To: All At&T Installation Suppliers s8
Total Page:16
File Type:pdf, Size:1020Kb
AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-238 TO: ALL AT&T INSTALLATION SUPPLIERS Date: 09/10/2014
EFFECTIVE DATE: 5 days from posted date or as per Supplier’s Contract
Submitter’s Name: Ed Williamson
TP: TP7300 Subject: Ironwork Requirements Action: Add: Modification: Delete:
Section: I Section Title: Ironwork Subsection: 2 Subsection Title: Requirements Subsection: 2.5 Subsection Title: Frames, Bays, Battery Stands and Equipment Cabinets
Prior to Change: 2.5.6.a) In lineups where 7’-0” or 9’-0” frames are the primary or only support for overhead cable rack, the equipment frame shall be secured to building floor with four anchors and junction to adjacent frames in accordance to paragraph 2.6.2. Cable rack shall not be considered a top support and cannot be relied upon to provide structural support of equipment frames.
2.5.9 The uprights of adjacent frames and cabinets shall be joined together per manufacturer’s specifications and at the top and bottom to form a continuous lineup.
Post Change: 2.5.6.a) In lineups where 7’-0” or 9’-0” frames are the primary or only support for overhead cable rack, the equipment frame shall be secured to building floor with four anchors and junction to adjacent frames in accordance to paragraph 2.5.1. Cable rack shall not be considered a top support and cannot be relied upon to provide structural support of equipment frames.
2.5.9 The uprights of adjacent frames and cabinets shall be joined together per manufacturer’s specifications to form a continuous lineup. a) Adjacent frames shall to be joined together at the top and bottom. b) Adjacent cabinets shall be joined together at the top using through bolts or junctioning plates.
Questions relative to this IRCN should be addressed to Serena Kwong at 510-796-1097
Serena Kwong Assoc Network Proc & Quality Manager [email protected] Access the TP's on the Extranet Site https://ebiznet.sbc.com/sbcnebs
Concurred Area Mgr Eng Network Quality Implementation Eng & Common Systems Date: 09-09-14 (Mike Cassidy)
Principal-Network Design Engineer (Seismic & Infrastructure) Date: 09-09-14 (Edward M Williamson)
Release Approved Assoc Network Proc & Quality Manager Date: 09-10-14 (Serena Kwong)
Page 1 of 1