
<p> SOP # Regional Transportation District Commuter Railroad RTDC-TR-AC-01 Use of Facilities Policy - Third Party and Public Access</p><p>RTD/DTO Commuter Rail Right of Way Access Request / Permit Complete all fields that are in Blue (and have asterisks)</p><p>*Company Representing: *Person Submitting Request: *CRT Safety Training certification expires: *Contact Person: *Email: *Contact Information: *Phone: *Fax: Dates of Access: (Not to exceed 30 days) *Requested From: *To: Time Period (military) time)*Requested From: *To: *Description of Work: *Location: *Equipment On Site: </p><p>Right of Way Access Rules: 1. Access permit requests will be reviewed and granted upon completion of CRT Safety Training.</p><p>2. Contractor must have Denver Transit Operators (DTO) qualified employees-in-charge on-site at each work location.</p><p>3. A copy of this completed access permit must accompany the work crew on each work site.</p><p>4. All personnel must wear required personal protective equipment (PPE) at all times.</p><p>5. Contractor must notify their assigned RWIC prior to entering and when clear of any job site.</p><p>6. All active tracks must be 100% useable at all hours by the Commuter Rail trains. All rail flangeways and work areas must be cleared of debris prior to leaving the work area. Trains cannot be delayed.</p><p>7. When equipment or tools are used within the Right-of-Way that may impact safety or train operation, the Contractor must have an RTD RWIC to protect and expedite train movement. RWIC rates: Mon – Fri 7:00am – 5:00pm, $100.00/hr (8-hour minimum); Off- shift, Weekends and Holidays - $120.00/hr. (8-hour minimum)</p><p>8. The overhead catenary (25,000 volts ac (nominal)) is to be considered Live and Hot at all times. If de-energization is requested, Contractor must confirm with DTO Traction Power personnel prior to entry. </p><p>Please email to [email protected]</p><p>Requestor Confirmation and Agreement *By checking this box, I acknowledge full understanding of RTD/DTO Access Permit rules and procedures and certify that RTDC on- track and electrical safety training has been completed and is current.</p><p>*Requestor: Type Name Here *Date FAILURE TO COMPLY WITH ACCESS PERMIT RULES WILL RESULT IN PERMIT REVOCATION THE SECTION BELOW IS FOR RTD/DTO USE ONLY Approved Dates of Access: From: To: Approved Time Period (military time): From: To: Approved Limits of Access: Inbound: To: Outbound: To: De-energize Overhead Power Required: Yes No Additional cost apply if yes box is checked. Operating Restrictions:</p><p>Issue Date: 08/24/2015 Revision 1 Page 1 of 2 Commercial in Confidence SOP # Regional Transportation District Commuter Railroad RTDC-TR-AC-01 Use of Facilities Policy - Third Party and Public Access</p><p>DTO – Safety Manager Permit Number DTO – General Manager RTD – Senior Manager, Commuter Rail</p><p>Issue Date: 08/24/2015 Revision 1 Page 2 of 2 Commercial in Confidence</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-