![Natural Resource Project Inventory (NRPI) s3](https://data.docslib.org/img/3a60ab92a6e30910dab9bd827208bcff-1.webp)
<p> Last Updated 05/30/18 CONTRACT SUMMARY This information will made available to the public on the State Water Resources Control Board’s (SWRCB) Website (see address below).</p><p>Use the "tab" and arrow keys to move through the form. If field is not applicable, please put N/A in block. Date filled out: </p><p>A) Contract Information Please use complete phrases/sentences. Fields will expand as necessary as you type. 1. Contract Number: SWRCB No. 02-085-252-0 2. Project Title: Apanolio Canyon Steelhead Passage Project 3. Project Purpose – Problem: (problem being addressed) Modification of barriers on Apanolio Creek to facilitate steelhead trout passage, retore to a more n trout passage, restore to more natural hydrologic regime, improve in-stream and riparian habitat. 4. Project Goals: Restore watershed to a near pristine condition. a. Short-term Goals: Remove fish barriers, restore in-stream and riparian habitat b. Long-term Goals: Increase population of steelhead, hopefully help remove from threatened ESA status 5. Project Location: (lat/longs, watershed, etc.) Lat 37, 29, 41 Long 122, 27, 21, EPA HUC 1805004- Pilarcitos Creek a. Physical Size of Project: (miles, acres, sq. ft., etc.) one mileb. Counties included in the project: San Mateo c. Legislative Districts: (Assembly and Senate) Mullin, 19th Assembly; Speier, 8th Senate 6. Which SWRCB program is funding this contract? Please put an "X" by the one that applies. ___ Prop 13 __x_ EPA 319(h) ___ Other </p><p>B) Contract Contact: Refers to contract project director. Name: Mike Ednoff Job Title: Executive Director Organization: San Mateo Resource Conservation DistrictWebpage Address: www.sanmateorcd.org Address: 625 Miramontes St, Sutie 103, Half Moon Bay, CA 94019-1942 Phone: 650-712-7765 Fax number: 650-726-0494 Email: [email protected] C. Contract Time Frame: Refers to the implementation period of the contract. From: 09-01-02 To: 12-31-05</p><p>D) Project Partner Information: Name all agencies/groups involved with project. Landowners Bongard, Gossett and Allied, Inc; DFG; CalTrans; Pilarcitos Creek Advisory Committee; San Mateo Co; maybe others E) Nutrient and Sediment Load Reduction Projection (if applicable): N/A</p><p>PLEASE PROVIDE A HARD COPY AND AN ELECTRONIC COPY TO YOUR CONTRACT MANAGER AND YOUR PROGRAM ANALYST WITH YOUR QUARTERLY/MONTHLY REPORT. ALL APPLICABLE FIELDS ARE MANDATORY. IF FIELD IS NOT APPLICABLE, PLEASE PUT N/A IN BLOCK. INCOMPLETE FORMS WILL BE RETURNED. THE ELECTRONIC VERSION OF THIS FORM CAN BE FOUND AT: http://www.swrcb.ca.gov/nps/319hproj.html.</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-