Sobha City” Project FORM-I at Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala
Total Page:16
File Type:pdf, Size:1020Kb
EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala FORM 1 (I) Basic Information S. No. Item Details 1. Name of the project/s Validity Extension of “Sobha City” Project 2. S. No. in the schedule 8 (b) 3. Proposed EC accorded Plot area = 2,29,535.91 m2 (56.72 capacity/area/length/tonnage to acres) be handled/command area/lease EC accorded Built-up Area = 3,24,665.28 m2 area/number of wells to be drilled 4. New/Expansion/Modernization Extension of EC Validity 5. Existing Capacity/Area etc. EC accorded :3,24,665.28 m2 Constructed Built Up Area: 2,23,106.812 m2 6. Category of Project i.e. ‘A’ or ‘B’ Category- A 7. Does it attract the general No condition? If yes, please specify. 8. Does it attract the specific No condition? If yes, please specify. 9. Location Plot/Survey/Khasra No. Sy. No. 217, 218, 534 to 544, 546 to 556 Village Puzhakkal Tehsil District Thrissur State Kerala 10. Nearest railway station/airport The nearest railway station is Amala Nagar along with distance in kms. Railway station at a distance of approx 1.5 km. The nearest Airport Cochin International Airport is about 49 km away from the site. (Source of information:- Google Image) 11. Nearest Town, city, District Thrissur City is approx. 4.0 km in SE Direction Headquarters along with distance in Kms. 12. Village Panchayats, Zilla Adat Panchayat, Puranattukara PO,Thrissur. Parishad, Municipal Phone:0487-2307302 Corporation, Local body (complete postal addresses with Kolazy Grama Panchayat, Thiroor, M G Kavu telephone nos. to be given). PO, Thrissur-680581 Phone: 0487-2200271 M/S. SOBHA LIMITED 1 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala 13. Name of applicant M/s Sobha Limited 14. Registered Address M/s Sobha Limited Sobha City, Puzhakkal PO, Thrissur, 680553 15. Address for correspondence : Mr. Nisanth M. N. Name (Area Head) Designation (Owner/Partner/CEO) M/s Sobha Limited, Sobha City, Puzhakkal PO Address Thrissur Pin Code 680553 E-mail [email protected] Telephone No. 0487-2389770/71/72 Fax No. 0487-2389773 16. Details of Alternative Sites No examined, if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves No approval/ clearance under: if yes, details of the same and their status to be given. (a)The forest (Conservation) act, 1980? (b) The wildlife (Protection) act, 1972? (C) The C.R.Z Notification, 1991? 22. Whether there is any No Government Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation No pending against the project and M/S. SOBHA LIMITED 2 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala /or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes There will be permanent change in land use, land use, land cover or topography land cover or topography including increase in including increase in intensity of intensity of land use. land use (with respect to local land Master plan is enclosed as Annexure 5. use plan) 1.2 Clearance of existing land, Yes Minimum trees, shrubs, herbs and grass at site vegetation and buildings? were cleared during the construction phase. 1.3 Creation of new land uses? No The project site is well developed according to the master plan of the city. 1.4 Pre-construction investigations e.g. No Pre-construction soil investigations have been bore houses, soil testing? carried out for the site. 1.5 Construction works? Yes All construction activities have been confined within the project premises; The construction basically involve foundation, framed structure using RCC, walls made of fly ash blocks, plastering, flooring, painting and solar energy to light up common areas. 1.6 Demolition works? No No demolition works involved. 1.7 Temporary sites used for Yes All the construction activity including construction works or housing of stocking of raw materials has been confined construction workers? within the project site only. Temporary labour hutments are proposed. Mobile toilets have been developed at site and same will be used M/S. SOBHA LIMITED 3 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala for extension phase. 1.8 Above ground buildings, structures Yes Excavation has been carried out for foundation or earthworks including linear of buildings and basements. The excavated structures, cut and fill or excavations soil will be used in backfilling and other area development activities. 1.9 Underground works including Yes Underground works and excavation was mining or tunneling? carried out for foundation of buildings and basements. 1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No No Production/Manufacturing process processes? involved as the project is an Integrated Complex with residential, villas, commercial, convention, hospital and hotel. 1.14 Facilities for storage of goods or Yes Temporary stores or sheds are provided for materials? storage of construction materials. 1.15 Facilities for treatment or disposal of Yes Solid Waste solid waste or liquid effluents? About 6,200 Kg/ day of solid wastes likely to be generated in project are of domestic in nature. Waste Quantity Disposal (kg/day) Method Organic 3100 To Organic Waste Converter Inorganic 3100 To Authorised Vendor for Recycling Liquid effluents: The wastewater generated during the operation phase will be treated in STP of 2000 KLD capacity and the treated sewage will be reused for toilet flushing (362 KLD), horticulture/gardening (650 KLD), 33 KLD for vehicle washing. 1.16 Facilities for long term housing of No Local laborers have been hired from nearby operational workers? areas during construction phase. So, there is no need to create permanent facilities for long- M/S. SOBHA LIMITED 4 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala term housing of operational workers. Same will be followed for extension phase 1.17 New road, rail or sea traffic during No Not Applicable construction or operation? 1.18 New road, rail, air waterborne or No Not Applicable other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No There is no need for diversion or closure of transport routes or infrastructure existing traffic routes. leading to changes in traffic movements? 1.20 New or diverted transmission lines or No There is no any a new/diverted transmission pipelines? line or pipelines around the project. 1.21 Impoundment, damming, culverting, No No impoundment, damming, culverting, realignment or other changes to the realignment or other changes to the hydrology hydrology of watercourses or of surface watercourses is proposed. aquifers? 1.22 Stream crossings? No There are no streams crossing in the project site. 1.23 Abstraction or transfers of water No During construction phase, water has been form ground or surface waters? provided by State Water Supply Board. Source of water during the operation phase is met through artificial lake provided within the premises with proper treatment. 1.24 Changes in water bodies or the land No Not Applicable surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes During the construction phase, about 20-24 for construction, operation or trucks were used per week. Adequate parking decommissioning? space within the project site for loading and unloading of materials has been provided. 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes During Operation phase, there will be a temporarily or permanently? permanent influx of 13,030 people due to the adequate infrastructure facility. M/S. SOBHA LIMITED 5 EC validity Extension of “Sobha City” Project FORM-I At Village: Puzhakkal, Guruvayyur Road, District: Thrissur, Kerala 1.29 Introduction of alien species? No Not Applicable 1.30 Loss of native species or genetic No There will be no significant impact on the diversity? native species or genetic diversity. 1.31 Any other actions? No Not Applicable. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate S. No. Information/checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The land measures to around 22.92 ha and agricultural land (ha) used for mixed use development. 2.2 Water (expected source & competing Yes During construction phase, water requirement users) unit: KLD is met through State Water Supply Board. During operation phase, about 1301.5 KLD of water demand is being met through Artificial Lake provided within the premises after proper Treatment confirming to IS 10500:2012 Drinking Water Quality Standards.