Life Cycle Plan
Total Page:16
File Type:pdf, Size:1020Kb
Project Name
Life Cycle Plan (LCP)
Team Number
[Team members ] [This page is intentionally left blank] Life Cycle Plan Version 0.1
Table of Contents
1 Introduction 1 1.1 Purpose of the Life Cycle Plan Document 1 1.2 Assumptions 1 1.3 References 1
2 Milestones and Products 3 2.1 Overall Life Cycle Strategy 3 2.2 Phase Milestones and Schedules 3 2.3 Project Deliverables 3
3 Responsibilities 5 3.1 Stakeholder Responsibilities 5 3.2 Development Responsibilities 5
4 Approach 7 4.1 Monitoring and Control 7 4.2 Methods, Tools and Facilities 7 4.3 Configuration Management 7 4.4 Quality Management 8
5 Resources 9 5.1 Work Breakdown Structure 9 5.2 Budgets 9
Appendix 11 A. COCOMO Results 11 B. Detailed Gantt Charts for milestones and schedules 11 Life Cycle Plan Version 0.1
Version control
Date Author Changes Version [Type today's date ] [Author's name ] [Changes made since last version ] 0.1
iv Life Cycle Plan Version 0.1
v Life Cycle Plan Version 0.1
List of Figures
Error! No table of figures entries found.
vi Life Cycle Plan Version 0.1
vii Life Cycle Plan Version 0.1
1 Introduction
1.1 Purpose of the Life Cycle Plan Document
The objectives of the life cycle plan are as follows: 1. Guide construction and transition efforts, and the subsequent client evolution effort 2. Help make the best use of people and resources throughout the life cycle. 3. Plan to overcome the difficulties likely to arise at the time of development. 4. Serve as the basis for controlling the project’s progress in achieving the software product objectives and as a plan for ensuring the timely execution of the project. 5. Ensure that the quality elements of the Feasibility Rationale including business-case analysis and resource level feasibility are met.
1.2 Assumptions
[Click here and type]
1.3 References
Operational Concept Description [Click here and type version referenced ] System and Software Requirements Definition [Click here and type version referenced ] System and Software Architecture Description [Click here and type version referenced ] Feasibility Rationale Description [Click here and type version referenced ] [Click here and type other references ]
1 Life Cycle Plan Version 0.1
2 Milestones and Products
2.1 Overall Life Cycle Strategy
[Click here and type]
2.2 Phase Milestones and Schedules
[Click here and type]
2.2.1 Engineering Stage (Inception and Elaboration Phases)
[Click here and type]
2.2.2 Production Stage (Construction and Transition Phases)
[Click here and type]
2.2.3 Support Stage
[Click here and type]
2.3 Project Deliverables
2.3.1 Engineering Stage
[Click here and type]
2.3.2 Production Stage
[Click here and type]
2 Life Cycle Plan Version 0.1
3 Responsibilities
3.1 Stakeholder Responsibilities
[Click here and type]
3.1.1 Stakeholder Representatives
[Click here and type]
3.1.2 Engineering Stage Responsibilities
[Click here and type]
3.1.3 Production Stage Responsibilities
[Click here and type]
3.1.4 Support Stage Responsibilities
[Click here and type]
3.2 Development Responsibilities
[Click here and type]
3.2.1 Development Organization Charts
[Click here and type]
3.2.2 Staffing
[Click here and type]
3.2.3 Training
3 Life Cycle Plan Version 0.1
[Click here and type]
4 Life Cycle Plan Version 0.1
4 Approach
4.1 Monitoring and Control
[Click here and type]
4.1.1 Closed Loop Feedback Control
[Click here and type]
4.1.2 Reviews
[Click here and type]
4.1.3 Status Reporting
[Click here and type]
4.1.4 Risk Monitoring and Control
[Click here and type]
4.1.5 Project Communication
[Click here and type]
4.2 Methods, Tools and Facilities
[Click here and type]
5 Life Cycle Plan Version 0.1
4.3 Configuration Management
[Click here and type]
4.3.1 Product Element Identification
[Click here and type]
4.3.2 Configuration Change Management
[Click here and type]
4.3.3 Project Library Management
[Click here and type]
4.3.4 Configuration Status Management
[Click here and type]
4.4 Quality Management
4.4.1 Quality Assurance
[Click here and type]
4.4.2 Verification and Validation
[Click here and type]
6 Life Cycle Plan Version 0.1
5 Resources
5.1 Work Breakdown Structure
[Click here and type]
5.2 Budgets
[Click here and type]
7 Life Cycle Plan Version 0.1
Appendix
A. COCOMO Results
[Click here and type]
B. Detailed Gantt Charts for milestones and schedules
[Click here and type]
8