Detail of MPCS works in as on 24.12.2019 S. Name of District Package Awarded Date of Completion Name of Validity of % of Payment Present Remarks Images No MPCS work No. Cost (Rs. Award / Date as per Agency / Contract Work made to Status in Cr.) Contract Schedule Contractor with No. of Done agency extension upto Date (Rs. in Cr.) 1 Construction of D.K 12 3.8 14.01.19 13.01.21 Sri Datta Nil 43% 55.01 Ramp, Nil Img1, Multipurpose District Constructions Sump,Stilt cyclone shelter / Avinash floor and near Zilla anchan Ground Panchayath floor slabs Higher Primary completed. School, First floor Hosabettu in slab Mangalore reinforcem Taluk ent work is under progress

2 Construction of D.K _ 2.7 14.01.19 13.01.21 Sri Datta Nil 0.67% _ Existing Nil Img1 Multipurpose District Constructions School cyclone shelter / Avinash building near Zilla anchan dismantling Panchayath work is Higher Primary under School, progress. Ombathukere, in Mangalore Taluk

3 Construction of Udupi Package 01.01.18 31.12.20 Sri. Sathya N Nill 100% 245 Work DG Set to be Img1 Multipurpose No-1 2.62 Shetty, Completed Fixed Cyclone Shelter Kundapura near Govt. Higher Primary School and PU college in Padu Kapu Village 4 Construction of Udupi Package 31.10.17 30.10.19 / Sri. Nill 97% 130 Interlockin (Handing Over Img1 MPCS near No-2 2.49 / 04.01.20 Prashanth, g, Solar Site) Govt. Higher Handove Molahalli, System & 05.01.2018 Primary r: Kundapura DG Set Kuvempu 05.01.18 works School,Thekkat pending te of Kundapur constituency of Kundapur Taluk. 5 Construction of Uttara 18 3.34 334.35 15.10.2019 14.04.2021 M/s Sweet - 0.6% Old Due to Multipurpose Home building in heavy rain Cyclone Shelter District Constructio the sites are at Chittakula ns dismantled. in this village, Excavation sesion Chittakula GP for starting of Taluk, foundation the work is work under delayed. District. progress. 6 Construction of Uttara 19 3.10 309.83 15.10.2019 14.04.2021 M/s - 1% Old Due to heavy Multipurpose Kannada Mahamaya building in rain in this Cyclone Shelter District Constructio the sites are sesion starting at Amadalli ns. dismantled. of the work is Village, Excavation delayed. Amadalli Gram for Panchayath, foundation Karwar Taluk, work and Uttar Kannada bar bending District. work under progress. 7 Construction of Uttara 20 2.69 20.02.20 19.08.2019 M/s A.E.E, 58% 47.39 All floor Nil Img1 Multi Purpose Kannada 18 Ramshree Issued a slab Cyclone Shelter District Global letter to concrete At HPS Constructions Contractor work Wadibogri Private for completed, Belembar Limited applying Parapet (Pujgeri E.O.T. wall and College Dummy Premises) in columns Ankola Taluk plastering Uttar Kannada works District. completed, Head room slab & wall concrete work completed, First floor Inner plastering works and inner racks work under progress.

8 Construction of Uttara 21 2.69 26.12.20 25.06.2019 M/s A.E.E, 39% 40.07 Ground Nil Img1 Multi Purpose Kannada 17 Ramshree Issued a floor slab Cyclone Shelter District Global letter to concrete at Kharviwada Constructions Contractor work HPS Private for completed, Village in Limited applying De- Ankola Taluk E.O.T. shuttering Uttar Kannada work under District. progress, First floor columns reinforcem ent work under progress. 9 Construction of Uttara 22 2.77 20.01.20 19.07.2019 M/s A.E.E, 98% 115.05 All floors Nil Img1 Multi Purpose Kannada 18 Mahamaya Issued a flooring Cyclone Shelter District Constructions letter to work at Manaki . Contractor completed, Village in for Side RCC Kumta Taluk applying drain work Uttar Kannada E.O.T. completed, District. Water supply & sanitation work completed, Inspection chamber work completed, All floor electrificati on works completed, Windows & Ventilators works completed, Interlockin g pavers work completed, Outside painting work completed and Water proofing work under progress. 10 Construction of Uttara 23 2.69 18.01.20 17.07.2019 M/s M.T A.E.E, 98% 187.79 All floors Nil Multi Purpose Kannada 18 Shetty Issued a flooring Cyclone Shelter District Engineers & letter to work at Manki Near Contractors Contractor completed, High School, for Side RCC Honnavar Taluk applying drain work Uttara Kannada E.O.T. completed, District. Water supply & sanitation works completed, Windows & Ventilators works completed, All floors electrificati on works compeleted and Painting work under progress, Staircase hand rail fixing work completed, Front Interlockin g pavers work completed, Outside painting work completed and Water proofing work under progress. 11 Construction of Uttara 24 2.75 15.11.20 14.05.2020 M/s M.T - 50% 46.12 UG Sump Nil Img1 Multi Purpose Kannada 18 Shetty work Cyclone Shelter District Engineers & completed, at Contractors Open well Village work (Tattlihakkal), completed, Shirali Grama Ground Panchayath in floor & Bhatkal Taluk first floor Uttara Kannada slab District. concrete work completed, Ground floor brick masonry work completed, Lintel and chejja reinforcem ent work and Second floor head room slab concrete work completed, First floor brick masonry work completed, Ground floor electrificati on work and plastering work under progress.