New M5 EIS Vol 2G App R Non-Aboriginal
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
National Disability Insurance Scheme (Becoming a Participant) Rules 2016
National Disability Insurance Scheme (Becoming a Participant) Rules 2016 made under sections 22, 23, 25, 27 and 209 of the National Disability Insurance Scheme Act 2013 Compilation No. 4 Compilation date: 27 February 2018 Includes amendments up to: National Disability Insurance Scheme (Becoming a Participant) Amendment Rules 2018 - F2018L00148 Prepared by the Department of Social Services Authorised Version F2018C00165 registered 22/03/2018 About this compilation This compilation This is a compilation of the National Disability Insurance Scheme (Becoming a Participant) Rules 2016 that shows the text of the law as amended and in force on 27 February 2018 (the compilation date). The notes at the end of this compilation (the endnotes) include information about amending laws and the amendment history of provisions of the compiled law. Uncommenced amendments The effect of uncommenced amendments is not shown in the text of the compiled law. Any uncommenced amendments affecting the law are accessible on the Legislation Register (www.legislation.gov.au). The details of amendments made up to, but not commenced at, the compilation date are underlined in the endnotes. For more information on any uncommenced amendments, see the series page on the Legislation Register for the compiled law. Application, saving and transitional provisions for provisions and amendments If the operation of a provision or amendment of the compiled law is affected by an application, saving or transitional provision that is not included in this compilation, details are included in the endnotes. Modifications If the compiled law is modified by another law, the compiled law operates as modified but the modification does not amend the text of the law. -
The Architecture of Scientific Sydney
Journal and Proceedings of The Royal Society of New South Wales Volume 118 Parts 3 and 4 [Issued March, 1986] pp.181-193 Return to CONTENTS The Architecture of Scientific Sydney Joan Kerr [Paper given at the “Scientific Sydney” Seminar on 18 May, 1985, at History House, Macquarie St., Sydney.] A special building for pure science in Sydney certainly preceded any building for the arts – or even for religious worship – if we allow that Lieutenant William Dawes‟ observatory erected in 1788, a special building and that its purpose was pure science.[1] As might be expected, being erected in the first year of European settlement it was not a particularly impressive edifice. It was made of wood and canvas and consisted of an octagonal quadrant room with a white conical canvas revolving roof nailed to poles containing a shutter for Dawes‟ telescope. The adjacent wooden building, which served as accommodation for Dawes when he stayed there overnight to make evening observations, was used to store the rest of the instruments. It also had a shutter in the roof. A tent-observatory was a common portable building for eighteenth century scientific travellers; indeed, the English portable observatory Dawes was known to have used at Rio on the First Fleet voyage that brought him to Sydney was probably cannibalised for this primitive pioneer structure. The location of Dawes‟ observatory on the firm rock bed at the northern end of Sydney Cove was more impressive. It is now called Dawes Point after our pioneer scientist, but Dawes himself more properly called it „Point Maskelyne‟, after the Astronomer Royal. -
AUSTRALIAN ROMANESQUE a History of Romanesque-Inspired Architecture in Australia by John W. East 2016
AUSTRALIAN ROMANESQUE A History of Romanesque-Inspired Architecture in Australia by John W. East 2016 CONTENTS 1. Introduction . 1 2. The Romanesque Style . 4 3. Australian Romanesque: An Overview . 25 4. New South Wales and the Australian Capital Territory . 52 5. Victoria . 92 6. Queensland . 122 7. Western Australia . 138 8. South Australia . 156 9. Tasmania . 170 Chapter 1: Introduction In Australia there are four Catholic cathedrals designed in the Romanesque style (Canberra, Newcastle, Port Pirie and Geraldton) and one Anglican cathedral (Parramatta). These buildings are significant in their local communities, but the numbers of people who visit them each year are minuscule when compared with the numbers visiting Australia's most famous Romanesque building, the large Sydney retail complex known as the Queen Victoria Building. God and Mammon, and the Romanesque serves them both. Do those who come to pray in the cathedrals, and those who come to shop in the galleries of the QVB, take much notice of the architecture? Probably not, and yet the Romanesque is a style of considerable character, with a history stretching back to Antiquity. It was never extensively used in Australia, but there are nonetheless hundreds of buildings in the Romanesque style still standing in Australia's towns and cities. Perhaps it is time to start looking more closely at these buildings? They will not disappoint. The heyday of the Australian Romanesque occurred in the fifty years between 1890 and 1940, and it was largely a brick-based style. As it happens, those years also marked the zenith of craft brickwork in Australia, because it was only in the late nineteenth century that Australia began to produce high-quality, durable bricks in a wide range of colours. -
Car Parking and Commercial Facilities International Terminal Precinct
SYDNEY AIRPORT Car parking and commercial facilities International Terminal Precinct Major Development Plan SYDNEY AIRPORT Car parking and commercial facilities International Terminal Precinct Major Development Plan Approved version APRIL 2005 Prepared by Sydney Airport Corporation Limited Airport Central Level 10, 241 O’Riordan Street MASCOT NSW 2020 CONTENTS SUMMARY ................................................................................................................................. i 1 INTRODUCTION .............................................................................................................. 1 1.1 Background to the proposal ..................................................................................... 1 1.2 Overview of the proposal ......................................................................................... 1 1.3 Proponent details ..................................................................................................... 2 1.4 SACL’s objectives for the proposed development ................................................... 3 1.5 The MDP process and other project approvals........................................................ 3 1.6 Structure of this MDP ............................................................................................... 4 2 BACKGROUND AND NEED FOR THE PROPOSAL ..................................................... 5 2.1 Background to the proposal ..................................................................................... 5 2.2 Need for the -
MASTER AIA Register of Significant Architecture February2021.Xls AUSTRALIAN INSTITUTE of ARCHITECTS REGISTER of SIGNIFICANT BUILDINGS in NSW MASTER
AUSTRALIAN INSTITUTE OF ARCHITECTS REGISTER OF SIGNIFICANT BUILDINGS IN NSW MASTER O A & K HENDERSON / LOUIS A & K HENDERSON OF MELBOURNE, 1935 1940 1991, 1993, T&G Building 555 Dean Street Albury Albury City 4703473Card HENDERSON rear by LOUIS HARRISON 1994, 2006, 2008 H Graeme Gunn Graeme Gunn 1968-69 Baronda (Yencken House) Nelson Lake Road, Nelson Lagoon Mimosa Rocks Bega Valley 4703519 No Card National Park H Roy Grounds Roy Grounds 1964 1980 Penders Haighes Road Mimosa Rocks Bega Valley 4703518 Digital National Park Listing Card CH [architect not identified] [architect not identified] 1937 Star of the Sea Catholic 19 Bega Street Tathra Bega Valley 4702325 Card Church G [architect not identified] [architect not identified] 1860 1862 Extended 2004 Tathra Wharf & Building Wharf Road Tathra Bega Valley 4702326 Card not located H [architect not identified] [architect not identified] undated Residence Bega Road Wolumla Bega Valley 4702327 Card SC NSW Government Architect NSW Government Architect undated Public School and Residence Bega Road Wolumla Bega Valley 4702328 Card TH [architect not identified] [architect not identified] 1911 Bellingen Council Chambers Hyde Street Bellingen Bellingen 4701129 Card P [architect not identified] [architect not identified] 1910 Federal Hotel 77 Hyde Street Bellingen Bellingen 4701131 Card I G. E. MOORE G. E. MOORE 1912 Former Masonic Hall 121 Hyde Street Bellingen Bellingen 4701268 Card H [architect not identified] [architect not identified] circa 1905 Residence 4 Coronation Street Bellingen Bellingen -
Annual Fire Safety Statement Inner West Council
Annual Fire Safety Statement Inner West Council Permutable Hector usually paunches some matron or popularising pardonably. Successful and photoperiodic Andie unscramble her duologues leman epitomize and swathe there. Kenyon hams her pyrrolidine stalely, she trichinises it wordily. What will either conditionally or fire safety and government association belongs to sexually victimized in No person other than the management or a person under management control shall beconsidered as an attendant. Creighton University has one separate campus in Phoenix, Arizona. Additionally, access to campus safety and security information for current students and employees is important for individuals who work and study at Youngstown State University. Loss of Supervisory Responsibilities. In ble requirements of this chapter the plans and drawings shall be submitted to the state fire marshalwhose decision shall be controlling. If only time and resources would allow such an endeavor! Except dwellings, lodging houses, private garage, sheds and agricultural buildings. The floor or landing shall not be more than inch lower than the threshold of thedoorway. Ramped aislesneed not have handrails on sides serving fixed seating. Yet the momentum of the new NFPA, as it was soon called, would soon be a magnet to others not eligible for active membership. Storerooms shall be maintained in a neat and propermanner at all times. Numerous resources are also provided with contact information, addresses, phone numbers, email addresses, and websites. Any violation in which consumption of alcohol was a contributing factor is also a violation of the alcohol policy regardless of the age. Creighton has developed TRAAC to care for intoxicated students who could be in danger. -
Stockland Community Grants Program Terms and Conditions (2017)
27th February 2017 Stockland Community Grants Program Terms and Conditions (2017) Stockland Corporation Limited ACN 000 181 733 Stockland Trust Management Limited ACN 001 900 741 AFSL: 241190 Level 25 133 Castlereagh Street Sydney NSW 2000 Tel: 02 9035 2000 Fax: 02 8988 2000 DX 121 Sydney www.stockland.com.au PART A – GENERAL TERMS 1 Stockland Development Pty Limited ABN 71 000 064 835 and Stockland Property Management Pty Ltd ABN 22 000 059 398 (Stockland) will offer grants to each eligible organisation (see Part C) (Applicant) who makes a successful Stockland Community Grants Program (Program) application subject to and in accordance with these terms and conditions (Grant). 2 An Applicant’s participation in the Program constitutes acceptance of these terms and conditions. 3 The amount of the Grant offered for each successful application will be determined by Stockland (in its sole and absolute discretion), but will not exceed the amount specified in Item 1 of the Schedule. PART B – STOCKLAND’S DETAILS 4 Stockland’s address is c/- Level 25, 133 Castlereagh Street, Sydney NSW 2000. 5 Stockland is a wholly owned subsidiary of Stockland Corporation Ltd ACN 000 181 733. 6 References to Stockland in this document include where relevant any partner, consultant or contractor of Stockland. Stockland has currently nominated Good2Give as a partner who will act in certain circumstances on behalf of Stockland during the Program. PART C – ELIGIBILITY 7 To participate in the Program, an Applicant must: (a) be: (i) an unincorporated community-based and not-for-profit organisation; or (ii) an incorporated community-based and not-for-profit organisation; and (b) outline a charitable or community initiative or program (Initiative) which: (i) supports one or more of the focus areas set out in Annexure A (Focus Area); and (ii) will be implemented within the local government area (LGA) of a Stockland Asset listed in Annexure B (Stockland Asset) ; and (iii) comply with these terms and conditions at all times. -
University of Technology Sydney Blackfriars Campus 4-12 Buckland St, Chippendale Conservation Management Plan
University of Technology Sydney Blackfriars Campus 4-12 Buckland St, Chippendale Conservation Management Plan Prepared for University of Technology Sydney November 2015 180 Darling Street Balmain NSW 2041 PO Box 296 Balmain NSW 2041 T+61 2 9818 5941 F+61 2 9818 5942 E [email protected] ABN 65 074 633 015 Nominated Architect Paul Davies Reg No, 6653 CONTENTS EXECUTIVE SUMMARY………..………………………………………………………………….IV 1.0 INTRODUCTION/BACKGROUND ................................................................................ 1 1.1 BACKGROUND AND BRIEF ......................................................................................... 1 1.2 LOCATION ..................................................................................................................... 1 1.3 ADMINISTRATION ........................................................................................................ 4 1.4 HERITAGE LISTINGS ................................................................................................... 4 Non statutory listings ..................................................................................................... 6 1.5 SCOPE AND METHODOLOGY .................................................................................... 6 1.6 AUTHORS ..................................................................................................................... 6 1.7 TERMS .......................................................................................................................... 7 1.8 ABBREVIATIONS -
Georges River Coastal Management Program Scoping Study
FINAL REPORT: Georges River Coastal Management Program Scoping Study December 2020 Document history Revision: Revision no. 02 Author/s M. Rosenthal M. Sano Checked M. Sano E. Zavadil Approved E. Zavadil Distribution: Revision no. 01a Issue date 18 May 2020 Issued to Peter Ryan (Georges Riverkeeper) Description: Draft for comment Revision no. 02 Issue date 4 December 2020 Issued to Peter Ryan (Georges Riverkeeper) Description: Final Report Citation: Please cite as: Alluvium (2020). Georges River Coastal Management Program Scoping Study. Report by Alluvium for Georges Riverkeeper. December 2020. Acknowledgement: Alluvium acknowledges the Traditional Owners and custodians of the lands on which we work. The sites assessed are on the lands of the Dharug and Dharawal People, and we acknowledge them as Traditional Owners. We pay our respects to their elders, and the elders of all Aboriginal and Torres Strait Islander Peoples, past, present, and into the future. Contents 1 Introduction 1 1.1 Scoping study purpose 1 1.2 Study area 1 1.3 Report structure 6 2 Program context 7 2.1 NSW Coastal Management Framework 7 2.2 Coastal Management Programs 8 3 Strategic context 11 3.1 Physical setting 12 3.1.1 Landscape context, geology and soils 12 3.1.2 Coastal processes, sediment supply and transport 14 3.1.3 Coastal hazards 17 3.1.4 Shoreline management 20 3.2 Hydrology and hydrodynamics 24 3.2.1 Catchment hydrology 24 3.2.2 Groundwater 24 3.2.3 Hydrodynamics 25 3.2.4 Tides 26 3.2.5 Flooding 26 3.3 Climate 27 3.3.1 Current climate 27 3.3.2 Past observations -
Appendix A: University of Sydney Overview History
APPENDIX A: UNIVERSITY OF SYDNEY OVERVIEW HISTORY THE PHYSICAL DEVELOPMENT OF BUILDINGS AND GROUNDS Prepared by Rosemary Kerr (Sue Rosen & Associates) ______________________________ With PRE-COLONIAL HISTORY AND DESCRIPTION by Dr Val Attenbrow, Australian Museum, and Cheryl Stanborough ______________________________ SUMMARY OF PLANNING AND BUILT FORM DEVELOPMENT by Donald Ellsmore ______________________________ OVERVIEW OF THE DEVELOPMENT OF AUSTRALIAN UNIVERSITIES by Duncan Marshall University of Sydney Grounds Conservation Plan —October 2002 Page A1 Table of Contents 1. Introduction 1.1 Authorship 1.2 Using the History as a Management Tool 2. Pre-Colonial Inhabitants and Land Use 2.1 People – The Original Inhabitants 2.2 Subsistence and material culture 2.3 Locational Details And Reconstruction Of Pre-1788 Environment 3. Early History of Grose Farm and Darlington 3.1 Church, School and Crown Land 3.2 Grose Farm 3.3 Surrounding Area 3.4 Female Orphan Institution 3.5 Subdivision 3.6 Pastoralism 3.7 Darlington Area 3.8 Subdivision and Residential Development 3.9 Institute Building and Darlington School 3.10 University Extension into Darlington 4. University of Sydney Foundation and Early Development 1850-1880 4.1 Background to Foundation 4.2 Establishment of University at Grose Farm 4.3 Initial Building Program 4.4 Great Hall and East Wing of Main Building 4.5 Development of Colleges 4.6 Grounds and Sporting Facilities 5. Development of Medicine and the Sciences 1880-1900 5.1 Expansion of Curriculum 5.2 Challis Bequest 5.3 Establishment of a Medical School 5.4 The Macleay Museum 5.5 ‘Temporary’ Buildings for Sciences and Engineering 5.6 Student Facilities 5.7 Sporting Facilities 5.8 Grounds 6. -
Heritage and Conservation Register 2006-07
1 Heritage and Conservation Register 2006-07 State Conservation Condition Comments Heritage Management Item name Register Plan (CMP) Good Fair Poor listed? prepared? Alexandra Canal Y Y No major works undertaken this financial year Allawah Reservoir (WS 0001) No major works undertaken this financial year Ashfield Reservoir (elevated) (WS 0003) Y Y No major works undertaken this financial year Balmain Reservoir (covered) (WS 0006) No major works undertaken this financial year Balmain Reservoir Valve House No major works undertaken this financial year Bankstown Reservoir (elevated) (WS 0007) Y Y No major works undertaken this financial year Bantry Bay Reservoir (WS 0008) No major works undertaken this financial year Bantry Bay Water Pumping Station (WPS 122) No major works undertaken this financial year Beattie Street Stormwater Channel No.15 No major works undertaken this financial year Beecroft Reservoir (WS 0009) No major works undertaken this financial year Bennelong Stormwater Channel No. 29 No major works undertaken this financial year Berkeley Reservoir (WS 0011) No major works undertaken this financial year Berkeley Reservoir (WS 0012) No major works undertaken this financial year Berowra Reservoir (elevated) (WS 0013) No major works undertaken this financial year Birds Gully Stormwater Channel No.10 No major works undertaken this financial year Blackwattle Bay Stormwater Channel No.17 No major works undertaken this financial year 2 Heritage and Conservation Register 2006-07 State Conservation Condition Comments -
Rockdale City Council Community Land and Open Space Plan Of
Rockdale City Council Plan of Management for Community Land and Public Open Space 2015 Plan of Management for Community Land and Public Open Space 2015 To be read in conjunction with: Version: 0.3 (draft) Approved By: Manager City Infrastructure Date: October Cook Park Plan of Management Last Amendment: 14 October 2015 2015 Muddy Creek Plan of Management Contact Officer: Landscape Next Review: January 2022 Infrastructure Planner Document History and Version Control Table Version Date Approved Approved By Brief Description Number 0.2 12 Oct 2015 J. Morgan Insert time (4:30pm) for closing of comments. Insert version table and update table of content page numbers. 0.3 14 Oct 2015 J. Morgan Corection to section 4.2 Rockdale City Council Plan of Management i Preliminary Title This plan is known as the Rockdale City Council Plan of Management for Community Land and Public Open Space 2015. Authority This plan is made under Part 2 Division 2 – Use and management of community land, Local Government Act 1993. Commencement This plan commences on [insert date]. Cancellation of Previous Plans This plan cancels and supersedes all other previous plans of management within the Rockdale City Council area: MASTERPLAN NOT REPEALED Name of the Plan of Management Adopted Bardwell Valley Golf Course Extension 1991 Arncliffe Park Plan of Management 1993 Bardwell Valley Plan of Management 1993 Bardwe ll Valley PoM Actions 1997 Bardwell Valley PoM – proposed extensions 1993 Bardwell Valley Golf Course PoM 1991 Eve Street Depot Conservation Assessment 1994 Plan