The Ryland Group

Total Page:16

File Type:pdf, Size:1020Kb

The Ryland Group

PHASE SPECIFIC SCOPE OF WORK CalAtlantic Homes - Baltimore Division

Revised for 2011 54430 Garage Door

Subcontractor: ______

Job: All Projects

I. Detailed Scope

1. The Subcontractor is to supply and install all garage doors, openers and hardware as specified by CalAtlantic.

2. The Subcontractor will supply and install scribe trim around garage door opening.

3. Garage door stops will be set with galvanized finishing nails.

4. The garage door’s warranty and keys must be placed in a plastic bag and tacked to the inside garage doorjamb.

5. Garage door opener remotes will be placed inside the opener light cover or atop the opener of the respective garage.

6. The Subcontractor will close, adjust and test to assure that the garage door lock mechanism works properly.

7. The Subcontractor will adjust the tension on the garage door so that a garage door opener can be installed in proper working order in the future.

8. The Subcontractor shall supply all garage doors with a factory-applied finish.

9. The Subcontractor shall supply two opener remotes per door. If one opener operates a 16’ wide door, then two remotes are required. If two 8’ doors and two openers are selected, then each door requires two remotes.

10. Subcontractor will supply and install light bulbs in the garage door openers.

______CalAtlantic Signature / Date Subcontractor Signature / Date

______Print CalAtlantic Name / Title Print Subcontractor Name / Title PHASE SPECIFIC SCOPE OF WORK CalAtlantic Homes - Baltimore Division

Revised for 2011 54430 Garage Door

Subcontractor: ______

Job: All Projects

II. Materials Specified

1. Wayne-Dalton steel insulated door with double lock bars. Series is determined by CalAtlantic Plans and specifications.

III. Standards/Warranties

1. The Subcontractor must guarantee all labor and material for one (1) year after settlement. If field inspection reveals improper material or workmanship, the Subcontractor will assume all liability for any future charges incurred in the correction of this work.

I:\BIDPROPS\SPECS\GRGDOOR.DOC 06/95 (rev. 1.1 11/21/95) JEC 04/07/18 1:04 AM

______CalAtlantic Signature / Date Subcontractor Signature / Date

______Print CalAtlantic Name / Title Print Subcontractor Name / Title