By Speed Post

Total Page:16

File Type:pdf, Size:1020Kb

By Speed Post

By Speed Post

DELHI POLLUTION CONTROL COMMITTEE DEPARTMENT OF ENVIRONMENT, (GOVT. OF NCT OF DELHI) 4TH FLOOR, ISBT BUILDING, KASHMERE GATE, DELHI-6 visit us at : http://dpcc.delhigovt.nic.in

F.No.DPCC/CMC-I/2009/ Dated:

Subject:- Minutes of the 61st meeting of the committee constituted for grant/ renewal / revoke the consent (Green) under the Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981 held on 01.02.2010.

Please find enclosed herewith the minutes of the Committee constituted for grant / renewal /revoke the Consent (Green) under the Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981 held on 01.02.2010 in the conference room of DPCC.

This issues with the approval of Member Secretary, DPCC.

(Pankaj Kapil) Environmental Engineer

1. M.S. DPCC 2. Dr. AK Nema, Asst. Professor, Dept. of Civil Engg, IIT, Delhi. 3. Dr. Chandra Prakash, SEE, DPCC. 4. Dr. Anil Kumar, Director, Env. Department, GNCTD, 5. Env. Engineer, CMC(I,II,III & IV) 6. AEEs & JEE of CMC (I,II,III & IV)

Copy for information to:- 1. Incharge, Computer Cell, DPCC-for placing the aforementioned minutes of the committee on the Website of DPCC 2. PS to Chairman for information of Chairman. Minutes of the 61st meeting of the Committee, Constituted for grant/ renewal / revocation of consent (GREEN) under Air / Water Act, held on 01.02.2010. The following persons attended the CMC meeting on 01.02.2010. 1) Member Secretary, DPCC. 2) Dr. Anil Kumar, Member, Environment Department. 3) EEs & AEEs of CMC DPCC.

Dr. A.K. Neema, Member, Academic Institute and Dr. Chandra Prakash, Sr. Env. Engineer, DPCC could not attend the meeting.

Following are the minutes of the said meeting: -

Agenda Item No 1: Cases of Consent to Establish w.e.f. 27.11.2009.

Decisions taken with respect to this agenda are tabulated and annexed as Annexure – 1.

Agenda Item No 2: Cases of Consent to Operate w.e.f. 02.05.2005.

Decisions taken with respect to this agenda are tabulated and annexed as Annexure – 2.

Agenda Item No 3: Cases of Consent to Operate (Renewal) w.e.f. 28.01.2005.

Decisions taken with respect to this agenda are tabulated and annexed as Annexure – 3.

Table Agenda Item No 1: M/s The Maison Co., D-12/3, Phase-II, Okhla Industrial Area, New Delhi-20

Inspection be conducted.

Table Agenda Item No 2: M/s Perfect Services, C-105/1, Phase-I, Naraina Industrial Area, New Delhi.

Inspection be conducted. Table Agenda Item No 3: M/s Ovn Trading Engineers Pvt. Ltd., BT-1/90, Phase-I, Mangolpuri Indsutrial Area, New Delhi

Decision taken on file ratified.

Table Agenda Item No 4 : M/s Century Impelx, A-101/3, Phase-II, Okhla Industrial Area, New Delhi-110020

Issue SCN for closure.

Table Agenda Item No 5 : M/s Lilliput Kidswear Ltd., B-95/1, Phase-I, Okhla Industrial Area, New Delhi-110020

Ask the unit existing at B-II/63, Phase-I, OIA to apply for Consent to Establish and Consent to Operate under Orange category immediately and inspection be conducted.

Table Agenda Item No 6 : M/s Samitech Electronics Pvt. Ltd., A-62, Phase-II, Mayapuri Industrial Area,New Delhi-64

Earlier CMC decision for grant of consent reviewed. Issue SCN for refusal and SCN for closure based on findings of inspection.

Table Agenda Item No 7: M/s G.S.I. Corporation, B-13, Phase-II, Okhla Industrial Area, Delhi.

Issue SCN for refusal of consent and SCN for closure based on findings of inspection.

Table Agenda Item No 8: M/s Wear Well India Pvt. Ltd., D-21/1, Phase-I, Okhla Industrial Area, New Delhi-20

Issue SCN for refusal and SCN for closure based on findings of inspection. Table Agenda Item No 9: M/s Fashion Editor, B-38, Lawrence Road Industrial Area, New Delhi

Issue SCN for refusal and SCN for closure based on findings of inspection.

Meeting ended with thanks to the chair. Status of the decisions taken in the 61st CMC(Green) meeting held on 01.02.2010.

Status of the decisions w.r.t. Consent to Establish cases

Consent granted / refused : 77

Inspection : 02

Others : 07

Total cases considered : 86

Status of the decisions w.r.t. Consent to Operate cases

Consent to Operate : 30 granted Consent to Operate : 03 refused To be treated as : 07 infructuous. Inspection : 09

Others : 20

Total cases considered : 69

Status of the decisions w.r.t. Consent to Operate (Renewal) cases Consent to Operate : 68 (Renewal) granted Consent to Operate : 09 (Renewal) refused To be treated as : 04 infructuous. Inspection : 20 Others : 74 Total cases considered : 175 Sl. No ID No appl_dt firm_name firm_address area_name Decision on 01.02.2010 1 32023 27-11-2009 SUNDER ENGINEERING PLOT NO 172, POCKET-O. BAWANA Issue Consent to Establish. INDUSTRIES SECTOR-1, DSIDC INDUSTRIAL AREA 2 32033 27-11-2009 PRERNA CATTLE FEED PLOT NO 272, POCKET-C, BAWANA Issue Consent to Establish. SECTOR-2, DSIDC INDUSTRIAL AREA 3 32054 01-12-2009 R.D. PLAST PVT. LTD. A-13/3 NARAINA Issue Consent to Establish. INDUSTRIAL AREA PH-I 4 32065 02-12-2009 SAJJANSON ENGINEERS 123, FIE PATPARGANJ Issue Consent to Establish. (PROP. AVTAR SINGH) INDUSTRIAL AREA 5 32074 03-12-2009 QUALITRONICS B-1, E-25 (GROUND MOHAN CO- Issue Consent to Establish with FLOOR) OPERATIVE the condition to send the e-waste INDUSTRIAL AREA to authorized recycler.

6 32081 04-12-2009 S.R. PRINTERS A-28 NARAINA Issue Consent to Establish. INDUSTRIAL AREA PH-I 7 32082 04-12-2009 ELECTROPOINT PLOT NO 54, POCKET-G, BAWANA Issue Consent to Establish. INDUSTRIES SECTOR-3, DSIDC INDUSTRIAL AREA 8 32101 07-12-2009 PRIMUS IMPEX & SHED NO 116, DSIDC, OKHLA INDUSTRIAL Issue Consent to Establish TRADERS PVT. LTD. PHASE-I AREA without washing, dyeing & bleaching. 9 32111 08-12-2009 GIFTS MART D-10 FLATTED FACTORY Issue Consent to Establish. COMPLEX, JHANDEWALAN 10 32121 08-12-2009 EPPELTONE ENGINEERS A-293/1, PHASE-I OKHLA INDUSTRIAL Issue Consent to Establish. AREA 11 32129 09-12-2009 R.R. TRENDS PRIVATE X-1, PHASE-II OKHLA INDUSTRIAL Issue Consent to Establish. LIMITED AREA 12 32145 10-12-2009 SINHAL METAL INDIA PLOT NO 8 SSI INDUSTRIAL Ask the unit to clarify as to why it PVT. LTD. AREA has filed two applications one is green category and another in orange category. 13 32172 14-12-2009 DELMECH ENTERPRISES 11, DSIDC SHED, PHASE- OKHLA INDUSTRIAL Issue Consent to Establish. II, SCHEME-III AREA 14 32174 14-12-2009 MONGIA ENTERPRISES C-50, FLATTED FACTORY Issue Consent to Establish COMPLEX, without moulding. JHANDEWALAN 15 32199 17-12-2009 VIKAS ENGG. COMPANY L-154, SECTOR-1 BAWANA Ask the unit to clarify mfg INDUSTRIAL AREA process. 16 32215 17-12-2009 LAXMI ENGG. WORKS PLOT NO B-64, PHASE-II NARAINA Issue Consent to Establish. INDUSTRIAL AREA PH-II 17 32217 18-12-2009 ACCEL FRONTLINE LTD C-123, PHAE-I OKHLA INDUSTRIAL Issue Consent to Establish. AREA 18 32231 21-12-2009 BLUE BIRD HOSIERY C-200, SECTOR-2, DSIDC BAWANA Issue Consent to Establish INDUSTRIAL AREA without washing, dyeing & bleaching. 19 32232 21-12-2009 RAMTECH ENERGY D-7/3, PHASE-II OKHLA INDUSTRIAL Issue Consent to Establish. SYSTEMS AREA 20 32240 22-12-2009 NARESH PEN CO B-15 FLATTED FACTORY Issue Consent to Establish COMPLEX, without moulding. JHANDEWALAN 21 32248 23-12-2009 G.G. INDUSTRIES (INDIA) 5/31 KIRTI NAGAR Issue Consent to Establish. INDUSTRIAL AREA 22 32249 23-12-2009 AEROTECH SYSTEMS 10/63-D KIRTI NAGAR Issue Consent to Establish. INDUSTRIAL AREA 23 32250 23-12-2009 PRAMOD ELECTRONICS E-34, SECTOR-5, DSIDC BAWANA Ask the unit to clarify the process INDUSTRIAL AREA of lamination in detail. 24 32253 23-12-2009 N.P. ENTERPRISES I-37, SECTOR-4, DSIDC BAWANA Issue Consent to Establish. INDUSTRIAL AREA 25 32255 23-12-2009 CHAUDHARY ENGINEERS PLOT NO 81, POCKET-M, BAWANA Issue Consent to Establish. SECTOR-3, DSIDC INDUSTRIAL AREA 26 32256 24-12-2009 AJS INDUSTRIES B-97, PHASE-I MAYAPURI Issue Consent to Establish. INDUSTRIAL AREA 27 32265 29-12-2009 CAPITAL'S THREAD A-3 GTK ROAD Issue Consent to Establish. HOUSE INDUSTRIAL AREA 28 32269 29-12-2009 CONIC ELECTRONIC C-110/2 NARAINA Issue Consent to Establish. INDUSTRIES INDUSTRIAL AREA PH-I 29 32278 30-12-2009 MEDI WAVES INC B-68 GTK ROAD Issue Consent to Establish. INDUSTRIAL AREA 30 32279 30-12-2009 HARI FLOUR MILL PLOT NO 183, POCKET-M, BAWANA Ask the unit to apply for Consent SECTOR-3, DSIDC INDUSTRIAL AREA to Establish under Orange category. 31 32293 31-12-2009 AJAY ELECTRICAL B-257 NARAINA Issue Consent to Establish. INDUSTRIES INDUSTRIAL AREA PH-I 32 32294 01-01-2010 UNISTYLE IMPEX PVT. B-51, PHASE-I OKHLA INDUSTRIAL Issue Consent to Establish LTD. AREA without washing, dyeing & bleaching. 33 32299 01-01-2010 JYOTI ENGINEERING C-160 NARAINA Issue Consent to Establish. INDUSTRIES INDUSTRIAL AREA PH-I 34 32308 04-01-2010 I.S.G. SOFTWARE PVT. C-7 FLATTED FACTORY Issue Consent to Establish. LTD. COMPLEX, JHANDEWALAN 35 32310 04-01-2010 UTKRISHT VATIKA A-48 FLATTED FACTORY Issue Consent to Establish OVERSEAS COMPLEX, without washing, dyeing & JHANDEWALAN bleaching. 36 32311 04-01-2010 DESIGN CORNER D-67 FLATTED FACTORY Issue Consent to Establish. COMPLEX, JHANDEWALAN 37 32312 04-01-2010 DESIGN CORNER D-68 FLATTED FACTORY Issue Consent to Establish. COMPLEX, JHANDEWALAN 38 32313 04-01-2010 THE MAKERS A-30 FLATTED FACTORY Issue Consent to Establish COMPLEX, without washing, dyeing & JHANDEWALAN bleaching. 39 32314 04-01-2010 MALHOTRA A-32 FLATTED FACTORY Issue Consent to Establish ENTERPRISES COMPLEX, without washing, dyeing & JHANDEWALAN bleaching. 40 32318 04-01-2010 KARONA CHEMICALS B-36/5 GTK ROAD Issue Consent to Establish. INDUSTRIAL AREA 41 32323 04-01-2010 G.K. NARULA B-70/80, DSIDC LAWRENCE ROAD Issue Consent to Establish INDUSTRIAL AREA without washing, dyeing & bleaching. 42 32324 04-01-2010 SHIVA PACKAGING PLOT NO 77, SECTOR-5, BAWANA Issue Consent to Establish INDUSTRIES POCKET-F, DSIDC INDUSTRIAL AREA without printing with the suggestion to install fire safety equipments. 43 32342 05-01-2010 TRITRONICS (INDIA) PVT. 240, FIE PATPARGANJ Issue Consent to Establish. LTD. INDUSTRIAL AREA 44 32348 05-01-2010 BHUSHAN ENTERPRISES PLOT NO 421-C/1, GALI FRIENDS COLONY Issue Consent to Establish with NO 6 INDUSTRIAL AREA condition that no wood will be used for heating. 45 32353 06-01-2010 JYOTI ENGINEERING 308/4A SHAHZADA BAGH Issue Consent to Establish. WORKS INDUSTRIAL AREA 46 32373 08-01-2010 ASHA GASKET I-221, SECTOR-2, DSIDC BAWANA Issue Consent to Establish. INDUSTRIES INDUSTRIAL AREA 47 32374 08-01-2010 PERSS WELL M-209, SECTOR-5, DSIDC BAWANA Issue Consent to Establish. COMPONENTS PVT. LTD. INDUSTRIAL AREA 48 32378 11-01-2010 PARKASH CANDLE C-109 NARAINA Issue Consent to Establish. WORKS INDUSTRIAL AREA PH-I 49 32382 11-01-2010 PRACHI INTERNATIONAL A-14, 1ST FLOOR WAZIRPUR Issue Consent to Establish. PVT. LTD. INDUSTRIAL AREA 50 32393 11-01-2010 PAWAN PACKERS PLOT NO 23, POCKET-G, BAWANA Issue Consent to Establish SECTOR-4, DSIDC INDUSTRIAL AREA without printing with the suggestion to install fire safety equipments. 51 32407 12-01-2010 HARYANA GENERAL 76 RAJASTHAN UDYOG Issue Consent to Establish STATIONRS PVT. LTD. NAGAR INDUSTRIAL without printing. AREA 52 32409 13-01-2010 RAKESH ENTERPRISES P-137, SECTOR-5, DSIDC BAWANA Issue Consent to Establish INDUSTRIAL AREA without washing, dyeing & bleaching. 53 32412 13-01-2010 DAYAL ENGINEERING B-45, PHASE-II MAYAPURI Issue Consent to Establish. WORKS INDUSTRIAL AREA 54 32420 13-01-2010 BENTEX CONTROL & B-63/3 NARAINA File be put up administratively. SWITCHGEAR CO. INDUSTRIAL AREA PH-II 55 32426 13-01-2010 DHARAMVIR GUPTA A-31 WAZIRPUR Issue Consent to Establish INDUSTRIAL AREA without buffing. 56 32428 14-01-2010 BHAGWATI C-18, PHASE-I OKHLA INDUSTRIAL Ask the unit to apply for Consent CONSTRUCTION & AREA to Establish under Orange ENGINEERS PVT. LTD. category in view of painting and polishing activity. 57 32437 15-01-2010 PRITAM SINGH J-16 UDYOG NAGAR Inspection be conducted. INDUSTRIAL AREA 58 32445 15-01-2010 ANANT RAM ATTA SHON O S-1/17, E BLOCK, NC-NW Issue Consent to Establish. CHAKKI DDA MARKET, PARSHANT VIHAR 59 32446 15-01-2010 BAL KISHAN MITTAL ATTA SHOP NO 18, CSC-4, NC-NW Issue Consent to Establish. CHAKKI SECTOR-5, ROHINI 60 32450 15-01-2010 SHIVA INDUSTRIES PLOT NO 237, POCKET-F, BAWANA Issue Consent to Establish. SECTOR-1, DSIDC INDUSTRIAL AREA 61 32452 15-01-2010 R.D. PLAST PVT. LTD. A-28 NARAINA Issue Consent to Establish. INDUSTRIAL AREA PH-I 62 32459 18-01-2010 NINE MOON FASHION C-2/13, 1ST FLOOR, MAYAPURI Issue Consent to Establish PHASE-II INDUSTRIAL AREA without washing, dyeing & bleaching. 63 32464 18-01-2010 J.B. TRADERS A-12, FLATTED FACTORY OKHLA INDUSTRIAL Issue Consent to Establish. COMPLEX ESTATE 64 32465 18-01-2010 A.K. PRECISION C-36, DDA SHEDS, OKHLA INDUSTRIAL Issue Consent to Establish. INDUSTRIES PHASE-I AREA 65 32478 19-01-2010 STEELAGE SHED NO 38, CATEGORY- NANGLOI DSIDC Issue Consent to Establish. COMPONENTS III, INDUSTRIAL AREA 66 32479 19-01-2010 STEELAGE SHED NO 37, CATEGORY- NANGLOI DSIDC Issue Consent to Establish. COMPONENTS III INDUSTRIAL AREA 67 32483 19-01-2010 G.M. ENTERPRISES A-11,PHASE-II MAYAPURI Issue Consent to Establish INDUSTRIAL AREA without printing with the suggestion to install fire safety equipments. 68 32488 19-01-2010 M.V.D. AUTO C-45, PHASE-I OKHLA INDUSTRIAL Issue Consent to Establish. COMPONENTS PVT. LTD AREA 69 32490 20-01-2010 VIKRAM OVERSEAS LTD. E-44/3, PHASE-II OKHLA INDUSTRIAL Issue Consent to Establish. AREA 70 32493 20-01-2010 KUMAR HANDICRAFTS B-64 FLATTED FACTORY Issue Consent to Establish COMPLEX, without moulding. JHANDEWALAN 71 32499 20-01-2010 BRW IMPEX 4/5 KIRTI NAGAR Issue Consent to Establish. INDUSTRIAL AREA 72 32514 21-01-2010 DEFTECH SERVICES (A B-18/1 PHASE-II OKHLA INDUSTRIAL Ask the unit to file fresh affidavit DIVISION OF AREA and clarification regarding testing GRAPHISADS PVT. LTD.) and equipment used in avionics.

73 32515 21-01-2010 CHORARIA INDUSTRIES 533, FIE PATPARGANJ Issue Consent to Establish. PVT. LTD. INDUSTRIAL AREA 74 32521 22-01-2010 SAIPEM TRIUNE PLOT NO B-1/H-4-A MOHAN CO- Issue Consent to Establish. ENGINEERING PVT. LTD. OPERATIVE INDUSTRIAL AREA 75 32522 22-01-2010 BOSTON NYLON 71/1 (A-18), RAMA ROAD NAJAFGARH ROAD Issue Consent to Establish. SPINNERS INDUSTRIAL AREA 76 32527 22-01-2010 BALI & CO. C-91 WAZIRPUR Issue Consent to Establish. INDUSTRIAL AREA 77 32532 22-01-2010 RELIABLE ENTERPRISES C-112, FFC OKHLA INDUSTRIAL Issue Consent to Establish. ESTATE 78 32535 22-01-2010 SIMRAN EXPORT INC. B-269, PHASE-I MANGOL PURI Inspection be conducted. INDUSTRIAL AREA 79 32542 22-01-2010 JASSI & CO. A-262, PHASE-I OKHLA INDUSTRIAL Issue Consent to Establish AREA without washing, dyeing & bleaching. 80 32546 25-01-2010 RIAN ENGINEERS 6/5B KIRTI NAGAR Issue Consent to Establish. INDUSTRIAL AREA 81 32548 25-01-2010 METROPOL 262, PHASE-III OKHLA INDUSTRIAL Issue Consent to Establish. ELECTRONICS PVT. LTD. ESTATE 82 32549 25-01-2010 VARNA DISPLAY 6/16-19, DLF MOTI NAGAR Issue Consent to Establish. SYSTEMS PVT. LTD. INDUSTRIAL AREA 83 32557 25-01-2010 ESS AAR INDUSTRIES PLOT NO B-36/6 GTK ROAD Issue Consent to Establish. INDUSTRIAL AREA 84 32558 25-01-2010 CARTON & PACKERS PLOT NO 229, POCKET-E, BAWANA Issue Consent to Establish SECTOR-4, DSIDC INDUSTRIAL AREA without printing with the suggestion to install fire safety equipments. 85 32559 25-01-2010 RAJENDER PLOT NO 120, POCKET-E, BAWANA Issue Consent to Establish. ELECTRONICS SECTOR-1, DSIDC INDUSTRIAL AREA 86 32560 25-01-2010 RANJIT INDUSTRIAL C-106/6 NARAINA Issue Consent to Establish. CORPORATION INDUSTRIAL AREA PH-I Sl. No ID No appl_dt firm_name firm_address area_name Decision on 01.02.2010 1 13861 02-05- GENERAL ENGG. C-2, DSIDC SHED NC-W Issue reminder 2005 WORKS (CWC), to DDA. JWALAPURI 2 14025 11-05- BAKHNWAT B-6, DSIDC SHED NC-W Issue reminder 2005 INDIA TOOLS (CWC0, to DDA. JAWALAPURI INDUSTRIAL AREA 3 19933 24-11- JVS PLASTIC C-111, REAR NARAINA Inspection be 2006 PVT. LTD ENTRANCE, INDUSTRIAL AREA expedited. PHASE-I PH-I 4 19956 27-11- SHANKAR 259, FIE PATPARGANJ Consent 2006 ENGINEERING INDUSTRIAL AREA application be WORKS made infructuous as it is closed. Issue SCN for closure to other two units existing at the premises. 5 21152 30-04- MALHOTRA 10, FIE PATPARGANJ Issue SCN for 2007 METAL WORKS INDUSTRIAL AREA closure due to non submission of CTE. 6 21334 16-05- PAL A-265-266,PHASE-I OKHLA Consent refused 2007 ENTERPRISES INDUSTRIAL AREA and issue closure directions. 7 21367 17-05- DAYAL C-40,PHASE-II OKHLA Issue reminder 2007 ASSOCIATES INDUSTRIAL AREA and put up in next CMC. 8 21368 17-05- RAGHURAJ C-39, PH-II OKHLA Issue reminder 2007 DAYAL INDUSTRIAL AREA and put up in next CMC. 9 21701 06-06- PRATAP A-72, GROUP WAZIRPUR Issue consent to 2007 INDUSTRIES INDUSTRIAL AREA operate without washing, dyieng & bleaching 10 21806 13-06- PARKASH 227, DSIDC SHED, OKHLA This consent 2007 PACKING PHASE-I INDUSTRIAL AREA application has INDUSTRIES already been refused. Enquiry Counter be informed accordingly for deletion.

11 22603 20-07- KIRTI FILMS E-6 FLATTED FACTORY Issue SCN for 2007 PVT. LTD COMPLEX, refusal due to no JHANDEWALAN application for CTE. 12 22648 23-07- INDIAN 37, OKHLA Issue reminder 2007 COMPRESSORS INDUSTRIAL to CPCB. LTD ESTATE 13 22799 25-07- LAXMI CHAND A-97/2 WAZIRPUR Ask the unit to 2007 HOSIERY INDUSTRIAL AREA apply for FACTORY Consent to Establish under Green category and inform CMC(Orange) about the information given by the unit as the case is under consideration by CMC(Orange) also. 14 22858 27-07- ATOPLINE 308/3-G SHAHZADA BAGH Issue consent to 2007 ELECTRICAL INDUSTRIAL AREA operate. INDUSTRIES 15 22912 30-07- VICTORIA A-114/4 WAZIRPUR Consent refused. 2007 ELECTRICAL INDUSTRIAL AREA INDUSTRY 16 22918 30-07- R.K. PLASTIC A-96/5 WAZIRPUR Inspection be 2007 INDUSTRIES INDUSTRIAL AREA expedited. 17 22961 01-08- COLOUR C-2/1 WAZIRPUR Inspection be 2007 PRINTING INDUSTRIAL AREA conducted. WORKS 18 23139 14-08- UTTAM AIR F-90/5, PHASE-I OKHLA Put up in next 2007 PRODUCTS P. INDUSTRIAL AREA CMC. LTD 19 23228 23-08- CREATIVE LINE A-50 FLATTED FACTORY Issue consent to 2007 COMPLEX, operate and JHANDEWALAN consent to establish. 20 24214 15-11- UNIVERSAL PLOT NO-14, BAWANA Send the letter at 2007 SWITCH GEAR POCKET-I, INDUSTRIAL AREA residential CONTROL SECTOR-3 address and also carry out the inspection. 21 24987 21-02- JIVA DESIGNS 45-48, DSIDC OKHLA Issue consent to 2008 PVT. LTD SHED, SCHEME-III, INDUSTRIAL AREA operate for PHASE-II basement and ground floor. 22 27049 22-08- LAAJ A-2 NARAINA Ask the unit to 2008 INTERNATIONAL INDUSTRIAL AREA clarify regarding PH-I non existence of the units to whom the unit has informed to have outsourced the washing. 23 29189 05-03- ELLORA F-23/1, PHASE-II OKHLA Ask the unit to 2009 CREATION PVT INDUSTRIAL AREA file an affidavit LTD. regarding removal of the hydro from the premises. CTO be issued immediately after receipt of the requisite affidavit. 24 30209 05-06- ROHIT HOSIERY E-4 SMA INDUSTRIAL Inspection be 2009 MILLS PVT. LTD. AREA expedited. 25 30429 23-06- FASHION PLOT NO. 89, FIE PATPARGANJ Reinspection be 2009 FUSION INDUSTRIAL AREA conducted. 26 30433 23-06- NEXUS POWER PLOT NO T-18, OKHLA Issue consent to 2009 SYSTEMS PHASE-II INDUSTRIAL AREA operate. 27 30515 30-06- OM DRISHIAN PLOT NO. 58, SSI INDUSTRIAL Issue SCN for 2009 INTERNATIONA AREA refusal and SCN L LTD. for closure based on findings of inspection. 28 30593 06-07- THEME EXPORT F-25/1, PHASE-II OKHLA Consent 2009 PVT LTD. INDUSTRIAL AREA application be made infructuous as unit has applied for consent to establish under Orange category. 29 30759 17-07- TVS-E B-II/17 MOHAN CO- Issue Consent to 2009 SERVICETEC OPERATIVE Operate with the LIMITED INDUSTRIAL AREA condition to send the e-waste to authorized recycler. 30 30786 20-07- K.L. EQUIPMENT B-282, PHASE-II MANGOL PURI Send the letter at 2009 INDUSTRIAL AREA residential address. 31 30993 03-08- SAVA G-I/13 GTK ROAD Issue SCN for 2009 INTERNATIONA INDUSTRIAL AREA refusal and SCN L PVT. LTD. for closure based on findings of inspection. 32 31061 10-08- R MANISH A-70, PHASE-II MANGOL PURI Inspection be 2009 JEWELLERY INDUSTRIAL AREA expedited. PVT. LTD. 33 31062 10-08- SHAHI EXPORT F-88, PHASE-I OKHLA Consent refused 2009 PVT. LTD. INDUSTRIAL AREA and link the file with orange category application of the unit. 34 31211 25-08- SPEEDCON PLOT NO 6, GALI FRIENDS COLONY Reinspection be 2009 ELECTRONICS NO 4 INDUSTRIAL AREA conducted. 35 31253 28-08- FUSION FLAT NO D-38 FLATTED FACTORY Put up in next 2009 COMPLEX, CMC. JHANDEWALAN 36 31297 01-09- STICHWELL D-79, PHASE-I OKHLA Issue consent to 2009 ENGINEERS INDUSTRIAL AREA operate. 37 31378 08-09- ROOP SIGN C-134, PHASE-II MAYAPURI Consent to 2009 GRAPHICS PVT. INDUSTRIAL AREA Establish be LTD. revoked and Consent to Operate be made infructuous and link the file with orange application in view of findings of inspection. 38 31380 08-09- NEERU CABLES H-1202 NARELA Consent to 2009 INDIA NEROLEX INDUSTRIAL AREA Establish be HOUSE revoked and Consent to Operate be made infructuous and link the file with orange application.

39 31394 09-09- K. PRODUCTS PLOT NO 1/536-D- FRIENDS COLONY Issue final 2009 3, GALI NO 5 INDUSTRIAL AREA reminder at both address. 40 31436 14-09- RAJ KUMAR A-128, GROUP WAZIRPUR Consent 2009 HOSIERY INDUSTRIAL AREA application be made infructuous. Ask the unit to apply for consent to operate at the time of starting the operation. 41 31489 18-09- SHRI DURGA 252, FIE PATPARGANJ Consent to 2009 EXPORT INC INDUSTRIAL AREA Establish be revoked and Consent to Operate be made infructuous and link the file with orange application.

42 31598 30-09- BALODIA OIL PLOT NO 262, BAWANA Ask the unit to 2009 MILL POCKET-O, INDUSTRIAL AREA correct the SECTOR-1, DSIDC deficiencies observed during the inspection. 43 31607 01-10- ARUN A-72 WAZIRPUR Issue consent to 2009 INTERNATIONAL INDUSTRIAL AREA operate without buffing. 44 31722 22-10- STAR INDUSTRY PLOT NO. 6/5D, KIRTI NAGAR Consent 2009 INDUSTRIAL AREA application be made infructuous as the earlier consent is still valid. 45 31731 26-10- APEX ULTRA PLOT NO 63/12-B, NAJAFGARH ROAD Issue consent to 2009 ELECTRICALS RAMA ROAD INDUSTRIAL AREA operate. PVT. LTD. 46 31903 16-11- AGRO FOOD C-13, PHASE-I OKHLA Issue SCN for 2009 INDUSTRIAL AREA refusal based on the findings of inspection report at both address. 47 32016 26-11- MASTER 5/37 KIRTI NAGAR Issue consent to 2009 CONTROL INDUSTRIAL AREA operate. 48 32045 30-11- KANWAR ENGG. L-148, SECTOR-3, BAWANA Issue consent to 2009 WORKS DSIDC INDUSTRIAL AREA operate. 49 32049 30-11- PAWAN STEELS C-8/1 WAZIRPUR Issue consent to 2009 INDUSTRIAL AREA operate without buffing. 50 32080 04-12- SAAV INC PLOT NO A-204, NARELA Issue consent to 2009 DSIDC INDUSTRIAL AREA operate without printing. 51 32094 07-12- ROOPA M-41, SECTOR-2, BAWANA Issue consent to 2009 ENTERPRISES DSIDC INDUSTRIAL AREA operate without washing, dyieng & bleaching 52 32103 07-12- S.R. PRINTERS A-28 NARAINA Issue consent to 2009 INDUSTRIAL AREA operate. PH-I 53 32151 11-12- KARTAR SINGH A-12, PHASE-II MAYAPURI Issue consent to 2009 & CO. INDUSTRIAL AREA operate. 54 32155 11-12- SEASONS D-18 FLATTED FACTORY Issue consent to 2009 COLLECTION COMPLEX, operate. JHANDEWALAN 55 32165 14-12- WIRE H-53 UDYOG NAGAR Issue consent to 2009 APPLIANCES INDUSTRIAL AREA operate. 56 32238 22-12- VAM ELECTRO 40, DLF KIRTI NAGAR Issue Consent to 2009 DEVICES PVT. INDUSTRIAL AREA Operate with the LTD condition to send the e-waste to authorized recycler. 57 32260 24-12- INTEGRATIVE B-73, PHASE-I MAYAPURI Issue Consent to 2009 SOLUTIONS PVT. INDUSTRIAL AREA Operate with the LTD. condition to send the e-waste to authorized recycler. 58 32263 29-12- MONGA PLOT NO 308/1 SHAHZADA BAGH Issue consent to 2009 ENGINEERING INDUSTRIAL AREA operate without WORKS printing. 59 32315 04-01- INTERNATIONA C-174, PHASE-II MAYAPURI Issue consent to 2010 L COIL LIMITED INDUSTRIAL AREA operate. 60 32331 04-01- KAMAL WH-104, PHASE-I MAYAPURI Issue Consent to 2010 PACKERS INDUSTRIAL AREA Operate without printing with the suggestion to install fire safety equipments.

61 32356 06-01- MACRO B-35/3 GTK ROAD Issue consent to 2010 SCIENTIFIC INDUSTRIAL AREA operate without WORKS PVT. buffing, printing LTD & painting. 62 32379 11-01- SAI COLOUR C-188, IST FLOOR NARAINA Inspection be 2010 SCAN INDUSTRIAL AREA conducted to PH-I ascertain the outsourcing of the developing process. 63 32463 18-01- A & K 59, DSIDC WAZIRPUR Issue consent to 2010 INDUSTRIES INDUSTRIAL AREA operate. 64 32472 18-01- PRAKASH 227, DSIDC OKHLA Ask the unit to 2010 PACKING COMPLEX, INDUSTRIAL AREA apply for INDUSTRIES PHASE-I consent to establish within 30 days, failing which, CTO application will be refused. 65 32507 20-01- SANT LAL A-136 WAZIRPUR Issue consent to 2010 INDUSTRIAL AREA operate without buffing. 66 32508 20-01- SANDEEP JAIN A-136 WAZIRPUR Issue consent to 2010 (BASEMENT) INDUSTRIAL AREA operate without buffing. 67 32509 20-01- RATTAN GUPTA A-136 WAZIRPUR Issue consent to 2010 INDUSTRIAL AREA operate. 68 32510 20-01- SINGHAL A-136 WAZIRPUR Issue consent to 2010 INDUSTRIES (BASEMENT) INDUSTRIAL AREA operate. 69 32513 21-01- FAB PLOT NO 11, BAWANA Issue consent to 2010 FURNISHERS POCKET-E, INDUSTRIAL AREA operate. SECTOR-5, DSIDC Sl. ID No appl_dt firm_name firm_address area_name Decision on No 01.02.2010 1 12524 28-01- AUTO DOCTORS A-262, PHASE- OKHLA INDUSTRIAL Consent refused 2005 I AREA and issue SCN for closure. 2 12709 21-02- DYNATECH T-4/70, PHASE- MANGOL PURI Issue SCN for 2005 CONTROLS PVT. LTD I INDUSTRIAL AREA refusal of consent.

3 13009 16-03- COMMUNICATION 33-A, NC-NW Issue reminder to 2005 ELECTRONIC FLATTED DDA. FACTORY DSIDC COMPLEX, SULTANPURI 4 13866 03-05- R.K. KHULLAR & C-203, PHASE- NARAINA Issue SCN for 2005 COMPANY I INDUSTRIAL AREA refusal of consent. PH-I 5 14604 21-06- AGNI INSTRUMENTS C-13, DSIDC TILAK NAGAR Issue reminder to 2005 INDUSTRIAL AREA DDA. 6 15874 02-08- WINGS H-18 UDYOG NAGAR Issue renewal of 2005 PHARMACEUTICALS INDUSTRIAL AREA consent. Decision PVT. LTD. regarding issuance of SCN to M/s Kamros be implemented. 7 19552 12-10- MANGLA EXPORTS 10, PRINTING NC-NW Inspection be 2006 PRIVATE LIMITED PRESS conducted. Send COMPLEX, letter at residential WAZIRPUR address. 8 20640 12-02- ABINITIO OVERSEAS F-10 UDYOG NAGAR Issue SCN for 2007 INC INDUSTRIAL AREA refusal of consent. 9 21088 19-04- SHARMA ATTA M-114, NC-SW Issue SCN for 2007 CHAKKI GANDHI refusal of consent. BAZAR, HARI NAGAR, CLOCK TOWER

10 21321 14-05- KALPANA C-40, PHASE-II OKHLA INDUSTRIAL Issue reminder and 2007 GARMENTS AREA put up in next CMC. 11 21323 14-05- MAHESH DAYAL C-42, PHASE-II OKHLA INDUSTRIAL Issue reminder and 2007 AREA put up in next CMC. 12 21580 30-05- VARUN UDYOG 36 SSI INDUSTRIAL Inspection be 2007 AREA expeidted 13 21703 06-06- SUBHASH B-70/13, DSIDC LAWRENCE ROAD Issue renewal of 2007 PACKAGING SHED INDUSTRIAL AREA consent. INDUSTRIES 14 21757 11-06- MADAN BINDING A-31/1, MAYAPURI Issue SCN for 2007 HOUSE PHASE-I INDUSTRIAL AREA refusal of consent. 15 21847 15-06- SHAKTI TOOLS & B-3, PHASE-II MANGOL PURI Issue SCN for 2007 PRODUCTS INDUSTRIAL AREA refusal of consent. 16 21878 18-06- SONY INDIA PVT. A-31, MOHAN CO- Since it has been 2007 LTD MATHURA OPERATIVE found that e-waste ROAD INDUSTRIAL AREA is not generated through the process in the form of residues. Hence, earlier decision dated 04.08.2009 reviewed and accordingly, renewal of consent and consent to establish be granted with the condition that e-waste will be sent to authorized recycler. 17 21893 19-06- ISG SOFTWARE P. C-7 FLATTED FACTORY Issue renewal of 2007 LTD COMPLEX, consent. JHANDEWALAN 18 21966 22-06- GAGAN DEEP STEEL C-54 WAZIRPUR Inspection be 2007 INDUSTRIAL AREA expeidted 19 22071 28-06- PAUL EXPO D-64 FLATTED FACTORY Consent application 2007 CREATORS COMPLEX, be made JHANDEWALAN infructuous as unit is not existing. Issue letter to M/s Om Sidivinayak Garment to apply for consent to operate immedilatey. 20 22078 29-06- THE NATIONAL B-49, PHASE-I MAYAPURI Consent refused. 2007 SCIENTIFIC INDUSTRIAL AREA Subsequently, INSTRUMENTS CO inspection be conducted. 21 22118 03-07- KHANDELWAL B-2684, DSIDC NARELA Inspection be 2007 INDUSTRIES INDUSTRIAL AREA expeidted 22 22142 03-07- SUBHASH CHAND 62 SSI INDUSTRIAL Inspection be 2007 JAIN AREA expedited as per decision taken in CTE application. 23 22177 04-07- PYARA SINGH PLOT NO. SHAHZADA BAGH Issue renewal of 2007 307/1/153 INDUSTRIAL AREA consent. 24 22387 13-07- EFFECTRON A-68, DDA OKHLA INDUSTRIAL Ask the unit to 2007 LUMINEX LTD SHED, PHASE- AREA confirm its reply on II an affidavit. 25 22498 18-07- SAMIT PRODUCTS E-64 FLATTED FACTORY Issue renewal of 2007 COMPLEX, consent without trade JHANDEWALAN effluent discharge. 26 22516 18-07- AVON STEEL B-24/2, PHASE- OKHLA INDUSTRIAL Issue SCN for 2007 INDUSTRIES (INDIA) II AREA refusal of consent. 27 22544 19-07- PARASNATH B-36/5 GTK ROAD Issue SCN for 2007 ELECTRONICS P. INDUSTRIAL AREA refusal of consent. LTD 28 22561 19-07- ASHU METAL SHED NO-14, WAZIRPUR Issue SCN for 2007 INDUSTRIES DSIDC INDUSTRIAL AREA refusal of consent and also ask the unit to confirm its reply on an affidavit. 29 22562 19-07- KAILASH HOSIERY A-28 WAZIRPUR Issue reminder to 2007 COMPANY INDUSTRIAL AREA submit an affidavit.

30 22611 20-07- AMIT EXPORTS D-2, DSIDC KIRTI NAGAR Issue reminder to 2007 COMPLEX INDUSTRIAL AREA DDA. 31 22636 20-07- POWER WELD 13-DSIDC WAZIRPUR Issue renewal of 2007 SYSTEM INDUSTRIAL INDUSTRIAL AREA consent. COMPLEX 32 22642 23-07- METROPOL 262, PHASE-III OKHLA INDUSTRIAL Issue renewal of 2007 ELECTRONICS PVT. ESTATE consent. LTD 33 22663 23-07- IJS ELECTRONICS W-25, PH-II OKHLA INDUSTRIAL Issue renewal of 2007 AREA consent. 34 22669 24-07- ROOTS OVERSEAS A-36/2, IIND MAYAPURI Suitable 2007 PVT. LTD FLOOR, INDUSTRIAL AREA clarification be sent PHASE-I to apply for consent to establish. 35 22670 24-07- KNITKIT GLOBAL A-36/2, IST MAYAPURI Suitable 2007 FLOOR, INDUSTRIAL AREA clarification be sent PHASE-I to apply for consent to establish. 36 22680 24-07- KAMAL METAL PLOT NO A- WAZIRPUR Issue SCN for 2007 INDUSTRIES 133, GROUP INDUSTRIAL AREA refusal of consent. 37 22687 24-07- VIKRAM OVERSEAS E-44/3, PHASE- OKHLA INDUSTRIAL Enquiry Counter be 2007 LTD II AREA informed to correct its record for deletion from the list. 38 22690 24-07- PATAL CHILDREN D-19/2, OKHLA INDUSTRIAL Issue renewal of 2007 WEAR PHASE-II AREA consent.

39 22719 24-07- SUMISON A-62, DSIDC MANGOL PURI Issue SCN for 2007 ENGINEERS SHEDS, INDUSTRIAL AREA refusal of consent. PHASE-I 40 22766 25-07- INTERCONTINENTA D-63, PHASE -I OKHLA INDUSTRIAL Consent be made 2007 L MERCHANDISE AREA infructuous in view of findings of inspection. 41 22769 25-07- SUPREME HOSIERY 109, PHASE-II BADLI INDUSTRIAL Inspection be 2007 FACTORY ESTATE expedited.

42 22798 25-07- MEGA TECHNOBIZ S-37, PHASE-II OKHLA INDUSTRIAL Issue renewal of 2007 CONSULTANTS P. AREA consent with the LTD condition to send the e-waste to authorized recycler. 43 22844 27-07- PRATAP METAL PLOT NO. A- WAZIRPUR Issue final 2007 INDUSTRIES 136 INDUSTRIAL AREA reminder. 44 22890 30-07- SEWA EXPORTS K-61 UDYOG NAGAR Issue SCN for 2007 INDUSTRIAL AREA refusal of consent. 45 22904 30-07- NATIONAL B-110, DDA OKHLA INDUSTRIAL Issue SCN for 2007 STORAGE SYSTEM SHED, PHASE- AREA refusal of consent. I 46 22948 31-07- VEERA PLOT NO 86, PATPARGANJ Issue final 2007 FRAGRANCES PVT. FIE INDUSTRIAL AREA reminder. LTD 47 22967 01-08- EAGLEMAN 3/19 KIRTI NAGAR Consent refused. 2007 ENTERPRISES INDUSTRIAL AREA Subsequently, inspection be conducted. 48 22988 02-08- SMS EXPORTS C-174, PHASE- OKHLA INDUSTRIAL Issue SCN for 2007 I AREA closure. 49 23014 06-08- AMRIK CW, 151, NC-NW Seek clarification 2007 ENGINEERING SANJAY from Industries WORKS GANDHI Deptt. TRANSPORT NAGAR 50 23037 08-08- SEA BIRD 282, PATPARGANJ Expedite the earlier 2007 REFRIGERATION INDUSTRIAL AREA CMC(Green) PVT. LTD decision. 51 23166 20-08- CONTINENTAL B-154, DDA OKHLA INDUSTRIAL Issue renewal of 2007 CROWNS & SHEDS, AREA consent. CLOSURES PHASE-I 52 23292 27-08- BANSAL STEEL A-74 WAZIRPUR Consent refused. 2007 WORKS INDUSTRIAL AREA Subsequently, inspection be conducted. 53 23334 30-08- ELECTRO-THERM D-1 FLATTED FACTORY Consent be made 2007 ENGINEERS COMPLEX, infructuous as unit JHANDEWALAN found locked during inspection. 54 23361 31-08- GARG STEEL BT-1/92, MANGOL PURI Expedite the earlier 2007 PHASE-I INDUSTRIAL AREA CMC(Green) decision. 55 23606 24-09- PREMIER 63 NAJAFGARH ROAD Issue SCN for 2007 CORPORATION INDUSTRIAL AREA refusal of consent in view of findings of inspection. 56 23607 24-09- QUALITRONICS B-1, E-25, MOHAN CO- Issue renewal of 2007 (GROUND OPERATIVE consent with the FLOOR) INDUSTRIAL AREA condition to send the e-waste to authorized recycler. 57 23760 04-10- MOBEL KRAFT C-166, PHASE- OKHLA INDUSTRIAL Issue renewal of 2007 I AREA consent. 58 23776 05-10- SONA ENTERPRISES B-55, PHASE-II NARAINA Decision of 2007 INDUSTRIAL AREA CMC(Green) dated PH-II 27.11.2009 reviewed. Consent refused. 59 23800 08-10- ANALCO INDIA PVT. B-I/F-6 MOHAN CO- Consent refused. 2007 LTD OPERATIVE Subsequently, INDUSTRIAL AREA inspection be conducted. 60 23804 08-10- SNEH EXPORTS A-32/B-1, MOHAN CO- Consent to 2007 MATHURA OPERATIVE establish be ROAD INDUSTRIAL AREA revoked and consent to operate (renewal) application be made infructuous and link the file with orange application. 61 24073 31-10- MODERN KNIT B-192, PHASE- NARAINA Issue final 2007 WORKS I INDUSTRIAL AREA reminder. PH-I 62 24307 23-11- JUNEJA ASSOCIATES 23, DSIDC, OKHLA INDUSTRIAL Issue renewal of 2007 PVT. LTD PHASE-II, AREA consent. SCHEME-II 63 24355 28-11- MAYUR AIR B-49, PHASE-I OKHLA INDUSTRIAL Put up in next 2007 PRODUCTS PVT. LTD AREA CMC.

64 24356 28-11- P.K. ENTERPRISES SHED NO-99 WAZIRPUR Implement decision 2007 INDUSTRIAL AREA taken on file. 65 24694 07-01- RAJ LAKSHMI A-12 WAZIRPUR Expedite the earlier 2008 KNITTING CO INDUSTRIAL AREA CMC(Green) decision. 66 24920 12-02- SCORPIOS B-126, PHASE- OKHLA INDUSTRIAL Issue renewal of 2008 APPARELS PVT. LTD I AREA consent without washing, dyeing & bleaching. 67 25038 27-02- V.S. TRADING PLOT NO 59 RAJASTHAN UDYOG Put up in next 2008 CORPORATION NAGAR INDUSTRIAL CMC. (INDIA) AREA 68 25393 03-04- SWIFT S-22, PHASE-II OKHLA INDUSTRIAL Ask the unit to 2008 ELECTRONIKS ESTATE apply for Consent to Establish. 69 25449 10-04- EDUCATIONAL A-110 WAZIRPUR Implement the 2008 PRODUCTS (I) INDUSTRIAL AREA earlier decision dated 17.11.2009 for making the application infructuous. 70 26073 16-06- APEX TRADERS 25 SSI INDUSTRIAL Inspection be 2008 AREA conducted. 71 27361 17-09- AFFLATUS D- OKHLA INDUSTRIAL Issue renewal of 2008 INTERNATIONAL 19/4&5,PHASE- AREA consent without II washing, dyeing & bleaching. 72 27494 23-09- HINDUSTAN C-12/2, WAZIRPUR Issue renewal of 2008 MECHANICAL GROUND INDUSTRIAL AREA consent. WORKS FLOOR 73 27664 03-10- CHAMPION CIBEE & B-92 GTK ROAD Inspection be 2008 CO. INDUSTRIAL AREA conducted. 74 29105 24-02- AUTO WIRES B-2/24, DSIDC, JHILMIL Consent refused. 2009 FLATTED INDUSTRIAL AREA Subsequently, FACTORY inspection be COMPLEX conducted. 75 29216 12-03- KRISHNA METAL PLOT NO FRIENDS COLONY Issue SCN for refusal 2009 INDSUTRY 340/20-A, GALI INDUSTRIAL AREA of consent and SCN NO 1B for closure as decided w.r.t. CTE application. Case of M/s Keshave Enterprises be put up before CMC(Orange). 76 29405 31-03- R.S. INDUSTRIES B-56, PHASE-II MAYAPURI Issue renewal of 2009 INDUSTRIAL AREA consent. 77 29457 08-04- NOVO ELECTROMEK B-46/1, GROUP WAZIRPUR Consent refused. 2009 INDUSTRIAL AREA Subsequently, inspection be conducted. 78 29563 17-04- DASHMESH 26, CSC, DDA NC-E Inspection be 2009 AUTOMOBILES SHOPPING conducted to CENTRE, confirm the number SWASTHYA of workers and VIHAR confirmation of affidavit submitted. 79 29721 30-04- RISHABH HOUSE F-3/9, PHASE-I OKHLA INDUSTRIAL Issue renewal of 2009 PVT. LTD. AREA consent. 80 29879 12-05- HANUMAN HOSIERY A-16/1 WAZIRPUR Issue final 2009 MILLS INDUSTRIAL AREA reminder. 81 29896 13-05- GENERAL H-1260, DSIDC NARELA Implement the 2009 EQUIPMENT INDUSTRIAL AREA earlier CMC COMPANY decision dated 27.11.2009 82 30040 25-05- KARONA B-36/5 GTK ROAD Inspection be 2009 CHEMICALS INDUSTRIAL AREA conducted. 83 30081 27-05- MONARCH 62, PHASE-II OKHLA INDUSTRIAL Issue SCN for 2009 SURGICAL AREA refusal and SCN INDUSTRIES for closure based on the findings of inspection. 84 30174 03-06- INTERNATIONAL S-96, PHASE-I BADLI INDUSTRIAL Issue SCN for 2009 CORPORATION ESTATE refusal of consent. 85 30285 12-06- NARULA MFG. CO. C-180, PHASE- MAYAPURI Letter be sent at 2009 II INDUSTRIAL AREA residential address also. 86 30453 24-06- BUDH SINGH & SONS D-23 SMA INDUSTRIAL Reinspection be 2009 AREA conducted. Issue reminder for submission of Bank Guarantee. 87 30491 26-06- BALI & CO. C-91 WAZIRPUR Issue renewal of 2009 INDUSTRIAL AREA consent. 88 30550 02-07- ARYA HOSIERY A-8/1 WAZIRPUR Inspection be 2009 FACTORY INDUSTRIAL AREA expedited. 89 30604 07-07- EAR HELP INDIA 2/63, LALITA NC-E Inspection be 2009 PARK, LAXMI conducted to verify NAGAR the facts of the affidavit submitted by the unit alongwith its reply. 90 30661 10-07- MANOHAR B-59 GTK ROAD Decision taken 2009 FILAMENTS PVT. INDUSTRIAL AREA w.r.t. CTE be LTD. implemented. 91 30794 21-07- M.V.D. AUTO C-45, PHASE-I OKHLA INDUSTRIAL Issue renewal of 2009 COMPONENTS PVT. AREA consent. LTD. 92 30851 24-07- NEW LOYDS B-15, DSIDC KIRTI NAGAR Issue reminder to 2009 SURGICO PACKAGING INDUSTRIAL AREA DDA. COMPLEX 93 30857 24-07- G.M. ENTERPRISES A-11, PHASE-II MAYAPURI Issue renewal of 2009 INDUSTRIAL AREA consent. 94 30870 24-07- HARYANA GENERAL 76 RAJASTHAN UDYOG Issue renewal of 2009 STATIONERS PVT. NAGAR INDUSTRIAL consent without LTD. AREA printing.

95 30922 29-07- J B TRADERS A-12, FFC OKHLA INDUSTRIAL Issue renewal of 2009 ESTATE consent. 96 31098 13-08- CALIBRATION PLOT NO. 20, FRIENDS COLONY Issue final 2009 SOLUTIONS GALI NO. 3 INDUSTRIAL AREA reminder. 97 31099 13-08- SUSHILS PLOT NO. 19, FRIENDS COLONY Issue final 2009 INSTRUMENT GALI NO. 3 INDUSTRIAL AREA reminder. SERVICE 98 31117 18-08- RAMTECH ENERGY D-7/3, PHASE- OKHLA INDUSTRIAL Issue renewal of 2009 SYSTEMS II AREA consent. 99 31133 18-08- AJS INDUSTRIES B-97, PHASE-I MAYAPURI Issue renewal of 2009 INDUSTRIAL AREA consent. 100 31186 24-08- BAL KISHAN SHOP NO. 18, NC-NW Issue renewal of 2009 MITTAL ATTA CSC4, DDA consent. CHAKKI MARKET, SECTOR-5, ROHINI 101 31192 24-08- MATHAROO ENGG. B-57 GTK ROAD Issue final 2009 WORKS INDUSTRIAL AREA reminder. 102 31199 24-08- PRIME ENTERPRISES A-103/10 WAZIRPUR Issue renewal of 2009 INDUSTRIAL AREA consent and consent to establish without buffing 103 31215 25-08- VINAYAK A-114/2 WAZIRPUR Issue renewal of 2009 INTERNATIONAL INDUSTRIAL AREA consent and consent to establish without buffing 104 31218 26-08- ANANT RAM ATTA SHOP NO S- NC-NW Issue renewal of 2009 CHAKKI 1/17, E BLOCK, consent. DDA MARKET, PARSHANT VIHAR 105 31222 26-08- JYOTI ENGINEERING 308/4A SHAHZADA BAGH Inspection be 2009 WORKS INDUSTRIAL AREA conducted to know the pollution potential. 106 31236 27-08- RELIABLE C-112, FFC OKHLA INDUSTRIAL Issue renewal of 2009 ENTERPRISES AREA consent. 107 31241 27-08- DIMPLE CREATION B-35, PHASE-I OKHLA INDUSTRIAL Issue SCN for 2009 (P) LTD. AREA refusal and SCN for closure based on the findings of inspection. 108 31257 28-08- EXPERT MATHAROO B-80 GTK ROAD Issue final 2009 ENGG. WORKS INDUSTRIAL AREA reminder.

109 31286 01-09- A K PRECISION C-36, DDA OKHLA INDUSTRIAL Issue renewal of 2009 INDUSTRIES SHEDS, AREA consent. PHASE-I 110 31357 07-09- INDO TECH B-61, PHASE-I MAYAPURI Issue final 2009 MAGNETICS INDUSTRIAL AREA reminder. 111 31368 07-09- CHORARIA 533, FIE PATPARGANJ Inspection be 2009 INDUSTRIES PVT. INDUSTRIAL AREA conducted to LTD. ascertain the mfg. process. 112 31532 23-09- BHAGWATI C-18, PHASE-I OKHLA INDUSTRIAL Implement the 2009 CONSTRUCTIONS AREA decision taken in AND ENGINEERS CTE application. PVT. LTD.

113 31539 23-09- VIKRAM OVERSEAS E-44/3, PHASE- OKHLA INDUSTRIAL Issue renewal of 2009 LTD. II AREA consent. 114 31540 24-09- AHUJA RADIOS 215, OKHLA INDUSTRIAL Issue renewal of 2009 ESTATE consent with the condition to send the e-waste to authorized recycler. 115 31575 29-09- LUMAX INDUSTRIES -85, 86, MAYAPURI Issue final 2009 LIMITED PHASE-I INDUSTRIAL AREA reminder.

116 31583 30-09- AGGARWAL METAL C-129, PHASE- MAYAPURI Issue final 2009 CONTAINERS II INDUSTRIAL AREA reminder.

117 31612 05-10- ADVANCED 40, DSIDC OKHLA INDUSTRIAL Ask the unit to 2009 ELECTRONIC SHEDS, AREA apply for Consent SYSTEM PHASE-I to Establish. 118 31648 08-10- HAPPY SOUND 247 OKHLA INDUSTRIAL Issue renewal of 2009 INDUSTRIES ESTATE consent with the condition to send the e-waste to authorized recycler. 119 31650 08-10- HAPPY SOUND 232-A OKHLA INDUSTRIAL Issue renewal of 2009 INDUSTRIES ESTATE consent with the condition to send the e-waste to authorized recycler. 120 31658 09-10- RAJDEEP E-49/2, PHASE- OKHLA INDUSTRIAL Issue renewal of 2009 INDUSTRIES II AREA consent. 121 31662 09-10- ACOS ELECTRONICS 81-F, PHASE- OKHLA INDUSTRIAL Issue renewal of 2009 III ESTATE consent. 122 31668 09-10- METRO ENGINEERS 15 TILAK NAGAR Issue final 2009 INDUSTRIAL AREA reminder. 123 31677 12-10- N.D. BROTHERS B-26 GTK ROAD Issue renewal of 2009 INDUSTRIAL AREA consent without trade effluent discharge. 124 31694 14-10- RAJ KUMAR GUPTA A-8/1, WAZIRPUR Issue final 2009 INDUSTRIAL AREA reminder. 125 31755 28-10- GAUBA INDUSTRIES B-35/1, GTK ROAD Issue renewal of 2009 INDUSTRIAL AREA consent and consent to establish. 126 31773 30-10- HIMALAYA T-2, PHASE-II OKHLA INDUSTRIAL Ask the unit to 2009 OVERSEAS AREA remove the washing activity and inform the name and address of the units from where washing is done and the same be confirmed on an affidavit. . Issue final reminder for CTE. 127 31805 05-11- ALTEK DEVICES F-95, PHASE- OKHLA INDUSTRIAL Since, it is already 2009 PVT. LTD. III ESTATE having CTO(R). Hence, issue renewal of consent without seeking consent to establish.. 128 31842 10-11- AJAY ELECTRICAL B-257 NARAINA Issue renewal of 2009 INDUSTRIES INDUSTRIAL AREA consent with the PH-I condition to send the e-waste to authorized recycler. 129 31857 11-11- V.S. B-98 NARAINA Issue final 2009 INTERNATIONAL INDUSTRIAL AREA reminder. PH-I 130 31881 12-11- ANAND DIARIES A-22 NARAINA Issue final 2009 PVT. LTD. INDUSTRIAL AREA reminder. PH-I 131 31912 16-11- SHRI SHUB LAXMI 74 RAJASTHAN UDYOG Issue final 2009 ENTERPRISES NAGAR INDUSTRIAL reminder. AREA 132 31958 20-11- GAME LAND E-133, PHASE- OKHLA INDUSTRIAL Since, as per the 2009 INDUSTRIES III ESTATE record unit is having CTO(R). Issue renewal of consent without seeking consent to establish. 133 31971 23-11- GUPTA LAMINATION PLOT NO 260, BAWANA Issue renewal of 2009 (INDIA) POCKET-C, INDUSTRIAL AREA consent. SECTOR-3, DSIDC 134 31972 23-11- R.K. UDYOG PLOT NO 13, BAWANA Ask the unit to 2009 POCKET-A, INDUSTRIAL AREA apply for Consent SECTOR-4, to Establish. DSIDC 135 31980 23-11- CAPITAL FOAM B-7, PHASE-I BADLI INDUSTRIAL Ask the unit to 2009 INDUSTRIES PVT. ESTATE apply for Consent LTD. to Establish. 136 31985 24-11- KUSUM S-16, PHASE-II OKHLA INDUSTRIAL Ask the unit to 2009 ENTERPRISES PVT. AREA apply for Consent LTD. to Establish. 137 32027 27-11- M.B. ENTERPRISES PLOT NO 5, PATPARGANJ Ask the unit to 2009 FIE INDUSTRIAL AREA apply for Consent to Establish. 138 32046 30-11- CRANE CONTROL A-90,, DDA OKHLA INDUSTRIAL Ask the unit to 2009 EQUIPMENTS SHED, PHASE- AREA apply for Consent II to Establish. 139 32066 02-12- SAJJANSON 123, FIE PATPARGANJ Issue renewal of 2009 ENGINEERS (PROP. INDUSTRIAL AREA consent. AVTAR SINGH)

140 32079 04-12- PREMIER TOOLS 59, PHASE-III OKHLA INDUSTRIAL Since, as per the 2009 ESTATE record unit is having CTO(R). Issue renewal of consent without seeking consent to establish. 141 32093 07-12- DELHI PLASTIC B-23/1, PHASE- OKHLA INDUSTRIAL Issue renewal of 2009 INDUSTRIES II AREA consent without washing, dyeing & bleaching. 142 32133 10-12- EASTERN ARTS PVT. C-68/2, PHASE- OKHLA INDUSTRIAL Issue renewal of 2009 LTD. II AREA consent without washing, dyeing & bleaching. 143 32143 10-12- ELTEK SHED NO 15, OKHLA INDUSTRIAL Since, as per the 2009 PERIPHERALS PVT. PHASE-IV ESTATE record unit is LTD. having CTO(R). Issue renewal of consent without seeking consent to establish. 144 32163 14-12- INDIAN 7/15 KIRTI NAGAR Issue renewal of 2009 REFRIGERATION INDUSTRIAL AREA consent. INDUSTRIES 145 32164 14-12- FREEZEKING 7/17 KIRTI NAGAR Inspection be 2009 INDUSTRIES INDUSTRIAL AREA conducted. 146 32188 16-12- BHAGWATI AUTO 69/6A/13 NAJAFGARH ROAD Ask the unit to 2009 INDUSTRIES INDUSTRIAL AREA apply for Consent to Establish. 147 32206 17-12- KUMAR TRADERS 66, FIE PATPARGANJ Issue renewal of 2009 INDUSTRIAL AREA consent. Subsequently, inspection be conducted. 148 32210 17-12- PARVEEN TOBACCO A-60 GTK ROAD Issue renewal of 2009 CO P. LTD INDUSTRIAL AREA consent.

149 32212 17-12- POLY QUAL (INDIA) A-210, PHASE- OKHLA INDUSTRIAL Inspection be 2009 PVT. LTD I AREA conducted to know the pollution potential. 150 32236 22-12- POWER CONTROL B-78 NARAINA Issue renewal of 2009 SYSTEMS INDUSTRIAL AREA consent. PH-II 151 32239 22-12- PRODUCTIVE FLAT NO C-56 FLATTED FACTORY Ask the unit to 2009 TECHNOLOGIES COMPLEX, apply for Consent PVT. LTD JHANDEWALAN to Establish. 152 32271 29-12- R.K. ENGINEERING 93, DSIDC OKHLA INDUSTRIAL Ask the unit to 2009 WORKS SHED AREA apply for Consent SCHEME-I, to Establish. PHASE-II

153 32277 29-12- S.N. TRICYCLE PLOT NO 300, PATPARGANJ Ask the unit to 2009 INDUSTRIES FIE INDUSTRIAL AREA apply for Consent to Establish. 154 32298 01-01- JYOTI ENGINEERING C-160 NARAINA Issue renewal of 2010 INDUSTRIES INDUSTRIAL AREA consent. PH-I 155 32363 07-01- BOMRAH 5/5 KIRTI NAGAR Issue renewal of 2010 INDUSTRIES INDUSTRIAL AREA consent. 156 32375 08-01- ARB BEARING LTD H-22 UDYOG NAGAR Issue renewal of 2010 INDUSTRIAL AREA consent. 157 32377 08-01- SHEELA OVERSEAS A-42, PHASE-II MAYAPURI Issue renewal of 2010 P. LTD INDUSTRIAL AREA consent.

158 32384 11-01- ELNOVA PRIVATE B-289, PHASE- OKHLA INDUSTRIAL Issue renewal of 2010 LIMITED I AREA consent with the condition to send the e-waste to authorized recycler. 159 32385 11-01- B.P. INDUSTRIES B-103 GTK ROAD Issue renewal of 2010 INDUSTRIAL AREA consent without plating & painting. 160 32399 12-01- DINESH JAIN A-95/3 WAZIRPUR Ask the unit to 2010 INDUSTRIAL AREA apply for Consent to Establish. 161 32400 12-01- ASHOK KUMAR JAIN A-95/3 WAZIRPUR Ask the unit to 2010 INDUSTRIAL AREA apply for Consent to Establish. 162 32427 13-01- CHIME E-17, SECTOR- BAWANA Inspection be 2010 ELECTRONICS 3, DSIDC INDUSTRIAL AREA conducted to know the pollution potential. 163 32431 14-01- THEETA J-11 UDYOG NAGAR Issue renewal of 2010 INDUSTRIAL INDUSTRIAL AREA consent. HEATING EQUIPMENTS (P) LTD. 164 32434 14-01- ALLIED J-9 UDYOG NAGAR Issue renewal of 2010 ELECTROPLATING INDUSTRIAL AREA consent. WORKS 165 32440 15-01- SERVO 83-84, DSIDC, OKHLA INDUSTRIAL Inspection be 2010 ELECTRONICS PVT. PHASE-II AREA conducted for e- LTD. waste. 166 32462 18-01- SWASTIKA 63/26 NAJAFGARH ROAD Ask the unit to 2010 INDUSTRIES INDUSTRIAL AREA apply for Consent to Establish. 167 32466 18-01- POPULAR HOSIERY F-6 UDYOG NAGAR Issue renewal of 2010 MILLS INDUSTRIAL AREA consent without washing, dyeing & bleaching. 168 32473 18-01- ABHINAV H-3 UDYOG NAGAR Issue renewal of 2010 INDUSTRIES INDUSTRIAL AREA consent without washing, dyeing & bleaching. 169 32497 20-01- ALOK INDUSTRIES A-14A, PHASE- MAYAPURI Issue renewal of 2010 I INDUSTRIAL AREA consent. 170 32502 20-01- I.B.M. ENTERPRISES 30, DSIDC WAZIRPUR Issue renewal of 2010 COMPLEX INDUSTRIAL AREA consent. 171 32523 22-01- JAY PEE C-128 NARAINA Issue renewal of 2010 ENTERPRISES INDUSTRIAL AREA consent. PH-I 172 32533 22-01- KRISHNA DYEING C-44/4, PHASE- OKHLA INDUSTRIAL Inspection be 2010 FACTORY II AREA conducted to know the pollution potential. 173 32534 22-01- SIMRAN EXPORT INC B-269, PHASE- MANGOL PURI Put up in next 2010 I INDUSTRIAL AREA CMC. 174 32545 25-01- RIAN ENGINEERS 6/5B KIRTI NAGAR Issue renewal of 2010 INDUSTRIAL AREA consent. 175 32550 25-01- TECHNOMAC INDIA 115, DSIDC, OKHLA INDUSTRIAL Ask the unit to 2010 PVT. LTD. PHASE-I AREA apply for Consent to Establish under Orange category in view of mfg process.