Nagaland Priority List of 2010-11

Estimated

Sl. cost Name of the Projects No. (Rs. in crore)

Health & Family Welfare 1 Setting up of Medical College at 340.22 Administration 2 Construction of Rest House in 28 41.52 Administrative Centres Art & Culture 3 Construction of “Rani Gaidinliu Library cum 11.00 Memorial Museum” at Agriculture 4 Northeast Agri Expo Centre at Dimapur (Ph-II) 15.00 Transport 5 Proposal for construction of Multi Storied Car Park at 53.05 Kohima 6 Bus & Truck Terminus at District HQ Model 15.00 Township Roads 7 Construction of road from Rusoma to Chiephobozou 40.00 via Thizama, – 32 km 8 Construction of road Hebron-, - 17.00 20 km 9 Construction of road from Jendang-Saddle-Noklak- 62.00 Pangsha, district-62 km 10 Construction of road from Tuli to Molungyimsen, 44.01 Khar, Changki, Mariani road,

Estimated

Sl. cost Name of the Projects No. (Rs. in crore)

Mokokchung District 51 km 11 Widening & Improvement of approach road from 10.00 Alongchen, to Khar via , – 15 km 12 Construction of road Kohima to Leikie road junction 10.00 to Tepuiki to Barak, Inter-district road-10 km (MDR) Ph-III 13 Construction of road from Lukhami BRO junction to 90.00 Seyochung Tizu bridge on Satoi road, Khuza, Phughe, Chozouba State Highway junction, Inter- district road- 90 km (ODR) 14 Improvement & Upgradation of road from 5.40 Border Road to Changlangshu, -19 km 15 Construction of road from Pang to Phokphur via 12.44 Chekipung village under Thonoknyu, -20 km 16 Japukong Range Road- NH-61 (Tuli), 44.50 Mokokchung District-58 kms 17 Construction of road from to 35.00 , Zunheboto road, Zunheboto district – 50 km (ODR) 18 Construction of road from Lerie to Kidima via 30.21 Phesama, Kigwe, Mima, Kohima district-35 km (ODR) 19 Construction of road from NH-61 at Yisemyong Agri 35.71 Research Centre to Noksen town via Chakpa & Longkong, Mokokchung District 20 Road connecting -Shamator, Zunheboto 10.00 District Ph-II 21 Construction of road from NH-150-Thipuzu road to 18.75 Phusachodu, district – 15 km 22 Construction of road from Chichama-Teichuma- 8.00 Tsemekhuma Road, Kohima district-14 km 23 Construction of road from Ganeshnagar/Khekiho 15.00 village to Jalukie via Horangse, 24 Construction of road from Suruhoto to Asukhume, 16.37 Zunheboto district-17 km (MDR) 25 Construction of road at (Tourist 9.60 village), Mokokchung district – 12 km 26 Construction of road from -Pongo 0.00 Yeangching-Ukha junction-Changlangshu-Tamkoang ITC (DAN)-Pangsha 20 km, Inter district road 27 Construction of road from NH-61 to Longleng 21.00 Ladigarh road via Yaongyimsen village 21 km 28 Construction of road from Sedzu to Yoruba via 28.00 Ighanumi with bridge 29 Construction of road from Chen Moho to Chingkao 34.97

Estimated

Sl. cost Name of the Projects No. (Rs. in crore)

including Tehok Bridge (69 kms) 30 Construction of road from Tuli-Kangching-32 kms 24.00

Geology & Mining 31 A)Construction of road from Molen to Molen Marble 7.94 deposit , – 10 km b) Upgradation of road from Pungro to Pokphur, 14.16 district – 28km

Bridges 32 Bridge over river Hipu on Satoi-Seyochung road 6.84 33 Bridge over River Doyang on Longidang-Shena road 11.26 34 Bridge over Bhumji river on Longkhim-Noksen road 12.75 35 Bridge over Loyi river on Kivikhu-Sukhai (on Phek- 6.84 Zunheboto road) 36 Bridge on Tizu river on the road from Lanye to 12.00 Meluri 37 Bridge on Sakuphu river on ARTC to Jalukie road 7.17 38 Bridge on Kizari river between Phek to Kizakie-Melrui 7.18 39 Bridge on river Yai on Shamatore to Hukir to 7.21 Aghunato 40 Bridge on over river Chathe between Toluvi to 9.45 Ghonivi, Dimapur

Rural Development 41 Integrated Development of identified village in 24.00 Soil & Water Conservation 42 Protection/control of landslide & soil erosion at 20.00 Tuensang town, Tuensang district Education 43 Construction of Tribal boys Hostel near Fazl Ali 4.71 College, Mokokchung town, Mokokchung district

Forest 44 Biodiversity Conservation 16.18 Power 45 Construction of 132 kv S/C -Zunheboto- 26.20 Mokokchung Transmission line-Phase-I Wokha Doyang NH-61 46 Construction of end equipments & 220 KV S/C 42.88 transmission line from Dimapur to Chiephobozou Ph- II. Strengthening of Sub-transmission and distribution 60.20 System for Dimapur TOTAL 1394.72