOIOan:II:\j" ;-., 6>'1l @(3acm;j11l nJ<'Jll6>cogl,oS .. ,n ,', c \ a Qd~=lGll0O" Gll0c3. 6)Wl~".,. ! ..J .• ~ G I - ';'

    'F,;;~ •

    , ':; I

    +----+------'------_nJ':J8.i" ... __ .. _-----_ ...... p. W. J) o;0:)(U)"

    1.

    , .,., ,

    "

    L ") MC""""" . r I \...... \) n lJ.9()f /::1'

    ~----7 I ,0~/ hMCWg, JDWtIT<> R>Csto>e>eU 'v . -. \. I \; ~J;' goC!"8> . E --rrg.Ll9 Ce;§8> 'Z . ---, ":,\ "CWCWg; ~CU9<>~ <>(/)O~UJ8)Ci5 'r , ,

    ;,i"':'())P.eJL(Q)2sro(9'f(we'9'C(Q)(~,aDf'G'(9 JiUlf") gml..O~'€' o0cm

    "<~;:?J/" '. "'J,, "', '>')::), f: rely c rU9 )i'i" tj 8,0 P..Ll'€' tj P..Ll aD et3 LfO }QJ.Q) (ill eW , '. "f", , '. \\.:S "L'i(n"~I':' yi,21&JJ" UWgDCWleJl9(9JW}WOC - 66v \,faJ o(Q)aDLWcoclill(Q)

    ~WC\'j2'9'\lffilJDeIDl 'oCW()jt'

    :') '."'. ,ru/, ~U'lI"ill)«(DC0CW0'UJQJ) oSC<.'B'sc(Q)81 Ls2IJ2SW(9 &l2FJ'ro'illilJ 'z • • ri:"Z, .. ":" '",''' "" r; \";g) y!)'B'\"; P)(~ r" (9U'IT9 (il gmL5C(~S (fju Le) /!3g,[JOcru 'j , \ . '

    ": gD '9' lJi5'& c CUl

    t'i'§ g; .- ...~,,--·_--.-tr .. .::J ("")(ill c '<:j , , " "CWC~i;) ..,gDWIDt> glcfuoo>ee; 'f> v/'\" '.. \'" \,\1( goC!"8> £

    J~r~~g.Ll9C~& 'G

    .( "O.DCt'§81 gxJ..19,,~!" ,,(J)o~(l)8)Cl"i " ,,,,~''\\

    (.I

    \.

    - •

    JI u.

    OJDD 9J:j069

    : - . ,.; i ( ~ Ok_ ' (r [ ~ ," _: _~ '. '-:: r :; '. r' ',\ ,-.' ~ ! ~ (1- : '<, .\(, t r:1 : ~\ Sf ',11''1. F '\ (. t 1')51) I -'" "', ,," '"" ',' ,'" ' ",""',:,,',':1 r;.,,~,GQ,~.,:) 10- :",:;,,:EI'~SI~~,~:~;twu ~ ~

    c:',),>"'''''''" : """:'k4~,'" I \M-:-O'1-.R.oc::lb 1; ,~~~ ,'," ' ~ __-'

    1 i~ 1 :\!.,(u r U i':,.~, r} C~ r~ ~:f !, 1Y ~ {...J-.i~r.rftt:f,,--;;-- ,," --~

    2 2- 9- 2 006, (o6TT5~ cnSl(O rum51 CU@ 0 ~Q ~6TIg'" 6XTU oJ"cmo6TlHn Q~ CTl)o ~(O3

    c:Jcmml(06m~o m>l(£lcml, cmJ~3c8 cm~'eJ3ffiu Sl o.f1~~~r Sl ~f3C1Oarrmv

    (nSl.63. cm.sGG.3c8) (PIN.680 001) mlO~nSlcmQ~cnSl(Olffi6cm [email protected]~CTl)v

    1.

    2.

    3. U.D /\/0)3 >'/ pvT . ' fY'~/;.'''''''''') v--J ". cb . q, S iJ--oL Eo N cQo.ve/ 11enru.;(-i eoau:J (?p. I') ZJ 10 r(Q"

    . .. , c9~~~3{~GYD< • •••• ~{rfv~ ?~'Id)' r:d\2«6.~• ,_..,_ ••• ","..., i " .," . " . .. '" .

    L ...... 6') (L--N P:-;c=)~J 6?CU"" -t1~, ", ...... ,., ...... ' ...... ,.. ), -n. .' .:~.: ..oQ,. ,. ··.c·"'·'.",

    " -,.';,:"

    ~ (fI ',\ .' c/~~ 6) ~ n;5C"¥V Q~ ~,.~ ,-, . \, r

    I r'' I \ I. , '

    , '

    - I 0100913070 \,

    2

    nD'!Jmfl6mf 6) CWOl f!1 o1u6) IJ or (D)J 6ITfl g1 m3 <8 Ol 6mfI Sl ffilO :Jo1 m v u rom)l6)oR 28-3- 20066)f!1 (86Tl1:Jrocw IJ'1glo600 OCTUf!1Jn2UcDl6)f!1 1-:Jo u mccru cml(031J:JmCo1

    L <-AGHAVeC::(2r9 !-iVC:N{;C/ pOc:..s C/)t9t~fJ.~77e~t~~:1M~~ '0 O~3 '7""';"eJ~ 2 ""', J7)213:;;'~ crl ..... t.i< .':('r)e':l . '.' ...... ," ". '. " '", '" ''',.-.-' ",'Q;~O ". h. " '; •••.,.~ _, .' ;.2~. •

    ".','

    .... -" [,:: .. -~ .~ c·

    cc8-il ~ ~ ~ /.~ ~ u!(,?,,:;~V';~f~1!p,~:;::" ::'. J:' .... ',.-.:t: 2 'Cct» 'l1~ Q Er> ~ ... OJDD 913071

    3

    Q:J

    v v (O):JQ au 0 CB'@06tS) 01 <8 g11au Q ce, crB ce,.gJ 01 So 61 crnoo6nJ anm153cm

    1 /1'\, ") v v \,.

    -,

    i'"0~' '.... : ;'. :;. ·.·········'·'········, ,'10- r,

    , . \

    ; . . ·l/," OJOO 9J3072

    4

    OJ(wmf' 1. <8Sld~auo m{'\~Jc3 (O):)fUJ

    (cJl.63 .dlCW~(c)o) (PIN.680 026) cmo(c)1(89;~P (809ru5laffi aD9IJauo

    fU

    , 'jl L 'j" .

    tI "" \" 4-d;,-,J~ '" , ""o""j)',,, v ,'~ ~, / ,,,",,W, ~" "o",",' , ,/,/"" ,\

    -\--;1 .s ~

    0. C0'...) dH\\J ""Ie il'2o,<:,n ~ ,,Jl (! ~0() ,

    .>' . '10)'2~\i 1bDrdlrd S?yz,I,t" ""?'(i)%'~ "

    ;laD ('2:xY:! I \D I aJ 8~s,11 0'z?0 ~cg, ~~od~~~~~ .--, oCillGei§&> g>W9 9g>GfU (J)°Lei§CD&>GtJ °1 5:/ 0 o /,0- . Co' \

    )'Sra81UU oQ)ccmW "oofrac(Q) Wf03)(Q) n(u)C~8log jlliCG)fD Aa.19Q)l~

    fU~OQli2) <::9 Ji:DWUWUU9 2D'9'G ,,(Q)cra&lfU(9(9 2DSCOO~(Q)~ru (SOf 089

    NI a) (L5Q)C '9'(9t9W) "CQlD)Qf)881 d3Q)C '9' (9 JSra81Lru LO~Go 2OO(Q)(9 I '"•, gl~t'.lli9LQ)~tJ noo~rac(Q) oQ)~fU8)~'9'2G oCillGei§&> °v 2DQ)C'9'~ruDw

    °C-[ l$R-'tJ81 nR:l:5(Q)fD ,,(illt9~fU20Qli2) 19 OSfD~'9' 2D'9'G }WI"BWfD

    ($>21000 O(lj)(jC(Q) @IDUTDCO&> cH.'.D&lLQ)Qli2) (no 089°Nld) (oQ)ccmLF

    °1:9W) nCQlD)Qf)881 1.$ J~ra81lJD oQ)c<'illW "oo'C'rac(Q) W'C'03)(Q) gDCI"8l O£

    }11xIDfD "Cl!Jt9tSillillR-'2 G L£ ° S fD ~ '9' 2D '9' G )WC C'.@&l ($> 210 ~ 0 cw CiC (Q)

    20) [STU co 8l C KD 8l LQ) eJ.DJ ( n 0 0 S 9 N I d) (0 Q) C <'ill W t9 lJu) "CillO) 00 f;'JPJ l~;

    J~ra &> UD 0 Q) C (fuLF n($>f ra C (Q) o(ill C WID Ji'j:)(G)fD ,,(ill t9 LCQl.Q) fU ~ 0 Qill) I 9

    osruft"'9' gD'9'G "CWI,,83WfD oo2rarQw) °rWCiC(Q) 20JlSfUC081 cH.'.D&lLQ)Ql8) ) . I' (no 089°Nld) (oQ)C !? J~raIDlJD oQ)ccmLF noofra C (Q) Wf03)(Q) j'oetfS (!)n ft" ISfU lJW ° Q) C '8'[SD R-' t9 ° Q) C '8' fUJ l'J C w

    glcf(Q)€?2(j (Q)L($>C(Q))ncw!]t6o [JIDcrwJW O C-L6P @ID£OO<:: ,,($>2fU9

    OC-J7 n(QDACW~O Jf.19cw Wf03)(Q) LFl1.9fD&l2OOWfDCU)@V JU)l"fflQ!fD °z

    ,.,

    6

    SlC813ooaJlU)~ (nfl. 63. ..a.flw; 0(0 0 ) (P IN .680 026) CBlO(()JC8q;}?O C8oocu5lr08

    em O!J

    QJ

    (nfl.63. .s:J1

    ®9E1;3

    rol9a51 C8~!)auo ~crrnQJc3ca.3Sl "VAYALOOR REAL ESTATE PVT LTD",

    NO. 13, RAGHAVEERA AVENUE, FOES GARDEN, CHENNAI, 600086 a.mcm

    <6>m.Jm1£b'J2C8OJ6Tlil @C8ctlO~6)"s<8!Jo<8 9, SILOAK

    ENCLAVE, HENNUR ROAD, BANGALORE-560 043 a.mcm oilE1:Xrururoflr08

    emo!JffiJcD1 C8~ofill 61 CBlO02nJrom51 63cm" OJWrnt 1 Lt :Gen Q!)({l)J6 Q!)Qa8 (Retd), No.23, NAL Layout

    East End Road, 4th T. Block. Jaya nagar, Bangalore- 560 041 a4)cm nf100m)

    '" '- rurofIcol3 (U):)!J 6fD"O W; !J <6> 08 <6>ffiJ a5l C8~::>cll 51 CBlOmJ u a.rrofJ63cm OJCQ.lffii'2. S. (J)1c3Id a.mm51OJc3C8nJ<8a»u a4)mroS16.l~sa

    1.

    7

    cm"iOJWJ00 (()):)6)~ oJ&l<:8>co51w3 oJ10101£:l0;S(ffi 1-Jomcmt, 010..0<:8>03

    m}cCW<3(TI»J03 ffil61}t or;;r;j1ffillcm'" J - Jo6DJ3£:l0u J 028 - Jo01J215 0 381 Q3emc08

    3850J6)(O OJC0.')(ffi~w3 2004c0'5 5098-0, 2-:)omcmt 010..0<9>03 S!6DJ3t€l5)v

    542-:)001:)eJjo 423Q3cmc0'5 427OJ6)(O O1Cf061m@lc0'5 1995c0'5 4668-0, v 3-:)omcmf 010..0<:8>00 Sl6llJ3£:l0 542-:)001Jf!.lS0 41lQ3

    OJCf061m@lw3 1995c0'5 4665-0, 4-:)offiCffi.t OJ 0..0<:8> 00 S!6TlI3cB))v 526-:)0

    O1:)Q.lSo 247Q3cmc0'5 2510J6)(O O1Cf061m@lc0'5 1995c0'5 2808-0, 5-:)oCOcmJ'"

    010..0<:8>00 Sl6llJ3cB))u 526- Jo01Jflj5o 253Q3cmc0'5 2570.16)(0 O1Cf067Sr3gfk08

    1995roS 2809-0, 6-Jomcm.t O1o..O<:8>Ci8 Sl6Tll3£:l0'" 542-JoOJJflj50 429143

    emwS 433016)0 O1Cf06tffi@lwS 1995wS 4669-omCCT2JJw:)(061mCi8 QJeJo

    <3 Q 2:l S1 m.ill J oJ m (()JD)16) (~ <3 oJ ccJ( co'5 61U.l6tffi @1c08 J - ') 0 CO (,CT2J 3 <9> ') (0 em u cmo;(t 0JJ6?Sf31 6)6)<:8>(JJ(fi)0 6l0J-3:l ((3](;ffi3rsOO!3:r O1(03cmcm3o <3Q&lSl " cru.o J oJ CO (()JD)1 ma Q J (em 0 cmo 01 <:8> J (fi) Q 3~ em3 0 <314 2:l Sl cruo ') oJ m

    ((JYtl:ll6) oR oJ (01 oJJell 6JR (<9> (Ql of] (<9> (Ql ffilJ,)((j) COOJ (()JD)lroB @(OlcB))3cm v ((J)2Q,)<:8>2(m2 7- :)oCDCCT2J'" 0.10..0<9>00 Sl6TlI3£:l0 599<)oOJ,)~0 275Q6crm

    ., 0/",/ oCillCWID g>CU9J3VCr<:,cf)°t~Wl!)(;\,i

    . ()"'\. ,<~

    Oe(Q)~2ueDC'E?£00fli o(Q))Cu 2WC@t;; 02(Q)UDEQ)fD JGUT),~JEwet,)) Jt IUtq

    o Qf.) fD '€P C9 C9 [5:lQ9 C fD ~0!oCill go Q)C '€P 2rw') (1)0 c - t: gill L@ffil9C0J9 0 ra ~'Ci gM.J.Q.9 ,. Q)cmcrw}WO-86VV gill966[ SWL81t.m9eDfD 0C9£089 SW(Q)2GS'9 o\tacru

    oC-L09 "oo2ru.9t;; gD'€POUfD "fU)}WOC-Gf 'o-E6t:t: SW966! swlfifJ..09

    eDfD Q)C9fDOLP £ill(Q)2uL9P 0Sh3C£OO C-L651 nOO'2fU9l.$ gD'9'OUfD )W')W

    oc - [[ '2UJJe"G'cue (Q)UJJ2ool,Q)® 2m [5illQ)1Cill)J(Q)c rcw@'€PJl!D@ '8'}ill9~)f.·rtl

    l,0rv ~C9C(u)l.$ o2(Q)oo2ueDC'8'fDeJW o(Q)}CG 2wc@1..? o2(Q)cw2e)fO

    "Ri'lJD82w0fli JrrfDC9 0Qf)fD'€PC9C9 l}l0.9CfO Pl,(Q) Ql)Q)c'8'2ru5)(j)oc (:

    u £ill~ ElQ9C0J9 tsm C @ '8' tJ;'rv lfU9 0 Q) C 'E? fU) Q) C CD c<'k u '8' C9 C9 Q) r " (U) Q) f U

    .Fl)}(j)oC-S'9£G gID866[ gIDL@ElQ9Qf)fO Q)(9rOotf gID(Q)2GS'[[ o\focru 1. °C - [[If nW2iU9l.? go '€PUUfD )U))WOC - 0 [ '0 -66vv gID966[ £illU§till9Qf) fu

    Q)C9fDU SW(Q)2u69 0)raC[OOC-L09 "W2fC.l9L,S 9j)'8'ourO "fU)}(j)OC-6

    'O-8pa gID9661 SW~t.m9Qf)[O Q)(9fOla gID(Q)2GL9G O)]oC[oOC-2:6<;

    ~CB'2fU9U3 go '9'OU fO )W')WOC -8 0 -8851S Qill966f gID~till9eDfD Q)C9[OeLG

    8

    9

    SJWJ 6) oR oJ (01 oJ.3

    em;3D::>8;3aD;3- 13-::>omCmr O1n.080(3 Sl6IlI;3n:nr 607 - ::>o01::>f!Uo 251D;3

    (.0)(03 255016)(0 O1cro6ffi3~mB 1996mB 4542-omccruJWJ(Oo !;llf11o 6lID6ffi3

    @lc03 4 - J 0 m [C11J2<6> J (0 cr3 aD'lo~ 01 J6GTS! 6)6)801 CIao 6)01.!lf cmam2ffi

    ~ O1(06ffi1aD3o SJWJm3 QJ[aDo

    oJ (OloJ.3aDCamJmm51roB @«)I.£D)3anem3QJ8a

    14-JomcmJ' QlnD803 SJ6IlI3.£D)v 1039-Jo01Jf!lS0 205Q2aDmB 209016)(0 u O1C1a~roB 2004c03 6402-0, 15-::>omccru O1n.0803 Sl6DJ6~u 1039

    -Jo01Jf!!.\o 189Q;3emc03 191016)(0 O1C1a6m3glroB 2004mB 6398-0, m[cruJ .

    W J (0 6m3 03 Q.3 E.J 0 6IOHiffi3 ~ mB 5 <) 0 m ccru 28 J (0 a3 aD"I 0 v 01 J 6&fl

    6) 6) <6> 01 CIa 0 6) 01 -l3:r cma m;3 (5 n.n -l3::( 01 (0;3 an em;3 0 SJ W ::> m;3 Q J (em 0 '..,. cma 018 J cro Q 2~aD 20 SJW J6) c@ oJ (01 oJ.3 c8 6JP C8 CID oDc.<& CID CTUJJ

    (CTQ)JeIDo:>lroB @(Olm3an

    sl6U.J2mv 607-Jo01Jf!!.\o 77D2aDam 80016)(0 O1cro6ffi3~m8 1996<08

    4501-0, 17 <)omcmf 01 n.O<£1> 0(3 Sl6Ill;3

    10

    282(16)(0 0l(f()6BT3~1c03 1996<08 3589-0, 18-:)omcmf Oln0808

    Sl6Tl12<6i-r 562 <)00l:) Q1S0 73 '32 IIDmTI 760l 6)(0 Olera6tll3~c03 1995 <08

    7030 - omc.ffil:) m:)

    " ,::n'1 0 U Ol:) 6BT31 6) 6) .a OJ (f() 0 6) OJ .g,f cmo m;:ps o1l_~r 01 <0 aem (0) ac

    sh.DJ:)ma Q :)((0)0

    C8

    OJ ill 8 CJ3 S!6TlJ3ffiU 563-:) cOl:) e{S0 25 5'36

    1995am 7J99-omc.cruXD:)(Oo Q,3ruo 6fO)6BT3 ~1c03 7 -:)0 mccrua 8::> (01

    cO)' 0 U OJ :) 6ffi31 6) 6) <9> OJ 00 0 6) OJ '!3:f ffilO m af5 o.fl.~f OJ (() aan (0) a0

    S!W:)(Olffi2 '3:)((0)0

    nJJWW?C8 wo11C8 W ffi)J:) em cams

    ~Ja18 OJ ill 8 §1r08 '36Jt'la a m1.a

    96 01, 265/96-Dl, 6687/9501, 6693/95Dl <)Omccru6.a~:)

    ~//// 1. Q~~o(J)°oJa~o6ID<3 ~OOUu ;:'f

    ,

    11

    ®am 2 Q (O)181§1 (0) (oJ8::)(oo Q6JR1§2crfl8rom5lm5l§2~(O)~cf),6(11)2'

    em 96)\:9

    n(j) ~p CGlO OJ <9. ::) CJa 6ffi3 ~ 2 0 <9. .3 Sl (8 Q &i Sl cru.o ::) oJ m (01'0)1 m U CGlO OJ

    89CJa6)2l§ ()JnD8CJ8,oo'~ 2,79,79,080&3,(0)20, 2-~om(cru28~(Omu

    (ffiO OJ 8::) CJa 6) 2l § Ol nD tB, CJ8,oov 1, 44 ,3 9, 00 O.fh (0)2 0, 3 - 'J om(cru 2<9. ~(O mO v midOltB, 9OO6)2l§ OJoIJtfhc!O,OO" 88,78,200&3>(0)20, 4- 90m CmJ2 9 (Om

    CBld0l8 :JOO6)2l§ OlnD

    CBld0l8 :JOO6)2l§ OlilltB,CJ8,oo'1.37 ,7~0{QQ9&3>(O)2o, 6- :Jom(mJ28~(Omv

    mid0l8:JOO6)2l§ Ol nDtB,CJ8,oov 1,50,15,000'£:)'(0)20, 7 - ~om(cru2.e,:)(Ol,oov

    mrdOJ 8:J CJa 6) 2l§ Ol nD 8 CJ8,oou 2·~,,)08fa.<>~ c£h(O)3o 83Sl 8:J6TD

    auo6ll5(0)2o CGlOS,ooo ~f5(O)aumemcoJ.e,~(Oo 8,10,22,080c£h nflQJcrflCJ!!lI t'

    em em1 (01,00 2 em ;3 . (0)'10;3 oJ10 n{j) ~t ~ cf), :J 51 n{j)@ aoj (ID0 eJ

    ~ co aoj cmm1 (() 6TtS :J (0)1 (0 cmm1 n{j) 6'I'l3 oj (ID0 (0,301 (0) 96) \:9 oJ 0 (0) 60

    (oJ

    (86YlJ :J p.~J 0 Ol (01 tB, CQ);3 0 oJ §18 Ol ill tB, CJ8 (8 Q 2l 51 8 cru m1 cOO v

    ®'io:) (1))1 oD6),§p ~l6TCmJ)v (o)LO:Jm

    1.

    / \ <>(U)C e@8) ~ W9<>f3£?C fU<>(f.)°lJ~:~(08)C fj "I ~'

    mUD e IV C CO)(9 C em ~ U~ CfP CJU CD 0 e CD (Q) ') C ei ~ W l,COl.Q) W ru C onJ) l?f'Pei8> oewgorum019 oefOroveWeIm 02fOQJ)fO'€PC9C9 o2({l)(Q)m:we:;s(9

    S(ge~CfPCJUro "eCIDe CfPC oe(Q)(Ql.Q)C~ a:a C5(9QJ) C '€P CDQill) C5(9 Q)C '€P!SDeIDJ oewwc 8 (i (Q) C9C~ eIm CW8> IJillillW fU C mw I? f'P (i 8> C W 8> gollil9 (Ql9

    02wl}O> UDe CfP~W "OI.,(Q) oe wgro UD 2 to) rrr C9 0 8 C 0 ce> C9C9 go ce> CJU CD

    '~ oe(Q)OO eSLSf'PC9QJ)C '€P fOCmw (is (9 l?f'€P 2s CCQJill8»CQ..l)} (Q)cfcw ~ ({l)CfPJut:xmCfJ'J oca>Jco 02wcillox.ll'-'c aruJ !?f'P 00 o~oogot1Q9(Ql9 goCfJ'CJU fO

    ~CU9C(Q)Cll)efOCWlJD~e~~ oe§R-'<.geIX'EI'fO C(isQ cfftrrtx.9

    OQJ)fOCfJ'C9C9 (Q)C9CsfCfP oe& ~gxm coo?llis(Q) cr:uo2Q)CCQX9C(U),,&

    CCID8>!JD ~L'€BQ)C9C 85 groLCQJillfO fU9 QJ) C ce> fOQW S C9 2 f9 t1Q9(Ql9 CCll) 8> LW gm~t1Q9[5D gmlJillillwru C aruJ I? f'P (i 8> 0 (Q) lSY"' cw go t1Q9 ((l) 5 rr

    "ofWl9l2 CfJ' fOC9l5Q>Qill) oe~t1Q95e.> ru,.raC(Q) o~({l)(Q) mw5S('§ o~81t1Q9QJ)c 'EI' fO

    C Q)C CfJ'lSDeIm (T)lJDc~ ~ fO C9!Sill eIm 02W)(Q) n ()fJQ) oQJ)C ce> fOC QJ) fO 'EI' C9C9 tc 02c.uxm 08CVCfJ'C9C9 o~ruJ.9(Ql9 02flX.1.)fUCmw ~oo ,,~rul.9!SD ~fO~

    ,,<93'[5DrwCfJ' GJ.)CD':' Ql11Ad HIVlSH 1VH1I 1I001VAVA f9C9'€P(JV fO " " CID2<93'LQ)fO lJD gro (Sm CfJ'[;Sru ffiC9C(Q) groc CD !Sill eIDJ "2 CID2 <93' LQ)l}O>,,({l) rrr C9

    Z I

    :? .,ClDC~ ~W9.,SWCru.,roO~8>Cfi 1 //~

    tpf\lJtJ8l oeBlD OOeQalgm<.m~ o(u)fDf5JCJ..D8)cm OeCilltJC9CeJC9

    )tl:HlliQID) 0 em LceJem C9~ oeBl

    UD8lcm gm~

    OeBlUWCOl9 OefDCDruCDnD tpf\lJ(i8l (illC9lCDfW'EJ' l?F\?()8) nUDfaC9®

    C Bl8l

    CBl8luwu

    W9Q)OO;ouLQ)~1,IJ BlQ)'9'8) 'cBl8)'9"0'L{ij3t,ge'EJ' C(8)() COO8)glCoouaC~8)

    'cBl8l 'CeJ8lSCfU

    C ra8l (Ql.Q) e SF\? C9 CDf.,m C SW QID) , C (ill 8) LemnfU ~ , C G;C9 'EJ' (Q)}ffiJ C fU9S '9'

    fl·

    x/' ..,CU>CW8I g>~CfU.,(j)°Li'r§ro8>CV 1 /~'\ /~

    8)(9C(O) o~~(U) O~f&t)mfflW~ oQJC'EJ'ft")~ "ec.u.i0BL~~ oecmC6?OOO\99'<:('P ,,~'EJ'(J"OfD oW~ 'OecmogL'(':6'LJ'(': ,,~'EJ'cY-'fD

    'EJ'fDQ)Cru90' 'Oecm'EJ'OOf'fP'9(,:'I "C93'gf.)'EJ'cY-'fO osCrweOfD(9 oecm'EJ'

    OOO'oZ'V6"C93'gJ)'EJ'cY-'fO 0Cli9C'EJ' "ec.u.i'EJ'C~§ty.D

    WCre'S> ...auXYx3QID) ~1PCRme>e5 Juj)wgIDei8l ~~%uxm "C93'tYJIW'EJ'

    !.$@'58l gJ)rul9Q)Cax;rrnlmgro581 "~CfU9 ,,(Q)({l)Cro(Q)ZCi (S.Q)e'e'lSD

    "e(ll)eCi81 Oe~ffi29 (Ql9

    "Wl5IDcm~ gIDccmC(Q)Q1)eQ)ro CCi81S?W C({1)81[Sillnrue@ C({1)81(Q)fcrucfU9

    Orroe6J(Ql)C9 (f)v C Ci 8l raf5 ow ru CJru) [;>EP Ci 8l C ~ 8l El.f2.9(Ql9 nOO'UD fUJ '6'

    [91'P 581 gID~ '&uo ro 0 ero(Q) 5 (U) ,,(Q) V)"o ora u;uro C ru9 ~ C ((1) 8l '6' e 00' ru C9

    OQf)ID'8lC9C9 ClID81'8leSR>(9Qf)C'8lroC(Jill)CiS0 go'e'Uoro 2ill(Q)eS~'8l gID!Sffi

    /.SDf)?> 0'f~ oQ)C 'EJ' 0'] 5(Q)(}D (ll9Q) '9'?lQ) rut~ ~ Q) '8l81 e~81 ruJ.9 (f)o e ITI9 ors r R> 5 8l ;'Cll9C(Q)OO e5

    QJ)C '9' IO cQ)e 'EJ'/.SDQW ...C93't}D fill '9' !'pEP 581 oeWI5IDCl.l) e Be 5 ,,00',,(CDro 8l

    U?)fU8> S(gelID)J.DfUJC(9'l}DQl.\}) Sh?C9mDm9 o e ES ce> f(9 Q) 8l C Ii3 (f)v 00 eCD UQ.lQ) QJ) e '9' ro OWJ Ci S 0 S C9 e (CD LW fUJ 'EJ'

    1'1

    15

    na)~3«P6cm ffi):)~OO :)6)6TD ~tU51roB 6lU>6UI300 63&ft§3«Pcrrfufl

    d302Cffi2· <8Q~S/ Q2 d3

    v <8Cl.l6l1illw3o 6lU>6tm~c08 2, 3, 4, 5, 6, 7 mCCTll3<£hOcOd30 <8QJ6l1illw3o

    Q2mi1m06)f!J I C I C I 6lll0£a(6)oR a»J~,3al C6lllo6lQl!16)f!J 03- 07- 066)f!J

    840040 mc,CTll:)cn5l

    n.1Q1W 5 arro6l'IDf <8<£hOSl 0,3nJW3o 6lll0!€b51 3,70 ,22,080&3J Q~cm"

    0~oJ S/ 6lll0£a(6)oR S/ C6lllo6Flill6)f!J 22-09-20066)f!J 912779-00 mc,w

    6)..ll.ld302(r..l<£h000

    .~ . u QJcnft§3~0<£h2(ffi2· 6lU>6m300d30 nJ2

    ofl.3(3<8n.102~O<£h2cm2· VAYALOOR REAL ESTATE PVT LTD o.4)cm

    <£hCTllCT5l(26)S PAN Card NorfACCV 2599 N ro@<£h6

    <8COTOJ W20 mtaQJffi) XD<8CUTU>W2 0 <8nJ ~<£h@lroB 6lU>6tm08 r..{D ~Xll0ao

    QQ3 <8oJ~2§1c08 6lU>6m3§1rol3 1- :)omCCTll 3<£h:) (()m2o 63&ll.32

    m51~£6)a:)(026)S CQ)11):::>(.<£hQo PAN Card No. ABNPV 7397R, AFFPP 1588 J, AGXPJ 3932 B, ACNPJ 7971 L, ACIPJ 9077 C -ocm:9<£h6

    (" eUlJe '6' C(o)UlJeCU9 C'6'eUlJ Qr Jlv CWC9 C C IJDllUllQlQJ cm CUlJe ~)o (l)C Oil ZC II fUcplJlcwgue 10 'eUlJe'6' C (Q)SlV'C9IJDlLO'l,'6'(}V(9 oaoe '0 ~ o(Q.l{J)c!,}C9'gJ5~IJ'[1l' o(o)f"eQJ@ 'gJ~ ,racUJL(O)f" It:s I:;;: I : "'I~ 0> g q,> p.:.tjvCWC9 gO I 'g £ 9lJJLUlJe'1J IJDlLsQrL(Q.l{J)lV'e~ '" " L5egJcw' ~O \me ~ Ql)C'B' IUCS CfUJe 0 1UC9 'B' IU gu f\\' = e5; UJC9 QJ 'Ell QI) 1JDllJ'? 9l1U es CQJ C '6' ID j'l;l.QJfUlJD 1JDl1.(Q.l{J)QJ C mcru5)UJoc - 999 ~ roC9~6 61

    O(l)C," l/9Cll IUC9gJcwguelO

    'eUlJe'6' C (0)

    SlV'CPIJDlLOSo'B'U"CP U9f"\!l\ ~: ~I~ I (" eUlJe 'e'C (O)WJeCU9 C'6' eUlJ Qr Jlv CW(9 9 9 IJDll)1llOl QJcmCW)e!'}) 'o(f)C:!I/>:"" IUCPlJlcwgue~ eUlJe'6' > C(JJ) Sf'l'C9IJDlLO So '6'U"(O 0"''' '0 QI!l(QJ C~(9 'WilLO

    '("tl" 0 (JJ) f"e 5; Q)u 'W ~ Jml9 Q1fJ) L'O.lJJJlV'e ~ ~ l;:lZ'ge \,'lJJl)U9QJ 1JDl1.sQr l)1llOllV'e!'} 1.5e'ill.lD.l9Qlfl) ~I&~ I ~I fUIJlCW lO oe 8! I11l9Q1) C'6' ruQJll.) c~ Qr oe 8l111l9((J) IJro­ lrul ~,&! ~ I o e OO'L5; e'0' [1',,5; C 0 full m l,rDra '6' cw ra CP l(JJ) QJll.)

    oe!U)Of" coe!'} eQJ<9 ~e!'}QI)C'6'rucSC!U)eOfU<9 '6'fU "'I W : I IVI ~ o "" 0> ~ QJC>U9f" UlJEOO'sl.'e' ()lDCUlJ1:9 oe(O)((J)LOO'C!U)Of" ~ [5OlOl'<1'15D o~1J OQJC'6'rJ) \lD'6'UQJ~eU)QlIJ) (;3R'OID oe(JJ)~QJfDUU \JlLl.\lllill QJcmcru\Jw OC-9601< RX9~OOZ --+---') )---

    o e.> ru W:A~ emoCW ru I~~H 1i ~ II --"---'- ~ ~, ~ "ll~2)l4».(\q~.ll. . I .L .,. ,-...... , ... ;._.,.. _-

    91

    17

    --.- ---". r------,------~------.-.- r 199~6}(:lJ I r-- I 4 66 5 - J '" (j crru "U! ~ (NOnD1

    d3;) 3ern:) to oS fj; ..qJ £9 3 nJ amD1 "" 0'l1 (\J)" 6lcru 0IlJcrJ' D 3 n"J=l63Cfn"ili(I)" ~ ~ 6l(O):)GJl(J91 o.Q)~" .oJ.D"Igdl. 6)Q:)iUJCl)o 0.04"0 (5)<>1)8" ollDB6l&f§(O)::J 8acrna. D3 rrBcru dl6l QJ 1148/JIl:)(f)o

    199561eJ 2009 -:) om(JUI:) W :JiO

    1995 (5)eJ 4009 - :)om(JUI:)w :)(MJ)U>11DB of)OJellls.lJ I!);lill- !oJ 8::J Oil!:l 3 ml oj, ffildl6lQJ aJro=ag1 G13&f611!lf (5)ffil o)i1Cf

    ~ : ~ '" ~ N oJ(O)l6lm.§vlGl1\dl. @ell3oJ

    , (0):) '. o

    19966leJ 3568- :Jom()W:)w:)«)=llDB of)OJellls.lJ o.J6rn \4119 : 0 10 ~ kl - M M o.JamDl=Grol.I" 6Xruo)i1m" 03&1(0)" IGl1\dl. 0 3&1= aJro6lIDJ" .oJ.G1i9dl. 6l!:l:)=o 1.1133 6)

    .' , ,'V /

    / \ \.

    \J'zw lD<9W(U)gDEIJ Will,IJ'I" oSW(9/":O)'" 'Il'\lln> ybt'qjQlOlR'EIJ

    !J.J Litv (U)(9 ft W:)I,) L CIJ<9 Will,IJ'f'" nWJ<9lf"EQJ@ Il'\lln> nSW<9l(Q)f" 0>' ~ I I~I I I I I 10 ~tffiJ(U) OCJ)C:lI gaJ[5llJ<9 gaJ[lllll9= tJIllllR'EIJ ~~=OO lD<9W(U) '(,0 OOillEIJQI)C'9'CDCOJ~ !Jrul(U) OQ)C'9'rVJQJCmcru.!)WO c -~9£Z 10(91)661

    ('eWJe'€P C(Q)WJeW9C'9'eWJ JOcw J.l.U(u(U)<9 006'6 bmlJllll9Qlfl) gCll[JClCW l(lli{J)R'eIJ l<'leUl.\ill900 !rX9W(WW . I I I I I '" I 1. OCJ)c:v ,fez" fO<9Il'(U)gDEIJ I I I I 1 I I~I 'E(J.).)f'€P c(Q)5FJ'(9g£lll.OSn'€P (]V<9 Oot-~'O OCIJ<9

    Ql&.IJ 'f'" n 0lJ<9!}llllll f" eQJem 'Ql\lln> n5W<9U O)f" JJ.U'u= ~QIJJ)1JU1'llf"JOCW l:S17 gaJ[JClcw gaJ[JClCWLFJ'eIJ I !':l10;1 :1 .. 1 ~ il t'

    OCJ)C:V f~~ll lD(9W(U)guEIJ 'eOlJe'€P C (Q)5FJ'<9 I ~0"l,'9'<9 O£Ll'O o(lli{J)CIJ<9 'WI\,IJ'fU n(Q)f"eOQIDJ W'llfl) ,,0 ~fl'llUlOJ l'vE Q)a:~ J41!uruxo 0 <;; L '<;; 9 IlCD!)U9Q) LO\lln> Ulilll>f,uh; l.ilt;(Qu:u.9Q1ll) fVOW(U)'l,o fOcEEIJ I <1\IN ~ ~ 0<1\ ; I "" I <1\ C'9' fU csclwEolu(9 'O'fU \lU9IJ (W<9<9 l'JNWl0<9 "'I I~I I f l.QJ IU lfo Qm[5UlOJ QJ c en C InJ) woe' 11<' a (iJ(Q Q (, " I I i t I I .... _ ..__ .~_~ ....._._ .....~ ... _. ____...... ~._. __ ... _...... ~ ..... _ .. _ ....L ....L .. , .• !. .•. _...•... _~ ___ ._ ..J_ .. _..L __ ! ..L .. J .-j

    '\ 81

    19

    .-. _.. : ! I o()nJ 01 gj T, , :.i!f~~'l:) ( 1J '(:',:) (10'),,,\ :~,1;~~:.l (il. III )rrx))()) (Hfl) 6llno,,a ~)-l r) d ()::J(0Il'JJ1

    , , , (n:) C~J k)t~ ['n :X!.~ L~JO 51, 97 6X'YU(lp,(nY ~P(() ;}-• .J (mo.\l6.} crr3'

    ,~ n I .-, .;1, "1("", ",'1('1')" ""(')(/\ Nij \ )1;;1',\.', ,·,.i4;':;'~.--'O '.. ,';} . .:} , ...1 I () .J. '~I,~nl)rru ,{;'6;c'JI 1;:~~::' Ii (("j 2(((0 (J):) (()(O'lD:;[({:;rJ

    : ~: ! iPO) J OJ-:Ol··)(Ji)()l3V~~~ ell,rfIJd;())(}! mro6lurm.o~fl ~~ ~r;':;I(urofl (r(:\C~n(Db (n:~lr!n(rrS 14nJemlmJef 6X1l)(l,R1:y)"-' illrr)6Mj' , , rr1(1yn. mf')(!:~(, !aJrnn(~(L\~S" DJ.l)19(~.61') ',«,1(1'00 '400 6),·.[),£')"~:: (51r.n06)rQJ§ (0):) ,f:h;jcrn3. o .,.1 C13crBmllDCilC)j 1122 (3 ~ ~I'" - --\----1- -r-l--l--l---I------l , I i 19966H?J 45 -1 2 - J amlJnl J m:, ro(omilrot\ OJ1ClJ ail '11 D'l fl.l !Xl 6nl 6) 6) rn; Q 6J1il OJ ,£J, 6l OJ 0 3iT.' J:J §:J OJ

    \ i i ~~OOil6)r!J 6402· :loCl)CCfl):)U):--){(')(t'J'T(Y)lc:ofl (}J1OJ!Ol-±J I ~:';~(Cl'~" OJ <'~'h:) (j"'l'~q~}~ ni. Cn)(Sr:))r)J ml7'J 6lTJ)m:1 ci' {

    OKflJa.P,' n.{j)(r()~ ..6:)6n)~(II)({J):)62((n~) : I (),j, ((L)C06)Q:l (U!OOrolO)f)g1 CJ3&J(OlO)!((3fb6TIJJI' ~~(rD"lbJ(f)O i 1 , 8 1 o(jJ(jM'51" mCle.foJ((J)" lli1!1W, mCle.foJCO, m:JetJ eOl'rnlo(jJ:g' ill, ,]''Ig (8, 6lQ:J <0'10)0 D, ~2 40 i I I 6)QJ 1155jr1;:)C!)o I I : I i I r, I '----.J

    00 01 ~ '"." -r-- 01 . ~'--'-.-'---~~"-----'"-" ---.~, I T f I :";1 ')t) ('ill.:':) ,! j () 1 - '.)0(1 )(fUJ~)(l) ~)(()((yro-)l(o?, "JJ k'J (OL:,)El;JClJ Jio I (~'J ;C<) ':Ji) 'j :~~~~1 01. Cf\)(O(N)J (\lrr~ 6VJ)T)) 601 ,) 3O'HOTO)]i I J ", .:~ Q I,~ I ,;:) ,,- (iI:1 (':J/(Dt, (!3 crr)1a.Jt, 6175 6xrunpryf ~1)("2"J(QIO~1 i M M : !(J 0 1 ! t? I() mrt)\jPJJi' (rnQ.l.fJ, "J;l2l;Jjo fll, '~i'lo(B. r)l'..A:)lOTu>o 002,00[ " 6!,·.Dl:')··~~ ej llw ('i)..t:J.3 (0):) ,L"b3(TD3.

    .:J 8(lOUl) roOKll 1122/1,3 (Q W1Tl8 (D:) (o(um>l

    flO) fro 2,(:)):J tlfn 2 crT) (en :") ,0) 2([1') 3) 01,m)(oo) C}j ';14 !~ 6m3 ffi)(O)::> ,f>' 3 (ma, -+-I------1 199(6)eJ 3 5 f:j 9 - :) 0 cn 0.1)):') (J) :) (0 ,um:i 1tLTl) oIl cu 101 \lJ I ,cJ6nl:J (oOJ '{>'6)OJ" 3WJ Cl ~p OJ .oJ.d'lgdl. M'" M 00 ~ '" o")Cl :)COTQ1o 0.3'61 6) 00 ,aosol 6D13cm(O)::> ""'2nD 3)

    .

    /'

    1.

    2 J

    ------,,------'-----~n--! , ------r------, , I I " I I ! I r i l':",-)~,())r:~J /1')') () ("nun!:) (1) :)(0 (olOil\Og ()/lrw6L I I'lJru :) I J l 3oJ=ln1ll<'!u 6lcrun)!lm" c.Jro;)())CDClrf1)" ~&

    N M ~2.-i~j(07o)l~ann" ~:d. QIQrB 6)r.}:)((JH},o 0.3642 (5) "".f) 'fn~t M'" - M Ir - '" ci1rnoOio..':Ijj (tTl:) J.:!) ?cn)~ I I I 1122/~, It:) (f) 0 (Q ,1 ~I I sqcril ClwB bXl1 6cfn:) U):)rocmvil(oB I 6)((1) nP,j .'-\IJ ((I)3.a:) onWTIl((f)~).e, 2(T02,) rz 1)"I1J :) &)..) " (j)(}1)J'- ~)4 ~

    i I - m :l I'J mi] co a

    Cil'..:;-··[J,', n.nof 1-- -- (,J~;16{IJrro')() 9.1:Je1'

    6)([J)£i;J'~ (lJ (!)) (.::J.~ !}; (",... J :)~o:f;.~?)((U') 6){))(pJ e11c.il () coJ' i::I1d:-1:. (nlDf1J(lJ~o, !'~J:')[:::Jrio rr, (ll\:r C_' .. _._--_. __ .-~--.'---.-.-.. ~.-..

    1.

    • , .

    22

    ~) , 1. Q~(J)sti7o(f)°oJ:J(g:f6TDaJ m~Q(nr.:) 5.

    2. !l3.e

    I.

    1. 5. ~D~"

    2. 6. ~:J6Tl3 ~""--

    3. 7.

    4. I . Pl1>lJ ,~~ 2P, i72i/flS, 71q.;th.•. G.P.S . °, "8 ~A \<.\--1 \'.,.10 " \';;a QJ10(;\j"'o , "8l1br\ GnJ°G21:}~" mOlJ

    531 A \ \ \ \ \

    5~-3 I iC5~: I J %"B'''' .21-5 J) \, A PaS'1 \ "0 ,:))

    CBS-4-)

    . (;;\-4 H ,., ., '88 G I --;:~;(-- "'-( 05·:<,) •.• -'-< •• '~-J( 'B I , ,. A !q' .., , 3\·G :~ ~.q. \'8 c '\3 "" -~, 1 , I ,.'-':>., I i (Cj';";?:p i" i 0'8 8'1.", I !ci35'1 gq·C L~ __ .~_~.~./ _." __._ I 43·.., oqjJ ---_____ J __~ 1\

    pc· 8'~G:liO_'bCID 1"Gl::;. n \z, lqs ,. \-<,. H \'JO " \ F:'I

    '------_._------,

    5+3 .1

    CI

    8 I \ \ "'" :.:" \ \ \, 545 9 r 0 ! "'--"'(/+"", . ~ ~ - <.;J-3..; __ _ \ \ '- '" ~ ___3:O..::·,-1 "'-----";'3<- - --", , C~~ II I I f

    ..~. '.". , 5+0 :0 .1 r-'" I ~

    I 54' !

    ~ II I I

    \ I 5+1 I t t,

    t· J

    pc,8\-::1::D;-::>'-\\-;)QD ,GiS ?'\\3\Q6

    j _ .....,,+. __ . ' •. _- 'lBf721jP.:i. 7 Ii\kh~. ('.' .l' ..'" ~. . 0 . OQJ3dl

    QJla~",o : -;.' , '.

    "'101 -~~L'-\

    ------531 I .x." . A 1 1,8." gO; \ \ -p.q ,-i ~t 'I C-\. \ GO, '2.', 5-8,. 5l.q ><1 '0'1' '28~ \ '2;~ i 1'O.q 0:;:, 12

    .,

    ;! C 553 5+"]

    /

    ,1 J i ':~

    , ,j

    "\ ..Jt:)..;lo. \ \:)01) :-"' ''':;l. S \4\:.')\0. '5 -.

    ~-"'--

    !lOw _: 'B ~r\

    (u)ocu 000': 3 "'l, ~s\ I

    ru101J'

    54-G 545 5.54 H ,\~'3 \ ------(G.'o.q ~ ~.. - ~---- /." Ci c)0" \ cr / 'c." I 5 \ I / -, I "' \

    541 ! ,- 5>49 \/ 550

    ----_._------~------

    p .c..- B \; cLncr\ I; G.J:i \- (',\ ~ \S \3)(6'

    n; .~"- ..

    ",1 W : '"J \~_l-\ )<..t·\ NO: \~ Gnlo021:)cfr»° mmJ(j 54- (lJ) 0 QJ 3"'" ° : "0~ri ,. 0 0-5940 Q rul0'<\j"'o, !'\o"tA -fU1rru (\)) ~'ht~') 6)Q!)d:h sre

    v A GooD

    I D 14G6) \ 105(3" / '035 ,I I

    ~ +' '" ,- 546

    ._-----_._-----

    -p·e '\3\-:r::O-OJ,bD.5J 1, "';\'~-; -\~.)\~\.-,_,\q..,) "

    "'1~ '~~ «Ilocu3.oo': "I, ~ \< \-\ No _ \ 'Q, eruoOf!3d)G}" mITlJO - 54 'c' -, OJ1.~ .. ' "

    ~: ! i' , ( .:S. I I C;q.\

    A -;5,8 h

    55~

    ,t:'

    55\

    , 10-8 08 r:.J -:::.- I iOn

    I:""'i"'i i",i>.i T d j'. ...s ,,,\-LAG'.. '2 " I "r'- I

    p, c. B \-.) 0:70.\""0.0 ;:-C-\';'; \4\,.\"1b

    _, '"N ___ ""' _'_' _____ " ____~"-,_._rr ___ _ I ..J20

    Nl~ ~~ ""~QJ6.oo· ~ Qjla~ .. • "'-'F.!,C> r -.

    553 J

    559

    I

    550 .,-

    t- .,-

    60-~ 1¢2.·6 '/-0 , roc· "1 7-Z 6:5." -S:1.,.;. 10 , 63·" . /J.2.. 5/ .75"-1-. ,(5 ,\"'-, ...... I J-'t .. 62.-3 ! ,: -, -'/ 0·3. F .. '/;f.6. ;? 1//- 6 b . fa-. 1 .2. 9f.S ~. 07' /10·0 C! 9-+) 9·f a·s- c..,. 9 ; /08-( ./06-:2", . .0-0 _.. ,Y:3. 7a-2. "-6 s i G-7 I , 7-0 +2-, u-! . . .. j~. 79-+ {;'f' 6'-"5 t, "/'7 .89_' I: :c:. ... 7 8-. .1f.:t 78-6. (.",<0 G'r--Q {;·o /3 J9-o /J.2. 7;3-8 . .Y0-8 62.·{) 63,, C. 57.1- 7 9.0 G-c 0·. -',9·9 ->-1.0 ,:;;. / (9/-0: ",9. .37'3 I 131·2,. ~·s • . '";k. .x.,-

    , ",- C;UQC£tl:.:.1C~:5 ";;.=.,'!" r:H"t~;'1.l;:':)J' ':,~':' "1/- ~t;-2.-9b 'i;'fi:i ::.> -.:",:>'.' J-. _:xn"ot". ! c( \ ) ...-.- .-,-' .

    "';','

    -. "' ... .,/ .. ] ~'?<~-'(; 601"(3[Pd5)" n'H1)J(0 ,'j. J (:J Sv<%-) -uI, nj1(ju\l

    1073 83-q. 80-0 c 75"7 -1;7'3

    E:. I

    "':'

    / • '0 6 2-19 v"'

    ;:(,. /

    ! i-v!.! I;, ( .... 2- I 2/-/ I 'c_ /. !

    Ii" ,i

    ,- ,;.-- >. ,. I (.' .

    "J Ii .'-: IC";".

    f1..-'; ,,.

    ("

    " 8-2 i7'o I ! L", e: 110-0 A

    . " / v

    ------~-- cuw ,.; "., :,', , " ' , : !

    . X· . '-"'--

    Bl.- OC k

    A f,' g

    3H~:. :2 i·, , 10·9 . o I c

    ' .. 3 I '-.. '. , I

    B

    i i

    \ i,

    ",• . -..' ,.,: "',

    ...... -~ .. -"' ...... ~...... , .. I

    , ~ -.. ,c.', :.; i2 !3aui L/l ,.I, '1-3 - s-'

    28/i21/0;,. 7 bkhs. G.r.s. 'ID'l,Ld. «J)J(Je'I,.o",· ~Q!ll c\, r-DJlo\\j"'"- ~d.------a..o1

    533 '\ I I Ii j " j / '. . Ii p-;/toCI.l. NC 1 5 )1 "l~ .PU "-Ii i'> \Z \<. R L \; t ' n I;:'Ii \ !i \ 1 ._•.. _. .... , :1.6'6 1 ': . i \ \ '" "? "I ':'\ "'" I 3 p'- '. ct L)-', i ,...'!l .- ,6'5 !b·g- n .,. / \ ,I;;' '" ,;; . I Q "' 1 ~,v= -"" - \s·~_~ - 4- \ ... 543 / '" ',:" / <'>-' " 12,,3 13·4 G_- i'€._ £ .-!.?:':_ __ 5 \ V I \ , \'?7' ,.." ,. J"~ J i 2..r r-: 6 ,4'" - . + ",. 'll,,- z;~'# 2'~: " _. i6 c::/~ is . ., , .• ¥r \. 7 " , \ \'2-_ ." .- (\ 5:3·3) ." - --'" ." -_.- So.;;- " - '" '" ... (150'1) , - . '" ... - ' .. - !'r:- '" . 1"" 69·3 ~';b ! c

    535

    , •

    'C 04b,r .' .

    . I ., _.-!,J . ,11-' - , I .'~?\~~"-J l{S2='\~'4G,_ • ~ .• ~c-\".l> I J i i I Ollru '6i""" d

    <0)0""1""'" 'b'2n c-l m""l§.O.!)". (lJrodO,Q,'., r-----~-~~.'---.~n __ ~ ______. ______o..i\~~ilU' o.n(llJ'®'l

    534 •

    >l 80. 5 I.D ____ _ (150.'1) .,.Gq.3 r-----~~~~==~S R -",

    '.- . - . -.. J ,. '" 68'3 . ':""\:'- ~ '" -- - .. (]' --- '"c ~ \ '. --- ~i'~ 542· I'" -"-~' ~'I .., BLOC~ N~' e !l I Pu::z:.HBKkP.lL I '" ' C-i:'" c· .'540 3 \ /

    ,. .- . ':: 8 34-1 c. ]) (34·,) g., 34·7 22'1 r-r-,-:---,_T'-1' I 7.0 I' ',5. 15.2,. r JJ i. ,.• l-rl I. C~'5) -I (14Q.8)1 i I.. 4.8! 10".8 ~ 1 g 34'6'! ! 46·4- I . L.., G,q qq., ' , ! (l :0,) I -11.-8 iZ3'81" i ,;, i 5-6 Sq'G ! , 7-41 81·8 i "TO·3 18.0" ••.•.l ['1·8 I GG'3 I I.. ,., 80·0 8·0 :3 I 68.q I I..., g.[ 59-4 . Ii: A " 32-9 50.2, ,0 II B 38·S 33·9 ,,'i: ,:" . 'I C-f1.2) , (ioz.Z) ~..v;J ...;;..~. " -- '0.. 'j '22,·2 21.0 ''-.-:;::'',;':t.:.,-. .. I') 89·2- 43·1. 1·7 "'­ 2.'0 1"/ 10·2 <'>"5 1'2 i 69,0 \-1 ~ c c: - ".... _. i __J._.--'_-::8O- ...... __'--

    • i. j\I) .&:~\hi,,:! •< ..

    • ~L~,~_G> 8r::.""" c;;, ri, \, ! 535

    I 'OLD

    \,

    \ i 3 \

    • ! , .'--.p I I, \

    -----= eSc<') _ ~c'~,o~:"" -i. '.' "c;'"~/

    ...... ~ .... , -- ,:-- ". --" , ,I :r'~'- I i 1<: -;

    ------,- ----. I ------

    ------(jiq:n) \.: : ---- -\5·4,-;:17-6 37·6 l/

    \,_-T

    / .' " -, .D, ------

    -- " ~J i3LOU...... 10·. 3 , C } , I

    "" 0.6 w ,0-5 "'I- D·\) ",-, 0'5

    '3"- 3-0

    . t/). S

    ".

    "- I . ') i ". \/1"1 \, :1 \" \ 41-'0. ('y,' \ .\ \,-

    I

    E . Ca.~·\) .. - ... - ~~~~c~~~,':~)~~~~~~~~~~~ ,.,

    -- ' ... -- ... --'"

    "

    f3 ~. \4'Q·B \--;a-:., i,;; "C-s 1~¢-5 /.\ '1-4 ~\.) , \'?.c-1 'C" '-J .- " G4 .'l,,4-G, l~C S:':l' \ A P 8';~''5 b v j -!3;::; ., G'B c4G. 5c;g 3·'.:) C. I -j. G" "1 8 .0 54<; C'" , 4-4- 8-8 -"'5'6 r' ,., c I .;i:, l~\o,-~ lc';J . :"'1~':' ~~ Te.\i\~c\ c",.J, i-o'l Y~~C""'-"""I('J ~ -~,",

    -j 1 ...

    "'1,,~ • "1j~~ an::l QJ 0

    f'­ '.; ." S3c i

    i • , d! 5".\

    I i I,

    ------

    p. c· ~2:, \--::0.)\0..\ ~Of)

    't'C-nS 'R.3j~iq~-- \ -rg~\ \-<. \-\ ND w \~ GnJo063:)d)S)°

    535 /

    • r "-' / \

    _.0 / o ,.u. r,\ 0: / o a- u

    539

    \ \

    ----.----~------.------~j---

    ? C> 'I3 YYll"lO,--1 bas) r'-,'),\.c; \,,,V\'\Ui}·' 'r"'-" ...., ..... ," \ 0I1~: f1\'!!li\ (ij)OQJ~dlf)·: nc~ 1-0:::.. \-l \"'-'.10 " l~ OJ1aru"'o; 'B'db~ 6JlJ"(j£lJ~,)0" ffi01Jb: 54 1 " 'I' o·6C:J75 Q..1 OJ 11> aD (;J:)1.. ,~?t;. "I 6)QDdh Sm

    I I I I . '. + .; "-... t? <¥ '. tl ro ') . 4- ro ~~- '" 3""~

    jIg +4- I G.G·3 ;;:n.c o-Ol s· ~1.\ I c I 13

    -

    Ii" c.. -G \-::'<=.0.""cD • ~G\S \ 'C\ ,,,,I 0,5 r

    ru1·\i\I"'o - lQo~brl 543~ .------_._------_._-_... - ----.

    I I

    , C t,, ./ ,9 9'" j. 1 / \ ,.,o ! ! I! 10_0 q:: i• :;' \ ciI \ ~\ \

    -. ~• -.

    ",!'

    \ !

    i- I - . \ ! i I \ I • ! •, i - j

    ~ (,(\)~';;0.d(W()6QS "'g:!!," (tri"i<:o.w,I(J;'.'6~ Ii'- c· B \-:,D:"J;o.~\-:'G.D rGl5 \<"\\'310,5

    ----.•. -_ .. - .... """ '" " " ; , - {' , , -'"',

    --:,. ,:':

    . I'll\\) : rq~ (1lJ~QJ3""": rg ~r\ \-<:. Hi'\.\ 0 '. \ ~ ='G 610 .!Xl 0 mCl1J ro, 54 QJla'<\J"" : "b"'b~ - o· 30QO rul(TlJ 0 {U)1m ffi:?? 6)Q!)d>~ sro

    A \ . \ 1- :D . \ " 0- i<> II \ ICil !

    \ ~ . . I .. \ 01

    .

    , \'. I H S ! \ I 1·1 ., , \ . I ' i I:), \\i ------~···-C'05·~) .. ~-·-· •.. ·-· B ~ --- __"":./-:J

    " ,", ~~ 'c, .:~, ", -~" "' ':', ",. \:,

    c·q t ._------_.-""'-,---.----- .- ----_.---_. -

    Pc.· 8~ Q..,"'C,1 \:)"-D \Gt8· n \0 1"16 ,. \..z \.\ ND

    -----'-.-~--.- .. -..----,

    5+3 .1 544,

    C\35.~. -..,.J _.. ':30.~ j \ \ \ I ~ 545 S> :, I• \ \ +1 I, 1 ;;e, --- I 1 , ! , G' ::- , 5+e .;- I '. . r- ", ,I '3 ~ I 54'7 ~ 5A,.C.;. !

    1 5+1 I i ! !,

    p, Co 8I-:i:lJ

    :!:f1/721/Wi. 7 lak~.h ('.'. I'"..",.

    . ~:lQJ3cOOo: ru1a9J"'o

    , /

    ... / / +... 111

    , .

    i 'I, • '.

    R1'i\l -~~

    6>a.D.!h"'SQ 531 , A I 'x· I , "8,'; Q'S I \ I -c,q I", :2C· ,"G'\ t- G::!-,. ""2,O)f, 5-8,! 5\.q 2,I t 0'1 "'8e \ 2.~ \'OG eG'l i !'22 Bi\3 12m3 '3151-1 l;l43 c I, D \ , UI6G) I I 2.\ 1, c·'¥? tel'! 54-5 I "ll'j'0 I i It-! ""13-5 I, 1°'1 ""'5 1 I 5G'3 I I lie I .1"',..4-. ! I"'''10--: I I I ~+ I,q !,15,j 0-, 1 I:~I )S~ !

    .~ I I ., -

    /

    L ______.. __

    ',' .n. _.. ;L':""l,,~ , " .\ ..; 0.:n C'.l,. \ ',~) Of) /(;\5 \~13\q5

    ;', '.

    1 1'l ru ,: '1l ~r\ anoCU3""'o: ~~~ 1-<. H t-.....IQ : \~ ru1aru"o ,

    5+(; 545 +., 5.54- G< . '\~rS CG~rC)-" \g·o .l. " h <> '. I' . -...... -... .c ( ~,]'~-.J ra 55.3 Cf " N \ 0",," :) \ C' ,.; ---- <' ~1; cr " / ,\.. I I " \ \\, 5"~ .,. \ ~ 0 .' , ~ \ " 01 / eo \ f 5=::'> . 0,~.

    54\

    550

    ,- ~ .

    •. _-_._----

    p c.. -8 \; COlcr\ It Qr; l-C,\,::; \~13)q!)

    Jj .~~ --"~",,,. "'1~ _~ :?P,/721IWi. 7 !",kh~, G.l'.\.

    "'''«13'''''' - rGi\~r\ \""-\-\ NO \\~ QJ1.~ .. • _ <:l;;Qbrl finJoG§}Jc1'i)o rnmJ(b~5+ ,,~ 0 e?~ 70

    ,,

    531

    Ic;;~' . 15·~ \'5-0 '"

    0Slffi>. ~i. = 10

    , ,

    '. :J

    R1W : '";l'!!3_rl (lJ)~ Q.I3.oo' : "\\!5 r1 Qj1o~ .." 'loW:,rI

    v A G·\) "

    I ,I I

    546

    ------_._-_.. --- ...

    ..1\\j ''''I,~ anoQJ3.oo" : ~ ~ \< \-\ \"....\D - \ TI., ·r. -. ru10t'\j"" , Olo'dbr\. mJoQ[!:),J)G)

    ( .". I Gq·\ llqB <-'..! I I !:>~rt l~q 2G 5::>4 G'B b," I r

    '.)4 le-e. "lG-G 1 ',.l~ 1;:a31 G4"lt I 55"" I ! 5'10 !8·';3 22 'Q:~.. -,.,.. :-.. ["'I'1BI 5G'3i .ti . '":,.16 "" I 5"'''1' I I ! 4'3'3 5B k) 55\ I ::s".", 1\\" 1'2 ! , ~4'4-I\GGI'i 1 I. \G, 1'+:'"11«' + I 1 '",;; 83 "" r ", Ie' i 10-8 1(3 I TO I , "; I " I,! t~~eal I 3· -;:> 1,>\ J 8-~ 'K.B·3! ·~3 '" i j i c! ( o -,0) E II 10i...... : I:j iCC;1 13) 111\I 1'...... 1"'i i\i'>iT ,-';20".2 I.. ,I CG l C,3G 1 II ,I I I ' -...; \~'-A.O\ ':: , , ! 'I' . ~-5 'I;0'6 -,. " ~ (', i '5--:

    .,

    p. c.- B \:)Cv"O.'\:)OJ:) r--C-.J,'5 14\~\(':rO

    ,i I I I I ! . i~)b ~ I I f ij • -c'.

    A1\ld 'g)~ <0>°"'3.00' ~ QJlo\ld'" &3'3,<"> f1 -.

    {Sa3 J

    D

    553

    --

    l3

    (~9/?, .0"..... ; 60.• 102,. t i , ?-O I"o().",/ i ",.2. 63J t /.0 63·

    rrvQ';;S.~~;')6~lS ~;.oJt, ('J)1~t'J,1"';-,~, s{f- «£-2.-96- J. SaOqok ,'\ ,-.) .. ~.-,.' "(

    ,., . , _. M.,. __ '.,_

    nl'i\j q)~"

    ! I

    •.• F,' t" '.

    r: ~'~QJ'm)<,-S1>l 5\g,t., 'v'1-::>::";~;-l'':'.,·&, &( - "'7-~-9,- J z"u,ciA . r

    IIDOQJ3~

    QJ1a~",o o.o1mlleo mOlJro 55-'( v "

    c.

    ~ \ ,7 , .~ I o , <: C "~ • j ".I • ! ", i (/-2. 1 "\"1 , .. 'ie 1 57" ;0'), ,,-()6- "-" I( ~ -1r·Y"<' l:. ,,- ,1'-1. "- • Ii: "j , 2~-'l / '7 i i~ ~ ~v I ; ,I 0·7 18-3 J? I c:. ; l I I, ,...,..~ ,:", , \...!..~::I.~/ , ! ! , . :1.<:1-5 o I ~ ..'3 i 1&' "I ::1..8-7 --~ -! : 15 j , ! /5-'9 ~}-.:; . ,.. , ,,\ D 1 2'

    I', 1, '. I 'I. -: •

    i· 1-7

    ~ /9 '5 -, '--" 07..1 ! ! ! I ..y...~- --;2· 2.. i " i i ~-f ! 32-8 l /6-7 Ii·.::; '::'Ii; too F}V 7·3

    '---,..

    ., . I'll"" wm~ ,","QJ 3'""· 'g) ~ ru1G?J(ll· <%ri;cl , ,

    I I

    I I . I , ) i ; , I i I, 55"('1 1 ., I• I ! I, I I I • I I j I . "~ , /.'!' " " ! - 1

    ~~) ;C:.,f , I , I ' • , ,• I,e! ..:.: I, " !I i I \.. r ~ r'-'> j I . , i t " 1 i I, I ! ; 553 ! h I, i ! •

    , j

    f3 II C!180~ i' 8'1·9 1 I •

    I I I •

    Rl~

    rula~ .. • <%$),c\ ~'O ..... _v " 0 >$'.. l. , .' 0..0 1(J;)(tO mrr:UQ fib 6 c· B,/)c, _ "r_ OJ !,Ttl @ ;,J~n~'J 6/,,,,,.,--: _.• \, C' 1------___ ------~-----______-----r'~~.,--'-if .. i' "

    . ,.,. (BfPBCTIlD u 2./ .. j/. :?lItO';} ~~).)_ ,.~. II,,' I i G- I ' , • <- ... ",-. "-"').t? Ai,"" ...... I""''' (9~;--o) ! 'S-I't.K 1 ,",r.."~rr·· /1\. , ~,

    II I' 1-0.(: II, ~c ,', ' ,.3<;·(; (i-j , 18 0.2. :::<'0-(.> <, c ! D i , / " ", ," i

    .. , '. '';'''';.,:.:

    ~:; r "" 'r' / \. "...... '. /' r: _; 1 <::,:<' ~ i -, .... \Q,O: I .'.9.,$ ;;"'0 ' I,d \ ! , 1,0' I N·~ i / I , I r- , ~ I I , ~:) , ',' (/.:? .... I " , I i 1.11:, (. , , , ! ,.,[ I, IDS;:;; I I i I Sr.·q-- . I I I I e~.+ .t, .... , I I, \, I ',V-, ! i ~·2·0 I "-;·2 \ G-, .C t j'.,!t.: ... L") i '-- ~.' •.~-; 1 1t }'LJ,' -'-':-: -:, 11 :_

    1) "."

    ".'

    ,

    POLUCHEM LABORATORIES (P) L TO. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY

    PALLATH BUILOING, N. KALAM ASS ERY P.O., ER NAKULAM· 683104 Phone: 0484-3261 174, 2544030, 8281982322 [email protected]

    CHE MIC A.L T-1658 ACCREDfTEO BY NABl- DEPT. OF SCIENCE AND TECHNOLOGY, GOVT. OF INDIA AND KSPCB AS "A • GRADE LABORATORY MICRQ810LOG Y T-2938

    TEST REPORT Page 01 0(01

    Client Name & Address Certificate No: PLiSGIRT /2212 01 7 Date of issue 15/07/20 17 Dale ofmoniwring 05 /07/20 17 Mis Sobha Limited Date of sample received 06/07/201 7 Sobha City, Puzhakkal Guruvayoor Road, Date of analysis Started 06/07 /20 17 Thrissur, Kerala Slack Diesel Generator -125K YA at Sample Description Saooh irc Buildi~~(Cummins) Sample Code given by client Nil Sample Identi fication No: G/G122/20 17

    SL NO PARAM ETEIl S TEST MET HOD RES ULTS KSPCB Limit

    , 01 *Diameter ... 0. 1016 m .. 02 ·Cross Sectional Area ... 0.008 m1 .. 03 Temperature I S 11255 part 31985 118 °C .. 04 Velocity of ern iss ion I S 11255 part 3 1985 6.08 m/sec ..

    Quantity of Gas discharged to 3 05 J S 112 55 part) 1985 133 Nm /l11' .. Atmosphere 06 Particulate matter J S 11255 part I 1985 22 mgINm3 75 mg/Nm3 07 Sulphur diox ide IS 11255 part 2 1985 63 mgINm3 1200 mgINml 08 Oxides of Nilrogen I S 11255 part 7 1985 4.8 ppmv 710 ppmv , Note. • . This parameter 1$ not Included In the NABL scope

    "'E nd of the Repol1*

    For and on behalfof The results are related only to the sample submitted for POL UCH EM LABORATORl ES (P) LTD. analysis. This certifi cate shal l not be reproduced except in full and wi thout the written permission with authorized signatory

    AUTHbR ZED SIGNATORY

    ANALYSIS OF AM8~~'-:-~-S-S'-0-N-' -SO- U- N- D- ,-L-'G- H- T-. -W-A-T-EA-'-E-F-~-LU-E-N-T-' -SO- IL-, S- P- 'C- E- S- ,-F-O-O-O-­ TEA, OIL, FERTILISERS, BASIC CHEMICALS. PESTICIDE RESIDUES, HEAVY METALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) L TO. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PALLATH BUILDING, N. KALAMASSERY P.O. , ERNAKULAM - 683104 Phone: 0484-3261174, 2544030, 8281982322 www.poluchem.com. [email protected]

    CHEMICAL T·l658 ....CCREDITED BY tiAB L _DEPT OF SCIENCE AND TECHNOLOGY, GOVT OF INDIA .... NO KSPC8 AS ",." GRADE LABORATORY MICFOBIOlOGY T·29311

    TEST REPORT Page 0 1 ora l

    Client Name & Address Certificate No: PL/SG /RTI21 /2017 Date of issue 15/07/20 17 MIs Sobha Limited Sobha City, Puzhakkal Date of monitoring 05/07/2017 Guruvayoor Road, Date of sample received 06/07/20 17 Thrissur, Kerala Date of analysis Started 06/07/2017 Stack Diesel Generator -380KVA at Topaz- Sample Description 2(Cummi ns) Sampk Code given by client Nil Sample Identification No: G/G/21/20 17

    SLNO PARAMETERS TEST METHOD RESULTS KSPCB Limit

    , 01 *Diameter .--- O.1524m -- 02 *Cross Sectional Area --.-- O.01 82 m2 -- 03 Temperature IS 11 255 part 31985 112 (}C -- 04 Velocity of emission I S 11 255 pan 31985 6.07 m/sec -- Quantity of Gas discharged 10 OS I S 11255 part 3 1985 307 Nm'/hr -- Atmosphere 06 Particulate matter IS 11255 parl I 1985 24 mg/Nml 75 mgINml 07 Sulphur dioxide r S 11255 part 21985 74 mgINrnl 1200 rng/Nml

    08 Oxides of Nitrogen I S 11 2SSp"rt71985 5. 1 ppmv 710 pprnv Note••. - Th is parameter IS not mclud. ed 111 the N,ABL scope

    *End of the Report*

    For and on behalf of The results are related on ly to the sample submitted for POL UCHEM LABORATORIES (P) LTD. analysis. This certificate sha ll not be reproduced except in full and without the written pennission with authorized signatory ~V-- AUTHO ~ D SIGNATORY

    ANALYSIS OF AMBIENT AIR, STACK EMISSION, SOUND, LIGHT. WATER, EFFLUENT, SOIL SPICES, FOOD TEA, OIL FERTILISERS, BASIC CHEMICALS. PESTICIDE RESIDUES, HEAVY METALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) L TO. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PALLATH BUILDING, N, KALAMASSERY PO" ERNAKULAM - 683 104 Phone: 0484-3261174, 2544030, [email protected]

    CHEMICAL T-16!i1! ACCREDlTED8Y NABL· DEPT Of SCIENCE AND ltCtlHOLOGY, GOvr. OF INOlA AND KSPCBAS ". " GRADE lABO!IATORV M1CROBKJLOOV T·29:J,8

    TEST REPORT Page 01 of 01 C li ent Na me & Address Certificate No: PLiSG/RT12 0/2017 Date of issue 15/0712017

    MIs Sobha Limited Date ofrnonitoring 05 /07/2 017 Sobha City, Puzhakkal Date of sample received 06/07/20 17 Guruvayoor Road, Thrissur, Kcrala Date of analysis Started 06/07/2017 Slack - Diesel Generator - 380K VA at Sample Description Topazl(Cummins) Sample Code given by client Nil Sample Identitication No: G/G/20/20 17

    SLNO PA RAMETERS TEST METHOD RESULTS KSPCB Li mit

    , 01 *Diameter ---- 0.1016 m -- 02 *Cross Sect ional Area -.--- 0.008 m1 -- OJ Temperature 1 S 11255 pan] 1985 l07°e --- 04 Velocity of emissi on I S 11255 part 3 1985 6.15 mlsec -- Quantity of Gas discharged to 05 I S 11255 part 31985 138 Nm 3lhr -- Atmosohere 06 Particulate matter IS 11255 part I 1985 36 mgINmJ 75 mgIN mJ 07 Su lphur dioxide IS 112 55 part 21985 40 mg/Nm l 1200 mglNmJ 08 Oxides ofNilrogen I S 11255 pan 71985 4.1 ppm v 710 ppmv Note., .- ThIS param eter IS not lIlcluded In the NABL scope *End orlhe Report*

    For and on behalf of The results are related only to the sampic submitted for POLUCHEM LABORATORIES (P) LTD. analysis. This certificate shall not be reproduced except in full and without Ihe written permission wi th authorized signatory

    AUTHORIZOD IGNATDRY

    ANALYSIS OF AMBIENT AIR , STACK EMISSION, SOUND, LIGHT. WATER, EFFLUENT. SOil, SPICES. FOOD TEA, Oil, FERTILISERS, BASIC CHEMICALS, PESTICIDE RESIDUES, HEAVY METALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) L TO. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PALLATH BUILDING, N. KALAMASSERY P. 0 .. ERNAKULAM - 683104 Phone : 0484-3261174, 2544030, 8281982322 www.poluchem.com. [email protected]

    OlEMICAL T·1658 ACCREDITED BY NABL • DEPT OF SClEUCf AIiD TECHNOLOGY, GOYl: OF INDIA AND KSPCB AS -A- GRADE LABORATORY MICR06!OLOG Y T·2936

    TEST REPORT Page 01 0[ 01

    Clie nt N:Hne & Add ress Certificate No: PLiSG/RTII9/201 7 Datc of issue 15/07/201 7

    MIs Sobha Limited Date of monitoring 05 /07/2017 Sobha City, Puzhakkal Date of sample received 06/07/2017 GUl'LIvayoor Road, Thrissur, Kerala Date of analysis 06/07/2017 Stack - Di esel Generator -320KYA a! Sample Description Tooaz-TlI (Cummins) Sample Code given by client Nil Sample Identification No: 0 /0119120 I 7

    SLNQ PARAMETERS TEST METHOD RESULTS KSPCB Limit

    01 *Diamcter --- 0.1016 m -- 02 ·Cross Sectional Area --- 0.008 m! -- 03 Temperature I S ]1255 pan 3 1985 10S 'C -- 04 Velocity of emission I S 11255 part] 1985 6.24 m/sec -- Quantity of Gas discharged to OS. r S 11255 part 31985 140 Nm3/hr Atmosohere -- 06 Particulate mattc-r 1 S 11255 pan I 1985 36 mgINm3 75 mgINm 3 07 Sulphur dioxide I S 11255 pa11 2 1985 54 mgfNm.1 1200 mgINnr; OS Oxides of Ni trogen I S 11255 part 7 1985 3.7 ppm v 710 ppmv

    Nole: >to - This parameter is not included in the NABL scope

    *End orthe Report'"

    For and on behalfof The resuhs are relaled only to the sample submitted for POLUCHEM LJ\ UORATORlES (P) LTD. analysis. This certificate shall not be reproduced except in full - and without the written permi ssion with authorized signatory ~' AUTHORIZE JS IoNATORY (~\~ ~ lJ\ v ANALYSIS OF AMBI NT AIR .STACK EMISSION " SOUND LIGHT" WATER EFFLUENT" SOIL SPICES , FOOD TEA, OIL, FERTILI SERS, BASIC CHEMICALS, PESTICIDE RES IDUES, HEAVY METALS AND MICROBIOLOGY .' POLUCHEM LABORATORIES (P) LTD. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PALLATH BUILDING, N. KA LAMASSERY P. O .• ERNAKULAM - 683 104 Phone : 0484-32611 74 , 2544030, 8281982322 [email protected]

    CMEMICA L T· 1658 ACC1lEDITED BY NABL • DEPt OF SCIENCE AND TECHNOLOGY, GOVT OF INOlA AND KSPCB AS "A- GRADE LABORATORY MICAOS.oLOGV T-2938

    TEST REPORT Page 01 of 01 Client Name & Address Certificate No: PL/SG/RT11812017 Date of issue 15/07/2017

    Mis Sobha Limited Date of monitoring 05107/2017 Sobha City, Puzhakknl Date of sample received 06/07/201 7 Guruvayoor Road, Thrissur, Kerala Date of analys is started 06/07/2017 Stack Diesel Generator 12SKVA at Sample Description Malachite (Cum mins) Sample Code given by client Nil Sample Identification No: GIGI18120 17

    SLNO PARAMETERS nST~fETHOD RESULTS KSpell Limit . 01 "'Diameter -- -- 0. 1016 m -- 02 ·Cross Sectional Area ---- 0.008 m' -- 03 Temperature IS 11255 part 31985 106 °C -- 04 Velocity of emi ssion I S I 1255 part 3 1985 6. 13 m/sec -- Quantity of Gas discharged 10 OS I S 11255 part 31985 13 8 Nm 3lhr -- Atmosphere 06 Particulate matter IS 11255 part 1 1985 22 mgINm 3 75 mglNm) 07 Sulphur dioxi de I S 11255 part 2 1985 48 mgINm 3 1200 mgINnrl 08 Oxides of Nitrogen I S 11255 pa,' 71985 4.2 ppm v 710 ppmv , Note••. - ThIs parameter IS not mcluded In the NABL scope

    "'End of the Repo rt '"

    For and on behalf or The results are related only to the sample subm itted fo r PO LUCIIEM LABORATORIES (P) LTD. analysis. This certificate sha ll not be re produced except in rul1 and without the written permission with authorized signatory 6;fty

    AUTHORIZEE> S GNATORY

    ANALYSIS OF AMBIENT AIR , STACK EMISSION, SOUND, LIGHT, WATER, EFFLUENT, SOIL, SPICES, FOOD TEA, OIL, FERTILISERS, BASIC CHEMICALS, PESTICIDE RESIDUES, HEAVY M.ETALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) L TO. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PA LLATH BUILDING, N. KALAMASSERY P. 0 , ERNAKULAM - 683104 Phone: 0484-3261174, 2544030, 8281982322 www.poluchem.com.poluchem@gmaitcom

    CHEMICAL , T·lese ,\CCREDfTED 8Y NABl - DEPT. OF SCIENCE AND TECHNOLOGY, aoYl. Of JNDlA AltO KSPCB AS "A" GRADE LABORATORY MICROBIOlOGV T·293t!

    TEST REPORT Page 01 of 0 1

    C Hent Name & Address Certificate No : PUSG/RT/17/20 17 Date of issue 15/07/2017

    Mis Sobha Limited Date of monitoring 05/07/20 17 Sobha Cily, Puzhakkal Dale ofsamp!e received 06/07/2017 Guruvayoor Road, Thrissur, Kerala Dale of analysis started 06/07/2 0 17 Slack Diesel Generator - 125KYA at Sample Description Jade(Cummins) Sample Code given by client Nil Sample Identification No: G/G/17/20 17

    SLNO PARAMETERS TEST METHOD RESULTS KSPCB Limit

    , 01 "'Diameter .--- 0. 1016 m --

    02 ·Cross Sectional Area -_.- 0.008 m2 -- OJ Temperature IS 112 55 part 31985 114 DC -- 04 Velocity of emiss ion lSI 1255 part 3 1985 6.36 mlscc -- Quantity of Gas discharged 1o OS I S 11255 part 31985 141 Nml/hr -- Atmosphcre 06 Particulate matter IS 112SSpart 11985 36 mg/Nm3 75 mgINm 3 07 Sulphur dioxide IS 11255 part 21985 45 mgINrn3 1200 mg!N m3

    08 Oxidcs of Nitrogen I S 112 55 part 7 1985 3.8 pprnv 710 ppm v Note., ., - TIllS parameter IS not Included lIllhe NABL scope

    *End of the Report·

    For and on behalf of The results are related only 10 the sample submitted for PO LUCHEM LABO. RATOR IES (P) LTD. analysis. This certificate shall not be reproduced except in full and without the wrilten penn iss ion with authori zed signatory I F AUTHq R ie:ED SIGNA TOR Y \%$( \.. ANALYSIS OF AMBIENT AIR, STACK EMISSION, SOUND, LIGHT. WATER, EFFLUENT, SOIL, SPICES, FOOD TEA, OIL. FERTILISERS, BASIC CHEMICALS, PESTICIDE RESIDUES, HEAVY Mi=TALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) LTD. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PALLATH BUILDING, N. KALAMASSERY P.O., £RNAKULAM - 683104 Phone 0484-3261174.2544030,8281 982322 loVWW.poluchem.com, poluchem @gmail.com

    CIiEMICAL T-1658 ACCREDITEO BY NABL • DEPT. OF SCIENCE AND TECHNOLOGY, GOVT. OF INDIA AND KSPCB AS "A" GRADE LABORATORY MICROBIOLOGY T·2938

    TEST REPORT Page 01 of 01 C lient Na me & Address Certificate No: PL/SGIRT/16/2017 Dale of issue 15/07/2017

    Mi s Sobha Limited Date of monitoring 05/07/2017 Sobha City, Puzhakkal Date of sample received 06/07/2 017 Guruvayoor Road, Date of analysis Started 06/07/2017 Thrissur, Kerala Stack - Diesel Generator -125K VA at Sample Description Commercial area (Cummins) Sample Code given by client Nil Sample Identificmion No: G/GII6/20 17

    SL PARAMETERS TEST METHOD R ESULTS KSPCB Limit NO

    01 "'Diameter --- 0, 10 16m -- 02 · Cross Sectional Area --- 0,00801' -- 03 Temperature 1 S 11255 part 3 1985 110 °C --- 04 Velocity of emission IS 11255 part 3 1985 6. 15 mlsec -- Quantity of Gas discharged 10 05 IS 11255part31985 137 Nrn 3/hr -- Atmosphere 3 06 Particulate matter I S 11255 part I 1985 17 mg/N Ol 75 mgINm) 07 Sulphur dioxide I S 11255 part 2 1985 42 mgIN m3 1200 mgIN m3 08 Oxides of Nitrogen I S 11 255 part 7 1985 3. 1 ppm v 710ppmv

    Note: '" • fhls parameter 15 not Included 1!1 the NABL scope

    "'End or tile Report'"

    For and on behalf of The resu lts are re lated onl y to the sample submitted for POLUCHEM LABORATORIES (P) LTD. analys is. Th is certifi cate shall not be reproduced except ~ q In fu ll and without the written pennission with authorized signatory ;[ 1 ,( ,y' AU' - RIZED SIGNATORY \'j~~~t'

    ANALYSIS OF AMBI NT AIR, STACK EMI SSION, SOUND, LIGHT, WATER. EFFLU ENT, SOIL, SPICES, FOOD TEA, OIL, FERTILISERS, BASIC CHEMICALS. PESTICIDE RESI DUES, HEAVY M,ETALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) L TO. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PALLATH BUILDING, N. KALAMASSERY P.O. , ERNAKULAM - 683104 Phone' 0484-3261174, 2544030, 8281982322 WINW.poluchem.com, [email protected]

    Cl1[MICAL T·l658 ACCREOITEO BY HASl- DEPT OF SCIENCE AHO TECHNOLOGY, GOVT OF INOlA AND KSPCB AS "A," GRADE LABORATORY MICROEHOLQGV T- 2938

    TEST REPORT Page 0 1 of 01 Client Name & Address Certifica te No: PLiSG/RT/15/20J 7 Date or issue 15/07/2017 Date ofmonitorillg 05/07/2017 M/s Sobha Limited Date of sample received 06/07/2017 Sobha City, Puzh akkal Date of anal ysis started 06/07/2017 Guruvayoor Road, Slack - Diesel Generator -380K YA at Club Thrissur, Kerala Sample Description House (Cummins) Sample Code given by client Nil Sample Identification No: G/GI15/20 17

    SL PARAMETE RS TEST MILTHOD R ESULTS KSPCB Limit NO

    01 • Diameter .--- 0.1016 m -- 02 "'Cross Sectional Area ---- 0.008 m2 -- 03 Temperature 1 S 11255 part 3 1985 107 °C -- 04 Velocity of emission J S 112 55 part 31985 6.08 mlsec -- Quantity of Gas discharged to OS I S 11255 part 3 1985 137 N m3/hr -- Atmosphere 3 3 06 Part iculate matter I S 11255 part I 1985 22 mg/Nm 75 mg/Nm 3 07 Sulphm dioxide IS 11255part 21985 48 mg/Nm3 1200 mg/N m 08 Oxides of Nitrogen I S 11255 part 7 1985 3.6 ppmv 710 ppmv ., Note: '" - I hi s parameter IS not Included In the NABL scope

    *End of th e Report'"

    For and on behalf of The results are related only to the sample submitted for POLUCHEM LABORATORIES (P) LTD. analysis. This certificate shal l not be reproduced except in full and without the \witten permission with authorized signatory RIZED S IGNATORY

    ANALYSIS OF AMBIENT AIR , STACK EMISSION , SOUND, LIGHT, WATER. EFFLUENT. SOIL. SPICES, FOOD TEA, OIL, FERTILI SERS, BASIC CHEMICALS, PESTICIDE RESIDUES. HEAVY ~ETALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) LTD. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PA LLATH BUILD IN G, N. KALAMASSEAY P.O., EANAKULAM - 683104 Phone: 0484·32611 74, 2544030, 8281982322 WWY'I.poluchem.com, [email protected]

    CHEMICAL T-l658 ACCflEDrTeO BY NAilL - DEPT OF SCIEnCE AHO TECHNOLOGY, GOVT OF IiDIAANO KSPCOlS -..." GRADE LABORATORY MICROBIOLOGY T-2938

    o TEST REPORT Pa 0 eOlofOl Client Na me & Address Certifica te No: PL/SG/RT/J312017 Date of issue 15/07/201 7 Date of monitoring 05/07/2017 Mis Sobha Limited Date of sample received 06/07/20 17 Sobha Ci ty, Puzhakkal Guruvayoor Road. Date of analys is Started 06/07/20 17 Thrissllf, Kerala SUlek - Diese l Generator - 125KVA at c.p- Sample Description 18 Plant-lI (C ummins) Sample Code given by client Nil Sample Identification No: 0 /0 / 13/2017

    SLNO PARAMETERS TEST METHOD RESULTS KSPCBLimit

    01 ... Diameter . --- 0.1016 m --

    02 "'Cross Sectional Area ---- 0.008 rn 2 OJ Temperature IS 11255 part 31985 10SoC 04 Velocity of em iss ioll IS 11255 pan 3 1985 6,2 1 mlsec -- Quantity orGas discharged to 05 J S 11255 part 3 1985 139Nm'!hr -- Atmosphere 06 Particulate matter I S 11255 part I 1985 16 mgINm1 75 mg/Nm 3 07 Sulpl1l!r dio.xide I S 11255 part 2 1985 46 mgfNm3 1200 mgINml 08 Oxi des of Nitrogen IS 11255 pan 7 1985 4.2 ppm v 710 ppmv

    Note: • - ThiS para meter IS not mcluded In the NABL scope

    ·End of the Report·

    For and on behal f of The results are related onty to the sample submitted for POLUCHEM LABORATORIES (P) LTD. analysis. This certificate shalt not be reproduced except in full and without the wrinen permission with authorized signatory

    AUT\lO\UZED SIGNATORY

    ANALYSIS OF AM BIENT AIR , STAC K EMISSION, SOUND, LIGHT, WATER. EFFLUENT, SOIL, SPICES, FOOD TEA, OIL, FERTILISERS, BASIC CHEMICALS. PESTICIDE RESIDUES, HEAVY METALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) L TO . CHEM ICAL, ENVIRONMENTAL AND MICROBIO LOGY LABORATORY PALLATH BUILDING, N. KA LAMASSEAY P.O., EANAKU LAM - 683104 .~ . Phone: 0484-3261174, 2544030, 8281982322 W'NW,po luchem.com. [email protected]

    •CHEMICAl T-1658 ACCREOITED BY NABL- DEPT Of SCIENCE AND TECHNOLOGY, GOYl: OF tNDlAAt40 KSPCB AS -A" GRADE LAeORATORY MICROBIOLOGY: T·2938

    TEST REPORT Page 0 1 of 01

    Clie nt Name & Address Certificate No: I' LlSGIRT/I2/20] 7 Date of issue 15/0712 017

    MIs Sobha Limited Date of monitoring 05/07/20 17 Sobha City, Puzhakkal Date of sample received 06/0 7/201 7 Guruvayoor Road, Thrissur, Kerala Date of analysis 06107/201 7 Stack - Diesel Generator -65KYA at Site Sample Description Office-(Cummins) Sample Code given by client Nil Sample Identification No: G/G/ 12/20 I 7

    SL NO PARAMET ERS TEST METl-IOD RESULTS Limits . 01 '" Diameter --- 0.101601 -- 02 "'Cross Sect ion al Area --- 0.008111 2 -- 03 Temperature IS 11255 part 3 1985 114 °C -- 04 Velocity of emission I S 11255 part 3 1985 6.45 mlsec -- Quantity of Gas discharged to 05 I S 11255 part 3 1985 143 Nmllhr Atmosphere -- 06 Part iculate matter IS 11255 part I 1985 16 mg!Nm ~ 75 mgfNm3 07 Su lphur dioxide I S 11 255 parl 2 1985 46 rn g/N m3 1200 mgIN m3 08 Oxides of Nitrogen J S 11255 part 71985 3.3 ppmv 710 ppmv

    Note: * . Th is parameter IS not Ind uded In the NABL scope

    *End orthe Report*

    For and on behalf of The results are related onl y to the sample subm itted for POLUC HE M LABORATORIES (P) LTD . analysis. This certificate shall not be reproduced except in full and without the wri tten permission wilh a:17~~i gnato ry AUT ~ SIGNATORY ~ 1Y~~~

    ANALYSIS OF AMBIENT A R , STACK EMISSION , SOUND, LIGHT, WATER, EFFLUENT I SOIL, SPICES , FOOD TEA, OIL, FERTILISERS, BASIC CHEMICALS, PESTICIDE RESIDUES, HEAVY METALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) LTD. CHEMICAL , ENVIRON MENTAL AND MICROBIOLOGY LABORATORY PALLAT H BUILDING, N. KALAMASSERY P.O., ERNAKULAM - 683104 Phone: 0484-3261 174, 2544030, 8281 982322 [email protected]

    CHEM ICA L T-1 658 ACCREDITED BYNABL· DEPl: OF SCIENCE AND TECHNOlOGY, GOVl OF INDIA AND KSPCB AS "A" GRADE LA BORATORY MICROB IOlOGY · T·2930

    TEST REPORT Page 01 of 01

    Client Name & Address Certificate No PLiAMB/RT/1l/2017 Date of issue 15/07/2017 Mis Sobha Limited Date ofmonitorinQ 05/07/2017 Sobha City, Puzhakkal Date of sample received 06/07 /2017 Guruvayoor Road, Date of analysis 06/07/2017 Thrissur, Kerala Sample Code GIGIII /2017 Ambient air - Ncar Middle Point of Sample description Topaz & Sapphire Sample code given by client Nil

    Parameters Test .Method Results Limit as per NAAQS

    3 Particulate Matter (PM IO) I S 5182 Part 23 2006 48.6 ~lg/mJ 100 pglm

    Particulate Matter (PM 2 _S) WIIAMB2.5/l0 22.3 ~tg/m3 60 ~lg/mJ 3 Sulphur dioxide( S02) IS 5) 82 Part 2 2001 7.2 Jlg/m 80 ~g1mJ 3 Nitrogen dioxide( N02) IS 5182 Part 06 2006 6.2 J-tg!m 80 ~lglmJ Carbon monoxidc( CO) IVIIGCANALlOI <1 mg/m3 4 mgim 3 'Lcad(Pb) IS 5182 Part 22 2004 < 0.1 pg/m3 I ~lglm3 3 3 *Ammonia( NH 3) CPCB < I Jig/m 400 )lg/m *Arsenic( As) IS 5182 Part 22 2004 <0. 1 ng/m 3 6 nglm3 *Ni ckel (Ni) IS 5182 Part 22 2004 <0.1 ng/m 3 20 ng/m 3 *Ozone (OJ) IS 5182 Part 091974 < I pg/mJ 180 ).lg/mJ J ¥8enzcnc(C6H6 ) IS 5182 Part I I 2006 < 0.1 pg/m 5 ).lg/m3 * Benzo (a) pyrene (BaP) IS 5182 Part 122004 < 0.1 nglm3 I ng/m 3 . Note: * - rillS parameter IS not Inc luded III the NABL scope NAAQS-National Ambient Air Quality Standards

    *End of the Rcport*

    For and on behalf of The results are related only to the sample submitted for POL UCHEM LABORATORIES (1') LTD analysis. This cel1ificate shall not be reproduced except in full and without the written perl11issi with authorized signatory

    ANALYSIS OF AMBIENT AIR , STACK EMISSION, SOUND, LIGHT, WATER, EFFLUENT, SOIL, SPICES, FOOD TEA, OIL, FERTILISERS, BASIC CHEM ICALS, PESTICIDE RESIDUES, HEAVY METALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) L TO. CHEMICAL , ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PALLATH BU ILDING, N. KALAMASSERY P O" ERNA KUL AM - 683104 Phone : 0484-3261174, 2544030, 8281982322 www.poluchem.com.lXlluchem@gmailocom

    CHEMICAL T'1658 ACCREOrT!O BY NABL _DEPT. OF SCIENCE AND TECHNOLOGY, GOY! OF INDlU.ND KSPeS AS "A" GRADE LABORATORY MICROB iOlOGY T·2938

    TEST REPORT Page 01 of 01

    C li en t Name & Address Certificate No PLiAMBIlH/10lZ017 Date of issue 15/07/2017 MIs Sobha Limited Date of monitorin!! 05/07/2017 Sobha City, Puzhakkal Date of sample received 06/07/2017 Guruvayoor Road, Date of analYsis 06/07/20 17 Thrissur, Kerala Sample Code GIGI I 0/20 I 7 Ambient air - Ncar Middle Point-Lake Sample description side Sample code !!iven bv client Ni l

    Panlmeters Test Method Results Limit as per NAAQS

    Particu late Matter (PM 1o) I S 51 82 Part 23 2006 53.6 llg/m3 100 ~glm '

    Particulate Maner (PM2.5) WIIAMB2.5/J0 23.4 pglmJ 60 ~glm J Sulphur diox ide( S02) I S 5,182 Part 2 2001 7. 1 ~g/m' 80 ).I glm)

    Nitrogen di oxide( N02) IS 5182 Part 06 2006 5.6,lg/m' 80 ,lg/m' Carbon mon oxide( CO) IVIIGCANALIOI <1 mg/m3 4 mg/m) ' Lead(Pb) IS 5182 Part 22 2004 < 0.1 ~glm ' I ~glm' J '" Ammonia( NH 3) CPCB < 1 ).Ig/m 400 ~l g/m 3 "'A rsenic( As) IS 5182 Part 22 2004 <0.1 nglm3 6 ng/m 3 "'Nickel (N i) IS 5182 Part 22 2004 <0. 1 nglm J 20 ng/m 3 "' Ozone (0)) IS 5182 Part 091974 < 1 pglm3 180 pg/m3 3 "'Benzene(C6i-16 ) IS 5182 Part II 2006 < 0.1 Jl g/m 5 ).I glm) '" l3 enzo (a) pyrene ( SaP) IS 5 18 2 Part 122004 < 0.1 nglm 3 1 ng!m) Note. '" - ThiS parameter IS not IJ1 clllded In the NA SL scope

    NAAQS-National Ambient Air Quality Standards

    *End of the Report'"

    For and on behalf of The results arc related only to the sample submitted Jor POL UC HEM LAB ORATORIES (P) LTD analysis. Thi s certificate shall not be reproduced except . Ln full and without the ~ o authorized signalory writt; " \\:~~ with , ( AUTHORI Ell SIGNATORY 1)"/Il'\" '-.J

    ANALYSIS OF AMBIENT AIR, STACK EMISSION, SOUND. LIGHT, WATER. EFFLUENT, SOIL. SPICES, FOOD TEA, Oil. FERTILISERS, BASIC CHEMICALS. PESTICIDE RESIDUES. HEAVY METALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) LTD. CHEMICAL, EN VI RONMENTAL AND MICROBIO LOGY LABORATORY PAL LATH BUI LDING, N. KALAMASSERY P.O., ERNAKULAM - 683104 Phone : 0484·3261174. 2544030, 8281982322 WW'N.poluchem.com, [email protected]

    CHEMoC A.L T· l 658 ACCREDITED BY HA9L • DEPT. Of SCIENCE AND fECHHOlOGY, GOYl OF lNotA ANO KSPCf.I AS -A" GRADE LABORATORY MICA08IOLOOY T·2938

    T EST RE P ORT Page O} 0 1' 01

    Client Name & Address Certificate No PLiAMB/RT /09/20 17 Date of issue 15/07/201 7 Mis Sobha Li mited Date of mo nitorin g 05/07/2 0 17 Sobha City, Pu zhakkal Date of sample received 06/07/20 17 GUfuvayoor Road, Date of analysis 06/07/2 0 17 Thrissur, Kcrala Sample Code G/G/09/20 17 Ambient a ir - Near 32 Meter road-Front Sample descri ption , gate Sample code given by cl ient N il

    Pa rameters Test Method Results Limit as per NAAQS

    Particulate Matter (PM 10) IS 5 182 Parl 23 2006 46.3 ~glm ' 100 ~glm ' Particulate Matter (PM2 .5 ) WII A MB2.511 0 24 .1 ~glm ' 60 ~ glm ' 3 Sulphu r dioxide( 50 2) I S 5 182 Part 2 200 I 7.6 pglm 80 ~ glm'

    Nitrogen dioxi de( N02) IS 5182 Pan 06 2006 5.8 lI g1m ' 80 ~lg / m 3 3 3 Carbo n monoxi de( CO) WI /GCAN ALlO I < I mghn 4 mg/m ' Lead(Pb) IS 51 82 Parl 22 2004 < 0.1 Il g/m3 1 ~ Lg/ m 3 *Ammoni a( Nl-b) C PCIl < I ~l g/ m 3 400 ~l glm3 "' Arscnie( As) IS 5 182 Part 22 2004 <0.1 ng/m 3 6 nglm3 "'Nickel (Ni) IS 5 182 Part 22 2004 <0.1 ng/m3 20 ng/m3 ' Ozone (0 ,) IS 5 18 2 Pan 09 1974 < I ~ t glmJ 180 ,Ltg/m3

    * Benzene(C61-1 6 ) IS 5 182 Part II 2006 < 0.1 ~ glm ' 5 llg/mJ , Benzo (a) pyrene (BaP) IS 5 182 Part 122004 < 0. 1 nglm' 1 nglm3 , Note: ., - [ h iS parameter IS not tncluded tn the NA BL scope

    NAA QS-National Ambient Air Qu ality Standards

    *End orthe Report*

    For and on beha lf or The results are related onl y to the sample submitted for POLUCHEM LABORATORIES (P) LTD ana lys is. Thi s cert ifi cate sh al l not be r produced except in fu ll and withoLlt pe(J)-1iss ion with authori zed signatory i't,V\ AUTHOR}' - SIGNATORY ANALYSIS OF AMBI ENT IR, STACK MISSION, SOUND, LIGHT, WATER, EFFLUEN, OI L, SPICES, FOOD TEA, OIL, FERTILISERS, BASIC CHEMICALS, PESTICIDE RESIDUES, HEAVY METALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) L TO. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PAL LATH BUILD ING, N, KALA MASSERY p, 0" ERNAKULAM - 683104 Phone: 0484-32611 74. 2544030, 8281 982322 'NW'N.poluchem.com, poluchem@gmaiLcom

    CHEMIC A. l : T- I£58 ACCREDITED BV NABl- DEPT. OF SCIENCE AND TECHNOLOGY, GOVT. OF INDIA AND KSPCB AS "A" GRADE LABORATORY MICROBIOLOG Y T-29:J.1l

    TEST REPORT Page 01 of 01

    Clicnt Name & Address Certificate No PLiAMIl/RT108/2 01 7 Date of issue 15107/2017 Mis Sobha Limited Date of monitoring 05/07/20 17 Sobha City, Puzhakkal Date of sample received 06/07/20 17 Guruvayoor Road, Date of ana Iv sis 06/07/2017 Thrissur, Kerala Sample Code G/G/08 /20 17 Sample description Ambient air - Near Villa -22 Front area Sample code given by client Nil

    Parameters Test Method Results Limit as per NAAQS

    Particulate Matter (PM 10) IS 5 182 Part 232006 42.6 ~lg/m 3 I 00 ~g/mJ Particulate Matter (PMz.s) WII AMB2.5/1 0 2 1.3 )lg/m3 60 ~lg/m3 Sulphur dioxide( S02) IS 5182 Parl2 2001 9,4 ~lg/mJ 80,ug/mJ

    Nitrogen dioxide( N02) IS 5182 Part 06 2006 5_2 ~g/m] 80 ~ r g/ m] Carbon monoxide( CO) WI/GCANALIOI <1 rug/ru 3 4 mg/m) ' Lead(Pb) IS 5182 Part 22 2004 < 0.1 ~g/m] 1 ~lglm ' *Ammonia( NH3) CPCB < 1 ~1g!rn 3 400 ~g/m) * Arsellic( As) IS 5182 Part 22 2004 <0 .1 ng/m3 6 nglm' *Nickel (Ni) IS 5182 Part 222004 <0.1 nglm3 20 nglm3

    "'Ozone (03) IS 5182 Patt 091974 < 1 )lg/m' 18 0 )lg/m3 3 3 6 ) < 0.1 ,ugfln *Bcnzene(C6H IS 5182 Paz111 2006 I 5 Jl-g/m * Benzo (a) pyrene (BaP) IS 5182 Part 122004 < 0. 1 nglmJ I nglm3

    Note: * - rhls parameter IS not lI1cludcd In the NABL scope

    NAAQS-National A mbient A ir Quality Standards

    *End of the RepOt1*

    For and on behal f of The results are related only to the sample submitted for POLUCHEM LABORATORIES (P) LT D analysis. This cenificate shall not be reproduced except . ,V- In ful l and without the written permission with authorized signatory , ~ ~ ~ ______~ ~ .\ ~~if~ ______~ __~ A~U~T~H~O+~~Z~E~_ D~S~IG~N~r A~T~O~R~Y______~~~ e~

    ANALY SIS OF AMBIENT AIR , STAC K EMISSION, SOUND, LIG HT. WATER, EFFLU ENT, SOIL, SP ICE S, FOOD TEA, OIL, FERTI LISERS, BASIC CH EMICALS, PESTI CIDE RES IDUES. HEAVY METALS AND MICROBIOLOGY POLUCHEM LABORATORIES (P) LTD. CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PA LLAT H BUILDING, N. KALAMASSERY P. O., ERNAKULAM· 683104 Phone: 0484-3261174, 2544030, 828 1982322 'oWJW.poluchem.com, poluchem @gmail.com

    CHEMICAL 1-1658 ACCREDITED BY NABL - DEPT. OF SCIENCE AND TECHttOLOGY, GOvr: OF INDIA AND KSPCB AS "A" GRADE LABORATORY MICR0810LOOY T-2938

    TEST REPORT Page 01 of 0 1

    C lient Na me & Address Certificate No PLiAMBIRT/0712017 Date of issue 15/071201 7 Mfs Sobha Limited Date of monitoring 05/07/20 17 Sobha City, Puzhakkal Date of sample received 06/07/20 17 Guruvayoor Road, Date of anal ys is Started 06/07/20 17 Th rissur, Kerala Sample Code GIG/07/20 17 Sample description Ambient air - Near Com merc ial Front Sample code !Jiven by cl ient Nil

    Parameters Test Method Results Limit as per NAAQS

    Parti cul ate Matter (PM 10) I S 5182 Part 23 2006 )'0 .0.)~gm I] I 00 ~lglm 3 Partic ul ate Matter (PM2.5) WI! AMB2.5/1 0 28 .5 ~g/m ] 60 Mg/m3 Sulphur dioxide( S02) IS 51S2 Part 2 2001 13 .4 pglmJ SO ,u g/m]

    Ni trogen d ioxide( N0 2) IS 51S 2 Pan 062006 S.6 ~g/m ] 80 ~ l glm 3 Carbon monoxide( CO) WI/GCANAUOI

    Note: .. - This parameter is not included in the NABL scope

    NAAQS-N ati onal Ambi ent Air Quality Standards

    "'End of the Report*

    For and on behalf of The results are related o nly to the sample submitted for POLUCHEM LABO RATORIES (P) LTD analysis. This certificate shall not be reproduced except In full and without th e written permi sian wit h authorized signatory . \__ ~v: '.\ 'ox( AUTHORI ZED SIGNA TORY \l '\ L' o'~ 0\ ANALYSIS OF AMBIENT AIR, STACK EMISSION, SOUND, UGHT, WATER, EFFLUENT, SOil, SPICES. FOOD TEA, OIL, FERTILISERS, BASIC CHEMICALS, PESTICIDE RESIDUES, HEAVY METALS AND MICROBIOLOGY "H~~' POLUCHEM LABORATORIES (P) L TO. ~ CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PALLATH BUILDING, N. KALAMASSERY P. 0, ERN AKULAM - 683104 Phone: 0484-3261174, 2544030, 8281982322www.poluchem.com.poluchem@gmail .com

    ACCREDITED BY DEPT. OF SCIENCE AND TECHNOLOGY, GOVT. OF INDIA AND KSPCB AS • A" GRADE LABORATORY

    I CERTIFICATE OF MONITORING I

    Client Name & Address Certificate No PLiSDIRT/6311/2017 Date of Issue 15/07120 17 MIs Sobha Li mited Date of monitoring 05/07/2017 Sobha City, Puzhakkal Guruvayoor Road, Sample Code SDID163 I 1120 17 Thrissur. Kcrala Sample description DG Noise Level Sample code given by N il client

    1V1onitoring Location SI. No. Results

    01 Diesel Generator -65K VA at Sile Office (Cummins) 71.6 dB(A) 02 Diesel Generator -125KV!\ at c.p Plant-II (Cummins) 72.8 dB(A) 03 Diesel Generator -180KVA at Cluh House (Cummins) 73.4 dB(A) 04 Diesel Generator -380KVi\ at Club HOllse (Cummins) 71.4 dB(A) 05 Diesel Generator -1 25 K VA at Commercial area (Cummins) 72.6 dB(A) 06 Diesel Generator - 125K VA at Jade (Cummins) 73.6 dB(A) 07 Diesel Generator -125K VA at Malachite (Cummins) 71.4dB(A) OS Diesel Generator -320K VA at Topaz-Ill (Cummins) 72.5 dB(A) 09 Diesel Generator - 380KVA at Topaz -I (Cummins) 70.2 dB(A) 10 Diesel Generator -3 80KVA at Topaz-2 (Cummins) 70.1 dB(A) II Diesel Generator -I 25K VA at Sapphire Building (Cummins) 71.2 dB(A) Limit 75 dB(A) , , Note: Sound Level Measured 3t a dIStance ! M trom the enclosure surface

    ror Poluchem Laboratories (P) Ltd . AlI1ho ~~n310rY.

    ANALYSIS OF AMBIENT AIR , STACK EMISSION, SOUND, LIGHT, WATER, EFFLUENT, SOIL, SP ICES. FOOD TEA, OIL, FERTILISERS, BASIC CHEMICALS, PESTI CIDE RESIDUES , HEAVY METALS AND MICROBIOLOGY "H~~' POLUCHEM LABORATORIES (P) LTD. ~ CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PALLATH BUILDING, N. KALAMASSERY P.O., ERNAKULAM - 683104 Phone: 0484-3261 174, 2544030, 8281982322 www.poluchem.com. [email protected]

    ACCREDITED BY DEPT. OF SCIENCE AND TECHNOLOGY, GOVT. OF INDIA AND KSPCB AS "A" GRADE LABORATORY

    I CERTIFICATE OF MONITORING I

    Client Name & Address Certificate No PLiSD/RT/6312/2 017 Date of iss lie 15/07/2017 ! Mis Sohha Limited Sample Code SO/0/63 2/20 17 Sobha City, Puzhakkal Sample dcscri ltioll Ambient Sound Guruvayoor Road, Sample code given by Thris5ur, Kernla Nil client

    Results Monitoring Location Night Time Day Time SL No. On 05.07.2017 On 05.07.201 7 06.07,2017 , (6.00 AM-IO_OO PM) (10.00 PM- 6.00AM) 01 Main Gate Outside 54.1 dR(A) 42.8 dB(Al 02 Site Oftlcc Front 53.6 dR(Al 43.2 dR(A) 03 Villa No: 1 47.8 d B(A) 40.1 dB(A) 04 Topaz Front 48.4dB(A) 41.3 dB(A) 05 Topaz Back 47.7 dB(A) 40.1 dB(A) 06 Sapphire Back 46.8 dOrA) 39.8 dB(A) 07 Jade Back 47.4 dB(A) 40.2 dB(A) 08 Villa No : 21 Front 48.4 dB(A) 40.8 dB(A) 09 Li fe Style Junction 47.9 dOrA) 41.6 dB(A) 10 Commercial Front 51.3 dA(A) 42.4 dB(A) Limit 55 dB (A) 45 dil(A)

    For Poluchem Laboratories (P) Ltd.

    Author Signatory.

    ANALYSIS OF AMBIENT AIR , STACK EMISSION, SOUND . LIGHT. WATER, EFFLUENT, SOIL. SP ICES, FOOD TEA, OIL, FERTILISERS, BASIC CHEMICALS. PESTICIDE RES IDUES. HEAVY METALS AND MICROBIOLOGY "H~~' POLUCHEM LABORATORIES (P) LTD. ~ CHEMICAL, ENVIRONMENTAL AND MICROBIOLOGY LABORATORY PALLATH BUILDING, N. KALAMASSERY P.O., ERNAKU LAM - 683104 Phone: 0484-3261 174. 2544030, 828 1982322 www.poluchem.com.poluchem@gmail. com

    ACCREDITED BY DEPT. OF SCIENCE AND TECHNOLOGY, GOVT. OF INDIA AND KSPCB AS "A" GRADE LABORATORY

    CERTIFICATE OF ANA L YS IS

    Ref No : PLiSOIRT/63 13/2017 Date of Issue: 15107/2017

    Client: MIs. Sobha Li mited, So bha City. Puzhakkal. Gu ruvavoor Road. Thrissur. Kera!a

    Test Certiflcare No . _ __---"6"3-'-13"' 1-=2,,O-'-17'--_ ____D atc of Sample co llected: 05/07/20 17

    Sample ;\ame: _ ___ ~S"'o"i'_I ______Test Method: _ __"'A "'O"fI.cC"---______

    Results Parameters pH 6.12 Electrical Conductivity I04 ~S/c m POtaSSi um 39 mg/kg Phosphorous 98 mg/kg Nitrogen 412 mg/kg Organic Carbon \.9 % Calcium 1874 mg/kg Magnesium I 630 mg/kg Fluoride SDL Sulphate 980 mg/kg Copper BOL Zinc BOL Mercury HOI. Chromium BOL Lead 8DL Arsenic SOL BDL - Below DetectIOn Level

    Date of Analysis Star ted 05107/2017 For Poillchem Laboratories (1)) lid.

    Date of AnalYSIS Completed: ___ _ -'1"'2/-"0-'-'7/-=-20"-1'-'7_r-_ A 111 horiz SREEJA R ,\ ES H QU..iI;ty (\.10"" .gcr Polu chem Laboratories (P) Ltd.

    ANALYSIS OF AMBIENT AIR , STACK EMISSION, SO NO, LIGHT, WATER, EFFLUENT, SOIL, SPICES, FOO~ TEA. OIL, FERTILISERS. BASIC CHEMICALS. PESTICIDE RESIDUES, HEAVY.METALS AND MICROBIOLOGY