MUNICIPAL CORPORATION NURM PROPOSALS FOR BRIDGES AND FLY-OVERS

Estimate Amount Name of the Work Rs. in Lakhs Construction of Two lane bridge across 250.00 Bundar Canal at Ramalingeswara Nagar Construction of Two lane bridge across 250.00 Bundar Canal at Y.V.Rao Hospital Road Construction of Two lane bridge across 250.00 at Sub-Jail Road end Construction of Two lane bridge across 250.00 Ryves Canal at kotha vanthana Construction of Two lane bridge across 250.00 Ryves Canal at Madhura Nagar Construction of Two lane bridge across Eluru Canal at C.K.Reddy Road near 250.00 Zymkhana Club Construction of Two lane bridge across 250.00 Eluru Canal at papulamill railway gate Construction of Two lane bridge across 250.00 Eluru Canal at Madhura Nagar Construction of Two lane bridge across 250.00 Budameru at Madhura Nagar Construction of Fly over bridge at Gunadala crossing Ryves Canal, Budameru Railway 1530.00 track Construction of Fly over bridge at Madhura 1200.00 Nagar over Railway Track constuction of road under Bridge at Howarah raily track near Gunadal Railway 300.00 gate Construction of Two lane bridge across Budamerunear Saibaba temple parllel to 250.00 road. construction of the fly over bridge across the 3400.00 Nynavaram gate formation of the road road between 300.00 ramakrishnapuram to nuzvid road formation of the road for connecting 500.00 between gundala and the road. formation of the road for connecting between nynavaram and the ramavarpadu 300.00 junction. Construction of sub way near Fire Station on 50.00 NH-5 constuction of road under Bridge at Madhura 120.00 Nagar

Construction of deviders and foot paths 100.00 VIJAYAWADA MUNICIPAL CORPORATION NURM PROPOSALS FOR BRIDGES AND FLY-OVERS

construction of fly over at 2000.00 VIJAYAWADA MUNICIPAL CORPORATION NURM PROPOSALS FOR BRIDGES AND FLY-OVERS

consruction of fly over at gurunanak coloney 1600.00 road junction formation of canal bund road along the new bund from 800.00 to varadhi widening of the nh-from varadhi to the sitar 1000.00 juction with central median formation of 4- lane road from the siris junction to the ramavarpadu village up to nh- 500.00 5 providing rail way track road 1000.00

consrtruction of four lane fly over bridge at 2500.00 ramavarpadu junctionroad from th

construction of sub way for the pedesraints 200.00 providing two lane road from the existing fly over bridge at singh nagar to the I- town 2000.00 including bridge on Budameru and railway fly over bridge via rajarajeswaripet construction traffic I-lands,rotories etc 100.00

Total 22000.00