SANCTION PROJECT LIST UNDER MLALADS from 2004-05 to 2008-09
Total Page:16
File Type:pdf, Size:1020Kb
SANCTION PROJECT LIST UNDER MLALADS FROM 2004-05 to 2008-09 (DEHNKANAL ASSEMBLY CONSTITUENCY)
Executing Sl. Agency Amount No Year Name of the Project Sanctioned Expenditure Status 1 2 3 4 5 6 9 BDO Sadar 1- Constn. Of Compound Wall of 100000 Satyabadi High School,Mangal Pur, Comple 1 2004-05 -Mangalpur G.P. 100000 ted BDO Sadar 2.Const.of boundary wall of Baliamba 70000 Comple 2 2004-05 High School, Baliamba G.P. 70000 ted BDO Sadar 3.Constn.ofAnimalTreatment Center 70000 (A.N.M), L.I.Center, Bhapur, Bhapur G.P Comple 3 2004-05 70000 ted BDO Sadar 1- Const of Comm Centre at Gohirakhola 52021 Comple 4 2004-05 Adivasisahi 52021 ted BDO Sadar Completion of classroom of Kunjabihari 180000 High school, Jhumpudia, C.S. Prasad GP. Comple 5 2004-05 180000 ted BDO Sadar Const of Two classroom of Swapneswar 388000 Comple 6 2004-05 H/S kakudibhag 388000 ted BDO Sadar Completion of Classroom of Kankadahada, 100000 Comple 7 2004-05 K.Hada GP 100000 ted BDO Sadar Const of CC at Manipur sabarsahi 60000 Comple 8 2004-05 60000 ted BDO Sadar Const of Sarala SSG Comm Centre near 50000 Siva Temple, Koilipangi Talasahi, M.S. Comple Patna GP. 9 2004-05 50000 ted BDO Sadar Const of CC at Badagila, Saptasajya GP. 80000 Comple 10 2004-05 80000 ted BDO Sadar Const of CC at Ganjeidihi school Sahi, 50000 Comple 11 2004-05 C.S. Prasad GP. 50000 ted BDO Sadar Const of CC at Oukhama Uparsahi, C.S. 150000 Comple 12 2004-05 Prasad GP 150000 ted A.E Electrification of Deopada Harijansahi, 41876 Athagarh, and Tanlasahi, Manipur GP. Electric Ongoin 13 2004-05 Dvn. g BDO 1- Compl of Nimidha Badagaon drain. 50000 50000 Comple 14 2004-05 Odapada ted BDO 1- Completion of Classroom of Dhalpur 101988 101988 Comple 15 2004-05 Odapada High School ted BDO 1- Const of Passenger’s Restshed near 52000 52000 Comple 16 2004-05 Odapada Maa Tareni Pitha, Jayantinagar ted BDO 2- Improvement of road from Panamuruga 120080 120080 Comple 17 2004-05 Odapada Paikasahi to River Ghat ted BDO 9. Constn. Of C.C.near Dinakrushna Club 53,000 53,000 Comple 18 2004-05 Odapada at Ekagharia Bangursingh G.P. ted BDO 1- Const of Nua Bangurusinga CC, at 52000 52000 Comple 19 2004-05 Odapada Keutasahi ted BDO 2- Const of Biswanathpur Comm Centre 41000 41000 Comple 20 2004-05 Odapada Nimidha GP ted BDO 3- Const of passenger rest shed near 78000 78000 Comple 21 2004-05 Odapada Mangala mandir Luni, Indipur GP. ted BDO 4- Const of CC at Mahadia Talasahi, 75000 75000 Comple 22 2004-05 Odapada Odapada ted BDO Completion of CC at Kasiadihi 95000 95000 Comple 23 2004-05 Odapada ted BDO Const of Boundarywall of Jenamani H/S 70000 70000 Comple 24 2004-05 Odapada Govindaprasad ted BDO Const of Haripur Vill Comm Centre 155000 155000 Comple 25 2004-05 Odapada ted BDO Const of Classroom of Baisayika Ucha 120000 120000 Comple 26 2004-05 Odapada Vidyapitha, Motanga ted BDO Const of Anganawadi centre, 153000 153000 Comple 27 2004-05 Odapada Upparbaghalunda ted BDO Const of Passenger Restshed near Trutia 100000 100000 Odapada Devajew temple Balarampur, B.Pur GP. Comple 28 2004-05 ted BDO Const of Cc Rd from Kasiadihi Sithasahi 100000 100000 Comple 29 2004-05 Odapada to Pradhansahi Chhak. ted BDO Const of CC at Badabaulpur Harijansahi, 50147 50147 Comple 30 2004-05 Odapada Sadasivpur GP. ted BDO Const of Passenger Restshed near 50560 50560 Odapada Sanischar Temple , Kalanga, kalanga GP. Comple 31 2004-05 ted BDO Const of CC Rd from end of CC Rd 100000 100000 Odapada towards school, Kalika Prasad kalanga GP. Comple 32 2004-05 ted E.O. 1- Renovation of Loknath Temple 50000 Dhenkanal Mahisapat (Byepass), WN- 8 Comple 33 2004-05 (M) 50000 ted E.O. 1.Const.of Boundary Wall of Reserve 100000 Dhenkanal Police Line School, DKL Comple 34 2004-05 (M) 100000 ted E.O. 2. Constn. Of C.C. Road from Ramesh 160000 Dhenkanal Mohapatra house to Kalapana Das house at Comple (M) Danda Sahi W.No.13 35 2004-05 160000 ted E.O. 3. Constn. Of Pitchu Road for Bhagirathi 175000 175000 Dhenkanal Sagar No rth saite in W.No. 4. Comple (M) 36 2004-05 ted E.O. 4. Constn. Of KalaraPada C.C. Road in 180000 180000 Dhenkanal W.No.6 Comple 37 2004-05 (M) ted E.O. 5. Constn. Of Refuse Colany Road in 135000 135000 Dhenkanal W.No.2 Comple 38 2004-05 (M) ted E.O. 6. Constn. Of Pitchu Road from Jaya 80,000 80,000 Dhenkanal Gopal Sahi School to Dr.B.D.Nayak Res in Comple (M) W.No. 17 39 2004-05 ted E.O. 7. Constn. Of Pitchu Road from Rathagada 250000 Dhenkanal Main Road to Khamar Sahi Via-L.I.C. Comple (M) Office in W.No,10 40 2004-05 250000 ted E.O. 8. Constn. Of Drain from Rabinaryan Rout 133000 Dhenkanal House to Kalinga Eye Hospital Comple 41 2004-05 (M) 133000 ted E.O. Const of passengers restshed near 75000 Dhenkanal Chaitanya temple, Dolamandap sahi Comple (M) Dolamandapsahi, WN-16 42 2004-05 75000 ted E.O. Const. Of Restshed near Nilakantheswar 28177 Dhenkanal temple,Khamarsahi W.N.10 Comple 43 2004-05 (M) 28177 ted EE CESCO 10. L.T. Extension for Power Supply to 39,178 DED Dkl inside Village Haladiabahal NayabhagirathiPur G.P. 44 2004-05 EE CESCO Setting up of Transformer in village, 135664 135664 Comple 45 2004-05 DED Dkl Sridihi, Badalo GP ted EE CESCO Electrification of Kankadahada harijansahi 71710 71710 Comple 46 2004-05 DED Dkl ted EE CESCO Electrification of Nimichira harijansahi 33097 33097 Comple 47 2004-05 DED Dkl ( K. Hada GP) ted EE, PHD- 1- Laying of Pipe line 300m for W/S from 200026 200026 II, main road to Krushna temple, Balaram CUTTACK High school, Ward No-8, Dhenkanal Comple 48 2004-05 Municipality ted EE, PHD- Laying of Pipe Line to Khamarsahi chhak 129203 129203 II, to MLA Sadar Office lane, Ward No.10, Comple 49 2004-05 CUTTACK Dhenkanal Municipality ted MANAGE 1- Electrification Manipur Harijansahi 16273 R, AED, ATHGAR 50 2004-05 H Total 5000000 4902673
Executing Sl. Agency Amount No Year Name of the Project Sanctioned Expenditure Status 1 2 3 4 5 6 9 BDO Sadar Const of Comm Centre at Sankarpur 50000 Complet 1 2005-06 Uparsahi, Sankarpur GP. 50000 ed BDO Sadar Const of CC Road from RD Road to 100000 Complet 2 2005-06 Dakhinasahi Bhapur, vill/ GP 100000 ed BDO Sadar Const of Platform of openwell at 30000 Complet 3 2005-06 Rajuapatna Uparsahi, M.S. Patna GP 30000 ed BDO Sadar Const of CC Road at Bimbol Nuasahi, 100000 Complet 4 2005-06 M.S. Patna GP 100000 ed BDO Sadar Const of CC Road from PMGSY to 50000 Swapneswar Siva temple, Kakudibhag Complet 5 2005-06 vill / GP 50000 ed BDO Sadar Const of CC Road from Rajuapatna 100000 Complet 6 2005-06 uparsahi to Talasahi, Madhusahupatna GP 100000 ed 7 2005-06 BDO Sadar Const of CC Road from Meghadhipasahi 100000 100000 Complet to old Cuttack Sambalpur Road ed Beguniapal, Bhapur GP
BDO Sadar Const of CC Road from Radhakrishna 100000 Mandap to Sarala temple, Koilipangi M.S. Complet 8 2005-06 Patna GP 100000 ed BDO Sadar Const of CC at Raidihi, Baliamba GP. 100000 Complet 9 2005-06 100000 ed BDO Sadar Const of Comm Centre at Chasapada. 40000 Complet 10 2005-06 40000 ed BDO Sadar Const of Radhakrishna Library Building. 100000 Complet 11 2005-06 100000 ed BDO Sadar Restoration of Jaunli Pokhari Math, 100000 Complet 12 2005-06 Dhenkanal 100000 ed BDO Sadar Const of CC Road from Swapneswar 55000 Temple to Sapua Riverghat, Kakudibhag Complet 13 2005-06 GP 55000 ed BDO Sadar Const of Comm Centre at Aukhama 100000 Complet 14 2005-06 Talasahi, C.S.Prasad, 100000 ed BDO Sadar Const of Comm Centre at Kamadhenukot 100000 complete 15 2005-06 near Jenagosain Temple, Dhirapatna GP 100000 d BDO Const of Passenger Restshed near Shiva 61,000 61,000 Complet 16 2005-06 Odapada Temple at Sainbiri, Gadasila GP. ed BDO Const of Passenger Restshed near 56000 56000 Complet 17 2005-06 Odapada Jivankhol, Podapada, Odapada GP. ed BDO Const of Comm Centre at Kandabindha. 75000 75000 Complet 18 2005-06 Odapada ed BDO Const of Comm Centre at Gunadei. 90000 90000 Complet 19 2005-06 Odapada ed BDO Const of Comm Centre near Bania 55500 55500 Complet 20 2005-06 Odapada Pokhari, Indipur, Indipur GP. ed BDO Const of Rd at Kurunti Chasasahi, 75000 75000 Complet 21 2005-06 Odapada Kuspanga GP ed BDO Const of CC Rd from Belabari to 75000 75000 Complet 22 2005-06 Odapada Kunjabihari Mandap, Khagdagaprasad GP ed BDO Const of CC Rd at Durgapur Harijansahi, 75000 75000 Complet 23 2005-06 Odapada Mangalpur GP ed BDO Const of CC Rd at Mangalpur Nua 75000 75000 Complet 24 2005-06 Odapada upersahi, Mangalpur GP. ed BDO Const of CC Road at Gadasila from 100000 100000 Odapada Pandab Sahoo’s House to Kalandi Sahoo’s Complet 25 2005-06 House ed BDO Const of CC Road at Oriya Harijansahi, 70000 70000 Complet 26 2005-06 Odapada Kasiadihi, Balarampur GP ed BDO Construction of Comm Centre near 40244 40244 Complet 27 2005-06 Odapada Gopinath Jew at Sadasivpur ed BDO Const of CC Road from Dola Mandap to 100000 100000 Complet 28 2005-06 Odapada Chamarsahi ed BDO Const of Boundarywall of Kottam Primary 70000 70000 Complet 29 2005-06 Odapada School, Kottam ed BDO Const of Passengers Rest Shed at 100000 100000 Complet 30 2005-06 Odapada Khuntujhari ed BDO Const of Passengers Rest Shed near 100000 100000 Complet 31 2005-06 Odapada Charada Gadia Jagannath Temple ed BDO Const of Passengers Rest Shed at Bauti 75000 75000 Complet 32 2005-06 Odapada Chhak, Khadagaprasad, K.Prasad GP ed BDO Const of Comm Centre near GP Office, 100000 100000 Complet 33 2005-06 Odapada Kuspanga GP ed BDO Const of Comm Centre at Kamalanga 75000 75000 Complet 34 2005-06 Odapada Paiksahi, Mangalpur GP ed BDO Const of Comm Centre at Khadagaprasad, 75000 75000 Complet 35 2005-06 Odapada Khadagaprasad GP ed BDO Const of Comm Centre at Manpur 100000 100000 Complet 36 2005-06 Odapada ed BDO Const of Classroom for Nodal UP school, 71000 71000 Complet 37 2005-06 Odapada Siminai GP ed BDO Const of Comm Centre at Belapada 60000 60000 Complet 38 2005-06 Odapada Kaibartasahi, Gundei GP ed BDO Const of C.C. road from Ghodadian 75000 75000 Complet 39 2005-06 Odapada Patrasahi to Sabarsahi, Badalo GP ed BDO Const of Comm Centre at Mahidharpur, 75000 75000 Complet 40 2005-06 Odapada Balarampur GP ed BDO Const of Passengers Restshed at 64000 64000 Odapada Nirvankhola, near Gailo Bus stand, Complet 41 2005-06 Gunadei GP ed BDO Const of Comm Centre at Podapada 155000 155000 Complet 42 2005-06 Odapada Village, Odapada GP ed BDO Renovation of Shiva Temple at Kurunti, 100000 100000 Complet 43 2005-06 Odapada Kuspanga GP ed BDO Const of Comm Centre at 80000 80000 Odapada Khadagaprasadpatna, Khadagaprasadpatna Complet 44 2005-06 GP ed BDO Const of Comm Centre at Ankarantipur, 130000 130000 Complet 45 2005-06 Odapada Siminai GP ed BDO Const of Comm Programme Centre at 125000 125000 Complet 46 2005-06 Odapada Haladiabahal Harijansahi, N.B.Pur GP ed BDO Const of Classroom of Dhalpur High 55000 55000 Complet 47 2005-06 Odapada School, N.B.Pur ed BDO Const of Community Programme Centre at 50000 50000 Odapada Nadhara Uppersahi in Nadhara GP Complet 48 2005-06 ed BDO Const of Passenger Restshed near 150000 150000 Odapada Ramachandi Temple, Nadhera in Nadhera Complet 49 2005-06 GP ed BDO Const of Passenger Restshed at 75000 75000 Odapada MeraMandali village near Siva Temple, Complet 50 2005-06 Motanga GP ed BDO Const of Community Centre near RDS 70000 70000 Complet 51 2005-06 Odapada Society Nadhera GP ed BDO Const of community programme center at 55000 55000 Complet Odapada Hindol Road Bazar, Bangurusingh GP 52 2005-06 ed BDO Const of Community Programme Centre 92000 92000 Odapada near Khandiabandha at A.S.Kateni under Complet 53 2005-06 Balaramprasad GP ed BDO Restoration of Bhagabataghar at Talasahi, 100000 100000 Complet 54 2005-06 Odapada Bido GP ed District Const of Changing Room in Mini Stadium, 200000 Atheletic Dhenkanal 55 2005-06 Association 56 2005-06 E.O. Const of Classroom for L.M. High School 100000 100000 Complet Dhenkanal Dhenkanal Municipality ed (M)
E.O. Const. Of Restshed near Nilakantheswar 21823 Dhenkanal temple,Khamarsahi W.N.10 Complet 57 2005-06 (M) 21823 ed Gramya Water Supply From Siminai To Gadasila 125500 Jala Jogana Prakalpa O Parimala Samity, 58 2005-06 Siminai MANAGE Electrification of Village Bhangamal in 86093 R, AED, Shankarpur GP 59 2005-06 ATHGARH MANAGE Electrification of Village Tailasahi, 16442 R, AED, Hadisahi, Binjharpur, Nuasahi, Bhangamal 60 2005-06 ATHGARH in Shankarpur GP Total 4999602 4571567
Executing Sl. Agency Amount No Year Name of the Project Sanctioned Expenditure Status 1 2 3 4 5 6 9 BDO Sadar Const of CC Road from Chasasahi Mandap 200000 to Shiva Temple, Koilipangi, M.S.Patna GP Complete 1 2006-07 200000 d BDO Sadar Const of drain from Gobardhan Brehera 200000 house to Bharat Sahoo house Jubuli Town, 2 2006-07 WN- 7 150000 Ongoing BDO Sadar Const of CC Road from Chasasahi to 70000 Complete 3 2006-07 Jenasahupatna, Manipur GP - 555 70000 d BDO Sadar Improvement of Road at Putasahi road at 70000 Gangadharprasad, Dhirapatna GP - 556 Complete 4 2006-07 70000 d BDO Sadar Renovation of Mangala Temple at 75000 Complete 5 2006-07 Shankarpur, Shankarpur GP - 557 75000 d BDO Sadar Const of CC Road at Dhirapatna, 60000 Complete 6 2006-07 Dhirapatna GP - 558 60000 d BDO Sadar Const of Community Programme Centre at 55000 Complete 7 2006-07 Pamala, Sankarpur GP - 559 55000 d BDO Sadar Completion of community programme 75000 center at Ganjeidihi chhak, C.S.Prasad GP - 8 2006-07 560 57000 Ongoing BDO Sadar Const of cement concrete road at Majuri 60000 Complete 9 2006-07 Sabarsahi, Mangalpur GP 60000 d BDO Sadar Const of Community Programme Center at 118000 Complete Sarion, Kankadahada GP- 563 10 2006-07 118000 d BDO Sadar Const of Community Programme Center 75000 near Ananta Ashram Kankadahada GP- 564 Complete 11 2006-07 50000 d BDO Sadar Const of cemete concrete road from Mahila 70000 Karmasala to PWD Rd Gohirakhol, BB Complete 12 2006-07 Kateni GP – 565 70000 d BDO Sadar Const of community programme center at 75000 Baliamba Uparsahi, Baliamba GP- 566 Complete 13 2006-07 40000 d BDO Sadar Restoration of Mangala Temple at 75000 Complete 14 2006-07 Beguniapal, Bhapur GP 75000 d BDO Sadar Const of compoundwall of Similipatna High 60000 Complete 15 2006-07 School, Kakudibhag GP 60000 d BDO Sadar Const of community programme center at 70000 Patrabhaga Bilisahi, Saptasajya GP Complete 16 2006-07 35000 d BDO Const. Of Compound wall of Similipatana Complete 17 2006-07 SADAR High School 100000 100000 d BDO Reston. Of Raghunath Jew Temple, Complete 18 2006-07 SADAR Balyamba 150000 150000 d BDO Restoration of Radhakanta Jew Temple , Complete 19 2006-07 SADAR Manipur 70000 70000 d BDO Renovation of Mukteswar Temple , 20 2006-07 SADAR Nachhipura 53000 30000 Ongoing BDO Compl. Of Common Programme Centre at 21 2006-07 SADAR Raidihi 50000 BDO 22 2006-07 SADAR Compl. Of Library Building at Mahulpunji 50000 BDO 23 2006-07 SADAR Const. Of Platform in Kunjabihari Temple 50000 BDO Const. Of CC Road from Ichhapur UP Complete 24 2006-07 SADAR School to Similipatana Chhak 60000 60000 d BDO Const. of Common Programme Centre at 25 2006-07 SADAR Bhagirathipur 80000 35000 Ongoing BDO 26 2006-07 SADAR Completion of Dussera Ghar at Ganjeidihi 100000 A.G.M. Power supply to Jagannathpur ( Talasahi ) 90920 90920 ( Eectrical) in Nimidha village, Nimidha GP, Odapada CESCO, Block - 596 DED, Complete 27 2006-07 Dhenkanal d BDO Const of Rest Shed near Kamana Temple, 60000 60000 Complete 28 2006-07 Odapada Siminai GP d BDO Restoration of Mangala Temple at 70000 70000 Complete 29 2006-07 Odapada Sariapada, - 549 d BDO Const of community programme center at 50000 50000 Complete 30 2006-07 Odapada Baliratnapur, Nimidha GP- 550 d BDO Const of community programme center at 70000 70000 Odapada Manpur, Paiksahi, Mangalpur GP - 551 Complete 31 2006-07 d BDO Restoration of Laxmi Narayan Temple 80000 80000 Complete 32 2006-07 Odapada Siminai, Siminai GP - 552 d BDO Const of Cement Concrete Road at Kurunti 70000 70000 Complete 33 2006-07 Odapada Chasasahi, Kusupanga GP- 553 d BDO Const of Community Programme Centre at 70000 70000 Complete 34 2006-07 Odapada Balabhadrapur, Khuntajhari GP - 554 d BDO Const of C.C. Road at Upar Baghalunda 200000 200000 Complete 35 2006-07 Odapada ( Nadhera GP) d BDO Const of Community Programme Center at 70000 70000 Complete 36 2006-07 Odapada Palasudha, Indipur GP – 567 d BDO Const of Passenger Restshed at Dengaborei 70000 70000 Complete 37 2006-07 Odapada in Gundichapada GP- 568 d BDO Const of Community Programme center at 100000 100000 Odapada Chhatia, Gundichapada GP- 569 Complete 38 2006-07 d BDO Const of Community Programme Center at 50000 50000 Complete 39 2006-07 Odapada Damasahi, Khadagaprasad GP- 570 d BDO Const of Community Programme Center at 40000 40000 Odapada Jharasahi, Khadagprasad GP – 571 Complete 40 2006-07 d BDO Const of Community Programme Center at 50000 50000 Odapada Garh Harijansahi, Khadagaprasad GP- 572 Complete 41 2006-07 d BDO Restoration of Madan Mohan Temple 70000 70000 Complete 42 2006-07 Odapada Ostapal, Ghatipiri GP- 573 d BDO Const of concrete road Brahmansahi to 70000 70000 Odapada Mangala Temple at Dinabandhupur, Complete Kalanga GP- 574 43 2006-07 d BDO Restoration of Sri Ram Jew Temple 50000 50000 Complete 44 2006-07 Odapada Kottam, Kottam GP- 575 d BDO Const of community programme center at 70000 70000 Odapada Ranipal Upparsahi, Govindprasad GP- 576 Complete 45 2006-07 d BDO Restoration of Nilakantheswar Temple, 70000 70000 Complete 46 2006-07 Odapada Bangurusinga village/ GP- 577 d BDO Const of Rest shed near Kamana Temple, 70000 70000 Complete 47 2006-07 Odapada Chainpur, village / GP- 578 d BDO Const of community programme center at 100000 100000 Odapada Kaunriapal, Uppersahi, Gunudei GP- 579 Complete 48 2006-07 d BDO Const of Community Programme Center at 131000 131000 Odapada ChainpurPatana, Gadasila GP- 580 Complete 49 2006-07 d BDO Rural electrification for area and road 110000 110000 Odapada lighting at village Indipur (Indipur GP)- 581 Complete 50 2006-07 d BDO Rural electrification for area and road 134000 134000 Odapada lighting at Gudiakateni Chhak (Indipur GP)- Complete 582 51 2006-07 d BDO Const of Classroom at Aurobindo 150000 150000 Odapada Vidyamandir, Meramandali, Motanga GP- Complete 52 2006-07 583 d BDO Renovation of Rameswar Jew Temple, 150000 150000 Complete 53 2006-07 Odapada N.B.Pur (East) , N.B.Pur GP d BDO Const of community programme center at 50000 50000 Odapada Talasahi near Sports club in Nadhera GP- Complete 54 2006-07 585 d BDO Const of Telisahi Community Programme 100000 100000 Odapada Centre at Godidihi village, Balaramprasad Complete GP - 590 55 2006-07 d BDO Restoration of Bhagabataghara at 210000 210000 Complete 56 2006-07 Odapada Balaramprasad, Balaramprasad GP d BDO Const of Community Programme Centre 100000 100000 Odapada Upperbaghalunda Harijansahi, Nadhera GP Complete 57 2006-07 - 592 d BDO Const of Compoundwall of Sri Jagannath 86000 86000 Odapada High School, Baulapur , Sadasivpur GP - Complete 593 58 2006-07 d E.O. Const of Rest Shed at Godisahi, Jubuli 100000 100000 Dhenkanal Town WN- 7 Complete 59 2006-07 (M) d E.O. Const of Drain & Culvert from Bhaskar 150000 150000 Dhenkanal Swain house to Basudev Sahoo’s house, Complete (M) Dandasahi WN- 13 60 2006-07 d E.O. Const of drain at Dhankuniasahi in WN- 21, 70000 70000 Dhenkanal Dhenkanal Municipality Complete 61 2006-07 (M) d E.O. Restoration of Hanuman Temple at Mahavir 210000 210000 Dhenkanal Bazar, W.N- 11 Complete 62 2006-07 (M) d EE CESCO Power supply to village Jenasahi Patana 11733 11733 Complete 63 2006-07 DED Dkl under Sadar Block d EE CESCO Power Supply to village Besalia Harijan 17672 17672 Complete 64 2006-07 DED Dkl Sahi (Panasahi) d EE, PHD- II, Installation of Tubewell ( 3 Nos) at CUTTACK Vivekananda Vidyapitha, Dkl, Jubuli Town ( Hadisahi), Dkl, and in front of PWD IB Complete 65 2006-07 near Shiva Temple, Dkl 146688 145100 d BDO ODAPAD Complete 66 2006-07 A Power Supply to Bachhuribank village 15000 15000 d BDO ODAPAD Const. Of Common Programme Centre at Complete 67 2006-07 A Ranja Singha Upersahi 50000 50000 d BDO ODAPAD Const. Of Common Programme Centre at Complete 68 2006-07 A Ranja Singha Talasahi 50000 50000 d BDO ODAPAD Const. Of Common Programe Centre at Complete 69 2006-07 A Kunjabiharipur 50000 50000 d BDO ODAPAD 70 2006-07 A Const. Of Rest Shed at Badaranibania 50000 0 Ongoing BDO ODAPAD Const. Of Compound Wall of Kandabindha Complete 71 2006-07 A High School 50000 50000 d BDO ODAPAD Const. Of Rest Shed near Kamana Temple , 72 2006-07 A Kandabindha 50000 0 Ongoing BDO ODAPAD L.T.Extension for Power Supply to Complete 73 2006-07 A Haladiabaha Matha Sahi 28000 28000 d EE, PHD- II, Complete 74 2006-07 CUTTACK Water Supply to Chandan Bazar Keutasahi 40000 25400 d EE, PHD- II, Instalation of T/W near Satyananda Rout Complete 75 2006-07 CUTTACK Res,Jayagopal Sahi 53566 37200 d EE, PHD- II, Const. Of Washing Platform, Drain, Tank & Complete 76 2006-07 CUTTACK Pipeline, Balaram temple 250000 223400 d E.O. Dhenkanal Const. Of Changing Room at Mini Complete 77 2006-07 (M) Stadium , Dhenkanal 150000 150000 d E.O. Dhenkanal Compl. Of Restoration work of Mahavir Complete 78 2006-07 (M) Temple, Dhenkanal 200000 200000 d E.O. Dhenkanal Const. Of Rest shed near Kamana Temple, Complete 79 2006-07 (M) Sarjangsahi,Dakhinakali Road 112000 112000 d E.O. Dhenkanal Restoration of Mangala Temple, Complete 80 2006-07 (M) Baunsapatana , Dakhinakali Road 62000 62000 d E.O. Dhenkanal Const. Of Rest Shed near Jayagopal Sahi Complete 81 2006-07 (M) Tank , Dhenkanal 76000 76000 d E.O. Dhenkanal Restoration of Moti Masjid , Kanchan Complete 82 2006-07 (M) Bazar, Dkl(Addl.Cost) 50000 50000 d E.O. Dhenkanal Const. Of Compound Wall of Sambhu Complete 83 2006-07 (M) Gopal Primary School 128000 128000 d E.O. Dhenkanal Const of CC Road in Kabarsthan , Complete 84 2006-07 (M) Bhagabanpur 100000 100000 d Total 7303579 6663425
Executing Sl. Agency Amount No Year Name of the Project Sanctioned Expenditure Status 1 2 3 4 5 6 9 BDO Restoration of Hanuman Temple, Complete 1 2007-08 SADAR Chhakilo 150000 150000 d BDO Const. Of Boundary Wall at Complete 2 2007-08 SADAR Paschimeswar Temple 200000 200000 d BDO Const. Of Comm. Programme Centre at Complete 3 2007-08 SADAR Kakudibhag 120000 120000 d BDO Const. Of Comm. Programme Centre at Complete 4 2007-08 SADAR Krushnaprasad 100000 100000 d BDO Const. Of Library Building of Complete 5 2007-08 SADAR Chinmaya Mission, Dhenkanal 200000 200000 d BDO Complete 6 2007-08 SADAR Impvt. Of B.B.High School , Dhenkanal 200000 200000 d BDO Const. Of Library Building near Complete 7 2007-08 SADAR Ramakrishna Sangha, Khamarsahi 100000 100000 d BDO Restoration of Shiva Temple, Complete 8 2007-08 SADAR Amalapada 50000 50000 d BDO Const. Of Comm. Programme Centre at Complete 9 2007-08 SADAR Chandamarisahi, Amalapada 100000 100000 d BDO Rural Electrification & Road Lighting Complete 10 2007-08 SADAR at Bhapur village 110000 110000 d BDO Rural Electrification & Road Lighting Complete 11 2007-08 SADAR at Kankadahad village 10000 10000 d BDO Rural Electrification & Road Lighting Complete 12 2007-08 SADAR at Sankarpur village 50000 50000 d BDO Rural Electrification & Road Lighting Complete 13 2007-08 SADAR at Badagila village 10000 10000 d BDO Comp. Of Renovation work of Mangala 14 2007-08 SADAR Temple , Sankarpur 60000 40000 Ongoing BDO Conswt. Of CC Road at Sarion (From Complete 15 2007-08 SADAR W.N.10 to 8) 60000 60000 d BDO Const. Of Common Programme Centre Complete 16 2007-08 SADAR at Sansailo,Nilataila,W.N.8 60000 60000 d BDO Const. Of Library Building at Complete 17 2007-08 SADAR Chasapada 60000 60000 d BDO Const. Of CC Road at Navajeevanpur Complete 18 2007-08 SADAR (Situaliasahi) 70000 70000 d BDO Reston. Of Mangala Temple , Complete 19 2007-08 SADAR Gopinathpur patna (M.S.Patna) 60000 60000 d BDO Renovation of Radhakant Jew Temple , Complete 20 2007-08 SADAR Patrabhag 70000 70000 d BDO Const. Of Compound Wall of Complete 21 2007-08 SADAR Swapneswar Temple,Kakudibhag 100000 100000 d BDO Impvt. Of village Play ground, complete 22 2007-08 SADAR Kankadahad 25000 25000 d BDO ODAPAD Restoration of Swapneswar Complete 23 2007-08 A ShivaTemple, Brundabanpur 150000 150000 d BDO ODAPAD Reston of Jagyanswar Temple , Complete 24 2007-08 A Khadagprasad 180000 180000 d BDO ODAPAD Complete 25 2007-08 A Reston of Shiva Temple , Kuspanga 150000 150000 d BDO ODAPAD Const. Of Rest Shed near Hanuman 26 2007-08 A Temple , Bangurusingh 150000 BDO ODAPAD Compl. Of Passenger Rest shed near Complete 27 2007-08 A Trutiya Dev Jew Temple 100000 100000 d BDO ODAPAD Const. Of Class Room at Anchalika Complete 28 2007-08 A H.S., Panamuruga 150000 150000 d BDO ODAPAD Reston. Of Shiva Temple at Complete 29 2007-08 A Murdangapali 80000 80000 d BDO ODAPAD Const. Of Class Room at Kamalanga Complete 30 2007-08 A Primary School 70000 70000 d BDO ODAPAD Comp. Of Comm. Programme Centre at Complete 31 2007-08 A Manpur Paiksahi 60000 60000 d BDO ODAPAD Const. Of Class Room at Nandinidevi Complete 32 2007-08 A H.S., Gaudakateni 100000 100000 d BDO ODAPAD Const. Of Restshed near Jagannath Complete 33 2007-08 A Temple , Nua Odapada 100000 100000 d BDO ODAPAD Const. Of Class Room at Bido High Complete 34 2007-08 A School, Bido 130000 130000 d BDO ODAPAD Completion of Restoration work of 35 2007-08 A Sriram Jew Temple,Kottam 30000 BDO ODAPAD Rural Electrification & Road Lighting Complete 36 2007-08 A at Khadagprasad village 180000 180000 d BDO ODAPAD Rural Electrification & Road Lighting Complete 37 2007-08 A at Nadhera village 50000 50000 d BDO ODAPAD Rural Electrification & Road Lighting Complete 38 2007-08 A at Odapada village 70000 70000 d BDO ODAPAD Rural Electrification & Road Lighting Complete 39 2007-08 A at Gadasila village 70000 70000 d BDO ODAPAD Rural Electrification & Road Lighting Complete 40 2007-08 A at Ghatipiri village 110000 110000 d BDO ODAPAD Rural Electrification & Road Lighting Complete 41 2007-08 A at Uper Baghalunda village 30000 30000 d BDO ODAPAD Rural Electrification & Road Lighting Complete 42 2007-08 A at Indipur village 10000 10000 d BDO ODAPAD Renovation of Trutiya Devi Temple at Complete 43 2007-08 A Panamuruga Chamar Sahi 150000 150000 d BDO ODAPAD Const. Of Rest Shed near Bauti Complete 44 2007-08 A Thakurani Temple, Suravi 50000 50000 d BDO ODAPAD Compl. Of Common Program Centre 45 2007-08 A near RDS Society, Nadhera 30000 BDO ODAPAD Const. Of Common Program Centre at Complete 46 2007-08 A Belpada Harijansahi 50000 50000 d BDO ODAPAD Renovation of Sri Lokanath Temple , Complete 47 2007-08 A Kasiadihi 50000 50000 d BDO ODAPAD Compl. Of Renovatiopn work of Complete 48 2007-08 A Mangala Temple, Sariapada 20000 20000 d BDO ODAPAD Const. Of Common Programe Centre at Complete 49 2007-08 A Matrubhaban 70000 70000 d 50 2007-08 BDO Const. Of Common Programe Centre at 70000 0 Ongoing ODAPAD Chandan Bazarsahi A CESU Power Supply to village Kalikaprasad Complete 51 2007-08 DED DKL Sahadev sahi Under Odapada Block 47351 47351 d CESU Complete 52 2007-08 DED DKL Electrification of Kantanali Basti 24910 24910 d CESU P/S to village Guhaldihi ( Addl cost of 53 2007-08 DED DKL S.P.F.07-08) 39079 EE, PHD- Water Supply from Dolamandap sahi to II, New Dolamandapsahi lane, DKL Complete 54 2007-08 CUTTACK (W.N.16) 193000 147400 d EE RWSS Piped W/S to Aukhuma village (0.5% Complete 55 2007-08 DKL 0f project cost) 136300 d E.O. Const. Of Drain with Culvert from Dhenkanal Sanjaya Sahoo house to Basudev Sahoo Complete (M) 56 2007-08 House 80000 80000 d E.O. Dhenkanal Impvt. Of Cremation Ground at Complete 57 2007-08 (M) Kunjakanta 100000 100000 d E.O. Dhenkanal Impvt. Of Cremation Ground at Suagi, Complete 58 2007-08 (M) Rameswarpur 184500 184500 d E.O. Dhenkanal Impvt. Of Cremation Ground at Complete 59 2007-08 (M) Badajora 100000 100000 d E.O. Dhenkanal Renovation of Church at Jayagopal Complete 60 2007-08 (M) Sahi, Dhenkanal 156000 156000 d E.O. Dhenkanal Const. Of Restshed at Jadupati Vihar , Complete 61 2007-08 (M) Dhenkanal 163000 159815 d E.O. Const. Of Common Programme Centre Dhenkanal near Sudhansu Mahila Samiti 62 2007-08 (M) Mandapasahi 70000 27886 Ongoing E.O. Dhenkanal Restoration of Akhandalamani Temple 63 2007-08 (M) near Bhagirathi sagar,DKL 195000 195000 Ongoing E.O. Dhenkanal Const. Of Library building near Netaji Complete 64 2007-08 (M) Club, Deulsahi, Dhenkanal 100000 100000 d E.O. Dhenkanal Restoration of Zama Masjid , Meena Complete 65 2007-08 (M) Bazar, Dhenkanal 100000 100000 d E.O. Restoration of Bhagabatghar near Maa Dhenkanal Mangala Temple ( Hirasagar Complete 66 2007-08 (M) Tank),Dhenkanal 50000 50000 d E.O. Dhenkanal Restoration of Bhagabat Ghar at Complete 67 2007-08 (M) Ragadisahi, Dhenkanal 70000 62038 d E.O. Dhenkanal Restoration of Moti Masjid , Kanchan Complete 68 2007-08 (M) Bazar, Dhenkanal 50000 50000 d E.O. Dhenkanal Const. Of Drain near Mangala Temple, Complete 69 2007-08 (M) Kumbharasahi 50000 50000 d E.O. Dhenkanal Const. Of Pitch Road from Singh Complete 70 2007-08 (M) Market to Harijan Basti 100000 100000 d E.O. Dhenkanal Const. Of Drain from Kohinoor Hotel to Complete 71 2007-08 (M) N.H.Colony 70000 70000 d E.O. Dhenkanal Const. Of Pitch Road from Complete 72 2007-08 (M) Banamaliprasad to harijan Basti 100000 91581 d E.O. Dhenkanal Const. Of CC Road at Bilasahi Harijan Complete 73 2007-08 (M) Basti 70000 70000 d E.O. Dhenkanal Const. Of Drain from Govt. Girls High 74 2007-08 (M) School to U.CO Bank,DKL 193334 166114 Ongoing E.O. Dhenkanal Const. Of CC Road at Dandasahi Complete 75 2007-08 (M) Harijan Basti 50000 50000 d E.O. Dhenkanal Const. Of Drain with Culvert from Sisir Complete 76 2007-08 (M) house to Hirasagar Tank 77000 67556 d E.O. Dhenkanal Const. Of Drain from Chandan Bazar Complete 77 2007-08 (M) Chhack to Sagarmal Petrol pump 50000 50000 d E.O. Dhenkanal Const. Of Drain at Alasua Nuasahi Hata Complete 78 2007-08 (M) Road 70000 70000 d E.O. Const. Of CC Road from Adibasi Sahi Dhenkanal Laxmighar to Siva Mandir Chhack 79 2007-08 (M) Khamarsahi W.N.10 100000 0 Ongoing E.O. Dhenkanal Reston. Of Gopinath Temple near Complete 80 2007-08 (M) Muktadeipur Sasan 133000 0 d E.O. Dhenkanal Const. Of Pitch Road from Gobardhan Complete 81 2007-08 (M) Behera House to Murdangashi 150000 150000 d Total 7497474 6645151
Executing Sl. Agency Amount No Year Name of the Project Sanctioned Expenditure Status 1 2 3 4 5 6 9 Const. Of Culvert on Tentulipatana to BDO Pathargarh Road(Near cremation 1 2008-09 SADAR ground) 40000 Ongoing BDO Completion of Comm. Programme Complet 2 2008-09 SADAR Centre at Pamal 40000 40000 ed BDO Const of Comm. Programme Centre at Complet 3 2008-09 SADAR Parbatia 80000 76000 ed BDO Const. of Comm. Programme Centre at 4 2008-09 SADAR Tentulipatna 53600 38000 Ongoing BDO Restoration of Sri Ram Temple, Complet 5 2008-09 SADAR Ratnapur 60000 60000 ed BDO Rural Electrification & Road Lighting Complet 6 2008-09 SADAR near Mangala Temple, Sankarpur 50000 50000 ed BDO Const. Of Comm. Programme Centre at 7 2008-09 SADAR Manipur Chasasahi 60000 0 Ongoing BDO Const. Of Rest Shed at Dhala Sahi , 8 2008-09 SADAR Manipur 60000 0 Ongoing BDO Const. Of CC Road at Deopada Tanla 9 2008-09 SADAR Sahi 50000 0 Ongoing
BDO Impvt. Of Common Programme Centre 10 2008-09 SADAR at Deopada Desua sahi ( Harijan Sahi) 40000 0 Ongoing BDO 11 2008-09 SADAR Const. Of Library Building at Badagila 60000 0 Ongoing BDO Const. Of Rest Shed at Jhillipada Sahi , Complet 12 2008-09 SADAR Badagila 50000 50000 ed BDO Const Of Common Programme Centre at Complet 13 2008-09 SADAR Padmanavpur Gaudasahi 60000 60000 ed BDO Const. Of Rest Shed near Mangala Complet 14 2008-09 SADAR Temple , Bankual 70000 70000 ed BDO Const. Of Rest Shed near Hanuman Complet 15 2008-09 SADAR Temple, Sadeibereni 60000 60000 ed BDO Restoration of Nabagraha Temple, Complet 16 2008-09 SADAR Saptasajya 100000 100000 ed BDO Const. Of Rest Shed near Shani Temple, Complet 17 2008-09 SADAR Sadeibereni 50000 50000 ed BDO Rural Electrification & Road Lighting at Complet 18 2008-09 SADAR Sadeibereni Chhak 30000 30000 ed BDO Restoration of Tareni Temple, Complet 19 2008-09 SADAR Kamadhenukote 100000 100000 ed BDO Completion Of Comm. Programme Complet 20 2008-09 SADAR Centre , Krushnaprasad 20000 20000 ed BDO Const. Of Comm. Programme Centre at Complet 21 2008-09 SADAR Gangadharprasad 100000 100000 ed BDO Const. Of Rest Shed at Chasapada Uppar Complet 22 2008-09 SADAR Sahi 60000 60000 ed BDO Complet 23 2008-09 SADAR Const. Of CC Road at Dhirapatna 70000 70000 ed BDO 24 2008-09 SADAR Const. Of Rest Shed at Kasipur 80000 0 Ongoing BDO Restoration of Raghunath Jew Temple, 25 2008-09 SADAR Balyamba 60000 40000 Ongoing BDO Improvement of Rest Shed at Balyamba Complet 26 2008-09 SADAR Uppar Sahi 40000 40000 ed BDO Const. Of Comm. Programme Centre at 27 2008-09 SADAR Sarakapatna 70000 40000 Ongoing BDO Complet 28 2008-09 SADAR Const. Of Rest Shed at Raidihi Tala Sahi 60000 53000 ed BDO Const. Of Comm. Programme Centre at 29 2008-09 SADAR Kantapatna 60000 0 Ongoing BDO Const. Of Women's Comm. Programme Complet 30 2008-09 SADAR Centre, Aukhuma 70000 70000 ed BDO Const. Of Rest Shed at Ganjeidihi Complet 31 2008-09 SADAR Talasahi 60000 54000 ed BDO Const. Of Common Programme Centre Complet 32 2008-09 SADAR at Dhalapur 60000 60000 ed BDO Impvt. Of Rest Shed near Shani Temple , Complet 33 2008-09 SADAR Jhumpudia 20000 20000 ed BDO Improvement of Shani Mandap at Complet 34 2008-09 SADAR Jhumpudia Uppar Sahi 20000 20000 ed BDO Improvement of Shani Mandap at Patna Complet 35 2008-09 SADAR Sahi, Jhumpudia 20000 20000 ed BDO Improvement of Shani Mandap at Complet 36 2008-09 SADAR Majhisahi, Jhumpudia 20000 20000 ed BDO Const. Of Comm. Programme Centre at 37 2008-09 SADAR Motari 80000 35000 Ongoing BDO Restoration of Nrushinghanath Jew 38 2008-09 SADAR Temple, M.S.Patna 150000 20000 Ongoing BDO Const. Of CC Road from Koilipangi Complet 39 2008-09 SADAR Main Road to Dalak Pokhari 80000 80000 ed BDO Restoration of Nilakantheswar Temple, Complet 40 2008-09 SADAR Bishnupur 100000 100000 ed BDO Const. Of Comm. Programme Centre at 41 2008-09 SADAR Tenua 50000 0 Ongoing BDO Const. Of Comm. Programme Centre at Complet 42 2008-09 SADAR Karadamada 50000 50000 ed BDO Const. Of Rest Shed near Hanuman 43 2008-09 SADAR Temple , Beguniapal 70000 34000 Ongoing BDO Const. Of Comm. Programme Centre at Complet 44 2008-09 SADAR Mahulpunji 70000 70000 ed BDO Const. Of Rest Shed near Trinath 45 2008-09 SADAR Temple, Ichhapur 70000 40000 Ongoing BDO Const. Of Comm. Programme Centre at 46 2008-09 SADAR Haridapasi 70000 65000 Ongoing BDO Const. Of Rest Shed at Haridapasi Complet 47 2008-09 SADAR Harijan Sahi 38000 38000 ed BDO Const. Of Comm. Programme Centre at 48 2008-09 SADAR Barsupal 70000 0 Ongoing BDO Const. Of Rest Shed near Jagannath Complet 49 2008-09 SADAR Temple, Similipatna 50000 50000 ed BDO Const. Of Comm. Programme Centre at 50 2008-09 SADAR B.B.Kateni 70000 35000 Ongoing BDO Const. Of Rest Shed at Sansailo Jatra 51 2008-09 SADAR padia 50000 0 Ongoing BDO Const. Of Comm. Programme Centre at 52 2008-09 SADAR Sardeipur 50000 0 Ongoing BDO Const. Of Comm. Programme Centre at 53 2008-09 SADAR Lambodarpur Brahman Sahi 50000 0 Ongoing BDO Rural Electrification & Road Lighting at Complet 54 2008-09 SADAR Gohirakhal Chhak 20000 20000 ed BDO Const. Of Comm. Programme Centre at 55 2008-09 SADAR Namichira 60000 0 Ongoing BDO Const. Of Compound Wall of Complet 56 2008-09 SADAR Swapneswar Temple, Kankadahad 70000 70000 ed BDO Const. Of Rest Shed near Shani Temple 57 2008-09 SADAR Nuabandha Sahi ,Kankadahad 60000 40000 Ongoing
BDO Completion of Comm. Programme Complet 58 2008-09 SADAR Centre near Anata Ashram, Kankadahad 40000 40000 ed BDO Const. Of Comm. Programme Centre at Complet 59 2008-09 SADAR Gothapadia 50000 50000 ed BDO Const. Of Comm. Programme Centre at 60 2008-09 SADAR Tumunda Chhak 70000 50000 Ongoing BDO Const. Of Comm. Programme Centre at 61 2008-09 SADAR Nadhanpur 128000 100000 Ongoing BDO Rural Electrification & Road lighting at Complet 62 2008-09 SADAR Majuri Chhak 20000 20000 ed BDO Rural Electrification & Road lighting at Complet 63 2008-09 SADAR Kantanali Chhak 80000 80000 ed BDO Const. Of Common Programme Centre Complet 64 2008-09 SADAR at Sansailo 70000 70000 ed BDO Completion of Restoration work of Complet 65 2008-09 SADAR Radhakrishna Jew Temple 30000 30000 ed BDO ODAPAD Const. Of Community Programme Complet 66 2008-09 A Centre at Badalo Gopalsahi 115000 115000 ed BDO ODAPAD Complet 67 2008-09 A Restoration of Shiva temple, Ghatipiri 100000 100000 ed BDO ODAPAD Completion of Restoration work of 68 2008-09 A Swapneswar Temple, Brundabanpur 100000 0 Ongoing BDO ODAPAD Completion of Restoration Work of 69 2008-09 A Kapileswar Temple, Kalanga 75000 50000 Ongoing BDO ODAPAD Rural Electrification & Road lighting at Complet 70 2008-09 A Dinabandhupur Chhak 50000 50000 ed BDO ODAPAD Impvt. Of Comm Programme Centre at Complet 71 2008-09 A Nadhera Tala Sahi 40000 40000 ed BDO ODAPAD Const. Of Rest Shed near Shani Mandap, Complet 72 2008-09 A Godidihi 70000 70000 ed BDO ODAPAD Rural Electrification & Road lighting at Complet 73 2008-09 A Balaramprasad village Mandap 20000 20000 ed BDO ODAPAD Rural Electrification & Road lighting at Complet 74 2008-09 A Godidihi village Mandap 70000 70000 ed BDO ODAPAD Rural Electrification & Road lighting at Complet 75 2008-09 A Meramandali Bazar 70000 70000 ed BDO ODAPAD Rural Electrification & Road lighting at Complet 76 2008-09 A Gaudakateni Bazar 30000 30000 ed BDO ODAPAD Rural Electrification & Road lighting at Complet 77 2008-09 A Dhalapur Bus Stand 50000 50000 ed BDO ODAPAD Rural Electrification & Road lighting at Complet 78 2008-09 A Bangurusingh village 50000 50000 ed BDO ODAPAD Rural Electrification & Road lighting at Complet 79 2008-09 A Siminaii Bazar 70000 70000 ed BDO ODAPAD Const. Of Comm. Programme Centre Complet 80 2008-09 A near Chaupadi Pala Mandap,Mangalpur 60000 60000 ed BDO ODAPAD Const. Of Comm. Programme Centre at 81 2008-09 A Bido 60000 0 Ongoing BDO ODAPAD Impvt. Of Comm. Programme Centre at 82 2008-09 A Ragadi Sahi ,Kuspanga 20000 0 Ongoing BDO ODAPAD 83 2008-09 A Restoration of Bhagabat Ghar at Jaripal 70000 56000 Ongoing BDO ODAPAD Const. Of rest Shed near Rama Chandi 84 2008-09 A Temple , Mahadia 70000 0 Ongoing BDO ODAPAD Impvt. Of Sachidananda Complet 85 2008-09 A Mahavidyalaya , Indipur 200000 200000 ed BDO ODAPAD Restoration of Kamana Temple , Nua 86 2008-09 A Oadapada 100000 0 Ongoing BDO ODAPAD Const. Of Rest Shed near Mangala Complet 87 2008-09 A Temple , Chhatia 60000 60000 ed BDO ODAPAD Const. Of Common Programme Centre 88 2008-09 A at Durgapur Gopal Sahi 100000 0 Ongoing EE, PHD- II, Sinking of Tube Well at Godi Sahi , Complet 89 2008-09 CUTTACK Jubuli Town 54700 41347 ed EE, PHD- Sinking of Tube Well near Res. Of Ajit II, Mahammad (MD Garage), Kanchan Complet CUTTACK 90 2008-09 Bazar Chhak 54700 41347 ed EE, PHD- II, Sinking of Tube Well near Res. Of Complet 91 2008-09 CUTTACK Manoranjan Nanda , Chandan Bazar 54700 41347 ed EE, PHD- II, Sinking of Tube Well at Moti Masjid, Complet 92 2008-09 CUTTACK Dhenkanal 54700 41347 ed 93 2008-09 EE, PHD- Sinking of Tube Well at Danda Sahi 54700 41347 Complet II, CUTTACK ed EE, PHD- II, Sinking of Tube Well near Res. Of Complet 94 2008-09 CUTTACK Dolagovind Singh, Baji Chouk 54700 41347 ed EE, PHD- II, Sinking of Tube Well near Complet 95 2008-09 CUTTACK Nilakantheswar Temple, Khamar Sahi 54700 41347 ed EE, PHD- II, Sinking of Tube Well near BB High Complet 96 2008-09 CUTTACK School Hostel 54700 41347 ed EE, PHD- II, Sinking of Tube Well at Church , Complet 97 2008-09 CUTTACK Jayagopal Sahi 54700 41347 ed EE, PHD- II, Sinking of Tube Well at Dama Sahi Complet 98 2008-09 CUTTACK ( Near Anathashram School) 54700 41349 ed EE RWSS Const. & Renovation of RCC Ring 99 2008-09 DKL Recharge Pint in Odapada Block 299988 Ongoing E.O. Dhenkanal Const. Of Community Programme 100 2008-09 (M) Centre at Korian 200000 0 Ongoing E.O. Dhenkanal Const. Of CC Road from R.N.Pattanaik Complet (M) 101 2008-09 house to Dr.R.C.Jee House, Danda Sahi 350000 350000 ed E.O. Dhenkanal Const. Of Compound Wall of Banamali Complet 102 2008-09 (M) Prasad UP School 100000 100000 ed E.O. Dhenkanal Impvt. Of Tenis Coat in the campus of 103 2008-09 (M) DAA,Dhenkanal 30000 E.O. Dhenkanal Completion of Restoration Work of Complet 104 2008-09 (M) Jaunli Pokhari Matha,DKL 100000 100000 ed E.O. Dhenkanal Restoration of Dakhinakali Temple, 105 2008-09 (M) Dhenkanal 100000 0 Ongoing E.O. Dhenkanal Impvt. Of Road from Danda Road to Complet 106 2008-09 (M) Dhala Babu Res 100000 100000 ed E.O. Dhenkanal Restoration of Sidheswar temple, Uttar Complet 107 2008-09 (M) Madhubana,Kunjakanta 50000 50000 ed E.O. Dhenkanal Restoration of Sarala Temple, Complet 108 2008-09 (M) Mandapasahi 35000 35000 ed E.O. Dhenkanal Restoration of Mangala Temple, Complet 109 2008-09 (M) Damasahi 40000 40000 ed E.O. Dhenkanal Restoration of mangala Temple near Complet 110 2008-09 (M) Hirasagar Tank 25000 25000 ed Total 7496588 5032472