MBTA Department of System-Wide Accessibility (SWA)

Total Page:16

File Type:pdf, Size:1020Kb

MBTA Department of System-Wide Accessibility (SWA)

MBTA Department of System-Wide Accessibility (SWA) Weekly Update Sunday 3/13/11 - Saturday 3/19/11

General Activities:

 Met with/or attended: o Human Resources to discuss System-Wide Accessibility Coordinator position o Marketing and Customer Service to discuss customer complaint process o MassDOT ADA Transition Plan sub-committee on accessible public meetings. o Manufacturer of the QPOD securement device system at Charlestown Bus garage o Interdepartmental committee regarding revisions to MBTA Baby Stroller special order o Interdepartmental work group on enhancements to Reduced Fare CharlieCard program

 Other: o Presented “How Can I Help You Today?” training to MassDOT front-line employees o Developed service alert text for Porter Sq. Red Line shuttle Massachusetts Bay Transportation Authority o Participated on 2011 APTA Rail ConferenceTen Park Planning Plaza, Boston, MA 02116 Committee conference call www.mbta.com Design and Engineering Activities:

 Reviewed plans/drawings/specifications; submitted comments on: o Revised layouts of curb ramps for improved pedestrian flow for Dudley Bus Station o Proposed improvements for Community College Station o Site inspection report on Dudley Bus Station with proposed improvements for pedestrian-friendly circulation throughout the station

 Conducted site inspections/site visits: o Dudley Bus Station for proposed police kiosk

 Met with: o MBTA Elevator Design Standard Committee o Project Development Group (PDG) about Orient Heights Station o Design committee for review of access and egress for Orient Heights Station o Project Development Group (PDG) for Orient Heights Station Reconstruction Project o Design & Construction, Operations Support and vertical transportation contractor to discuss MBTA Elevator Design Standards o Staff from General Manager's office, Design & Construction, Operations and Transit Police to discuss Dudley Station improvements project

SWA Weekly Update 3/19/11 Page 2 of 3 Customer Complaint Tracking Activities:

 5 customer complaints; 3 complainants o Fixed Route: 4 complaints - 2 forwarded to Office of Diversity & Civil Rights (ODCR) o THE RIDE: 1 complaint  1 commendation – fixed route

Internal Access Monitoring (IAM) Program Activities:

 11 Monitors conducted 50 trips throughout all of fixed route system (46 Bus; 3 Subway; 1 Commuter Rail)  Continue generating internal monitoring report for Q2-10  Forwarded 2 violations to ODCR for investigation  Revised the station survey instrument

Reduced Fare CharlieCard Program Activities:

 Issued 1157 reduced-fare CharlieCards: o 693 Senior CharlieCards o 432 Transportation Access Pass (TAP) CharlieCards o 25 Blind Access CharlieCards o 7 “THE RIDE” CharlieCards  Reviewed 245 Transportation Access Pass CharlieCard applications  Processed 197 account deposits for customers of the MBTA Paratransit program THE RIDE

SWA Weekly Update 3/19/11 Page 3 of 3

Recommended publications