WORK PLAN OF THE CIMO EXPERT TEAM ON DEVELOPMENTS IN IN-SITU TECHNOLOGIES (ET-DIST)

(Submitted by B. Hartley and J. Warne)

Summary and purpose of document

This document provides information on the proposed Work Plan for ET-DIST

ACTION PROPOSED

The Meeting is invited to note the structure and content of the draft Work Plan, and to approve the Workplan.

______

Appendix: Draft Workplan of ET-DIST CIMO/MG-13/Doc. 3.1(2), p. 2

WORK PLAN OF THE CIMO EXPERT TEAM ON DEVELOPMENTS IN IN-SITU TECHNOLOGIES (ET-DIST)

1. INTRODUCTION

The proposed Work Plan for ET-DIST is contained in the Appendix for the consideration and approval of the CIMO Management Group. It will be noted that responsible persons have not yet been identified for Tasks 4 (radiation), 9 (polar observations) or 10 (soil moisture). The current membership of the ET-DIST may lack the required expertize for these tasks and the session is invited to consider options for filling these gaps.

______CIMO/MG-13/Doc. 3.1(2), APPENDIX

APPENDIX: Workplan of ET-DIST (2014-2018)

Person Deadline for Status No. Task description Action Deliverable Comments responsible deliv. [%] 1. Performance of new a) Dubovetskiy 1. Monitor and review 1.1 Report on 06/2016 in situ technologies: Ford performance of new in situ preliminary findings CIMO-16 4.19 a) Upper Air b) Warne surface and upper-air b) Surface T, P c) Hietanen technologies and 1.2 Recommended 06/2017 c) Wind e) Lejbjuk measurement techniques updates to CIMO Guide e) Precip f) de Podesta f) AWS g) Guo g) Siting etc h) Wauben h) Clouds, Vis, Pwx i) Ford i) Trace Gas Measurement Pevny 2. Review outcomes of Dubovetskiy 1. Inclusion of guidance material 1 Documentation on 06/2016 assigned Lead in IOM reports guidance material Centres (Lindenburg, 2. Update CIMO Guide as 2. Recommended 06/2017 Chupungnyeong) required to take into account updates to CIMO Guide technological developments 3. Investigate and make a) Lejbjuk, 1. Identify and review existing 1.1 Update list of 1.1 12/2015 CIMO-16 Doc. 4, §4.14, proposals concerning Nomura, Guo, guidance material on the existing documents 1.2 06/2016 4.26, 7(3).8, 7(4).4 design and Pevny optimal use of methods to 1.2 Draft report on 1.3 06/2017 installation of, a) (Infrastructure) measure severe severe conditions Note: include infrastructure and b) hydrometeorological events 1.3 New text for CIMO guidance developed instruments, to b) Warne, and conditions. Guide on hardening in collaboration with withstand extreme Dubovetskiy, methodologies EC-PORS. weather conditions Pevny (Instruments)

4. Review development ??? TBA ??? 1. Assess the development of 1-3.Preliminary reports ET-MR&ACM-2, para of new radiation new reference pyrheliometers 1-5. Update of CIMO 7.2.2 reference instruments including traceability to SI Guide chapter 7 (covered by TT-RadRef?) CIMO-16 4.15 2. Report on the development of new reference pyrgeometers and pyrgeometer response 3. Include outcomes of equations and propose EMRP ENV-03 CIMO/MG-13/Doc. 3.1(2), APPENDIX, p. 2

Person Deadline for Status No. Task description Action Deliverable Comments responsible deliv. [%] suitable approaches (covered by TT-RadRef?) No Radiation experts 3. Investigate developments in currently in ET. Scope UV measurement. of work depends on 4. Incorporate outcomes of TT- work plan of TT- RadRef into CIMO Guide, if RadRef. appropriate 5. Address comments received from WMO Members on CIMO Guide chapter on radiation measurements 5. Icing Wauben 1. Liaise with CBS IPET-OSDE 1. User requirements 1. 03/2015 Hietanen to ascertain user requirements specified in RRR 2. 12/2016 CIMO-16 §4.16 Lejbjuk 2. Update CIMO Guide taking 2. Proposed update to (dependent Ford into account findings of COST- CIMO Guide on response 727 on icing to 1.)

6. Automatic cloud type Wauben, 1. Review automatic cloud 1a Guidance on best 1a. 06/2016 CIMO MG-11 and amount reporting Guo, reporting practices and practices 1b 06/2017 De Podesta instrumentation. 1b Update of CIMO 2 12/2017 (Dipasquale?) 2. Investigate the prospects for Guide chapter establishing traceability of 2 Report on the scope such observations to for establishing recognized standards. traceability for these observations 7. Instrument Warne 1. Review national practices. 1-2a. Instrument 06/2016 CIMO-16, 4.13, §6.27 performance De Podesta, 2. Develop a framework on performance monitoring Note: focused on monitoring Guo, instrument performance framework. 06/2017 instrument performance Hietanen, monitoring, including what and 2b. Update of CIMO metadata (e.g., battery Arrifudin, how to monitor and how to Guide voltage) Pevny communicate the information. Ford 8. Use of Dubovetskiy 1. Develop WMO position on the 1. Report including 1. 06/2016 CIMO-XV, para 5.9 environmentally Nomura use of environmentally friendly recommendation to friendly radiosondes Warne radiosondes be submitted for Hietanen 2. Collaborate with other approval to CIMO- international organizations MG 2. As needed (CEN, HMEI) if and as 2. Development of joint relevant in development/ standard CIMO/MG-13/Doc. 3.1(2), APPENDIX, p. 3

Person Deadline for Status No. Task description Action Deliverable Comments responsible deliv. [%] review of related standards 9. Polar Observations TBA 1. ??? 1. Need to recruit an expert? 10. Soil Moisture TBA 1. Review instrumentation and 2. Guidance document 1. 12/2015 Need to recruit an their principles of operation 3. CIMO Guide update 2. 06/2016 expert? for soil moisture measurement 3. 06/2017 2. Draft a guidance document on the measurement of soil moisture 3. Update CIMO Guide