Asset Management  Staff, Asset Condition, Systems (Mydata, Etc)  Finance  Staff, LTFP (Asset Based)  Procurement, Contracts, Etc

Total Page:16

File Type:pdf, Size:1020Kb

Asset Management  Staff, Asset Condition, Systems (Mydata, Etc)  Finance  Staff, LTFP (Asset Based)  Procurement, Contracts, Etc Does it have a place in Local Government? Why is ARCC using it? By: Don Cole - Ararat Rural City Council Brief History In 1857, Chinese miners travelling from Robe on the SA coast to the Central Victorian Goldfields discovered gold. The Canton Lead was one of the world's richest shallow alluvial goldfields – and it was ~8km in length. The Chinese called it Gum San (Gold Mountain) The Ararat Goldfields grew to 30,000+ people in just a few weeks. Gum San – Gold Mountain Ararat Performing Arts Centre Ararat Rural City Council (ARCC) Population » 11,297 Area » 4,230 km2 (~1 million acres) Rateable properties » 7,017 Employees » 126.6 EFT Councillors » 7 Rate revenue » $11.836m (2011-12) Total revenue » $32.065m (2011-12) Length of sealed local roads » 917 km Length of unsealed local roads » 1,466 km A Generalist VS My first 18 months Studying ARCC and Council processes Staff, Services, Business Systems, BEF, ELG, etc I.C.T. “Just fix I.T.” Waste Management Staff, kerbside contract, landfill, waste management groups Asset Management Staff, Asset Condition, Systems (MyData, etc) Finance Staff, LTFP (Asset based) Procurement, contracts, etc. Looking at strategic procurement, shared services, etc Initial Thoughts… Asset Management Team No Assets Manager Two Technical Officers (under utilised) Highly dedicated depot staff – reactive maintenance Asset Management Systems Bespoke business systems ○ SQL, Excel, Road Corridor, other AMS (MyData) not used ○ Numerous issues, including ○ Poor quality and missing data, unknown support for future capabilities Documentation Out of date, lack of ownership Initial Thoughts (Continued)… Council Gradual hollowing-out of villages Council making short-term decisions - based on insufficient data High level of community dissatisfaction (rates too high) Physical Assets Roads – generally seem OK Buildings – most neglected (poor data) Other assets – poor data 2013 -14: VAGO Audit ! One of 5 Councils: Ararat Rural City Council Cardinia Shire Council Kingston City Council Port Phillip City Council Wodonga City Council. 2014 VAGO Audit Fully embraced VAGO audit Audit managed across entire team Executive Leadership Group Management Team Financial Team Fully support all recommendations Asset Management During the course of the VAGO audit: We hired two new Assets Managers Get the right people (strategic + operational)! One AM redeployed to manage ICT Progressed development of a business framework - to be applied across the entire organisation: Based on ISO / AS / Industry Best practice Alignment with standards i.e. not certification! Progressing with evaluation of proposed intranet solution As-Is State Understand and document “As-Is” Legal Requirements Status of AM business application/s Main AM Issues (renewal gap, data, etc) Current state of documentation ○ Asset Management Plans ○ End to end processes ○ Standard Operating Procedures Current state of physical assets Industry standards for AM (eg. STEP) Local Terminology ○ eg Strategy vs Continuous Improvement, Strategy vs Plan To-Be State Develop and document our “To-Be” State (4-pronged strategic approach – more details later) 1) Asset Management as a stand-alone service Effectiveness of documentation, processes, practices etc 2) Interactions with other Council services Financial services, reception, payroll, procurement, etc 3) Interactions with the outside world Legal requirements, MAV directions, other Councils, etc 4) Future state (1, 3 & 5-year horizon) Industry Analysis ○ Asset Management ○ IT (Cloud, Mobility, etc) ○ Legal and other requirements ○ Vendors (flexibility, affordability, support, etc) Other knows / unknowns eg: Community consultation, population trends, economics Service-centric Approach Council delivers 200+ diverse services Each service (group) will require: A Service Policy (CEO) A Service Strategy (To-Be) (Director) A Service Operations Plans (As-Is) (Managers) E2E Processes (Manager) SOPs (Team Leaders) Work Instructions (Officers) Forms and Templates (Managers), and Clearly defined Compliance & Reference documents Proposed Document Hierarchy Mayor CEO CEO Director Director Manager Director Manager Manager Team Leader T/Leader Officer Service Strategy 4-pronged strategic approach Management Systems: Requirements First Edition: 15 January 2014 ISO 55000 What is it? ISO 55000: Asset Management Application of standards enables a consistent approach across all Council Services Other ISO Standards we will use… ISO 9000 Quality Management System (default) ISO 14000 Environmental Management System ISO 31000 Risk Management System Australian Standards we will use… AS/NZS 4801, Occupational Health and Safety Management Other non-“Standards” PMBOK ISO 55000 ISO 9000 ISO 14000 ISO 55000 > Policy 5.2 Policy Top management shall establish an asset management policy that: a) is appropriate to the purpose of the organization; b) provides a framework for setting asset management objectives; c) includes a commitment to satisfy applicable requirements; d) includes a commitment to continual improvement of the asset management system. The asset management policy shall: o be consistent with the organizational plan; o be consistent with other relevant organizational policies; o be appropriate to the nature and scale of the organization's assets and operations; o be available as documented information; o be communicated within the organization; o be available to stakeholders, as appropriate; o be implemented and be periodically reviewed and, if required, updated. Asset Management Policy ARCC’s Objective Consistency across all Council Services Closing Thoughts QDE: Quality, Delivery, Efficiency (and cost) ARCC is small, so this approach may not suit every Council We're learning as we go, and we are happy to share our experiences. Questions or Comments? .
Recommended publications
  • Asset Management in a BIM Environment
    Asset Management in a BIM Environment Fulvio Re Cecconi1, Mario Claudio Dejaco2, Daniela Pasini3, Sebastiano Maltese4 1) Ph.D., Associate Professor, Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, Milano, Italy. Email: [email protected] 2) Ph.D., Assistant Professor, Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, Milano, Italy. Email: [email protected] 3) Ph.D. candidate, Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, Milano, Italy. Email: [email protected] 4) Ph.D., Research fellow, Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, Milano, Italy. Email: [email protected] Abstract: Nowadays construction projects are more and more delivered by Building Information Models instead of traditional 2D drawings. This allows for information rich projects but this information is, in many cases, accessible only for those who are able to use a BIM authoring software. In the current market, both the top levels (CEO and executives) and the low levels (on site and off site operators) of an asset or a facility management company are not able to use a BIM authoring tool, thus to use the valuable information stored in the model. Moreover, BIM models that work fine for the design stage will be of no use during the operational stage if not correctly created. A research has been carried on to cope with these problems and the preliminary results are shown in this paper. Asset managers’ work procedures and needs have been analyzed to identify what information is needed and when in the operational stage and then an IFC compliant standard has been adopted to store data.
    [Show full text]
  • Deliverable D7.5: Standards and Methodologies Big Data Guidance
    Project acronym: BYTE Project title: Big data roadmap and cross-disciplinarY community for addressing socieTal Externalities Grant number: 619551 Programme: Seventh Framework Programme for ICT Objective: ICT-2013.4.2 Scalable data analytics Contract type: Co-ordination and Support Action Start date of project: 01 March 2014 Duration: 36 months Website: www.byte-project.eu Deliverable D7.5: Standards and methodologies big data guidance Author(s): Jarl Magnusson, DNV GL AS Erik Stensrud, DNV GL AS Tore Hartvigsen, DNV GL AS Lorenzo Bigagli, National Research Council of Italy Dissemination level: Public Deliverable type: Final Version: 1.1 Submission date: 26 July 2017 Table of Contents Preface ......................................................................................................................................... 3 Task 7.5 Description ............................................................................................................... 3 Executive summary ..................................................................................................................... 4 1 Introduction ......................................................................................................................... 5 2 Big Data Standards Organizations ...................................................................................... 6 3 Big Data Standards ............................................................................................................. 8 4 Big Data Quality Standards .............................................................................................
    [Show full text]
  • Semantic 3D Modelling for Infrastructure Asset Management
    Semantic 3D Modelling for Infrastructure Asset Management Master’s Thesis Department of Built Environment School of Engineering Aalto University Espoo, 1st of November 2016 M.Sc Sanna Makkonen Supervisor: Prof. Kirsi Virrantaus Advisor: M.Sc (Tech) Sonja Vilpas Aalto University, P.O. BOX 11000, 00076 AALTO www.aalto.fi Abstract of master's thesis Author Sanna Makkonen Title of thesis Semantic 3D Modelling for Infrastructure Asset Management Degree programme Degree Programme in Geomatics Major Geoinformation Technology Code IA3002 Thesis supervisor Professor Kirsi Virrantaus Thesis advisor(s) Sonja Vilpas Date 03.11.2016 Number of pages 73 Language English Abstract Infrastructure asset management has long been based on 2D based geographical information sys- tems. However, 3D based solutions have been taking over the market and, for example, other infra- structure management phases, planning and constructions have started taking advantage of these 3D based solutions. Many studies have shown that 3D facilitates the understanding of the models which improves communication and leads to more efficient working methods. This thesis aims to outline the rationale, current practices and benefits of semantic 3D modelling in infrastructure asset management. In other words, the thesis suggests what the rationale for intro- ducing semantic 3D modelling into infrastructure asset management is, what kind of technical so- lutions or practices have been provided and what are the benefits of introducing semantic 3D mod- elling into asset management. In the end, change factors were outlined to illuminate what should be done to enable semantic 3D based infrastructure asset management. Methods used in this thesis consists of literature, software review and expert interviews.
    [Show full text]
  • D6.1 – Service Bricks Specifications V1
    DELIVERABLE D6.1 – Service Bricks Specifications v1 Project Acronym: PROPHESY Grant Agreement number: 766994 (H2020-IND-CE-2016-17/H2020-FOF-2017) Project Full Title: Platform for rapid deployment of self-configuring and optimized predictive maintenance services Project Coordinator: INTRASOFT International SA DELIVERABLE D6.1 – Service Bricks Specifications v1 Dissemination level PU – Public Type of Document (R) Report Contractual date of delivery M12, 30/09/2018 Deliverable Leader AIT Status - version, date Final, v1.0, 28/09/2018 WP / Task responsible WP6 / Task 6.1 Keywords: Service Bricks, PROPHESY Building Blocks, PdM Tools and Solutions, PROPHESY Services, KPI List, Packaging, PROPHESY-SOE, Predictive Maintenance, PROPHESY Ecosystem, Data Analytics, Data Collection, Visualization, Security, Predictive Maintenance D6.1 – Service Bricks Specifications v1 Final – v1.0, 28/09/2018 Executive Summary This report specifies the PROPHESY “constituent components” that comprise the building blocks of an integrated PdM service or solution. The definitions of “Service Bricks”, “Connectors”, “Tools”, “Services” (as well as their subtypes) are presented in detail. A comprehensive taxonomy of the above entities is provided in terms of type, use, provider, category, instance and other important properties. Deployment and Packaging rules for them are also initially addressed, although these will be further refined thoroughly during technical and development work packages WP3, WP4 and WP5. Most importantly, a methodology for the combination of “Service Bricks” and other building blocks into “Solutions” is introduced as input for the ensuing Task 6.2 for the PROPHESY-SOE, since the ultimate end-product of the entire WP6 is the composition of “optimized turn-key solutions in Predictive Maintenance”, in order to target specific KPIs at first, and to subsequently offer cost-benefit calculations of the deployment.
    [Show full text]
  • Asset Information Requirements Guide
    Asset Information Requirements Guide: Information required for the operation and maintenance of an asset www.abab.net.au Australasian BIM Advisory Board (ABAB) In May 2017, the Australasian BIM Advisory Board (ABAB) was established by the Australasian Procurement and Construction Council (APCC) and the Australian Construction Industry Forum (ACIF), together with NATSPEC, buildingSMART Australasia and Standards Australia. This partnership of national policy and key standard-setting bodies represents a common-sense approach that captures the synergies existing in, and between, each organisation’s areas of responsibility in the built environment. It also supports a more consistent approach to the adoption of Building Information Modelling (BIM) across jurisdictional boundaries. The establishment of the ABAB is a first for the Australasian building sector with government, industry and academia partnering to provide leadership to improve productivity and project outcomes through BIM adoption. The ABAB is committed to optimal delivery of outcomes that eliminate waste, maximise end-user benefits and increase the productivity of the Australasian economies. The ABAB has evolved from a previous APCC–ACIF collaboration established in 2015 at a BIM Summit. This summit produced resource documentation to support BIM adoption (refer to www.apcc.gov.au for copies). Members of the ABAB have identified that, without central principal coordination, the fragmented development of protocols, guidelines and approaches form a significant risk that may lead to wasted effort and inefficiencies, including unnecessary costs and reduced competitiveness, across the built environment industry. www.abab.net.au What is Building Information Modelling (BIM)? For the context of the Asset Information Requirements Guide, the European Union (EU) BIM Task Group’s description has been adopted: BIM is a digital form of construction and asset operations.
    [Show full text]
  • Enable Good Asset Management with Integrated Enterprise Information Software Using Technology to Support PAS 55 Specifications
    SAP Thought Leadership Paper Enterprise Asset Management Enable Good Asset Management with Integrated Enterprise Information Software Using Technology to Support PAS 55 Specifications ENABLE GOOD Asset MANagemeNT WITH INtegRateD ENTERPRISE INFORmatION SOFTWARE Table of Contents 5 The Mission-Critical Role of Asset Management PAS 55: The Guideline for Good Asset Management Practices The Scope and Key Principles of PAS 55 Implications of PAS 55 for Asset Management Software 10 SAP Software: Supporting an Integrated Approach to Meeting PAS 55 Guidelines Enterprise Asset Management Software Complementary, Integrated SAP Solutions Corporations spend billions to design, buy, operate, and decommission production equipment and other physical assets. Managing assets and optimally using and running these investments can be mission critical. As a result, the assets are under the constant and watchful eyes of top management, shareholders, and regulators. But how can you be confident that your asset management practices are maximizing return on assets? IT’S ALL ABOUT RETURN ON Assets, COMPETITIVENess, AND BUSINess SUstaINABILITY The Mission-Critical Role of Asset Management Uncertain markets are forcing companies PAS 55: THE GUIDELINE FOR GOOD PAS 55 can help your company gain to maximize return on assets. Meanwhile, Asset MANagemeNT PRactIces competitive advantage by helping ensure globalized competition is challenging that you are effectively managing your businesses to drive competitiveness by PAS 55 as an asset management frame- assets. In fact, many companies are achieving operational and maintenance work describes and defines essential key seeking to get PAS 55 certified through excellence. But most of all, increased attributes and good practices for the specialized consulting organizations with awareness of sustainability issues is management of physical assets.
    [Show full text]
  • An Openbim Approach to Iot Integration with Incomplete As-Built Data
    applied sciences Article An openBIM Approach to IoT Integration with Incomplete As-Built Data Nicola Moretti 1,* , Xiang Xie 1,* , Jorge Merino 1 , Justas Brazauskas 2 and Ajith Kumar Parlikad 1 1 Institute for Manufacturing, Department of Engineering, University of Cambridge, 17 Charles Babbage Road, Cambridge CB3 0FS, UK; [email protected] (J.M.); [email protected] (A.K.P.) 2 The Computer Laboratory, Department of Computer Science and Technology, University of Cambridge, 15 JJ Thomson Ave, Cambridge CB3 0FD, UK; [email protected] * Correspondence: [email protected] (N.M.); [email protected] (X.X.) Received: 2 November 2020; Accepted: 19 November 2020; Published: 23 November 2020 Featured Application: The proposed methodology has been developed to support the Asset Management (AM) decision making according to an open Building Information Modelling (openBIM) approach. Within the context of the West Cambridge Digital Twin Research Facility, a real case scenario has been considered, where the as-built data is imprecise or absent. The methodology is well suited to dealing with incomplete data on existing buildings, when the objective is integration among AM, the Internet of Things (IoT) and BIM information. Abstract: Digital Twins (DT) are powerful tools to support asset managers in the operation and maintenance of cognitive buildings. Building Information Models (BIM) are critical for Asset Management (AM), especially when used in conjunction with Internet of Things (IoT) and other asset data collected throughout a building’s lifecycle. However, information contained within BIM models is usually outdated, inaccurate, and incomplete as a result of unclear geometric and semantic data modelling procedures during the building life cycle.
    [Show full text]
  • Information Standards for Use in the Oil and Gas Industry
    IOGP information standard poster Information Standards for use in the oil and gas industry The Digitalization and Information Standards Subcommittee (DISC) are supporting the following list of standards: ISO 19128 Geographic information – Web map server interface ISO 22745 Industrial automation systems and integration – Open technical dictionaries and their application to master data ISO 8601 Date and time format IEC 62541 OPC unified architecture ISO 80000 Quantities and units IEC 62769 Field Device Integration (FDI) ISO 639 Language codes IEC 62832 Industrial-process measurement, control and automation – ISO 3166 Country codes Digital factory framework ISO 4217 Currency codes IEC 63280 Automation engineering of modular systems in the process industry (MTP) ISO 55000 Asset management IEC 63131 System control diagram ISO 14224 Petroleum, petrochemical and natural gas industries – collection and IEC 61131 Programmable controllers exchange of reliability and maintenance data for equipment IEC 61499 Function blocks ISO 15926 Industrial automation systems and integration – Integration of life- cycle data for process plants including oil and gas production facilities IEC 62714 Engineering data exchange format for use in industrial automation systems engineering – Automation Markup Language ISO 19008 Standard cost coding system for oil and gas production and processing facilities IEC 62443 Industrial communication networks – Network and system security ISO 18101 Automation systems and integration – Oil and gas interoperability IEC 62890 Industrial-process measurement, control and automation – Life-cycle-management for systems and components IEC 61360 Standard data element types with associated classification scheme IEC 62264 Enterprise Control System Integration IEC 61987 Industrial-process measurement and control – Data structures and elements in process equipment catalogues IEC 61512 Batch Control www.iogp.org IEC 62683 Low-voltage switchgear and control gear – Product data and properties for information exchange.
    [Show full text]
  • Asset Management Application Guide for ISO 55001
    Asset Management Application Guide for ISO 55001 International Copper Association (ICA) Latin America Av. Vitacura 2909, Oficina 303 Las Condes, Santiago Chile www.copperalliance.org COPYRIGHT © 2015 International Copper Association NOTE OF CLARIFICATION The document was originally created in Brazil, written in Portuguese and translated into English. Although this document has been prepared with due care, the ICA and any other participating institution are not responsible for the information and analysis herein presented, which shall be credited directly to their authors. This study does not restrain and nor does it exempts consultation and full reading of the standard ISO 55000/1/2 of the ISO - International Organization for Standardization and the British specification PAS-55 (Publicly Available Specification number 55) of the British Standards Institution [1]. Citations and references to the ISO 55000/1/2 and case studies were authorized by their respective organizations and their representatives in Brazil were the original texts were written. DATASHEET Original Text in Portuguese Prepared by: Marisa Zampolli Revised and Supervised by: Glycon Garcia Jr. Contributors (authors of practical examples and annexes) in the order they appear in the document: Alexandre Felix do Nascimento Ítalo Claudio Caiani Spanó – Reliasoft Brasil Rafael Schmitz Venturini de Barros – AES Tietê Gilberto Martins Junior – Elektro Eletricidade e Serviços S.A. Henrique Eduardo Pinto Diniz – CEMIG Valéria Simões de Marco – Eletrobrás Eletronuclear S.A. Paulo Marcio Nepomuceno de Sousa – CEMIG Pedro Monteiro de Castro Souza – CEMIG Henderson Saldonas da Silva João Esmeraldo da Silva, Dr. - Fundação Gorceix - Departamento de Pesquisa e Educação Continuada Jefferson Januário Mendes, Msc. - Instituto Federal Minas Gerais – Departamento de Engenharia de Produção Ruben Antonio Llobell Solé, Dr.
    [Show full text]
  • Iso 55000: a Strategic Look at Asset Management and Creating a Culture of Excellence!
    THE VOL 32 ISSUE 4 08.2020 WWW.NPMA.ORG PROPERTY ISSN-1072-2858 PROFESSIONAL ISO 55000: A STRATEGIC LOOK AT ASSET MANAGEMENT AND CREATING A CULTURE OF EXCELLENCE! IN THIS ISSUE Self-Assessment: That is the Question What is Your Trademark? Back to Basics: The Interconnectedness of the DFARS Business Systems TM Enterprise Power! Mix & Match Flexibility AUID® EZ-DisposeTM UID Registry Automated Disposition Interface & Reporting EZ-Move PEMS® TMAS® Property Move Property & Equipment Materials & Spares Order & Shipping Management Management RTX ENCATS TRAXX TM EZ-Service Appropriations IT Cataloging Mobile Asset Service Request Tracking System Tracking Management Buy Only The Modules That Fit Your Needs. Now That’s SMART! [email protected] 800.775.3968 www.assetsmart.com VOL 32 ISSUE 4 CONTENTS SPECIAL FEATURES 14 Self-Assessment: That is the Question BY KIMBERLY SAEGER, CPPM, CF, COCHISE CHAPTER 18 What is Your Trademark? BY BLAINE HULL, CPPS, GREAT SALT LAKE CHAPTER 20 Back to Basics: The Interconnectedness of the DFARS Business Systems BY ALEX MIKHELSON, CPA, DC-FEDERAL CENTER CHAPTER & THOMAS RUCKDASCHEL, CPPM, CF, DC-FEDERAL CENTER CHAPTER REGULAR FEATURES 04 National President’s Column 05 Editor’s Column 27 Connection Corner 28 Ask the Expert 29 Member Forum INDUSTRY CHATTER 06 Pentagon Names Seven New Military Sites for 5G Testing 07 Car Connectivity Consortium Announces Digital Key 2.0 Specification 16 ‘New Normal’ Playbook Starts with Honest COVER STORY Assessment of Telework Performance 17 Army to Probe the Economics of Modernization 17 Bone “Paint” May Aid Wounded Warriors ISO 55000: A Strategic Look at 19 NDIA Policy Points: Protectionism Won't Bolster Asset Management and Creating Supply Chains a Culture of Excellence! 24 Defense Acquisitions Annual Assessment: Drive to Deliver Capabilities Faster Increases Importance of Program 08 Knowledge and Consistent Data for Oversight BY STEVEN F.
    [Show full text]
  • GAO-19-57, Accessible Version, FEDERAL REAL PROPERTY
    United States Government Accountability Office Report to Congressional Requesters November 2018 FEDERAL REAL PROPERTY ASSET MANAGEMENT Agencies Could Benefit from Additional Information on Leading Practices Accessible Version GAO-19-57 November 2018 FEDERAL REAL PROPERTY ASSET MANAGEMENT Agencies Could Benefit from Additional Information on Leading Practices Highlights of GAO-19-57, a report to congressional requesters Why GAO Did This Study What GAO Found The federal government is the largest GAO identified six key characteristics of an effective asset management real property owner in the United framework (see table 1) that can help federal agencies manage their assets and States and spends billions of dollars to resources effectively. GAO identified these key characteristics through reviews of operate and maintain these assets, the International Organization for Standardization (ISO) 55000 standards—an which include buildings, roads, bridges, international consensus standard on asset management—studies and articles on and utility systems. Federal agencies asset management practices, and interviews with experts. GAO reviewed the are responsible for developing asset asset management practices of six federal agencies: the U.S. Coast Guard management policies, processes, and (Coast Guard); U.S. Army Corps of Engineers (Corps); General Services plans. In 2014, the ISO 55000 asset Administration (GSA); National Park Service (Park Service); National management standards were issued. Aeronautics and Space Administration (NASA); and U.S. Forest
    [Show full text]
  • Standards for Enabling Trade— Mapping and Gap Analysis Study
    Standards for Enabling Trade— Mapping and Gap Analysis Study An IA-CEPA Early Outcomes Initiative November 2017 Standards For Enabling Trade—Mapping and Gap Analysis Study 2 An IA-CEPA Early Outcomes Initiative – November 2017 Contents ListofFigures..............................................................................................................3 Abbreviations...............................................................................................................4 Terms..........................................................................................................................6 Acknowledgements......................................................................................................8 ExplanatoryNotes........................................................................................................8 Foreword.....................................................................................................................9 Recommendations.....................................................................................................10 ExecutiveSummary....................................................................................................11 Introduction................................................................................................................13 ProjectPurpose.........................................................................................................13 Objectives..................................................................................................................13
    [Show full text]