The Ryland Group

The Ryland Group

<p> PHASE SPECIFIC SCOPE OF WORK CalAtlantic Homes - Baltimore Division</p><p>Revised for 2011 54430 Garage Door</p><p>Subcontractor: ______</p><p>Job: All Projects</p><p>I. Detailed Scope</p><p>1. The Subcontractor is to supply and install all garage doors, openers and hardware as specified by CalAtlantic.</p><p>2. The Subcontractor will supply and install scribe trim around garage door opening.</p><p>3. Garage door stops will be set with galvanized finishing nails.</p><p>4. The garage door’s warranty and keys must be placed in a plastic bag and tacked to the inside garage doorjamb.</p><p>5. Garage door opener remotes will be placed inside the opener light cover or atop the opener of the respective garage.</p><p>6. The Subcontractor will close, adjust and test to assure that the garage door lock mechanism works properly.</p><p>7. The Subcontractor will adjust the tension on the garage door so that a garage door opener can be installed in proper working order in the future.</p><p>8. The Subcontractor shall supply all garage doors with a factory-applied finish.</p><p>9. The Subcontractor shall supply two opener remotes per door. If one opener operates a 16’ wide door, then two remotes are required. If two 8’ doors and two openers are selected, then each door requires two remotes.</p><p>10. Subcontractor will supply and install light bulbs in the garage door openers.</p><p>______CalAtlantic Signature / Date Subcontractor Signature / Date</p><p>______Print CalAtlantic Name / Title Print Subcontractor Name / Title PHASE SPECIFIC SCOPE OF WORK CalAtlantic Homes - Baltimore Division</p><p>Revised for 2011 54430 Garage Door</p><p>Subcontractor: ______</p><p>Job: All Projects</p><p>II. Materials Specified</p><p>1. Wayne-Dalton steel insulated door with double lock bars. Series is determined by CalAtlantic Plans and specifications.</p><p>III. Standards/Warranties</p><p>1. The Subcontractor must guarantee all labor and material for one (1) year after settlement. If field inspection reveals improper material or workmanship, the Subcontractor will assume all liability for any future charges incurred in the correction of this work. </p><p>I:\BIDPROPS\SPECS\GRGDOOR.DOC 06/95 (rev. 1.1 11/21/95) JEC 04/07/18 1:04 AM</p><p>______CalAtlantic Signature / Date Subcontractor Signature / Date</p><p>______Print CalAtlantic Name / Title Print Subcontractor Name / Title</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us