To: All At&T Installation Suppliers s8

To: All At&T Installation Suppliers s8

<p>AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-238 TO: ALL AT&T INSTALLATION SUPPLIERS Date: 09/10/2014</p><p>EFFECTIVE DATE: 5 days from posted date or as per Supplier’s Contract</p><p>Submitter’s Name: Ed Williamson</p><p>TP: TP7300 Subject: Ironwork Requirements Action: Add: Modification: Delete: </p><p>Section: I Section Title: Ironwork Subsection: 2 Subsection Title: Requirements Subsection: 2.5 Subsection Title: Frames, Bays, Battery Stands and Equipment Cabinets</p><p>Prior to Change: 2.5.6.a) In lineups where 7’-0” or 9’-0” frames are the primary or only support for overhead cable rack, the equipment frame shall be secured to building floor with four anchors and junction to adjacent frames in accordance to paragraph 2.6.2. Cable rack shall not be considered a top support and cannot be relied upon to provide structural support of equipment frames. </p><p>2.5.9 The uprights of adjacent frames and cabinets shall be joined together per manufacturer’s specifications and at the top and bottom to form a continuous lineup. </p><p>Post Change: 2.5.6.a) In lineups where 7’-0” or 9’-0” frames are the primary or only support for overhead cable rack, the equipment frame shall be secured to building floor with four anchors and junction to adjacent frames in accordance to paragraph 2.5.1. Cable rack shall not be considered a top support and cannot be relied upon to provide structural support of equipment frames. </p><p>2.5.9 The uprights of adjacent frames and cabinets shall be joined together per manufacturer’s specifications to form a continuous lineup. a) Adjacent frames shall to be joined together at the top and bottom. b) Adjacent cabinets shall be joined together at the top using through bolts or junctioning plates.</p><p>Questions relative to this IRCN should be addressed to Serena Kwong at 510-796-1097</p><p>Serena Kwong Assoc Network Proc & Quality Manager [email protected] Access the TP's on the Extranet Site https://ebiznet.sbc.com/sbcnebs</p><p>Concurred Area Mgr Eng Network Quality Implementation Eng & Common Systems Date: 09-09-14 (Mike Cassidy)</p><p>Principal-Network Design Engineer (Seismic & Infrastructure) Date: 09-09-14 (Edward M Williamson)</p><p>Release Approved Assoc Network Proc & Quality Manager Date: 09-10-14 (Serena Kwong) </p><p>Page 1 of 1</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us