M U A D I B A D R U D I N Email : [email protected] Mobile : +62-81315767012

A PATHERNSHIP BETWEEN INDONESIAN EXECUTIVE AGENCY FOR UPSTREAM OIL AND GAS BUSSINESS ACTIVITIES (BPMIGAS) WITH CONOCOPHILLIPS (www.conocophillips.com)

OBJECTIVE:

To offer well developed Operations Specialist with abilities and base of experience in oil and gas operations and utility production, quality control management, Implementing and controlling of Company Health Safety and Environmental activities which has provide proven leadership of day to day operations of facilities and business performance continues improvement program, technical innovation to the entire oil & gas Industry to achieve world class facilities standards.

SUMMARY PROFILE:

. Exposure working experiences in oil and gas industry in A world class multinational companies and QATAR – Middle East companies environmental in Operations facilities

. Proven Technical and Operational skills in oil and gas industry for project management, commissioning and normal mode operations include TURN AROUND activities.

. Excellent communication skills both verbally and written, results oriented and proven ability to handle multi task, working with multi disciplines team/nationalities and manage a variety of works/services.

. Independent, hard worker, self-motivated, Strong Influence leadership skills, very strong computing system, dynamic and confident.

CONOCOPHILLIPS INDONESIA Mobile : +62-81315767012 Email: [email protected] M U A D I B A D R U D I N Email : [email protected] Mobile : +62-81315767012 EXPERIENCES:

CONOCOPHILLIPS INDONESIA (www.conocophillips.com)

PRODUCTION OPERATOR (November 2007 – present)

Achieved day to day operation of oil and gas process facilities to meet objectives quality and quantity that meets customer’s requirements at save and environmentally sound manner

. Performed pre-commissioning and commissioning, working closely with main contractor representative. . Joining Project Management Teams, to carry out punch list on piping and equipments after Mechanical Completion. . To be responsible for starting-up and shutting-down the platform facilities (Utilities, Wellheads, and Central Process) . Undertake the planning, preparation, and execution of equipment &/or system isolation as required for routine PPM and Corrective maintenance . Continuously or periodically monitor the work activities and progress to en- sure compliance with the PTW requirements and restrictions. . Ensure an accurate and complete handover to the next shift &/or operating team of the status of all ongoing works. . Undertake the final inspection at the completion of all works, ensuring the works have been completed satisfactory to the scope and PTW requirements; all tools, materials and debris removed; where applicable, determine that the equipment / system is deemed to be worthy of returning to service; and exe- cute the closure of the PTW, & work request. Alternate and backfill as required with the Senior Operator-Tech. . Provide technical knowledge and experience in diagnosing and resolving oper- ational problems, &/or identification of opportunities for improvement . Provide accurate and clear communications to operations and facilities team personnel to enable meeting of team targets and goals.

CONOCOPHILLIPS INDONESIA Mobile : +62-81315767012 Email: [email protected] M U A D I B A D R U D I N Email : [email protected] Mobile : +62-81315767012 . Feedback to the Senior Op-Tech, DCS Operator and Operations Supervisor any changes to production which affect work plans and schedules . Clear and accurate communication with the facilities support teams in the de- livery of support services to the operations and maintenance efforts. . Understand and have detailed knowledge of the company's Emergency Re- sponse Procedures. . Perform emergency response duties and tasks as defined in the company's Emergency Response Procedures Manual . Perform emergency response duties and tasks as a Fire team member. . Understand, monitor and intervene where necessary to ensure the safe, effi- cient and effective operation of the outside utility systems, wellhead, process, and safety systems and equipment, whilst avoiding unnecessary processing up- sets &/or equipment shutdowns. . Coordinate and monitor the routine utility, process sampling and analysis, en- suring the results are within the quality and environmental control parameters, and making adjustments as required to meet prescribed QAQC standards, whilst optimizing on the consumables usage wherever possible. . The routine inspection & monitoring of the process consumables and the orga- nization of replenishment(s) as required. . The routine starting /stopping of equipment &/or adjustments to the process & equipment as directed by the DCS Operator. . The identification and reporting of corrective maintenance requirements with- in the assigned operating area. . Routine well opening and shut-in, adjustments to the process & equipment as- sisting in the coordination of Wire line and well intervention activities. . Provide operational support on rig for drilling department during drilling/ work over operations. . Ensure work area is well maintained and carries out house keeping in area of responsibility. . Logging and record all running equipment parameters and report any abnormalities

CONOCOPHILLIPS INDONESIA Mobile : +62-81315767012 Email: [email protected] M U A D I B A D R U D I N Email : [email protected] Mobile : +62-81315767012 . To regularly patrol the area and ensure that equipment is performing in the designed, safe manner and that standby spare equipment are available for immediate use if required. . To be responsible for monitoring and ensuring the efficient operation of the equipment in designated area, handing over to the incoming shift in a systematic and orderly manner . To react to plant process/safety emergencies promptly and carry out actions as laid down in procedures.

QATAR PETROCHEMICAL COMPANY, Co. Ltd (QAPCO) (www.qapco.com)

OUTDOOR OPERATOR (January 2002 – 2007)

Achieved successful day-to-day operations of operations oil and gas /Petrochemical process facilities to meet objectives quality and quantity that meet customer’s requirements at safe and clean environmental sound manner.

. Starting-up and shutting-down the plant safely

. Logging and record all running equipment parameters and report any abnormalities

. To regularly patrol the area and ensure that equipment is performing in the designed, safe manner and that standby spare equipment are available for immediate use if required.

. To be responsible for monitoring and ensuring the efficient operation of the equipment in designated area, handing over to the incoming shift in a systematic and orderly manner

. To react to plant process/safety emergencies promptly and carry out actions as laid down in procedures.

. To use correct chemicals and other consumables in an optimal manner to ensure cost saving.

. Do area cleaning to keep all equipments and work area /environment in safe condition, clean and tidy

CONOCOPHILLIPS INDONESIA Mobile : +62-81315767012 Email: [email protected] M U A D I B A D R U D I N Email : [email protected] Mobile : +62-81315767012 . Carry out operational preparation prior to maintenance job (i.e. gas releasing/depressurizing, isolation of all equipment, nitrogen purging, etc) to ensure proper implementation of Work Permit

. To handle emergency incidents (Fire, Gas leak, Plant Shutdowns etc.) and ensure emergency plans and procedures are adhered to.

PT. CHANDRA ASRI PETROCHEMICAL CENTER (CAPC), Ciwandan - Anyer, West Java, Indonesia

CONTROL ROOM OPERATOR (Dec 1993 – January 2002)

. Performed pre-commissioning and commissioning of Ethylene and Utility Plant, working closely with main contractor representative. . Joining Project Management Teams, to carry out punch list on piping and equipments after Mechanical maneuver accomplishment. Verified P&ID building specifications and issued non-compliance reports with regards to deficits. . Attended loop check activities for instrumentations, DCS alarm set point, and interlock tests for trip system, suggested changes on the logic system and alarm setting. . Controlled and directed Olefins Plant operation activities to meet operating parameter. Ensures safe and efficient performance operation of the Ethylene plant. . Reviewed Lab results, and ensures that operation is within recommended operating limits & guidelines to meet customer satisfaction. . Operated control panels comprising highly sophisticated and computerized equipment in the assigned operating area. . Successfully Supported Pre-commissioning, commissioning, and initial started-up the plant . Successfully Attended normal and emergency shutdown the plant and Turn around maintenance (General shutdown) . Operated Steam Generation Unit (Boiler), Power Generation Unit (Steam Turbine Generator, Gas Turbine Generator), Cooling System (Fresh Cooling water System and Sea Water system)

CONOCOPHILLIPS INDONESIA Mobile : +62-81315767012 Email: [email protected] M U A D I B A D R U D I N Email : [email protected] Mobile : +62-81315767012 . Ensured of the capabilities the Integrated Control System is fully utilized to improve plant efficiency, product quality and safety. . Maintained the detail records of daily activities, Laboratory analysis in order to keep product quality on specification. . Reported chemical consumption, water/steam/electricity balance . Ensured the integrity functional tests, change over routines and other scheduled verification tasks are completed efficiently and maintain the appropriate records & documents

EDUCATION & TRAINING

Formal:

Petroleum Engineering Department, Oil and Gas Academy CEPU – PERTAMINA WHOLLY STATE OWNED COMPANY IN INDONESIA (Diploma-2).

Non Formal:

. Control Room Operator Competency Assessment (OPITO Standard Recommended), by Benchmark Training & Management Services, October 10th – 11th, 2008

. Favelle Favco Crane Operator Training, by Favelle Favco Equipment Services Sdn. Bhd, May 13th – 14th, 2008

. Effective Presentation Skills With Visual Aids training, by Applied Languages, March 26th – 28th, 2008

. Tropical BOSIET Including Travel Safely by Boat Training (OPITO approved), by Survival system Asia and Samson Tiara, November 16th, 2007

. Oil Control and Lubrication Training, by Qatar Petrochemical Company, Ltd, April 4th, 2006 . Boiler Water Treatment Training, by Qatar Petrochemical Company, Ltd, March 5th - 6th, 2005. . Piping and Instrumentation Drawing (PID) Reading Course, by Qatar Petrochemical Company, Ltd, February 8th, 2005

CONOCOPHILLIPS INDONESIA Mobile : +62-81315767012 Email: [email protected] M U A D I B A D R U D I N Email : [email protected] Mobile : +62-81315767012 . Electrical Safety Training, by Qatar Petrochemical Company, Ltd, January 19th – 20th, 2003

th . Gas Turbines Training, by Qatar Petrochemical Company, Ltd, march 5 – 6th, 2003

. Boiler Operation Training, by Qatar Petrochemical Company, Ltd, March 16th – 17th, 2003

st th . First Aid Training , by Qatar Petroleum, October 21 - 24 , 2002

. Pumps, Compressors, and Turbines Training, by Petroleum India International and Qatar Petrochemical Company, Ltd, June 2nd - 6th, 2002

st . Leadership in 21 Era and Beyond Training, by University of Tirtayasa, Indonesia, November 12th – 13th, 2001

. Boiler and Cooling Water treatment training, by Ondeo-Nalco, Jakarta, October 9th – 10th, 2001

. Environmental Regulation Course for ISO 14001 PT Chandra Asri, by Produksi Bersih Benefita, Cilegon, Indonesia, May 31st – June 1st, 2001

. Seminar for Year 2001 World Environment Day, by Government of Cilegon District (Environment Section), Cilegon, Indonesia, June 27th, 2001

. Waste Water Treatment Training for Professional Operator, by Qipra Galang Kualita, Jakarta, May 2nd – 4th, 2001

st . Water Treatment Seminar, by Kastraco Engineering, Jakarta, April 21 , 2001

. Basic Electrical and Emergency Procedure for Utility Plant Training, by PT Chandra Asri, June 20th – 21st , 2000

. Boiler Operator Certification Class-1 Training, held by Ministry of Labor, Indonesia,1996

. Training Program for Steam Generation Facility, by Samsung Heavy Industry Co, Ltd (organized by Toyo Engineering Corp, Japan), August 24th – 26th, 1994

. Training Program for Gas Turbine Generator, by European Gas Turbine S.A.(organized by Toyo Eng Corp, Japan), July 4th – 9th, 1994

CONOCOPHILLIPS INDONESIA Mobile : +62-81315767012 Email: [email protected] M U A D I B A D R U D I N Email : [email protected] Mobile : +62-81315767012 th . Utility/Offsite Guidance Training, by Toyo Engineering Corp, June 7 – July 1st, 1994

. Utility System Classroom Training Program, by Chandra Asri Petrochemical Center, 1994

PERSONAL

. 40 Years old, Married and excellent Health performance by 2010.

. Can provide outstanding personal and professional references at the appropriate time.

The statements in this application are true and correct information. A False statement or dishonest answer to any question may be grounds for my immediate discharge from employment.

Applicant Signature,

MUADI BADRUDIN

CONOCOPHILLIPS INDONESIA Mobile : +62-81315767012 Email: [email protected]