Natural Resource Project Inventory (NRPI) s3

Total Page:16

File Type:pdf, Size:1020Kb

Natural Resource Project Inventory (NRPI) s3

Last Updated 05/30/18 CONTRACT SUMMARY This information will made available to the public on the State Water Resources Control Board’s (SWRCB) Website (see address below).

Use the "tab" and arrow keys to move through the form. If field is not applicable, please put N/A in block. Date filled out:

A) Contract Information Please use complete phrases/sentences. Fields will expand as necessary as you type. 1. Contract Number: SWRCB No. 02-085-252-0 2. Project Title: Apanolio Canyon Steelhead Passage Project 3. Project Purpose – Problem: (problem being addressed) Modification of barriers on Apanolio Creek to facilitate steelhead trout passage, retore to a more n trout passage, restore to more natural hydrologic regime, improve in-stream and riparian habitat. 4. Project Goals: Restore watershed to a near pristine condition. a. Short-term Goals: Remove fish barriers, restore in-stream and riparian habitat b. Long-term Goals: Increase population of steelhead, hopefully help remove from threatened ESA status 5. Project Location: (lat/longs, watershed, etc.) Lat 37, 29, 41 Long 122, 27, 21, EPA HUC 1805004- Pilarcitos Creek a. Physical Size of Project: (miles, acres, sq. ft., etc.) one mileb. Counties included in the project: San Mateo c. Legislative Districts: (Assembly and Senate) Mullin, 19th Assembly; Speier, 8th Senate 6. Which SWRCB program is funding this contract? Please put an "X" by the one that applies. ___ Prop 13 __x_ EPA 319(h) ___ Other

B) Contract Contact: Refers to contract project director. Name: Mike Ednoff Job Title: Executive Director Organization: San Mateo Resource Conservation DistrictWebpage Address: www.sanmateorcd.org Address: 625 Miramontes St, Sutie 103, Half Moon Bay, CA 94019-1942 Phone: 650-712-7765 Fax number: 650-726-0494 Email: [email protected] C. Contract Time Frame: Refers to the implementation period of the contract. From: 09-01-02 To: 12-31-05

D) Project Partner Information: Name all agencies/groups involved with project. Landowners Bongard, Gossett and Allied, Inc; DFG; CalTrans; Pilarcitos Creek Advisory Committee; San Mateo Co; maybe others E) Nutrient and Sediment Load Reduction Projection (if applicable): N/A

PLEASE PROVIDE A HARD COPY AND AN ELECTRONIC COPY TO YOUR CONTRACT MANAGER AND YOUR PROGRAM ANALYST WITH YOUR QUARTERLY/MONTHLY REPORT. ALL APPLICABLE FIELDS ARE MANDATORY. IF FIELD IS NOT APPLICABLE, PLEASE PUT N/A IN BLOCK. INCOMPLETE FORMS WILL BE RETURNED. THE ELECTRONIC VERSION OF THIS FORM CAN BE FOUND AT: http://www.swrcb.ca.gov/nps/319hproj.html.

Recommended publications