Cheap Natural Gas, Stagnant Power Demand, and Power Prices That

Total Page:16

File Type:pdf, Size:1020Kb

Cheap Natural Gas, Stagnant Power Demand, and Power Prices That Cheap natural gas, stagnant power demand, and power prices that have fallen significantly since 2008 have jeopardized the economics of about two-thirds of the nation’s 100-GW nuclear capacity, according to a working paper from the Massachusetts Institute of Technology (MIT) Center for Energy and Environmental Policy Research. About 21 GW in merchant deregulated markets are retiring, or are at high risk of retiring the paper suggests. Here’s a profitability outlook for all 61 nuclear plants in the U.S. over the short term (between 2017 and 2019), according to the research entity. Source: “Early Nuclear Retirements in Deregulated U.S. Markets: Causes, Implications and Policy Options,” MIT Center for Energy and Environmental Policy Research (March 2017) —Copy and artwork by Sonal Patel, a POWER associate editor. Millstone 14.8 Seabrook 14.0 Nine Mile Point 13.7 North Anna 13.7 James A. FitzPatrick 12.9 Indian Point 2 12.6 Pilgrim Nuclear 9.9 Calvert Cliffs 9.5 Indian Point 3 9.0 R.E. Ginna/Ontario Sta. 13 8.2 Surry 5.1 Davis Besse 4.5 Clinton Power Station 3.6 Perry 3.5 *Profitability is defined as the net pre-tax Limerick 1.9 Dresden 1.8 earnings of the individual facilities, Peach Bottom 1.7 calculated as the sum of energy sales, Donald C. Cook 1.4 capacity market revenue, and policy support Susquehanna 1.3 (subsidies if applicable) minus the cost of Braidwood Generating 0.8 generation. Salem 0.4 LaSalle County 0.3 St. Lucie 0.1 Beaver Valley –0.1 Palo Verde –0.5 Hope Creek –0.5 Grand Gulf –1.2 Alvin W. Vogtle –1.4 South Texas Project –2.6 ELECTRIC POWER MARKETS McGuire –3.0 Oconee –3.7 Northwest Quad Cities –3.7 Traditional markets, Diablo Canyon Southwest typically with –4.1 vertically integrated Palisades –4.1 Southeast Comanche Peak –4.5 utilities Browns Ferry –4.6 California (CAISO) Turkey Point –4.9 Point Beach –5.2 MISO Joseph M. Farley –6.0 SPP Markets that foster Edwin I. Hatch –6.4 Texas (ERCOT) competition for Waterford 3 –6.4 power generation Catawba –6.4 New England (ISO-NE) Oyster Creek –6.5 New York (NYISO) Three Mile Island –7.1 Byron Generating Station –8.0 PJM Sequoyah –8.1 Watts Bar Nuclear –8.3 Callaway –8.4 River Bend –8.7 Brunswick –9.1 V.C. Summer –9.8 Cooper Nuclear Station –9.8 Fermi –10.2 Duane Arnold Energy Ctr. –11.1 Arkansas Nuclear One –12.8 Columbia Generating –13.6 Shearon Harris Nuclear –15.8 Wolf Creek –17.6 H.B. Robinson –21.6 Prairie Island –26.8 Monticello –29.4 Estimated net profit* per MWh generated over Revised (8/15/2017): Corrects market data using input from EPA, EIA-860, 2017–2019 ($/MWh) 2015. Copyright: POWER magazine.
Recommended publications
  • Analyzing the Energy Industry in United States
    +44 20 8123 2220 [email protected] Analyzing the Energy Industry in United States https://marketpublishers.com/r/AC4983D1366EN.html Date: June 2012 Pages: 700 Price: US$ 450.00 (Single User License) ID: AC4983D1366EN Abstracts The global energy industry has explored many options to meet the growing energy needs of industrialized economies wherein production demands are to be met with supply of power from varied energy resources worldwide. There has been a clearer realization of the finite nature of oil resources and the ever higher pushing demand for energy. The world has yet to stabilize on the complex geopolitical undercurrents which influence the oil and gas production as well as supply strategies globally. Aruvian's R'search’s report – Analyzing the Energy Industry in United States - analyzes the scope of American energy production from varied traditional sources as well as the developing renewable energy sources. In view of understanding energy transactions, the report also studies the revenue returns for investors in various energy channels which manifest themselves in American energy demand and supply dynamics. In depth view has been provided in this report of US oil, electricity, natural gas, nuclear power, coal, wind, and hydroelectric sectors. The various geopolitical interests and intentions governing the exploitation, production, trade and supply of these resources for energy production has also been analyzed by this report in a non-partisan manner. The report starts with a descriptive base analysis of the characteristics of the global energy industry in terms of economic quantity of demand. The drivers of demand and the traditional resources which are used to fulfill this demand are explained along with the emerging mandate of nuclear energy.
    [Show full text]
  • Byron, Units 1 & 2, Dresden, Units 2 & 3, James A. Fitzpatrick, Lasalle
    200 Exelon Way Exelon Generation ® Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.55a RS-19-089 JAFP-19-0084 August 27, 2019 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 N RC Docket Nos. 50-373 and 50-37 4 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 N RC Docket Nos. 50-352 and 50-353 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Subject: Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI Reference: NRC Regulatory Issue Summary 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI," dated July 28, 2004 U.S. Nuclear Regulatory Commission Request to Use a Provision of a Later Addenda of the ASME B&PV Code, Section XI August 27, 2019 Page 2 In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (g)(4)(iv), and the guidance provided in the referenced document, Exelon Generation Company, LLC (Exelon) requests NRC approval to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, Section XI, for the units identified above.
    [Show full text]
  • Nrc Liaison Report
    SC-2Mtg07-2_Att#10 NRC LIAISON REPORT • STP first company to step forward in decades seeking new reactor license The application, a 200,000-page document submitted on a single DVD, was filed on September 24. The staff and STP officials met October 11 for the first public meeting since the application was filed. NRC staffers outlined several issues during the meeting, including a lack of supporting documents for at least two sections, outdated data for one section, missing figures for another and, in one instance, the absence of state emergency preparedness plans that were cross-referenced in the application. • TVA Opts For AP1000 Design Instead Of Completing Partially Finished Existing Reactors. TVA is submitting the combined operating license request nearly two decades after work stopped in 1988 toward building two similar-sized reactors at Bellefonte. TVA officials determined that finishing those reactors, which the agency started building in 1973, would be too costly." Application will be the first involving construction of a Westinghouse AP1000 advanced reactor, made by Westinghouse Electric Co., which is owned by Japan's Toshiba Corp. • Grid Security A video released last month by CNN illustrates the potential danger to the power grid, experts say. While in the past, most had imagined a cyberattack might shut down patches of the US grid for a few days at worst, But the video shows a demonstration by the Idaho National Laboratory that a large electric generator shaking violently, spraying metal parts, and spewing smoke before grinding to a stop. The method of attack used in that demonstration could be replicated to destroy more and larger equipment, several experts say.
    [Show full text]
  • Electric Power Monthly December 1997
    DOE/EIA-0226(97/12) Distribution Category UC-950 Electric Power Monthly December 1997 With Data for September 1997 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 mmwm OF m$ mumr is mmm This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts The Electric Power Monthly is prepared by the U.S. Department of Energy's Energy Information Administration. Questions and comments concerning the contents of the Electric Power Monthly may be directed to: Ms. Sandra Smith, Project Leader Energy Information Administration, EI-524 U.S. Department of Energy Washington, DC, 20585 Telephone number: (202)426-1173 Internet E-Mail number: [email protected] or the following subject specialists: Subject Contact Phone Number Internet E-Mail Electricity Supply and Demand Forecast.. Rebecca McNerney 202-426-1251 [email protected] Industry Developments Kenneth McClevey 202-426-1144 [email protected] New Electric Generating Units Karen McDaniel 202-426-1234 [email protected] U.S. Electric Utility Net Generation Melvin E. Johnson 202-426-1172 [email protected] U.S. Electric Utility Consumption of Fuels . Melvin E. Johnson 202-426-1172 [email protected] U.S. Electric Utility Stocks of Fuels Melvin E. Johnson 202-426-1172 [email protected] U.S.
    [Show full text]
  • 20071204-Ucs-Brief-Got-Water
    GOT WATER? Nuclear power plants are usually built next to lakes, rivers, and oceans.1 Not for the scenic views that such locales provide, but because water can absorb the waste heat produced by the plants. Nuclear power plants consume vast amounts of water during normal operation to absorb the waste heat left over after making electricity and also to cool the equipment and buildings used in generating that electricity. In event of an accident, nuclear power plants need water to remove the decay heat produced by the reactor core and also to cool the equipment and buildings used to provide the core’s heat removal. This issue brief describes the reliance of nuclear power plants on nearby bodies of water during normal operation and under accident conditions. All of the 104 nuclear reactors currently licensed to operate in the United States are light2 water reactors. Sixty-nine (69) are pressurized water reactors (PWRs) and 35 are boiling water reactors (BWRs). In a PWR, water flowing through the reactor core is In a BWR, water flowing through the reactor core is heated by its thermal energy. Because this water is heated by its thermal energy and boils. The steam flows maintained under high pressure (over 2,000 pounds per from the reactor vessel to the turbine. The steam spins the square inch), it does not boil even when heated to over turbine, which is connected to a generator that produces 500ºF. The hot water flows from the reactor vessel and electricity. The steam exits the turbine into the condenser. enters thousands of metal tubes within the steam Water from the nearby lake, river, or ocean flows through generator.
    [Show full text]
  • Dresden Nuclear Power Station, Units 2 & 3
    UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 July 19, 2017 Mr. Bryan C. Hanson Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3—NRC INTEGRATED INSPECTION REPORT 05000237/2017002 AND 05000249/2017002 Dear Mr. Hanson: On June 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your Dresden Nuclear Power Station, Units 2 and 3. On June 30, 2017, the NRC inspectors discussed the results of this inspection with Mr. J. Washko and other members of your staff. The results of this inspection are documented in the enclosed report. Based on the results of this inspection, one issue was self-revealed and was evaluated under the risk significance determination process as having very low safety significance (Green). The NRC has also determined a violation is associated with this issue. Because the licensee initiated a condition report to address this issue, the violation is being treated as a Non-Cited Violation (NCV), consistent with Section 2.3.2 of the Enforcement Policy. This NCV is described in the subject inspection report. If you contest the violations or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555–0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at the Dresden Nuclear Power Station.
    [Show full text]
  • Generic Fundamentals Examination Results
    October 7, 2019 THIS LETTER DISTRIBUTED TO THE FOLLOWING DOCKET NUMBERS: Arkansas Nuclear One, Unit 2, Docket No. 50-368 Columbia Generating Station, Docket No. 50-397 Diablo Canyon Power Plant, Docket Nos. 50-275/323 River Bend Station, Unit 1, Docket No. 50-458 SUBJECT: GENERIC FUNDAMENTALS EXAMINATION RESULTS On September 4, 2019, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees at your facility. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A “P” in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an “F” indicates that the individual failed the examination. If you have any questions concerning this examination, please contact Mr. Eric Cushing at 301-415-1064 and/or [email protected]. Sincerely, /RA Gregory E. Werner, Chief Operations Branch Division of Reactor Safety Enclosures: As stated Reactor 50 dockets - 2 - cc w/enclosures: Dennis Kilpatrick, Training Manager Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Glenn Pierce, Manager Nuclear Training Columbia Generating Station Energy Northwest, MD-1023 P.O. Box 968 Richland, WA 99352-0968 Justin Rogers, Training Manager Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 Kevin Stupak, Manager Training Entergy Operations, Inc.
    [Show full text]
  • Operating License Renewal Stage Arkansas Nuclear
    Applicant’s Environmental Report – Operating License Renewal Stage Arkansas Nuclear One - Unit 1 Introduction Set forth below is Entergy Operations’ Environmental Report-Operating License Renewal Stage for Arkansas Nuclear One, Unit 1. This report was prepared in conjunction with Entergy Operations’ application to the U. S. Nuclear Regulatory Commission to renew the operating license for ANO-1. In compliance with applicable NRC requirements, this ER analyzes potential environmental impacts associated with renewal of the ANO-1 license. It is designed to assist the NRC staff with the preparation of the ANO-1 specific Supplemental Environmental Impact Statement that is required for license renewal. The content of the ER complies with the requirements of 10CFR Part 51, as augmented by the NRC’s “Generic Environmental Impact Statement for License Renewal of Nuclear Plants” (NUREG-1437). Specifically, the ANO-1 ER complies with 10CFR54.23, which requires license renewal applicants to submit a supplement to the ER that complies with requirements of Subpart A of 10CFR Part 51. This report also addresses the more detailed requirements of NRC environmental regulations in 10CFR51.45 and 10CFR51.53, as well as the underlying intent of the National Environmental Policy Act, 42 U.S.C. § 4321 et seq. For major federal actions, the NEPA requires federal agencies to prepare a detailed statement that addresses significant environmental impacts, adverse environmental effects that cannot be avoided should the proposal be implemented, alternatives to the
    [Show full text]
  • Clinton Power Station, Unit No. 1 - Issuance of Amendment No
    May 19, 2021 Mr. David P. Rhoades Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: CLINTON POWER STATION, UNIT NO. 1 - ISSUANCE OF AMENDMENT NO. 237 REGARDING ADOPTION OF 10 CFR 50.69, “RISK-INFORMED CATEGORIZATION AND TREATMENT OF STRUCTURES, SYSTEMS AND COMPONENTS OF NUCLEAR POWER REACTORS” (EPID L-2019-LLA-0098) Dear Mr. Rhoades: The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 237 to Facility Operating License No. NPF-62 for the Clinton Power Station, Unit No. 1. The amendment is in response to your application dated April 30, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20121A241) as supplemented by letter dated November 24, 2020 (ADAMS Accession No. ML20329A433). The amendment adds a new license condition to the Facility Operating License to allow the implementation of the risk-informed categorization and treatment of structures, systems, and components of nuclear power reactors in accordance with Title 10 of the Code of Federal Regulations Section 50.69. A copy of the Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission’s next monthly Federal Register notice. Sincerely, /RA/ Joel S. Wiebe, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461 Enclosures: 1. Amendment No. 237 to NPF-62 2. Safety Evaluation cc: Listserv EXELON GENERATION COMPANY, LLC DOCKET NO. 50-461 CLINTON POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
    [Show full text]
  • A Comparative Analysis of Nuclear Facility Siting Using Coalition Opportunity Structures and the Advocacy Coalition Framework
    UNIVERSITY OF OKLAHOMA GRADUATE COLLEGE ORDER IN A CHAOTIC SUBSYSTEM: A COMPARATIVE ANALYSIS OF NUCLEAR FACILITY SITING USING COALITION OPPORTUNITY STRUCTURES AND THE ADVOCACY COALITION FRAMEWORK A DISSERTATION SUBMITTED TO THE GRADUATE FACULTY in partial fulfillment of the requirements for the Degree of DOCTOR OF PHILOSOPHY By KUHIKA GUPTA Norman, Oklahoma 2013 ORDER IN A CHAOTIC SUBSYSTEM: A COMPARATIVE ANALYSIS OF NUCLEAR FACILITY SITING USING COALITION OPPORTUNITY STRUCTURES AND THE ADVOCACY COALITION FRAMEWORK A DISSERTATION APPROVED FOR THE DEPARTMENT OF POLITICAL SCIENCE BY ______________________________ Dr. Hank C. Jenkins-Smith, Chair ______________________________ Dr. Carol L. Silva, Co-Chair ______________________________ Dr. Christopher M. Weible ______________________________ Dr. Deven E. Carlson ______________________________ Dr. Jill A. Irvine © Copyright by KUHIKA GUPTA 2013 All Rights Reserved. Dedication For my incredible parents, Anil and Alpana Gupta, for making all of this possible, and my husband, Joseph T. Ripberger, for being a constant inspiration. Acknowledgements This dissertation would not be possible were it not for the invaluable support I have received throughout my journey as an undergraduate at Delhi University in India, a graduate student at the University of Warwick in England, and my pursuit of a doctorate at the University of Oklahoma in the United States. During my time at Delhi University, Ramu Manivannan was an amazing mentor who taught me the value of making a difference in both academia and the real world. My greatest debt is to Hank Jenkins-Smith and Carol Silva at the University of Oklahoma, whose encouragement, guidance, and intellectual advice has made this journey possible. I am deeply grateful for their unending support; this dissertation would not exist without them.
    [Show full text]
  • Issuance of Amendment Nos. 230 and 193 to Adopt 10 CFR 50.69
    UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 31, 2018 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: LIMERICK GENERATING STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENT NOS. 230 AND 193 TO ADOPT TITLE 10 OF THE CODE OF FEDERAL REGULATIONS SECTION 50.69, "RISK-INFORMED CATEGORIZATION AND TREATMENT OF STRUCTURES, SYSTEMS AND COMPONENTS FOR NUCLEAR POWER REACTORS" (CAC NOS. MF9873 AND MF9874; EPID L-2017-LLA-0275) Dear Mr. Hanson: The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment Nos. 230 and 193 to Renewed Facility Operating License Nos. NPF-39 and NPF-85 for the Limerick Generating Station, Units 1 and 2, respectively, in response to your application dated June 28, 2017, as supplemented by letters dated August 14, 2017; January 19, 2018; April 23, 2018; and July 27, 2018. The amendments added a new license condition to the Renewed Facility Operating Licenses to allow the implementation of risk-informed categorization and treatment of structures, systems, and components for nuclear power reactors in accordance with Title 10 of the Code of Federal Regulations Section 50.69. A copy of our related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice. Sincerely, . Sreenivas, Project Manag Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 Enclosures: 1. Amendment No. 230 to Renewed NPF-39 2.
    [Show full text]
  • Mailing List of U.S. Domestic Nuclear Utilities
    Mailing List of Domestic Nuclear Utilities ",Plant .. I Address Arkansas Nuclear One, Units 1 and 2 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Beaver Valley Power Station, Units 1 & 2 Eric A. Larson Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077 Browns Ferry Nuclear Plant, Units 1, 2 & 3 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant Units 1 & 2 George T. Hamrick, Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461 Byron Station, Units 1 & 2/Braidwood Station, Michael J. Pacilio Units 1 & 2 Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon -Nuclear 4300 Winfield Road Warrenville, IL 60555 Callaway Plant, Unit 1 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company Ameren Missouri P.O. Box 620 -Fulton, MO 65251 Calvert Cliffs Nuclear Power Plant Units 1 & 2 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC. Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Catawba Nuclear Station, Units 1 & 2 Mr. Kelvin Henderson Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745 All -2- Plant Address Clinton Power Station, Unit No. 1 Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555 Columbia Generating Station Mr.
    [Show full text]