Sony's 3D Time of Flight Sensing Solution in the Huawei P30 Pro
Total Page:16
File Type:pdf, Size:1020Kb
REVERSE COSTING® – STRUCTURE, PROCESS & COST REPORT Sony’s 3D Time-of-Flight Sensing Solution in the Huawei P30 pro Deep analysis of the rear 3D sensing module with Sony’s CIS and Lumentum’s flood illuminator. Following major OEMs, Huawei has joined Vertical Cavity Surface Emitting Laser the trend of 3D sensing technology with (VCSEL) for the flood illuminator coming the integration of ToF (Time-of-Flight) from Lumentum. technology in its flagship smartphones. For Along with the complete physical analysis, the Mate 20 pro, introduced in late 2018, this report analyzes costs and estimates the 3D sensing solution was used in facial prices for the 3D depth sensing solution. It recognition application. The P30 pro, one also includes a technical and cost of the latest Huawei flagship smartphones, comparison with the rear 3D sensing features a rear 3D sensing solution for solution in the Samsung Galaxy Note 10+ depth sensing and Augmented Reality (AR) and the OPPO Rx17 pro. The comparison applications. This 3D sensing solution is looks at the near infrared camera module provided by Sony Depth Sensing Solutions and the flood illuminator architecture. which is strengthening its position as one of the leaders in this technology. This full reverse costing study has been COMPLETE TEARDOWN WITH Title: Sony’s 3D conducted to provide technology data, the Time of Flight manufacturing cost and selling price of the • Detailed photos Sensing Solution in the Huawei P30 pro rear 3D sensing module found in the P30 • Precise measurements pro. Pages: 117 • Materials analysis The rear optical hub features a main Date: • Manufacturing process flow February 2020 red/green/blue camera, a telephoto camera, an ultrawide-angle camera and a • Supply chain evaluation Format: PDF & Excel file 3D ToF module composed of separated • Manufacturing cost analysis flood illuminator and NIR camera. Price: • Estimated sales price EUR 3,990 This report focuses on the 3D ToF module. • Comparison with the ToF modules It includes a Back-Side Illumination (BSI) Reference: in the Samsung Note 10+ and the CIS featuring 10µm size pixels and SP20518 OPPO Rx17 pro resolution of 47 kilopixels developed by Sony Depth Sensing Solutions and one IC – LED – RF – MEMS – IMAGING – PACKAGING – SYSTEM – POWER - DISPLAY SONY'S 3D TIME-OF-FLIGHT SENSING SOLUTION IN THE HUAWEI P30 PRO TABLE OF CONTENTS Overview/Introduction Manufacturing Process • Executive Summary • Overview • Reverse Costing Methodology • NIR ToF Image Sensor Die Front-End Process Company Profile and Fabrication Unit • Sony, Sunny Optical Technology and Lumentum • Flood Illuminator NIR VCSEL Process Flow and Fabrication Unit • Huawei P30 pro Cost Analysis Market Analysis • Summary of the Cost Analysis • Forecast and Supply chains • Yield Explanations and Hypotheses Physical Analysis • NIR Camera Module • Summary of the Physical Analysis Pixel Array, BSI and optical front-end cost • 3D Sensing System Assembly NIR ToF image sensor wafer and die cost Module views, opening & cross-section Lens module and component cost • NIR ToF Camera Module • Flood Illuminator Module view, dimensions and cross- section NIR VCSEL Front-End cost, probe test, thinning and dicing • NIR ToF Image Sensor NIR VCSEL die wafer cost Die overview and dimensions Component cost Die process and cross-section • ToF Sensing Solution Price Die process characteristic • Complete Solution Price • Flood Illuminator Technical & Cost Comparison Module view, dimensions and cross- section • Huawei P30 Pro vs Galaxy Note 10+ vs OPPO Rx17 pro • NIR VCSEL Die Die view, dimensions, process and cross- section Die process characteristic AUTHORS Taha Ayari, PhD is involved in Nicolas Radufe is in charge of physical analyzing compound semiconductor analysis at System Plus Consulting. He devices within Power Electronics and has a deep knowledge in chemical and Compound Semiconductors team. Taha physical analyses. He previously holds a PhD in Electrical and Computer worked in microelectronics R&D for Engineering from Georgia Tech CEA/LETI in Grenoble and for Lorraine. STMicroelectronics in Crolles. RELATED REPORTS Samsung Galaxy Note 10+ Sony’s 3D Time-of-Flight Huawei Mate 20 Pro’s 3D 3D Time of Flight Depth Depth Sensing Camera Depth-Sensing System Sensing Camera Module Module The complete system includes a Deep analysis of the rear 3D Deep analysis of the Sony’s 3D 3D camera, flood illuminator, sensing module with Sony’s 2nd ToF Sensor and the VCSEL in the and DOT projector featuring a Generation CIS. Oppo RX17 Pro. DOE. January 2020 - EUR 3,990* March 2019 - EUR 3,990* February 2019 - EUR 3,990* REVERSE COSTING® – STRUCTURE, PROCESS & COST REPORT COSTING TOOLS Parametric IC MEMS Power Display PCB Costing Tools Price+ Price+ Price+ Price+ Price+ Process-Based MEMS Power LED 3D Package Costing Tools CoSim+ CoSim+ CoSim+ SYSCost+ CoSim+ Our analysis is performed with our costing tools MEMS CoSim+, IC Price+ and LED CoSim+. System Plus Consulting offers powerful costing tools to evaluate any process or device, the production cost and selling price, from single chip to complex structures. All these tools are on sale under corporate license. IC Price+ MEMS CoSim+ The tool performs the necessary cost simulation of any Cost simulation tool to evaluate the cost of any Integrated Circuit: ASICs, microcontrollers, memories, MEMS process or device. DSP, smartpower… LED CoSim+ Process-based costing tool to design and evaluate the cost of any LED process flow. ABOUT SYSTEM PLUS CONSULTING WHAT IS A REVERSE COSTING®? System Plus Consulting is specialized in the cost analysis of electronics Reverse Costing® is the process of disassembling a device (or a system) in order to identify its technology and calculate its from semiconductor devices to manufacturing cost, using in-house models and tools. electronic systems. A complete range of services and costing tools to provide in-depth production cost studies and to estimate the objective selling price of a product is available. CONTACTS Our services: • STRUCTURE & PROCESS Headquarters America Sales Office Asia Sales Office ANALYSES 22, bd Benoni Goullin Steven LAFERRIERE Takashi ONOZAWA • Nantes Biotech Western USA & Canada Japan & Rest of Asia TEARDOWNS 44200 Nantes +1 310-600-8267 +81 80 4371 4887 • CUSTOM ANALYSES France [email protected] [email protected] • COSTING SERVICES +33 2 40 18 09 16 [email protected] Chris YOUMAN Mavis WANG • COSTING TOOLS Eastern USA & Canada Greater China • TRAININGS Europe Sales Office +1 919-607-9839 TW +886 979 336 809 Lizzie LEVENEZ [email protected] CN +8613661566824 Frankfurt am Main [email protected] www.systemplus.fr Germany [email protected] +49 151 23 54 41 82 Peter OK [email protected] Korea +82 10 4089 0233 [email protected] TERMS AND CONDITIONS OF SALES 1.INTRODUCTION The present terms and conditions apply to the offers, sales and deliveries of services managed by System Plus Consulting except in the case of a particular written agreement. Buyer must note that placing an order means an agreement without any restriction with these terms and conditions. 2.PRICES Prices of the purchased services are those which are in force on the date the order is placed. Prices are in Euros and worked out without taxes. Consequently, the taxes and possible added costs agreed when the order is placed will be charged on these initial prices. System Plus Consulting may change its prices whenever the company thinks it necessary. However, the company commits itself in invoicing at the prices in force on the date the order is placed. 3.REBATES and DISCOUNTS The quoted prices already include the rebates and discounts that System Plus Consulting could have granted according to the number of orders placed by the Buyer, or other specific conditions. No discount is granted in case of early payment. 4.TERMS OF PAYMENT System Plus Consulting delivered services are to be paid within 30 days end of month by bank transfer except in the case of a particular written agreement. If the payment does not reach System Plus Consulting on the deadline, the Buyer has to pay System Plus Consulting a penalty for late payment the amount of which is three times the legal interest rate. The legal interest rate is the current one on the delivery date. This penalty is worked out on the unpaid invoice amount, starting from the invoice deadline. This penalty is sent without previous notice. When payment terms are over 30 days end of month, the Buyer has to pay a deposit which amount is 10% of the total invoice amount when placing his order. 5. OWNERSHIP System Plus Consulting remains sole owner of the delivered services until total payment of the invoice. 6.DELIVERIES The delivery schedule on the purchase order is given for information only and cannot be strictly guaranteed. Consequently any reasonable delay in the delivery of services will not allow the buyer to claim for damages or to cancel the order. 7.ENTRUSTED GOODS SHIPMENT The transport costs and risks are fully born by the Buyer. Should the customer wish to ensure the goods against lost or damage on the base of their real value, he must imperatively point it out to System Plus Consulting when the shipment takes place. Without any specific requirement, insurance terms for the return of goods will be the carrier current ones (reimbursement based on good weight instead of the real value). 8.FORCE MAJEURE System Plus Consulting responsibility will not be involved in non execution or late delivery of one of its duties described in the current terms and conditions if these are the result of a force majeure case. Therefore, the force majeure includes all external event unpredictable and irresistible as defined by the article 1148 of the French Code Civil? 9.CONFIDENTIALITY As a rule, all information handed by customers to system Plus Consulting are considered as strictly confidential. A non-disclosure agreement can be signed on demand.