Ohio Department of Transportation District 9

DRAFT* Annual Work Plan & Four-Year Look Ahead

*This is a draft list, and all information contained herein is proposed and subject to change.

Ohio Department of Transportation – District 9 Ohio Department of Transportation - District 9 Annual Work Plan FY2016-2019 Project List

hio’s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible for maintaining one of the largest transportation networks in the nation. Guided by ethical principles and accountability, ODOT works to improve safety, enhance travel and advance economic development. As a $2.8 Obillion enterprise, the department wisely invests in its core services of snow and ice removal, annual construction program and highway maintenance operations.

The following summary outlines those projects which are being programmed or considered for construction during fiscal years 2015 through 2019. Due to production and planning variables, not all projects may be sold as proposed. Any cost estimates or sale dates cited in this document are subject to change. For the purposes of this document, FY2015 = July 1, 2014 – June 30, 2015; FY2016 = July 1, 2015 - June 30, 2016; FY2017 = July 1, 2016 – June 30, 2017; FY2018 = July 1, 2017 – June 30, 2017; and FY2019 = July 1, 2018 – June 30, 2019.

For more information regarding the proposed projects cited in this document, please contact the ODOT District 9 Offices at 740-774-8834 or 740-774-8982.

PID = Project Identification Number CRS = County, Route, Section

Ohio Department of Transportation – District 9

Adams County FY2015 Proposed/Planned Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 94281 ADA-County HMF Maintenance Construction of a new, full-service facility on S.R. 41. 03/01/15 $9,879,206 Facility Facility MOT: NA; construction will be completed off roadway. 87391 ADA-125-13.26 Slide Repair Located between T.R. 256 (Ralston Road) and C.R. 56 (Frank Young 04/23/15 $1,715,187 Road). MOT: Traffic will be maintained with temporary signals. 92853 ADA-247-1.20 Slide Repair Approximately one mile north of U.S. 52. 01/15/15 $524,246 MOT: The route will be closed; traffic will be detoured via S.R. 136. 95344 ADA-41- Bridge Replacement Located between C.R. 3C (Clayton Road) and T.R. 233 (Irwin Road). 05/21/15 $577,432 5.20/5.89 (two locations) MOT: The route will be closed, and traffic will be detoured via U.S. 52 and S.R. 136. 89401 ADA-770-2.07 Slide Repair Between C.R. 14 (Tranquility Pike) and T.R. 411 (McCreight Road). 10/16/14 $731,125 MOT: Traffic will be maintained with temporary signals. 96899 ADA-125-0.34 Slide Repair Immediately east of T.R. 12 (Grimes Road) and Brown County line. 06/04/15 $842,329 MOT: Traffic will be maintained with temporary signals. 94121 ADA-32- Bridge Repair Just east of T.R. 130 (Mendenhall Road); one-half mile west of S.R. 01/29/15 $3,299,748 16.99/19.42 (two locations) 73. MOT: Traffic will be maintained in a minimum of one lane in each direction. 97558 ADA-CR3F (Island Bridge Replacement Bridge Partnership Program 07/01/14 $384,000 Creek Road) MOT: The route will be closed; traffic will be detoured locally. 97558 ADA-CR2E Bridge Replacement Bridge Partnership Program 07/01/14 $294,000 (Eckmansville Rd) MOT: The route will be closed; traffic will be detoured locally.

Ohio Department of Transportation – District 9 Adams County FY2016 Proposed/Planned Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 87228 ADA-125-1.41 Bridge Replacement Between T.R. 80106 (Kent Lane) and T.R. 13 (Aid Run Road). 06/02/16 $395,000 MOT: The route will be closed; traffic will be detoured via U.S. 62, S.R. 32 and S.R. 136. 87225 ADA-137-0.32 Bridge Replacement Just north of S.R. 136, at the north corporation limit of Cherry Fork. 02/11/16 $362,000 MOT: The route will be closed; traffic will be detoured via S.R. 136, S.R. 32 and S.R. 247. 88718 ADA-247-8.82 Bridge Replacement Between C.R. 22 (Chapparal Road) and T.R. 76 (Rigdon Road). 03/03/16 $495,000 MOT: Traffic will be maintained with temporary signals. 87220 ADA-41- Bridge Replacement East of C.R. 20 (Ripley Road); east of T.R. 326 (Stanfield Road). 04/07/16 $1,069,647 2.73/4.29 (two locations) MOT: The route will be closed; traffic will be detoured via U.S. 52 and S.R. 136. 91601 ADA-41-21.14 Bridge Replacement Between C.R. 6 (Fawcett Road) and T.R. 91 (Murphin Ridge Road). 01/14/16 $337,165 MOT: Traffic will be maintained with temporary signals. 95537 ADA-73-0.00 Resurfacing From the Highland County to the Scioto County line. 02/11/16 $1,957,000 MOT: Traffic will be maintained in one lane with flaggers. 87230 ADA-73-6.45 Bridge Replacement Approximately one mile west of S.R. 41. 09/24/15 $2,193,707 MOT: Traffic will be maintained with temporary signals. 87226 ADA-52-6.26 Bridge Replacement West of T.R. 237 (Gilkison Hollow) and the village of Manchester. 04/01/16 $516,000 MOT: Traffic will be maintained with temporary signals. 87298 ADA-52-12.49 Bridge Replacement One-half mile west of S.R. 247. 11/19/15 $1,732,900 MOT: Traffic will be maintained with temporary signals. 86703 ADA-136-24.60 Bridge Replacement One-half mile south of the Highland County line. 11/19/15 $341,500 MOT: The route will be closed; traffic will be detoured via S.R. 32 and U.S. 62. 87233 ADA-125-0.00 Resurfacing From the Brown County line to S.R. 41. 08/13/15 $1,788,268 MOT: Traffic will be maintained in one lane with flaggers. 96805 ADA-Brush Creek Culvert Replacement Various locations within the state park. TBD $174,018 State Park MOT: Local roads will be subject to temporary closure. 97228 ADA-32-21.54 Culvert Liner East of C.R. 127 (Black Hollow Road). 05/19/16 $133,000 Replacement MOT: Traffic will be maintained in one lane in each direction. 96770 ADA-41-25.95 Sidewalk Intersection of Olive Street and S.R. 41 in Peebles. 04/07/16 $59,475

Ohio Department of Transportation – District 9 Construction MOT: Traffic will be maintained on affected routes by flaggers.

Adams County FY2017 Proposed Projects PID CRS Project Type Sale Estimated Cost Date 91602 AD Bridge Replacement TBD $594,000 A- 136 - 23. 18 88723 AD Bridge Replacement TBD $297,000 A- 136 - 17. 36 91969 AD Resurfacing TBD $1,892,181 A- 136 - 9.3 9 93346 AD Bridge Replacement TBD $528,000 A- 348 - 9.1 5 91408 AD Bridge Replacement TBD $979,000 A- 41- 31. 77

Ohio Department of Transportation – District 9 97590 AD Slide Repair TBD $658,360 A- 41- 32. 00 97986 AD Culvert Liner TBD $518,000 A- 781 - 7.0 9 91970 AD Resurfacing TBD $2,822,508 A- 52- 0.0 0 87226 AD Bridge Replacement TBD $516,000 A- 52- 6.2 6

FY2018 Proposed Projects PID CRS Project Type Sale Estimated Cost Date 97312 AD Resurfacing TBD $1,967,000 A- CR1 00/ 400 95552 AD Resurfacing TBD $2,101,086 A- 247 - 7.4 1 21964 AD Bridge Replacement TBD $243,000

Ohio Department of Transportation – District 9 A- 40- 20. 28 98008 AD Bridge Replacement TBD $286,000 A- 41- 3.2 2

FY2019 Proposed Projects 96955 AD Bridge Replacement TBD $1,028,200 A- 52- 20. 61 95554 AD Resurfacing TBD $2,060,000 A- 41- 13. 11 81716 AD Resurfacing TBD $3,938,408 A- 32- 19. 98 96328 AD Resurfacing TBD $1,752,000 A- 136 - 0.0 0 96773 AD Bridge Replacement TBD $512,000 A- CR1 00- 4.0

Ohio Department of Transportation – District 9 3

Brown County FY2015 Proposed/Planned Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 87253 BRO-52/68- Resurfacing U.S. 52: From the western corporation limit of Higginsport to just 09/18/14 $2,925,532 4.31/41.01 east of T.R. 255 (Pisgah Hill Road). U.S. 68: From the southern corporation limit of Fayetteville to the Clinton County line. MOT: Traffic will be maintained in one lane with the use of flaggers. 88981 BRO-62-13.92 Resurfacing From the junction with U.S. 68 to northern corporation limit of 02/10/15 $1,100,642 Russellville. MOT: Traffic will be maintained in one lane with the use of flaggers. 86586 BRO-41-0.89 Culvert Approximately one-half mile north of U.S. 52. 12/11/14 $495,232 Replacement MOT: Traffic will be maintained with the use of temporary signals. 88982 BRO-68-31.28 Resurfacing From S.R. 32 at Mt. Orab to U.S. 50 in Fayetteville. 12/11/14 $1,401,674 MOT: Traffic will be maintained in one lane with the use of flaggers. 93620 BRO-Mt. Orab Sidewalks MOT: Traffic will be maintained on affected routes as needed by 05/07/15 $173,052 flaggers. 75466 BRO-353-0.65 Bridge Replacement Between U.S. 62 at Redoak and T.R. 4 (Mt. Aire Road). 07/30/15 $297,000 MOT: The route will be closed. 86580 BRO-505-7.25 Bridge Replacement Between S.R. 756 and C.R. 84 (Feesburg-Poetown Road). 06/04/15 $290,970 MOT: The route will be closed. 86594 BRO-763-11.92 Bridge Replacement Between T.R. 24 (West Fork Road) and S.R. 353. 03/19/15 $351,645 MOT: The route will be closed. 85341 BRO-52-12.30 Streetscape MOT: Traffic will be maintained on affected routes as needed by 05/21/15 $837,897 flaggers.

Ohio Department of Transportation – District 9

Brown County FY2016 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sal Estimated Cost e Dat e 92900 BRO-41-1.93 Alignment Improvement Just north of T.R. 563 (Slickaway Road). 05/ $2,819,078 MOT: The route will be closed. 19/ 16 88978 BRO-125-0.00 Resurfacing From the Brown-Clermont County line to just east of T.R. 402 11/ $1,089,999 (Gillette Station Road). 05/ MOT: Traffic will be maintained in one lane with the use of 15 flaggers. 93347 BRO-763-1.02 Bridge Replacement Between T.R. 251 (Stringtown Road) and T.R. 350 (Lawwill 06/ $1,543,247 Road), approximately one mile north of S.R. 41. 02/ MOT: The route will be closed. 16 87236 BRO-50-0.00 Resurfacing From the Clermont County line to the Highland County line. 07/ $1,696,053 MOT: Traffic will be maintained in one lane with the use of 30/ flaggers. 15 87303 BRO-68-41.42 Bridge Replacement At the northern corporation limit of Fayetteville. 09/ $627,000 MOT: The route will be closed. 10/ 15 87279 BRO-32-15.29 Resurfacing From T.R. 171 (Freeh Road), 1.5 miles west of U.S. 62, to the 12/ $1,863,829 Adams County line. 17/ MOT: Traffic will be maintained in one lane in each direction. 15 97177 BRO-125-9.47 Signalization At the intersection of Home Street in the village of 06/ $495,704 Georgetown. 02/ MOT: Traffic will be maintained on affected routes as needed 16

Ohio Department of Transportation – District 9 with the use of flaggers.

Brown County FY2017 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sa Estimated Cost le Da te 82882 BRO-CR13-3.3 Bridge Replacement 01 $3,784,607 /0 1/ 17 78609 BRO-CR42A-0.28 Bridge Replacement 01 $430,000 /0 1/ 17 85031 BRO-CR50-0.42 Bridge Replacement 01 $468,000 /0 1/ 17 86595 BRO-505-6.51 Bridge Replacement 01 $596,200 /0 2/ 17 95533 BRO-68-22.37 Resurfacing 07 $1,592,252 /1

Ohio Department of Transportation – District 9 0/ 16 96309 BRO-62-19.82 Bridge Replacement 07 $463,000 /0 1/ 16 91937 BRO-50-8.03 Resurfacing 10 $570,850 /0 1/ 16 94364 BRO-52-8.84 Bridge Replacement 10 $527,680 /0 1/ 16 97591 BRO-52-10.17 Slide Repair 07 $319,516 /0 1/ 17 98009 BRO-286-8.19 Bridge Replacement 07 $258,500 /0 1/ 17 97238 BRO-62-25.50 Culvert Replacement 04 $499,000 /0 1/ 17 Brown County FY2018 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sa Estimated Cost le Da te 91999 BRO-62-16.81 Resurfacing 10 $1,867,797 /0 1/ 17

Ohio Department of Transportation – District 9 Brown County FY2019 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sa Estimated Cost le Da te 98319 BRO-221-0.00/353-0.00 Resurfacing TB $2,164,000 D 96333 BRO-41-0.45 Resurfacing TB $791,400 D 98138 BRO-52-13.33 Micro-resurfacing TB $823,374 D

Highland County FY2015 Proposed/Planned Projects PID CRS Project Type Location Description & Maintenance of Traffic Sa Estimated Cost le Da te 97109 HIG-TR144-0.50 Bridge Replacement On Fenwick Road, just south of S.R. 321. 09 $409,694 MOT: The route will be closed. /0 4/ 14 89233 HIG-TR225-1.26 Bridge Replacement On Tolle Road, between U.S. 62 and S.R. 138. 03 $12,068,721 MOT: The route will be closed. /1 9/ 15 83933 HIG-CR11-16.78/17.40 Bridge Replacement On Bridges Road, over Hardin Creek. 06 $2,126,855 MOT: The route will be closed. /0 5/ 14

Ohio Department of Transportation – District 9 83987 HIG-Hobart Drive, New Construction 01 $10,120,813 Parts 1, 2 /1 5/ 15 87214 HIG-753-16.75 Bridge Replacement Between T.R. 357 (Rupple Road) and T.R. 360 (Titus Road). 09 $574,767 MOT: The route will be closed. /1 8/ 14 88985 HIG-138-22.89 Resurfacing MOT: Traffic will be maintained in one lane with the use of 11 $1,365,590 flaggers. /1 3/ 14 88720 HIG-247-11.07 Bridge Rehabilitation Approximately one-half mile south of the Hillsboro 02 $1,242,788 corporation limit. /1 MOT: The route will be closed. 0/ 15 87238 HIG-28-0.00 Resurfacing MOT: Traffic will be maintained in one lane with the use of 10 $1,170,770 flaggers. /1 6/ 14

Highland County FY2016 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sa Estimated Cost le Da te 88986 HIG-50-18.22 Resurfacing MOT: Traffic will be maintained in one lane with 09 $1,894,495 the use of flaggers. /2 4/ 15

Ohio Department of Transportation – District 9 Highland County FY2017 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sa Estimated Cost le Da te 92789 HIG-CR5-14.29 Intersection Improvement 10 $4,888,438 /0 1/ 16 87333 HIG-138-27.24 Bridge Rehabilitation 01 $2,103,503 /0 1/ 17 91998 HIG-135-0.00/138-16.64 Resurfacing 10 $1,600,092 /0 1/ 16 95531 HIG-73-0.00/62-13.32 Resurfacing 04 $1,971,678 /0 1/ 17 87242 HIG-73-10.72 Resurfacing 10 $2,460,218 /0 1/ 16 86696 HIG-753-9.59 Bridge Replacement 10 $322,000 /0 1/ 16 89140 HIG-TR280-0.28 Bridge Replacement 10 $639,000

Ohio Department of Transportation – District 9 /0 1/ 16 93788 HIG-28-10.40 Bridge Replacement 10 $2,307,050 /0 1/ 16 98013 HIG-321-7.88 Bridge Replacement 10 $462,000 /0 1/ 16 95531 HIG-73-0.00/62-13.32 Resurfacing 10 $2,460,218 /0 1/ 16 Highland County FY2018 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sa Estimated Cost le Da te 98014 HIG-134-14.43 Bridge Rehabilitation 07 $1,797,600 /0 1/ 17 95550 HIG-28-7.27/41-8.95 Resurfacing 07 $1,793,735 /0 1/ 17 91995 HIG-62-15.89 Resurfacing 10 $3,110,937 /0 1/ 17 Highland County FY2019 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sa Estimated Cost

Ohio Department of Transportation – District 9 le Da te 98151 HIG-138-7.03 Resurfacing 07 $1,767,490 /0 1/ 18 95550 HIG-28-7.27/41-8.95 Resurfacing 07 $1,793,735 /0 1/ 18 96330 HIG-506-0.00/753-0.00 Resurfacing 07 $1,803,500 /0 1/ 18 95563 HIG-50-12.27 Resurfacing 07 $1,100,000 /0 1/ 18 96329 HIG-62-0.00 Resurfacing 07 $1,947,700 /0 8/ 18

Jackson County FY2015 Proposed/Planned Projects PID CRS Pr Location Description & Maintenance of Traffic Sale Date Estimated Cost oj ec t Ty p

Ohio Department of Transportation – District 9 e 94479 JAC-Jackson Br On Harding Avenue and over Little Salt Creek in the city of 03/05/15 $799,773 id Jackson. ge MOT: The route will be closed. R e pl ac e m e nt 93989 JAC-TR291-1.50 Br MOT: The route will be closed. 09/30/14 $201,174 id ge R e h a bil it at io n 75442 JAC-139-4.40 Br Between C.R. 52 (Lenhart Road) and T.R. 319 (Albert Swartz 01/29/15 $276,000 id Road). ge MOT: The route will be closed. R e pl ac e m e nt 89400 JAC-327-19.50 R MOT: Traffic will be maintained in one lane with the use of 11/26/14 $648,007 es flaggers. ur

Ohio Department of Transportation – District 9 fa ci ng 86588 JAC-93-0.15 Br Just north of the Jackson-Lawrence County line. 02/10/15 $770,000 id MOT: There should be no impact to traffic. ge R e pl ac e m e nt

Jackson County FY2016 Proposed Projects PID CRS Pr Location Description & Maintenance of Traffic Sale Date Estimated Cost oj ec t Ty p e 94362 JAC-35-17.72 Sli Between C.R. 55 (Stand Pipe Road) and C.R. 79 (Clary Road). 07/01/15 $922,800 d MOT: Traffic will be maintained in one lane in each direction. e R e p ai r

Ohio Department of Transportation – District 9 Jackson County FY2017 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 94361 JAC-35-6.32 Slide Repair 01/01/16 $673,920 91994 JAC-233-0.00 Resurfacing 04/01/17 $648,215

Jackson County FY2018 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 96299 JAC-327-0.77 Bridge 07/01/17 $452,000 Replacement 98152 JAC-327-6.08 Resurfacing 07/01/17 $1,067,538 96297 JAC-776-10.87 Bridge 07/03/17 $529,000 Replacement

Jackson County FY2019 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 97313 JAC-CR-Various Pavement 07/01/18 $150,000 Marking 96292 JAC-139-12.45 Bridge 07/01/18 $364,000

Ohio Department of Transportation – District 9 Rehabilitation 98153 JAC-349-0.00 Resurfacing 07/01/18 $169,589 96948 JAC-35-4.33 Bridge Liner 07/01/18 $683,000

Lawrence County FY2015 Proposed/Planned Projects PID CRS Project Type Location Description & Sale Date Estimated Cost Maintenance of Traffic 95633 LAW-Chesapeake Bypass Building Demolition MOT: NA; construction will be 06/04/15 $106,000 completed off roadway. 87217 LAW-217-5.85 Bridge Replacement Between the intersecting points of 02/10/15 $1,320,370 S.R. 378. MOT: The route will be closed at the bridge; however, the intersections will remain open. Traffic will be maintained in one lane with the use of flaggers and/or temporary signals. 95545 LAW-7-2.45 Drainage Construction Just east of the junction with S.R. 06/04/15 $650,492 527, in the village of Chesapeake. 87393 LAW-775-13.04 Slide Repair Between the intersections of C.R. 10/30/14 $740,345

Ohio Department of Transportation – District 9 2 (Greasy Ridge Road). MOT: Traffic will be maintained in one lane with the use of flaggers and/or temporary signals. 92854 LAW-93-23.17 Slide Repair Between C.R. 193 (Telegraph Hill 03/05/15 $341,873 Road) and C.R. 40 (Brady Fork Road). MOT: Traffic will be maintained in one lane with the use of flaggers and/or temporary signals. ----- LAW-CR6 Bridge Replacement Bridge Partnership Program 07/01/14 $185,000 98166 LAW-52-11.30 Bench Cleaning MOT: Traffic will be maintained in 01/15/15 $280,670 a minimum of one lane in each direction.

Lawrence County FY2016 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sa Estimated Cost le Da te 91989 LAW-243-0.00 Resurfacing MOT: Traffic will be maintained in one lane with the use of 10 $1,260,310 flaggers. /0 8/ 15 86702 LAW-7-0.27 Bridge Replacement Just east of the junction with U.S. 52. 10 $1,660,665 MOT: Traffic will be maintained in one lane with the use of /0 flaggers and/or temporary signals. 1/

Ohio Department of Transportation – District 9 15 87243 LAW-650-0.00 Resurfacing MOT: Traffic will be maintained in one lane with the use of 09 $1,634,967 flaggers. /1 0/ 15 88719 LAW-775-18.05 Bridge Replacement Between T.R. 177 (Rappsburg Buckeye Creek Road) and T.R. 75 08 $374,000 (Buckeye Greasy Ridge Road). /2 MOT: The route will be closed, and traffic will be detoured via 7/ S.R. 141. 15 97230 LAW-141-4.06 Culvert Immediately west of T.R. 208 (Branch Sugar Creek Road). 04 $555,000 Replacement MOT: The route will be subject to a 14-day closure; at all other /2 times, traffic will be maintained in one lane with the use of 1/ flaggers and/or temporary signals. 16 91063 LAW-Ironton Trail/Walkway MOT: Traffic will be maintained on affected routes as needed 06 $1,035,000 Facility with the use of flaggers. /1 6/ 16

Lawrence County FY2017 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 91063 LAW-Union/Rome Township Trail/Walkway Facility 10/01/17 $1,035,000 91579 LAW-140-0.82 Bridge Rehabilitation 10/01/16 $539,000 91413 LAW-141-16.17 Bridge Replacement 10/01/16 $683,000 93350 LAW-217-2.17 Bridge Replacement 04/01/17 $583,000 93795 LAW-775-13.70 Bridge Replacement 04/01/17 $583,000

Ohio Department of Transportation – District 9 10379 LAW-93-15.39 Bridge Replacement 04/01/17 $560,000 95415 LAW-Various Routes Pavement Marking 07/01/17 $50,000 94359 LAW-93-22.34 Bridge Replacement 07/01/16 $877,140 84651 LAW-52-11.85 Resurfacing 01/01/17 $3,973,573

Lawrence County FY2018 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 99495 LAW-52-12.32 Rock Barrier Construction 01/01/18 $2,108,550 79798 LAW-93-6.11 Intersection Improvement 04/01/18 $793,000 94592 LAW-217-5.95 Slide Repair 07/01/17 $601,930

Lawrence County FY2019 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 97314 LAW-CR5/CR29 Resurfacing 07/01/18 $1,225,000 98961 LAW-Ironton Parking Deck/Transit Center 07/01/18 $2,000,000 96285 LAW-141-12.98 Bridge Replacement 07/01/18 $2,676,000 96135 LAW-County HMF Facility Building Construction 02/15/19 $470,000

Pike County FY2015 Proposed/Planned Projects PID CRS Project Type Location Description & Maintenance of Traffic Sal Estimated Cost e Da te 91366 PIK-CR50-1.95 Slide Repair MOT: Traffic will be maintained in one lane with 07 $1,525,000 the use of temporary signals. /2 4/ 14 91992 PIK-124-0.00 Resurfacing MOT: Traffic will be maintained in one lane with 10 $1,125,924

Ohio Department of Transportation – District 9 the use of flaggers. /2 1/ 14 83081 PIK-23-5.25 Resurfacing MOT: Traffic will be maintained in one lane in 09 $7,100,312 each direction. /1 8/ 14

Pike County FY2016 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sal Estimated Cost e Da te 95879 PIK-TR403-0.68 Bridge Replacement MOT: The route will be closed. 11 $1,099,971 /0 5/ 15 83667 PIK-104-10.64 Reconstruction Between S.R. 551 and S.R. 552 at Lake White. TB $34,521,452 D 87244 PIK-124-7.53 Resurfacing MOT: Traffic will be maintained in one lane with 07 $1,663,043 the use of flaggers. /1 6/ 15 95529 PIK-772/335-13.41/24.78 Resurfacing MOT: Traffic will be maintained in one lane with 12 $1,583,275 the use of flaggers. /1 7/ 15 96777 PIK-CR43-3.26 Bridge Replacement MOT: The route will be closed. 04 $388,730 /2 1/ 16

Ohio Department of Transportation – District 9 98913 PIK-CR84 Pavement Rehabilitation MOT: Traffic will be maintained in one lane with 04 $340,080 the use of flaggers. /0 7/ 16

Pike County FY2017 Proposed Projects PID CRS Project Location Description & Maintenance of Traffic Sale Date Estimated Cost Type 9587 PIK-TR403-0.68 Bridge 11/05/15 $1,099,971 9 Replaceme nt 8718 PIK-124-7.47 Bridge 04/01/16 $902,000 1 Replaceme nt 9199 PIK-104-6.54 Resurfacin 10/01/16 $1,071,999 1 g 9208 PIK-CR50-0.51/0.62 Bridge 10/01/16 $1,456,545 0 Replaceme nt 9379 PIK-335-18.75 Bridge 10/01/16 $413,000 0 Replaceme nt Pike County FY2018 Proposed Projects

Ohio Department of Transportation – District 9 PID CRS Project Location Description & Maintenance of Traffic Sale Date Estimated Cost Type 7922 PIK-220-6.98 Relocation 07/01/17 $15,964,195 1 9724 PIK-124-7.04 Culvert 04/01/17 $128,500 4 Replaceme nt 9677 PIK-CR69-0.70 Bridge 07/01/17 $451,000 9 Replaceme nt 9633 PIK-41-0.00 Resurfacin 07/03/17 $817,761 4 g 9724 PIK-552-0.00 Resurfacin 04/01/17 $635,000 3 g 9695 PIK-772-7.90 Bridge 07/01/18 $506,000 7 Replaceme nt Pike County FY2019 Proposed Projects PID CRS Project Location Description & Maintenance of Traffic Sale Date Estimated Cost Type 9867 PIK-TR665-0.27 Bridge 07/01/18 $696,000 0 Replaceme nt

Ross County FY2015 Proposed/Planned Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Estimated Cost

Ohio Department of Transportation – District 9 Dat e 88278 ROS-Frankfort Sidewalks MOT: There should be no impact to traffic. 05/ $210,800 21/ 15 90252 ROS-CR1/60/92 Guardrail MOT: Traffic will be maintained in one lane 04/ $300,000 Replacement with the use of flaggers. 23/ 15 88592 ROS-CR205-9.78 Bridge MOT: The route will be closed. 06/ $470,004 Replacement 04/ 15 87840 ROS-CR235/240/241 Guardrail MOT: Traffic will be maintained in one lane 05/ $300,000 Replacement with the use of flaggers. 07/ 15 90254 ROS-CR-Various Pavement MOT: Traffic will be maintained in one lane 09/ $150,000 Markings with the use of flaggers. 15/ 14 95340 ROS-772-1.89 Culvert Between T.R. 152 (Harris Station Road) and T.R. 06/ $138,600 Replacement 154 (Camelin Hill Road). 04/ MOT: The route will be closed. 15 83652 ROS-772-13.22 Slide Repair Just north of C.R. 175 (Liberty Hill Road). 11/ $1,384,366 26/ 14 92852 ROS-50-37.50 Slide Repair Immediately west of the Ross-Vinton County 10/ $724,680 line. 13/ MOT: Traffic will be maintained in one lane 14 with the use of temporary signals. 83182 ROS-23-9.26 Bridge One-quarter mile north of the S.R. 104/Three 09/ $1,190,630 Repair/Scour Locks Road exit. 22/ MOT: 14

Ohio Department of Transportation – District 9 Ross County FY2016 Proposed Projects PID CRS Project Type Location Description & Sale Date Estimated Cost Maintenance of Traffic 95341 ROS-138- Culvert Replacement Just east of T.R. 72 (Waugh 08/13/15 $ 6.29 Road). MOT: The route will be closed. 92010 ROS-23- Resurfacing MOT: Traffic will be 10/22/15 $2,369,000 16.36 maintained in a minimum of one lane in each direction. 79976 ROS-23- Resurfacing MOT: Traffic will be 11/19/15 $1,031,000 4.63 maintained in a minimum of one lane in each direction. 96238 ROS-772- Culvert Replacement Between T.R. 169 (Rinehart 06/02/16 11.85 Road) and C.R. 175 (Liberty Hill Road). MOT: Traffic will be maintained in one lane with the use of temporary signals. 97231 ROS-207- Culvert Replacement Between T.R. 124 (Rinkliff 04/07/16 4.73 Road) and C.R. 111 (Stone Road). MOT: Traffic will be maintained in one lane with the use of temporary signals.

Ohio Department of Transportation – District 9

Ross County FY2017 Proposed Projects PID CRS Project Type Location Description & Sale Date Estimated Cost Maintenance of Traffic 95341 ROS- Culvert Replacement 07/01/15 $237,600 138- 6.29 95534 ROS- Resurfacing 01/10/16 $1,957,000 159- 1.22 92010 ROS-23- Resurfacing 10/01/15 $2,369,000 16.36 79976 ROS-23- Resurfacing 10/01/15 $1,031,000 4.63 97178 ROS-50- Intersection Improvement 04/01/17 $1,014,888 21.75 98004 ROS- Bridge Replacement 04/01/17 $1,054,000 772- 6.82/7.2 4 97588 ROS-50- Slide Repair 10/01/16 $539,890 8.04

Ohio Department of Transportation – District 9 95532 ROS-50- Resurfacing 01/01/17 $1,545,000 28.11 95417 ROS- Guardrail Replacement 07/01/16 $301,000 Various Routes Ross County FY2018 Proposed Projects PID CRS Project Type Location Description & Sale Date Estimated Cost Maintenance of Traffic 87280 ROS-35- Resurfacing 07/01/17 $2,141,626 4.48 97085 ROS- Resurfacing 07/01/17 $1,048,569 159- 4.69 95418 ROS- Resurfacing 07/01/17 $1,490,000 550- 4.98 Ross County FY2019 Proposed Projects PID CRS Project Type Location Description & Sale Date Estimated Cost Maintenance of Traffic 98007 ROS- Bridge Replacement 07/01/18 $440,000 772- 9.56 97317 ROS-CR- Raised Pavement Markers 07/01/18 $75,000 Various 97316 ROS-CR- Guardrail Replacement 07/01/18 $300,000 Various 97315 ROS- Resurfacing 07/01/18 $1,755,000 CR167- 0.00 96290 ROS-23- Bridge Replacement 07/01/18 $1,231,500 4.97

Ohio Department of Transportation – District 9 Scioto County FY2015 Proposed/Planned Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 94037 SCI-Shawnee Forest Culvert Replacement Various forest roads. 12/11/14 $454,165 MOT: Roads will be subject to intermittent closures; at all other times, traffic will be maintained by flaggers. 94038 SCI-Shawnee Forest Culvert Replacement Various forest roads. 07/01/14 $156,800 MOT: Roads will be subject to intermittent closures; at all other times, traffic will be maintained by flaggers. 13234 SCI-73-1.10 Bridge Replacement Immediately west of village of Rarden. 10/02/14 $1,248,303 MOT: Traffic will be maintained by flaggers and temporary traffic signals. 87249 SCI-139-0.52 Resurfacing MOT: Traffic will be maintained in one lane 04/23/15 $4,348,042 with the use of flaggers. 84965 SCI-140-9.22/9.48 Bridge Replacement Between C.R. 17 (Frederick Road) and the 08/21/14 $808,904 community of South Webster. MOT: Traffic will be maintained by temporary signals. 84453 SCI-335-14.52 Bridge Replacement Between C.R. 204 (Cathey Road) and T.R. 192 06/04/15 $286,000 (Adams Road). MOT: Traffic will be maintained by temporary signals. 92851 SCI-348-6.94 Slide Repair Approximately one-half mile east of S.R. 73, at 11/13/14 $334,562 the village of Otway. MOT: Traffic will be maintained by temporary signals.

Ohio Department of Transportation – District 9 Scioto County FY2016 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 87331 SCI-140-9.73 Bridge Replacement Between T.R. 294 (Railroad Hollow Road) and 04/01/16 $462,000 the community of South Webster. MOT: Traffic will be maintained by temporary signals. 87259 SCI-348-0.00 Resurfacing MOT: Traffic will be maintained in one lane 09/10/15 $1,134,057 with the use of flaggers. 92856 SCI-772-1.99 Slide Repair Approximately two miles north of S.R. 73 and 01/01/16 $939,180 immediately south of T.R. 77 (Kirker Road). MOT: Traffic will be maintained by temporary signals. 87182 SCI-776-0.19 Bridge Replacement Just east of S.R. 335. 07/16/15 $275,000 MOT: The route will be closed. 97319 SCI-52-19.07 Resurfacing MOT: Traffic will be maintained in a minimum 03/17/16 $1,218,335 of one lane in each direction. 95352 SCI-CR50-0.00 Resurfacing MOT: Traffic will be maintained in one lane 06/16/16 $1,739,000 with the use of flaggers.

Ohio Department of Transportation – District 9 Scioto County FY2017 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 91411 SCI-125-0.73 Bridge 04/01/17 $605,000 Replacement 84964 SCI-139-1.66 Bridge 07/01/16 $990,000 Replacement 91930 SCI-140-2.38/2.43 Intersection 07/01/16 $1,311,898 Improvement 91410 SCI-335-13.61 Bridge 10/01/16 $561,000 Replacement 94517 SCI-728-1.53 Bridge 07/01/16 $726,000 Replacement 91580 SCI-73-11.73 Bridge 10/01/16 $429,000 Rehabilitation 97680 SCI-23-10.57 Minor 01/01/17 $1,538,367 Rehabilitation 99474 SCI-104-11.91 Roundabout 01/01/17 $1,100,709 98140 SCI-253-0.00 Minor 07/01/17 $1,283,854 Rehabilitation 93794 SCI-140-7.28 Alignment 01/01/16 $473,000 Improvement 76461 SCI-23-11.43 Resurfacing 01/01/17 $2,369,000 Scioto County FY2018 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 95438 SCI-348-12.80 Resurfacing 01/01/18 $1,979,729 98005 SCI-335-8.63 Bridge 07/01/17 $1,412,400 Replacement Scioto County

Ohio Department of Transportation – District 9 FY2019 Proposed Projects PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost 98150 SCI-23-0.00 Resurfacing 07/01/18 $3,510,210 97318 SCI-CR-Various Guardrail 07/01/18 $300,000 Replacement

Districtwide

FY2015 Proposed Projects PID CRS Project Type Sale Date Estimated Cost 87326 Various Routes Bridge Maintenance 12/11/14 $441,704 93929 Various Routes Auxiliary Markings 10/01/14 $133,000 93930 Various Routes Pavement Marking 05/07/15 $1,392,000 93931 Various Routes Raised Pavement Markers 03/19/15 $232,000

FY2016 Proposed Projects PID CRS Project Type Sale Date Estimated Cost 93945 Various Routes Auxiliary Markings 10/01/15 $133,000 93949 Various Routes Pavement Marking 04/01/16 $1,392,000 95342 Various Routes Culvert Reconstruction 04/01/16 $258,500 93950 Various Routes Raised Pavement Markers 01/01/16 $232,000

FY2017 Proposed Projects PID CRS Project Type Sale Date Estimated Cost 93969 Various Routes Auxiliary Markings 10/01/16 $124,800 93970 Various Routes Pavement Marking 10/01/16 $1,339,000 93971 Various Routes Raised Pavement Markers 01/01/17 $231,000

Ohio Department of Transportation – District 9 Ohio Department of Transportation – District 9