Right of Way Access Rules
Total Page:16
File Type:pdf, Size:1020Kb

SOP # Regional Transportation District Commuter Railroad RTDC-TR-AC-01 Use of Facilities Policy - Third Party and Public Access
RTD/DTO Commuter Rail Right of Way Access Request / Permit Complete all fields that are in Blue (and have asterisks)
*Company Representing: *Person Submitting Request: *CRT Safety Training certification expires: *Contact Person: *Email: *Contact Information: *Phone: *Fax: Dates of Access: (Not to exceed 30 days) *Requested From: *To: Time Period (military) time)*Requested From: *To: *Description of Work: *Location: *Equipment On Site:
Right of Way Access Rules: 1. Access permit requests will be reviewed and granted upon completion of CRT Safety Training.
2. Contractor must have Denver Transit Operators (DTO) qualified employees-in-charge on-site at each work location.
3. A copy of this completed access permit must accompany the work crew on each work site.
4. All personnel must wear required personal protective equipment (PPE) at all times.
5. Contractor must notify their assigned RWIC prior to entering and when clear of any job site.
6. All active tracks must be 100% useable at all hours by the Commuter Rail trains. All rail flangeways and work areas must be cleared of debris prior to leaving the work area. Trains cannot be delayed.
7. When equipment or tools are used within the Right-of-Way that may impact safety or train operation, the Contractor must have an RTD RWIC to protect and expedite train movement. RWIC rates: Mon – Fri 7:00am – 5:00pm, $100.00/hr (8-hour minimum); Off- shift, Weekends and Holidays - $120.00/hr. (8-hour minimum)
8. The overhead catenary (25,000 volts ac (nominal)) is to be considered Live and Hot at all times. If de-energization is requested, Contractor must confirm with DTO Traction Power personnel prior to entry.
Please email to [email protected]
Requestor Confirmation and Agreement *By checking this box, I acknowledge full understanding of RTD/DTO Access Permit rules and procedures and certify that RTDC on- track and electrical safety training has been completed and is current.
*Requestor: Type Name Here *Date FAILURE TO COMPLY WITH ACCESS PERMIT RULES WILL RESULT IN PERMIT REVOCATION THE SECTION BELOW IS FOR RTD/DTO USE ONLY Approved Dates of Access: From: To: Approved Time Period (military time): From: To: Approved Limits of Access: Inbound: To: Outbound: To: De-energize Overhead Power Required: Yes No Additional cost apply if yes box is checked. Operating Restrictions:
Issue Date: 08/24/2015 Revision 1 Page 1 of 2 Commercial in Confidence SOP # Regional Transportation District Commuter Railroad RTDC-TR-AC-01 Use of Facilities Policy - Third Party and Public Access
DTO – Safety Manager Permit Number DTO – General Manager RTD – Senior Manager, Commuter Rail
Issue Date: 08/24/2015 Revision 1 Page 2 of 2 Commercial in Confidence