Submission of Form – I & Ia Towards Getting Prior Environmental Clearance
Total Page:16
File Type:pdf, Size:1020Kb
` SUBMISSION OF FORM – I & IA TOWARDS GETTING PRIOR ENVIRONMENTAL CLEARANCE (EC) For M/s. TOUCH STONE PROJECTS (Construction of Commercial cum Residential High Rise Building ) Site Address: Sy.No: 21/2 (P), Vadlapudi Village, Gajuwaka Mandal Zone-V, Ward No.53, G.V.M.C Limits, Visakhapatnam Office Address: D. No. 27 -01-20/1, Opp . Varun JCB Show Room, Srinagar, Gajuwaka, Visakhapatnam – 530026. Submitted to STATE ENVIRONMETNAL IMPACT ASSESSMENT AUTHORITY (SEIAA) O/o. AP POLLUTION CONTROL BOARD, VIJAYAWADA Prepared& Submitted by Enviro House, Block –B, B-1, IDA, Auto Nagar, Visakhapatnam – 530 012 Ph: 0891-2755528 , Telex: 0891-2755529, E-mail: [email protected] Cell: 9440338628 QCI No – 138 & Recognized by MOE&F, New Delhi. FORM 1 (I) Basic Information Sl.No. Item Details 1. Name of the project(s) M/s . Touchstone Projects 2. S.No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage to be Construction of Commercial cum handled/command area/lease area/number of Residential High Rise Building in an area wells to be drilled. of 2.52Acres Total Built up Area – 76678.22 Sq.mts . 4. New/Expansion/Modernization New Construction of Commercial cum Residential High Rise Building 5. Existing Capacity/Area etc. NIL 6. Category of Project i.e. ‘A’ or ‘B’ Category – B 7. Does it attract the general condition? If yes, No please specify. 8. Does it attract the specific condition? If yes, No please specify. 9. Location Plot/Survey/Khasra No. Sy. No. 21/2 (P) Village Vadlapudi Village, Tehsil Gajuwaka Mandal Zone-V, Ward No. 53, G.V.M.C Limits, District Visakhapatnam State Andhra Pradesh 10. Nearest Railway Station/Airport along with Duvvada Railway station at 2.29 Kms distance in kms. Visakhapatnam Railway station – 9.17 Kms 11. Nearest Town, City, District Headquarters along Within Kurmannapalem with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal GVMC, Gajuwaka Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/s . Touchstone Projects Sri Vallapani Sreenu 14. Registered Address D. No. 27-01-20/1, Opp. Varun JCB Show Room, Srinagar, Gajuwaka, Visakhapatnam – 530026. 15. Address for correspondence: Name Sri Vallapani Sreenu Designation (Owner/Partner /CEO) Managing Partner Pin code 530026 E-mail [email protected] Telephone No. 9866010679 Fax No. -- 16. Details of Alternative Sites examined, if any. Site selection criteria play an important Location of these sites should be shown on a topo role in the initiation of any developmental sheet. activity such as Residential/commercial developmental project. Availability of basic infrastructure necessary for the construction project & demand for housing proposed as it is facilitated for general requirements like educational institutes, Transportation, etc, no alternate site is examined. 17. Interlinked Projects Nil 18. Whether separate application of interlinked NA project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, 1980? NA ii. The Wildlife (Protection) Act, 1972? NA iii. The C.R.Z. Notification, 1991? NA 22. Whether there is any Government Order/Policy Nil relevant /relating to the site? 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? Nil a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Details thereof (with approximate quantities /rates, wherever possible) Yes/No with source of information data 1.1 Permanent or temporary change in Yes The land earmarked for Construction of land use, land cover or topography Residential Building project with a site including increase in intensity of land area of about 9851.434 Sq.mts and the use (with respect to local land use total built up area is 76678.22 Sq.mts. plan) This land is sufficient for construction of Residential and associated other utilities. A total of 9851.434 Sq.mts of land is available and is sufficient for the construction activity. Total Built up area = 76678.22 Sq.mts Further the above land is barren land. Therefore no change in land use / land cover / topography. 1.2 Clearance of existing land, vegetation No The land is barren and developed land. and buildings? No vegetation or building existing in this land for clearance. 1.3 Creation of new land uses? No No extra new land will be used. The project is having 9851.434 Sq.mts of land and the total built up area is 76678.22 Sq.mts. In this land only the proposed project will be constructed. 1.4 Pre-Construction investigations e.g. No For the total area of 9851.434 Sq.mts bore houses, soil testing? already ground water and soil testing carried. 1.5 Construction works? Yes The firm intends to construct 384 nos. of two & three bed roomed apartments in two buildings (A+B) along with commercial complex in ground floor, first floor and second floors. Structures comprises of two & three bed room flats, commercial complex, water storage tanks, DG Set room, Sewage Treatment Plant, etc. 1.6 Demolition works? No The site is leveled one and does not contain any temporary / permanent structures. Therefore no demolition work will be carried. 1.7 Temporary sites used for construction No Local manpower will be utilized for the works Or housing of construction construction work. Therefore no workers? temporary site used for construction works. 1.8 Above ground buildings, structures or Yes BUILDINGS earthworks including linear structures, Residential Building cut and fill or excavations Commercial Complex Sewage Treatment Plant Water Storage Tank DG Set Room 1.9 Underground works including mining No No mining or tunneling activity. or tunneling? 1.10 Reclamation works? No No reclamation work 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Cement storage materials? Building materials storage 1.15 Facilities for treatment or disposal of Yes Liquid effluents The waste water generated from the solid waste or liquid effluents? proposed project will be in the form of sanitary waste water only which will be routed to sewage treatment plant and thereby reuse, firefighting and if surplus to local municipal sewerage network. Waste water Generation -239 KLD Solid waste Municipal waste – 1008 kg/day DISPOSAL: Convert to manure and reuse as manure for greenbelt development 1.16 Facilities for long term housing of No Majority of manpower will be recruited Operational workers? from local people only. Therefore no housing scheme proposed. 1.17 New road, rail or sea traffic during No The site is well connected to roadway. Construction or operation? No new road, rail or sea traffic is envisaged during construction or operation phase. 1.18 New road, rail, air waterborne or other No Not applicable. transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No No transport routes will be changed. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not required to divert transmission lines / pipelines? pipelines. 1.21 Impoundment, damming, culverting, No Not applicable realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No stream crossings present. 1.23 Abstraction or transfers of water form Yes Municipal supply and Ground water from ground or surface waters? the existing bore well will be used to meet the water requirements of 265.0 KLD for domestic purpose. 1.24 Changes in water bodies or the land No No change in water bodies and no surface affecting drainage or run-off? changes occur in drainage pattern. As the proposed unit is Construction of Apartments and Commercial complex it does not affect drainage or run-off. 1.25 Transport of personnel or materials Yes During construction activity, private for construction, operation or tippers will be used for supply of metal, decommissioning? sand, cement and iron. 1.26 Long-term dismantling or No No dismantling work will be carried in decommissioning or restoration the project as it is construction of works? Residential and Commercial complex. 1.27 Ongoing activity during No No decommissioning activity proposed. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes There would be a marginal influx of Temporarily or permanently? people since the project consists of residing flats. 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No No native species will be destroyed. As diversity? the proposed project will be constructed in barren land. Therefore no chance of loss of native species or generic diversity occurs. 1.31 Any other actions? Yes The Residential cum Commercial project proposed to develop green belt all along the sides of boundary wall. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities / rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The present status of land is barren and agricultural land (ha) non-agricultural.