URBAN CORRIDOR MANAGEMENT FOR HETEROGENOUS TRAFFIC CONDITIONS – A CASE STUDY OF AMEERPET TO CORRIDOR,

J Pradeep Chytanya Asst. Engineer (Highway Designs) Egis Consulting Engineers Pvt. Ltd.

Page 1 INTRODUCTION

¾CORRIDOR: ¾MANAGEMENT:. ¾CORRIDOR PROBLEMS: PHV, VOR, ACCESS & CONVINIENCE, CURRENT TRENDS, SAFETY, PEAK HOUR ¾ SIGNIFICANCE: INCREASED POPULATION, MISMATCH B/W FUNDING & NEED, A CMP IS A GOOD BACK BONE FOR CTTP ¾OBJECTIVES: IDENTIFY, UNDERSTAND, EVALUATE MANAGE

Page 2 LITERATURE REVIEW

• HAND BOOKS OF VARIOUS DOT’S HAS BEEN REFERRED • AMERIACN, EUROPEAN AND AUSTRALIAN METHODOLOGIES HAVE BEEN THROUGLY REVIEWED & BEST METHODOLOGY FOR INDIAN CONDITIONS WAS DRAWN

Page 3 US DOT METHODOLOGY EUROPEAN METHODOLOGY

GETTING ORGANIZED IDENTIFY CORRIDOR KNOW THE CORRIDOR CONVEY TO PUBLIC DEVELOP THE CHOICES REVIEW OF OPTIONS SELECT PREFFERED DRAFT CMP IMPLEMENTATION PUBLIC REVIEW &COMENTS SUSTAIN THE VISION FINAL CMP

AUSTRALIAN METHODOLOGY

GETTING ORGANIZED EXISTING & FUTURE CONDITIONS DEVELOP VISION & STRATEGIES DEVELOP IMPLEMENTATION PLAN DRAFT CMP & PUBLIC ISSUE MONITOR PROGRESS

Page 4 CURRENT STUDY METHODOLOGY

Page 5 ABOUT STUDY AREA

¾STUDY AREA = HYDERABAD ¾STUDY AREA DESCRIPTION : Hyderabad, the capital of Andhra Pradesh has emerged as most preferred destination for innovative technologies. The main growth driver in Real Estate Market is IT, ITES and BPO industries. Hyderabad, during the last 7- 8 years. ¾STUDY CORRIDOR = AMEERPET – KUKATPALLY (NH-9) MAIN ARTERIAL

Page 6 Page 7 AMEERPET - MYTHRIVANAM

Page 8 MYTHRIVANAM – SR NAGAR

Page 9 SR NAGAR - ESI

Page 10 ESI -

Page 11 ERRAGADDA - KUKATPALLY

Page 12 DATA COLLECTION • INTERSECTIONS = 6 •SEGMENTS = 5 • CORRIDOR LENGTH = 6.1 Km SEGMENT LENGTHS

Page 13 PHYSICAL INVENTORY

Page 14 DATA ANALYSIS & RESULTS

Page 15 TRAFFIC VOLUMES OF SEGMENTS SEGMENT PEAK HOUR PEAK HOUR VOLUME (PCU’S/HR) Ameerpet Jn to 5075 11:30 am - 12:30 noon Mythrivanam Mythrivanam to SR Nagar 4853 11:00 am - 12:00 noon SR Nagar to ESI 5292 6:00 pm – 7:00 pm ESI to Erragadda 4844 4:45 pm – 5:45 pm Erragadda to Kukatpally Y 4602 9:30 am – 10:30 am Jn.

Page 16 TRAFFIC VOLUMES OF INTERSECTIONS INTERSECTION PEAK HOUR PEAK HOUR VOLUME (PCU’S/HR)

SRINAGAR 13105 6:45 PM to 7:45 PM MYTHRIVANAM 6712 10:15 AM to 11:15AM SR NAGAR 16181 10:00 AM to 11:00 AM ESI 12740 10:45 AM to 11:45 AM ERRAGADDA 8848 7:00 PM to 8:00 PM KUKATPALLY “Y” Jn 6721 7:00 PM to 8:00 PM

Page 17 PEAK HOUR VARIATIONS

Page 18 MODAL SHARES ALONG THE CORRIDOR

Page 19 Page 20 Page 21 SIGNAL TIMINGS ALONG THE CORRIDOR

Page 22 CAPACITY OF MID BLOCKS

¾ CAPACITY & LOS OF MID BLOCKS • MORTAB AND CHARI 1991 = 4 LANE DIVIDED For LOS “C” & for 10% SMV the DSV’S are as follows MODE DSV’S CARS 2075 BUS 1820 TRUCKS 1445 AUTOS 1935 2 WHEELERS 3300 Capacity of Single Lane = Capacity * (100/(100 - % of SMV))..(1) Capacity of whole Segment = Capacity of single lane * 2………..(2) Page 23 • SPEED FLOW CURVES = 6 LANE DIVIDED

¾DELAY & LOS OF INTERSECTIONS BASED ON HCM 200 Controlled Delay = Stopped Delay +Acc/Dcc Delay……3 dad = FVS * Correction Factor ………………………...4 FVS = Fraction of vehicles stopping = Vstop / Vtot …....5

Free-Flow ≤7 vehicles 8-19 20-30 Speed vehicles vehicles ≤ 60km/h +5 +2 +1 >60-71 km/h +7 +4 +2 >71 km/h +9 7 +5 Page 24 DELAYS & LOS OF INTERSECTIONS INTERSECTION STOPED DELAY Acc/Dcc Delay LOS (Sec/Veh) (Sec/Veh)

SRINAGAR 16.4 1.9 B

MYTHRIVANAM 37.9 1.5 D

SR NAGAR 65.2 1.8 E

ESI 24.1 1.3 C

ERRAGADDA 23.4 1.5 C

KUKATPALLY 49.6 1.3 D “Y” Jn

Page 25 CAPACITY & LOS OF SEGMENTS SEGMENT NAME CAPACITY V/C LOS (vph) RATIO

Ameerpet Jn to Mythrivanam 4200 0.766 C

Mythrivanam to SR Nagar 4465 0.835 D

SR Nagar to ESI 6246 0.763 C

ESI to Erragadda 4560 0.827 D

Erragadda to Kukatpally Y Jn. 5688 0.756 C

Page 26 FLOATING CAR SURVEYS

• 2 TRAILS IN PEAK & OFF PEAK •TO & FRO • PEAK = 10:00 AM – 11:00 AM • OFF PEAK = 1:00 PM – 2:00 PM

Page 27 AMEERPET TO KUKATPALLY ELEMENT PEAK OFF PEAK

13.08 8.15

Avg. Journey Time (Min) 12.35 7.76

Avg. Running Time (Min) 27.15 44.73

Avg. Journey Speed (Kmph) 29.07 47.67

Avg. Running speed (Kmph) 44 23

Avg. Delay (Sec) Page 28 KUKATPALLY TO AMEERPET

ELEMENT PEAK OFF PEAK

15.33 9.76 Avg. Journey Time (Min) 14.35 9.43 Avg. Running Time (Min) 24.96 41.53 Avg. Journey Speed (Kmph) 26.32 44.19 Avg. Running speed (Kmph) 59 20 Avg. Delay (Sec) Page 29 BOTTLENECK ANALYSIS

• DATA COLLECTED FLOATING CAR SURVEYS • TIME/100m • PLOTTED USING MINITAB 15 & D – PLOT •X –AXIS = TIME • Y – AXIS = DISTANCE • Z – AXIS = SPEED • RESULTS COMPARED

Page 30 WORKING WITH MINITAB 15

Page 31 WORKING WITH D-PLOT

Page 32 COMPARISION OF BOTTLENECKS

Page 33 OBSERVATIONS

Page 34 SPEED PROFILES

• RECORDED DURING FLOATING CAR SURVEYS • SPEEDS COMPARED B/W PEAK AND OFF PEAK TIMES

Page 35 Page 36 CAUSALITY ANALYSIS

• CARRIED OUT DURING SURVEYS • PROBLEMS IDENTIFIED • MANAGEMENT MEASURES SUGGESTED

Page 37 AMEERPET - MYTHRIVANAM

LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

AMEERPET BUS STOP SLOW TRAFFIC MOVEMENT RELOCATION OF BUS STOP DUE TO BUS STOP BUS STOP

MYTHRIVANAM JN. PEDESTRIAN CROSSING SEPARATE PHASE FOR PEDESTRAIN CROSSINGS INSTALL BULLBOUTS

MYTHRIVANAM JN. MINOR LEG EXPERIENCING GREEN TIME HAS TO BE MORE DELAY ALTERED

Page 38 MYTHRIVANAM – SR NAGAR

LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

MYTHRIVANAM BUS STOP HIGH SPEEDS OF THE INSTALL SPEED BREAKERS VEHICLES, PEDESTRAIN OR CUSHIONS OR A SPEED CROSSING HUMP FOOT OVER BRIDGE

SR NAGAR JN. SIGNAL JUMPING AT TYRE FLATTENING, AMEERPET TO KUKATPALLY LEG

SR NAGAR JN. DELAY AND QUEUE LENGTH CLOSE THE DIVIDER WHICH ARE GETTING INCREASED IS JUST 28M OF LENGTH FOR THE MINOR LEG Page 39 SR NAGAR - ESI

LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

ESI BUS STOP SLOWING DOWN OF SPEEDS MUST BE RELOCATED BECAUSE IT WAS LOCATED AFTER 300M VERY NEXT TO THE NARROWED ROAD AT DARGA.

ESI JN. SIGNAL JUMPING FROM THE TYRE FLATTENING. TWO WHEELERS.

Page 40 ESI - ERRAGADDA

LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

FRUIT MARKET ENCROACHMENTS AND SIDE ENCROACHMENTS NEED TO FRICTION. BE STRICTLY CLEARED

FRUIT MARKET ILLEGAL MEDIAN OPENING, ILLEGAL MEDIAN OPENING HAS TO BE CLOSED.

ERRAGADDA JN. PEDESTRIAN CROSSINGS MEDIAN HAS TO BE RAISED CAUSING INTERFERENCE TO TO SOME HEIGHT SO THAT THE THROUGH TRAFFIC. THE CROSSINGS WILL BE DONE AT THE ESI JN. Page 41 ERRAGADDA - KUKATPALLY

LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

MOOSAPET ENCROACHMENTS AND SIDE ENCROACHMENTS NEED TO FRICTION. BE STRICTLY CLEARED

MOOSAPET BUS STOP ILLEGAL MEDIAN OPENING ILLEGAL MEDIAN OPENING HAS TO BE CLOSED.

KUKATPALLY “Y” JN. BUSES ARE STOPPING ON THE BUS STOP HAS TO BE PASSENGERS REQUEST AT RELOCATED AT A DISTANCE THE JUNCTION OF 250M FROM THE “Y” JN. INSTALL A SPEED HUMP JUST BEFORE THE INTERSECTION SO AS TO REDUCE THE SPEED OF THE THROUGH TRAFFIC. Page 42 BULL BOUTS

Page 43 SPEED HUMPS

Page 44 CONCLUSIONS

¾ PEAK HOUR VOLUME IS HIGH AT SR NAGAR Jn & SR NAGAR – ESI MID BLOCK ¾ DELAY AT SR NAGAR IS HIGH & LESS AT SRINAGAR ¾ SR NAGAR – ESI HAVE HIGHEST CAPACITY ¾ AMEERPET – MYTHRIVANAM HAVE LESS CAPACITY ¾ KUKATPALLY – ERRAGADDA HAVE MORE DELAY ¾ ESI – SR NAGAR HAVE LESS DELAY ¾ 4 BOTTLENECKS IDENTIFIED WITH 2 ON EITHER SIDE

Page 45 • OVERALL CORRIDOR PERFORMANCE CAN BE IMPROVED WHEN, ™ PEDESTRAIN CROSSINGS IMPROVED ™ ENCROACHMENTS CLEARED

Page 46 VERY GLAD TO HAVE THIS OPPORTUNITY THANKING YOU,

J Pradeep Chytanya

Page 47