Proposed by Thiru. M.Palani
Total Page:16
File Type:pdf, Size:1020Kb
Form-1 (As per EIA Notification 2006) 0.53.5HA 477/1 & 477/2, Proposed by Thiru. M.Palani, FORM I (I) BASIC INFORMATION S. No Item Details 1 Name of the project/s Thennampatti Rough Stone quarry project 2 S. No. in the schedule 1(a) 3 Proposed capacity/ The proposed quantity of reserves is to be mined is area/length/tonnage to be 18470m3 of Rough Stone for a period of Five years handled/command area/lease only. area/number of wells to be drilled Area = 0.53.5Ha The command area = 0.38.8Ha (effective quarrying area after leaving safety distance) It is a shallow open cast quarry. The massive charnockite formation is found followed by the 1m (max) topsoil formation. Hence no wells are proposed not drilled. It is a New Proposal Rough Stone quarry project (the 4 New/ Expansion/ Modernization area has been quarrying operation earlier) in Thennampatti Village. Existing capacity/Area etc. The proposed quantity of reserves is to be mined is 18470m3 (or) 3263 Lorry Load of Rough stone up to a depth for 26m below the ground level for a period of Five years. Top soil 5 Rough stone Description formation in m3 in m3 Geological Resources 133750 5350 Available Mineable reserves 18470 - Five years plan period As in 18470 - the approved mining plan 6 Category of project i.e. `A’ or ‘B’ Category - B2. 7 Does it attract the general condition? If 7.5m safety distance all along the boundary of the yes, please specify. applied area. 8 Does it attract the specify condition? If The project does not attract any specify condition in the yes, please specify. lease area. Location Topo Sheet No. 58 J/03 9 10°29’08’’N to10°29’39’’N 78°04’28’’E to 78’04’31’’E Plot/ Survey/ Khasra No. 477/1 & 477/2 Village Thennampatti Taluk Vedasandur District Dindigul State Tamilnadu 10 Nearest railway station/ airport along Eriyodu Railway station - 4kms - NW with distance in kms Madurai Airport - 72kms - S Nearest Town, city, District Town - Vadamadurai - 6kms–SE 11 Headquarters along with distance in Nearest City - Dindigul - 17kms–SW kms District - Dindigul - 17kms–SW Village Panchayats, ZilaParis had, Village - Thennampatti Municipal Corporation, Local body Panchayat Union - Eriyodu 12 (complete postal addresses with Taluk - Vedasandur telephone nos. to be given) District - Dindigul 13 Name of the applicant M.Palani, S/o. Mari Kudumban, 14 Registered Address Thennampatti, Vedasandur Taluk, Dindigul District. Address for correspondence: Name M.Palani, Designation (Owner/Partner/CEO) Owner/Proprietor S/o. Mari Kudumban, Thennampatti, 15 Address Vedasandur Taluk, Dindigul District. Pin Code - E-mail [email protected] Telephone No. 9791469016 Fax No. - Details of Alternative Sites examined, There is no alternative sites are examined. The project 16 if any. Location of these sites should be is site specific. shown on a Topo sheet. 17 Interlinked Projects There is no interlinked project. Whether separate application of As there is no interlinked project, no application has 18 interlinked project has been submitted? been submitted. As there is no interlinked project, no application has 19 If yes, date of submission been submitted. 20 If no, reason The project involves Rough Stone Quarry only. Whether the proposal involves approval/ clearance under: if yes, (a) The project does not attract the Forest details of the same and their status to (Conservation) Act 1980. be given. (b) There is no wild life in the project site area under 21 (a) The Forest (Conservation) Act, the Wildlife (protection) Act 1972. 1980? (C) The project area does not fall the C.R.Z (b) The Wildlife (Protection) Act, Notification, 1991. 1972? (c) The C. R. Z. Notification, 1991? Whether there is any Government Order/ Policy relevant/ relating to the The precise area communication letter was received site? from the District Collector, Dindigul vide Rc.No: 566/2015 (Mines), Dated: 07.10.2015. 22 The mining plan was approved by the Assistant Director, Department of Geology and Mining Dindigul vide Rc.No: 566/2015 (Mines), Dated: 16.11.2015. 23 Forest land involved (hectares) There is no forest land involved in this project area Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? There is no court case pending, litigations relating to 24 (a) Name of the Court the project directly or indirectly. (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use changes in water bodies, etc.) Details thereof (with approximate Information/Checklist S. No Yes/No quantities/rates, wherever possible) with sources confirmation of information data The lease applied area exhibits almost plain topography, will be changed after the quarrying of Rough Stone as per the Mining plan, Conventional Open cast Semi Mechanized Mining with 5.0 meter vertical bench with a bench width of 5.0 meter is being proposed. The quarry operation is proposed up to depth for 26m below the ground level for a period of Five years. The ultimate pit dimensions are given below. Description Length Width Depth (Max) (Max) (Max) Permanent or temporary change (m) (m) (m) in land use, land cover or Conceptual 55 47 26 1.1 topography including increase Yes Topography will change in respect to overburden in intensity of land use (with excavation. However, measures will be respect to local land use plan) implemented as per mining Plan. As the area of the quarry remains the same, there will not be any increase in intensity of local land use. Present Area at the Description Area end of lease (Ha.) period (Ha.) Area under Quarrying 0.25.8 0.25.8 Infrastructure Nil 0.01.0 Roads 0.02.0 0.02.0 Green Belt Nil 0.10.0 Unutilized 0.25.7 0.14.7 Grand Total 0.53.5 0.53.5 There is no vegetation and building in this project Clearance of existing land, lease area, hence there is no requirement of clearing 1.2 vegetation and building? No the vegetation and building. There is an existing road leads to the quarry which has 5mts carriage way width. The total quarrying activity is proposed to carry out within the quarry lease applied area. Hence, there is no proposal for creating of new land uses. Temporary approach road within the area will be 1.3 Creation of new land uses? No form for the easy access of men and machinery which will be well maintained. The manual loading directly for tippers will transport the Rough Stone to the needy to customer by existing road. The area has been quarrying operation earlier. The Pre-construction investigations Rough Stone is clearly visible, hence pre- 1.4 No e.g. bore houses, soil testing? construction investigation and soil testing is not proposed before quarrying operation. There will be no major civil works, Other than the following: Office building, storeroom, toilet and 1.5 Construction works? Yes first aid room will be provided as permanent structures within the quarry lease applied area, after the grant of lease area. There are no existing building within the lease 1.6 Demolition works? No applied area hence no demolition work is involved. Temporary sites used for Sites service on permanent structure will be 1.7 construction works or housing Yes constructed only after grant of quarry lease within of construction workers? 7.5m safety barrier. Above ground buildings, There are no tall buildings or linear structure found structures or earth works 1.8 No within the quarry site. There is no requirement of including linear structures, cut cutting and filling in the site. and fill or excavations Conventional open cast semi mechanized quarrying Underground works including 1.9 No will be adopted. No underground mining or mining or tunneling? tunneling is proposed. There is no reclamation works is proposed. In the proposed mining plan only 26m below the ground level has been envisaged as workable depth for safe & economic mining during the lease period. Hence, 1.10 Reclamation works? No after quarry reaches ultimate pit limit (for this lease period) of 26m, fencing will be constructed around the quarried pits to prevent inherent entry of the public and cattle. There is no such type of activities involved in this 1.11 Dredging? No opencast quarrying operation. There is no such type of activities involved; It is an 1.12 Offshore structures? No inland quarrying project. No production or manufacturing is involved in this Production and manufacturing Rough Stone quarrying. The Rough Stone is 1.13 No processes? liberated from the parent rock mass and transported to the needy to customer. There is no proposal for storage of material within Facilities for storage of goods the quarry lease applied area. The Rough Stone will 1.14 No or materials? be loaded directly to the tippers and transported to needy Residential & Industrial customers. The entire quarried Rough Stone will be consumed. The anticipated waste will be very minimal the entire Rough Stone irrespective of size has a good commercial market. Domestic waste water will be treated in Septic Tank 1.15 Facilities for treatment or No followed by soak pit. The manure will be treated and disposal of solid waste or liquid used for green belt development. The Rough Stone effluents? will not produce toxic effluence in the form of solid, liquid or gas. No waste water will be discharged by quarry operation. The proposed project is 0.53.5Ha for a period of Five years only.