Status Report on Breakdowns
Total Page:16
File Type:pdf, Size:1020Kb
TSSPDCL - LMRC / Corporate office DR 17.05.2018 Status Report on Breakdowns (Urban / Rural) Urban Breakdowns No.of Feeders Attended Time taken for restoring the occurred during Existing Urban during the day supply the day S.No Circle Rectified Not Rectified Remarks (Pending) (Within 24 (Above 24 33KV 11KV 33KV 11KV 33KV 11KV Hours) Hours) 33KV 11KV 33KV 11KV 1 MBN 18 107 2 NLG 22 358 3 MDK 97 359 4 SDPT 5 RR(S) 53 234 10 10 10 6 RR(N) 54 550 19 19 19 7 RR(E) 168 403 8 Hyd 194 1044 2 258 2 258 2 258 Total 606 3055 2 287 2 287 2 287 0 0 Rural Breakdowns No.of Feeders Attended Time taken for restoring the occurred during Existing Rurals during the day supply the day S.No Circle Rectified Not Rectified Remarks (Pending) (Within 24 (Above 24 33KV 11KV 33KV 11KV 33KV 11KV Hours) Hours) 33KV 11KV 33KV 11KV 1 MBN 107 849 9 9 9 2 NLG 144 988 4 4 4 3 MDK 7 7 7 7 7 7 107 933 4 SDPT 5 RR(S) 58 396 6 RR(N) 38 114 7 RR(E) 22 133 Total 476 3413 16 11 16 11 16 11 0 0 Grand Total 1082 6468 18 298 18 298 18 298 0 0 TSSPDCL - LMRC / Corporate office Date: 17.05.18 Name of 132/33KV Name of 33 KV Name of the Relay Sub Stations S.No Circle Vol From To Duration Cause of Breakdown Alternate Supply Arranged SS Feeder Division Indication Effected Alternate Supply Arranged 1 Mahabubnagar Hanwada 33KV Mahabubnagar 17.48 20.00 02.12 EL Insuator failed and supply stude OK. Hanwada from 132KV Puttapad SS Alternate supply arranged 2 Maddur Kothapally 33KV Narayanapet 19.30 21.20 01.50 EL No visible fault Supply Stude OK Kothapally from 33KV Vepur SS 3 Maddur Vepur 33KV Narayanapet 19.30 20.40 01.10 EL Pin Binding damaged at Kothapally Vepur No Tag on to 33KV kothakota 4 Wanaparthy Buddaram 33KV Wanaparthy 16:20 23:35 7:15 Breaker problem at 132KV WNP Buddaram feeder MBNR 5 Gadwal Nandinne 33KV Gadwal 17:27 Nandinne Tree branch fallen on the line near 6 Gadwal Rws 33KV Gadwal 17:59 0:41 6:42 Rws No Chinnatarevally Jumper opened at 7 Balanagar G.R Cable 33KV Jadcherla 18:05 19:55 1:50 EL No visible fault Supply Stude OK G.R Cable Rangareddy guda (V) 8 Polepally Gangapur 33KV Jadcherla 16:30 19:40 3:10 EL Tree fallen on the line at JDCL Gangapur No 9 Polepally Jadcherla 33KV Jadcherla 16.30 19.03 02.33 EL Disc failed and Replaced at Kavarampet Jadcherla No 1 Kandhi Aradhana 33KV Sangareddy 15:05 17:45 2:40 No visible fault Aradhana No 2 Pashamailaram SOL 33KV Sangareddy 15.15 18.56 03.41 BD Due to disc failed SOL No 3 Bollaram Agarwal Globle Steel 33KV Patancheru 15.10 16.45 01.35 BD Due to heavy wind & Gale Insulator failed Agarwal Globle Steel No MDK 4 Bollaram Coca Cola 33KV Patancheru 15.10 18.50 03.40 BD Due to heavy wind & Gale Insulator failed Coca Cola No 5 Bollaram Shathavahana 33KV Patancheru 15.10 17.10 02.00 BD Due to Tree fallen on the line Shathavahana No 6 Gummadidala GPSS-1 33KV Patancheru 15.35 18.25 02.50 BD Due to Tree fallen on the line GPSS-1 No 7 Gummadidala GPSS-2 33KV Patancheru 14:50 19:20 4:30 BD Due to heavy wind & Gale Insulator failed GPSS-2 No Loads transferred onto 220KV Osm. Cable damaged digging by L&T near Tarnaka 1 Lalaguda 33KV Chilkalguda 02.00 02.15 00.15 OL Lalaguda 220KV Osm.University SS via HYD S University Chowrastha 33KV S.C.R. fdr 2 220KV Ch' Gutta D.R.D.L. 33KV Malakpet 17:12 20:09 2:57 EL Tree fallen on the line D.R.D.L. No TSSPDCL - LMRC / Corporate office Date: 17.05.18 Name of 11 KV Name of the Relay S.No Circle Name of 33/11KV SS Vol From To Duration Cause of Breakdown Alternate Supply Arranged Feeder Division Indication 1 Cheedella Mukundapuram 11KV Suryapeta 12:30 14:30 2:00 E/L Conductor snapped No 2 Pamangundla Pittampally 11KV Nalgonda 12.40 13.50 01.10 E/L 11KV Line cut No NLG 3 Pamangundla Ismailpally 11KV Nalgonda 09.00 10.35 01.35 E/L 11 KV Disc failed No 4 Repala Narsimhulagudem 11KV Huzurnagar 12.40 15.00 02.20 E/L 11KV Line cut No 1 Cheryal Turbovent 11KV Sangareddy 16:20 20:15 3:55 BD Due to Tree fallen on line No 2 Bollaram II Kottam 11KV Patancheru 15.15 18.08 02.53 BD Due to Tree fallen on line No 3 Bollaram II Vasagatta 11KV Patancheru 15.15 18.08 02.53 BD Due to Tree fallen on line No 4 MDK Bollaram II Rupa 11KV Patancheru 15.15 19.12 03.57 BD Due to Tree fallen on line No 5 Thogita Aurangabad 11KV Medak 06.22 07.45 01.23 B/d due to conductor snapped No 6 Thogita Kuchanpally 11KV Medak 11.20 12.15 00.55 B/d due to conductor snapped No 7 Seelampally Chilipched 11KV Medak 14:30 15:33 1:03 B/D due to 11 KV Jumper cut. No No Visible Fault Due To heavy Rain wind and 1 Gaganpahad Gaganpahad 11KV RJNR 16:58 18:05 1:07 No Gale 11kv Insulator failed at Venkateshwara Flexo 2 Gaganpahad Jaibhavani 11KV RJNR 16.58 18.25 01.27 No Company 3 Kattedan-II New citizenkanta 11KV RJNR 16.53 18.02 01.09 11kv Insulator failed at new citizenkanta No 11KV Line Phase to Phase line touched at 4 Chandanagar Taranagar 11KV GCB 15.10 18.10 03.00 No Pochamma Temple. 11KV Line AB Switch Sparked at Radha Krishna 5 Chandanagar HUDA Colony 11KV GCB 16.40 17.40 01.00 No Apartment. 6 RR S KPHB 6th Phase 11KV GCB 16.31 18.15 01.44 11KV Disc failed near HIG - 337 at 6th Phase. No 11KV AB Cable Failure to Replacement near 7 Nanakramguda Manjeera Daimond 11KV GCB 15.45 19.17 03.32 No Gopanpally Thanda. Tree branches fallen on the 11KV line near 8 IIIT GPRA 11KV GCB 15.54 17.16 01.22 No Indian Bank at Indra Nagar. 11KV Line Phase to Phase at Sai Raghavendra 9 Gachibowli Gopanpally 11KV GCB 16.20 17.40 01.20 No near lorry Shed. 11KV Line AB Switch opened at Ujwala Plywood. 10 Mathrusrinagar Kalyan Garden 11KV GCB 16:05 17:10 1:05 No 11Kv Disc failed near Bommarillu Function Hall. 1 Mayurinagar laxminagar 11KV Kukatpally 15:40 16:50 1:10 Due to rain No 2 JTPL RTC Colony 11KV Kukatpally 15.30 17.30 02.00 11kv line Pin Insulater failed at RTC Colony No 3 Mayurinagar Mayurinagar 11KV Kukatpally 21.30 22.30 01.00 Lorry Touched 11kv line at Indiramma House No Tree braches fallen on the 11kv line near Volvo 4 Guntur Vikas Volvo 11KV Kukatpally 15.43 17.55 02.12 No Gate 5 Guntur Vikas Apparana 11KV Kukatpally 15.43 17.52 02.09 Tree brachesh fallen on the 11kv line No 6 VemanaColony Bhavanipuram 11KV Kukatpally 15.20 16.00 00.40 HT/LT Lt line Pole Dameged No 7 Nizampet Bandari Lay Out 11KV Kukatpally 15.00 16.26 01.26 Due to rain No 8 Nizampet Rajadhani School 11KV Kukatpally 15.00 16.20 01.20 Due to rain No 9 Nizampet Journalist Colony 11KV Kukatpally 15.10 16.20 01.10 Due to rain No 10 JDMSS-V Wing Tools 11KV Jeedimetla 15.15 17.30 02.15 11kv line Endkit failed No RR N Jumper cut & Tree branches fallen on the 11kv 11 JDMSS-I Phase-II 11KV Jeedimetla 14.32 16.23 01.51 No line 12 Suraram Sai Baba Nagar 11KV Jeedimetla 15.17 17.00 01.43 11kv line Endkit failed No 13 Suraram Matrix 11KV Jeedimetla 16.22 17.55 01.33 Jumper cut No RR N 14 DPPally Bowrampet 11KV Jeedimetla 15.40 19.23 03.43 Tree brachesh fallen on the 11kv line No 15 DPPally Gagillapur 11KV Jeedimetla 15.50 19.40 03.50 Tree brachesh fallen on the 11kv line No 11KV Pin Insulator failed near Sumangali 16 Medchal Victory 11KV Medchal 14.50 16.40 01.50 No Aluminium Company 17 Dulapally IDA-I 11KV Medchal 15.22 16.52 01.30 Tree brachesh fallen on the 11kv line No 18 Gowdavelly Basaragadi 11KV Medchal 16.00 17.52 01.52 11KV Pin insulator failed No 11KV Pin Insulator and Disc failed near 19 Bandamadaram Srirangavaram 11KV Medchal 19:55 23:45 3:50 No Srirangavaram Village 1 Tirumalagir Srinagar Colony 11KV VI 15.44 17.20 01.36 All Indication Tree branches fallen on lines at Foot Ball Ground No 2 Sanjeevaiah Park Patigadda Quarters 11KV IV 16:27 17:50 1:23 EL Tree branches fallen on lines at Auto Stand No 3 Yellareddyguda Akber Form 11KV X 15:50 17:20 1:30 EL No Visible Fault due to heavy rain & wind No 4 Addagutta Ambedkar Nagar 11KV V 15:45 17:35 1:50 EL No Visible Fault due to heavy rain & wind No 5 Addagutta Shanthi Niketan 11KV V 15:35 17:30 1:55 OL-Bph Tree branches fallen on lines at Shanthi Niketan No 6 Addagutta Tagore Home 11KV V 15:45 21:45 6:00 EL Tree branches fallen on lines at Manju Apts No HT Cable Jumper cut at Sanjeevaiah Park & Tree 7 Patigadda Sanjeevaiah Park 11KV V 15:38 19:10 3:32 EL,OL No branches fallen on lines at Opp: Yogi Bear 8 Zamistanpur Sanjeevapuram 11KV V 15:40 17:55 2:15 All Indication DTR fault at Grave Yard, Sunnam Batti No 9 Zamistanpur MCH Park 11KV V 15:48 20:23 4:35 EL,OL-Rph Pin Insulator flash over at P.R Nagar Park No 10 Lalaguda Vijayapuri 11KV V 15:30 17:10 1:40 EL No Visible Fault due to heavy rain & wind No 11 Lalaguda Chenna Reddy 11KV V 15:45 16:55 1:10 EL,OL-Bph Tree branches fallen on lines at Badam Apts No 12 Lalaguda Lalapet 11KV V 15:30 17:33 2:03 EL No Visible Fault due to heavy rain & wind No 13 Lalaguda Nagarjuna Nagar 11KV V 15:40 17:45 2:05 EL Tree branches fallen on lines at S.S Heights Apts No 14 R.P.Nilayam Vaishnavi Matha 11KV VI 16:20 18:20 2:00 EL Tree branches fallen on lines at Satya Complex No 15 R.P.Nilayam Venkatapuram 11KV VI 16:30 18:20 1:50 EL No Visible Fault due to heavy rain & wind No 16 Chilkalguda Bhokalpur 11KV V 15:40 19:45 4:05 EL No Visible Fault due to heavy rain & wind No 17 Chilkalguda P.R.Nagar 11KV V 15:40 18:10 2:30 EL No Visible Fault due to heavy rain & wind No 18 Chilkalguda Dandu Pentaiah 11KV V 15:40 19:30 3:50 EL No Visible Fault due to heavy rain & wind No 19 Chilkalguda New Boiguda 11KV V 15:40 18:20 2:40 EL No Visible Fault due to heavy rain & wind No 20 Chilkalguda Pragatools 11KV V 15:40 20:00 4:20 EL Tree branches fallen on lines at Pragatools No 21 Chilkalguda Water Works 11KV V 15:40 17:40 2:00 EL No Visible Fault due to heavy rain & wind No 22 Road No.2 Lumbini Mall 11KV X 15:27 18:24 2:57 EL Tree branches fallen on lines at Sagar Society No 23 Gymkhana Mud Fort 11KV V 15:45 18:40 2:55 All Indication Bus Coupler Bph Red hot at SS No Arranged Partial loads on 24 Gymkhana Apollo 11KV V 15:45 19:45 4:00 All Indication Tree branches fallen on lines at Various locations HYD N 11KV Vikrampuri feeder 25 Gymkhana Pared Ground 11KV V 15:45 20:05 4:20 All Indication 3No.