(Translation) Minutes of the 9Th Meeting of the Development

Total Page:16

File Type:pdf, Size:1020Kb

(Translation) Minutes of the 9Th Meeting of the Development (Translation) Minutes of the 9th Meeting of the Development, Planning and Transport Committee 5th Wan Chai District Council Hong Kong Special Administrative Region Date : 11 April 2017 (Tuesday) Time : 2:30 p.m. Venue : District Council Conference Room, Wan Chai District Office Present Chairperson Ms LEE Kwun-yee, Kenny, MH Vice-chairperson Mr LAM Wai-man, Wind, Anson Members Mr NG Kam-chun, Stephen, BBS, MH, JP Dr CHOW Kit-bing, Jennifer, BBS, MH Dr TANG King-yung, Anna, BBS, MH Ms NG Yuen-ting, Yolanda, MH The Hon TSE Wai-chun, Paul, JP Ms LEE Pik-yee, Peggy Miss YEUNG Suet-ying, Clarisse Mr LEE Man-lung, Joey Mr CHENG Ki-kin Co-opted Members Mr NG Kwok-shing Ms WONG Ching-chi, Gigi Representatives of Government Departments Miss WONG Wing-yee, Amy Assistant District Officer (Wan Chai), Home Affairs Department Ms LAM Fung-han, Grace Liaison Officer i/c (South), Wan Chai District Office, Home Affairs Department Ms CHAN Ching-han, Peggy Senior Estate Surveyor/HKE(2), Lands Department Miss LO Yuk-man, Josephine Senior Town Planner/HK 3, Planning Department Mr LEUNG Pak-ho, Henry District Operations Officer (Wan Chai), Hong Kong Police Force Mr SIT Ka-fai Officer-in-charge District Traffic Team (Wan Chai), Hong Kong Police Force Mr YU Wing-lun, Alan Senior Environmental Protection Officer(Regional S)4, - 1 - Environmental Protection Department Mr CHAN Chi-pong, Steven Senior Transport Officer/Wan Chai, Transport Department Ms YEUNG Lok-kei, Kiki Engineer/Wan Chai 2, Transport Department Mr Tony C N CHEUNG Project Coordinator/HNW(Wan Chai), District Section, Highways Department Mr HO Yick-man, Evan Engineer 19 (HK Island Division 2), Civil Engineering and Development Department Representatives of Other Government Departments and Organisations Mr TO Chi-hung Engineer/Construction Division, Water Supplies Department Ms WONG Sin-yan Engineer/Consultants Management Division, Water Supplies Department Mr CHOW Man-chung Resident Engineer, AECOM Asia Company Ltd Mr LO Tin-sown President, Wan Chai Community Association Mr TSANG Hin-man Senior Engineer/CWY2, Highways Department Mr CHAN Chi-ming Senior Engineer/Special Duties, Traffic Engineering (HK), Transport Department Mr Walter LAM Construction Manager – SCL Civil, MTR Corporation Limited Mr Vincent YIU Senior Construction Engineer – Civil, MTR Corporation Limited Ms Sandy WU Projects Communications Manager, MTR Corporation Limited Mr WU Ka-lun, Kelvin Senior Liaison Engineer, MTR Corporation Limited Mr SHEK Man-pong, Lawrence Engineer/Priority Railway 8, Transport Department Mr LEUNG Tak-kuen Senior Engineer/SCL(4), Highways Department Ms LI Oi-yin Senior Engineer/SCL(6), Highways Department Mr CHAN Tai-chi Senior Engineer 1/Central Wanchai Bypass, Highways Department Mr TSE Hoi-yin Engineer 5/Central Wanchai Bypass, Highways Department Mr LUK Wai-hung Assistant Director/New Works, Water Supplies Department Mr CHEUNG King-min Senior Engineer/Design(2), Water Supplies Department Mr FUNG Yuk-ming Engineer/Design(9), Water Supplies Department Mr LI Chiu-kit, Joe Senior Transport Officer/Bus and Railway Branch, Transport Department Ms Emily CHUNG Transport Officer/Bus and Railway Branch, Transport Department Mr Mistral SIN Manager (Planning), Citybus Limited/New World First Bus Services Limited Miss Joyce WAN Chief Public Affairs Officer, Citybus Limited/New World First Bus Services Limited Mr LEUNG Wang-cheong Assistant Manager, Lai Chi Kok Depot, The Kowloon Motor Bus Company (1933) Limited Ms Dorothy LAU Assistant Public Relations Manager - External Affairs, MTR Corporation Limited Mr Philip LEUNG Building & Architectural Engineering Manager, MTR Corporation Limited Mr CHAN Chi-hing Executive Director, Centralcon Investment Holding (Hong Kong) Company Limited - 2 - Mr Ambrose TANG Deputy Director, Project Development, Centralcon Investment Holding (Hong Kong) Company Limited Ms Vivian WONG Vice-president, Centralcon Investment Holding (Hong Kong) Company Limited Ms Cindy TSANG Town Planner, Centralcon Investment Holding (Hong Kong) Company Limited Ms Delius WONG Town Planner, Centralcon Investment Holding (Hong Kong) Company Limited Ms Yu-yao GONG Town Planner, Centralcon Investment Holding (Hong Kong) Company Limited Mr Kelvin KUO Geotechnical Engineer, Centralcon Investment Holding (Hong Kong) Company Limited Ms Camay LAM Landscape Architect, Centralcon Investment Holding (Hong Kong) Company Limited Ms Rebecca CHAN Traffic Consultant, Centralcon Investment Holding (Hong Kong) Company Limited Mr Charles LEE Traffic Consultant, Centralcon Investment Holding (Hong Kong) Company Limited Absent with Apologies Mr WONG Wang-tai, Ivan, MH Ms CHUNG Ka-man, Jacqueline Ms CHING Lei-yuen Co-opted Member Ms LAU Pui-shan Co-opted Member Secretary Ms Janet AU Executive Officer (District Council)3, Wan Chai District Office, Home Affairs Department Action Opening Remarks The Chairperson welcomed Members and representatives of government departments to the 9th Meeting of the Development, Planning and Transport Committee (DPTC) of the Wan Chai District Council (WCDC). 2. The Chairperson informed attendees that the meeting would be timed to ensure it be conducted in an efficient manner. Each Member would be allowed to speak for two minutes each time. - 3 - Action 3. The Chairperson reported that the Co-opted Member, Ms LAU Pui-shan had informed the Secretariat prior to the meeting that she was unable to attend the meeting because of other engagements. According to Section 51(1) of the Standing Orders of WCDC, the Council should only give consent to notifications of absence filed on the grounds of sickness or attendance of an activity on behalf of the Council. Therefore, the Co-opted Member, Ms LAU Pui-shan was regarded as being absent from the meeting. Besides, Ms Grace LAM, Liaison Officer i/c (South) stood in for Ms Daphne CHAN, Senior Liaison Officer (Community Affairs), Wan Chai District Office of the Home Affairs Department, who could not attend the meeting either because of other engagements. 4. The Chairperson said that since she could not preside at the meeting due to sickness, the Vice-chairperson would take the chair. 5. The Vice-chairperson said that the Secretariat had been notified by Ms Yolanda NG’s ward office prior to the meeting that Ms Yolanda NG would like to propose an amendment to the draft minutes of the 8th meeting. He suggested reshuffling the priority of the agenda, such that the Secretariat could consolidate the above proposed amendment before the Committee voted to decide whether to pass the motion of confirmation of the minutes of the 8th meeting. 6. Mr Joey LEE hoped that the Secretary could provide supplementary information on the arrangement of agenda items. th 7. The Secretary said that according to the Standing Orders of the 5 WCDC, the Secretary shall prepare the agenda for approval by the Chairman. Subject to the consent of more than half of the members of the Council present at the meeting, the Chairman may at the commencement and in the course of the meeting approve the inclusion of an item in the agenda or adjustment of the order of business on the agenda. 8. Miss Amy WONG of the Home Affairs Department said that since the Secretariat had received the proposed amendment just before the meeting, it would take some time to consolidate the above proposal. The consolidated document would be submitted to the Committee for Members to consider whether to confirm the revised minutes of the 8th meeting. 9. After discussion, Members agreed to the Vice-chairperson’s suggestion. - 4 - Action Information Papers Item 2: Summary of Major Temporary Traffic Arrangements in Wan Chai District - Transport Department (DPTC Paper No. 23/2017) 10. Mr Steven CHAN of the Transport Department (TD) briefly introduced the paper. 11. The Committee noted the above paper. Item 3: Summary of Works in Wan Chai District – Civil Engineering and Development Department (DPTC Paper No. 24/2017) 12. The Chairperson welcomed the following representatives to the meeting: Water Supplies Department (WSD) Engineer/Construction Division Mr TO Chi-hung Engineer/Consultants Management Division Ms WONG Sin-yan AECOM Asia Company Ltd Resident Engineer Mr CHOW Man-chung 13. Mr Evan HO of the Civil Engineering and Development Department (CEDD) briefly introduced the paper. 14. Mr TO Chi-hung of WSD said that since co-ordination would be required between its Public Works Programme (PWP) No. 043WS: Fenwick Street Water Mains Work and the retrofitting of barrier-free facilities at the footbridge at Gloucester Road undertaken by the Highways Department (HyD), the expected completion date of the works at Fenwick Street would be deferred from the third quarter to the fourth quarter of 2017. 15. Members raised the following enquiries: i. The reason for the delay in the completion date of PWP No. 579TH: Central - Wan Chai Bypass and Island Eastern Corridor Link (CWB) construction project; and ii. They enquired whether the Slip Road 8 section of the tunnel beneath Victoria Park would be commissioned on schedule. 16. The Chairperson enquired about the expected completion date of the PWP No. 043WS: Fenwick Street Water Mains Work undertaken by WSD, and whether WSD had convened a meeting with HyD to deliberate about the solutions to the works delay at Fenwick Street. - 5 - Action 17. Mr TO Chi-hung of WSD said that WSD had already convened a meeting with HyD to work out solutions to the problems at the above site. Nevertheless, so far no consensus was reached between the two parties as to the retrofitting of barrier-free facilities and the mainlaying works. It was therefore anticipated that the works would be postponed for three to four months. 18. The Vice-chairperson thanked the representatives of WSD for attending the meeting. (Representatives of WSD left the meeting.) (Ms Yolanda NG joined the meeting at 2:45 p.m.) (Post-meeting note: CEDD had submitted after the meeting the supplementary information related to PWP No. 579TH: CWB construction project and PWP No. 043WS: Fenwick Street Water Mains Work undertaken by WSD.
Recommended publications
  • Transport Department Notice
    TRANSPORT DEPARTMENT NOTICE Special Traffic and Transport Arrangements on Hong Kong Island for the Public Processions on 1 January 2020 (Wednesday) Notice is hereby given that the following special traffic and transport arrangements will be implemented to facilitate the public processions on Hong Kong Island on 1 January 2020 (Wednesday): I. Special Traffic Arrangements A. Road Closure (i) The following roads will be temporarily closed to all vehicular traffic from about 1.30 pm onwards until the crowd is dispersed and the road closure is lifted: (a) The U-turn slip road leading from Gloucester Road southbound to Gloucester Road northbound underneath Tai Hang Road flyover; (b) Sugar Street; (c) Great George Street (if necessary); (d) The section of Paterson Street between Gloucester Road and Great George Street (if necessary); (e) Kingston Street (if necessary); (f) The section of Gloucester Road southbound between Victoria Park Roadflyover and Causeway Road (if necessary); (g) Cleveland Street (if necessary); (h) Cannon Street (if necessary); (i) The section of Lockhart Road east of Percival Street (if necessary); and (j) The section of Jaffe Road east of Percival Street (if necessary). (ii) The following roads will be temporarily closed to all vehicular traffic from about 1.45 pm onwards until the crowd is dispersed and the road closure is lifted: (a) Jardine’s Bazaar; (b) Tang Lung Street; (c) The section of Canal Road East between Russell Street and Hennessy Road; (d) The section of Canal Road West between Sharp Street West and Hennessy Road; (e) The section of Wan Chai Road between Canal Road West and Morrison Hill Road; and (f) The section of Bowrington Road between Sharp Street West and Hennessy Road.
    [Show full text]
  • List of Buildings with Confirmed / Probable Cases of COVID-19
    List of Buildings With Confirmed / Probable Cases of COVID-19 List of Residential Buildings in Which Confirmed / Probable Cases Have Resided (Note: The buildings will remain on the list for 14 days since the reported date.) Related Confirmed / District Building Name Probable Case(s) Islands Hong Kong Skycity Marriott Hotel 5482 Islands Hong Kong Skycity Marriott Hotel 5483 Yau Tsim Mong Block 2, The Long Beach 5484 Kwun Tong Dorsett Kwun Tong, Hong Kong 5486 Wan Chai Victoria Heights, 43A Stubbs Road 5487 Islands Tower 3, The Visionary 5488 Sha Tin Yue Chak House, Yue Tin Court 5492 Islands Hong Kong Skycity Marriott Hotel 5496 Tuen Mun King On House, Shan King Estate 5497 Tuen Mun King On House, Shan King Estate 5498 Kowloon City Sik Man House, Ho Man Tin Estate 5499 Wan Chai 168 Tung Lo Wan Road 5500 Sha Tin Block F, Garden Rivera 5501 Sai Kung Clear Water Bay Apartments 5502 Southern Red Hill Park 5503 Sai Kung Po Lam Estate, Po Tai House 5504 Sha Tin Block F, Garden Rivera 5505 Islands Ying Yat House, Yat Tung Estate 5506 Kwun Tong Block 17, Laguna City 5507 Crowne Plaza Hong Kong Kowloon East Sai Kung 5509 Hotel Eastern Tower 2, Pacific Palisades 5510 Kowloon City Billion Court 5511 Yau Tsim Mong Lee Man Building 5512 Central & Western Tai Fat Building 5513 Wan Chai Malibu Garden 5514 Sai Kung Alto Residences 5515 Wan Chai Chee On Building 5516 Sai Kung Block 2, Hillview Court 5517 Tsuen Wan Hoi Pa San Tsuen 5518 Central & Western Flourish Court 5520 1 Related Confirmed / District Building Name Probable Case(s) Wong Tai Sin Fu Tung House, Tung Tau Estate 5521 Yau Tsim Mong Tai Chuen Building, Cosmopolitan Estates 5523 Yau Tsim Mong Yan Hong Building 5524 Sha Tin Block 5, Royal Ascot 5525 Sha Tin Yiu Ping House, Yiu On Estate 5526 Sha Tin Block 5, Royal Ascot 5529 Wan Chai Block E, Beverly Hill 5530 Yau Tsim Mong Tower 1, The Harbourside 5531 Yuen Long Wah Choi House, Tin Wah Estate 5532 Yau Tsim Mong Lee Man Building 5533 Yau Tsim Mong Paradise Square 5534 Kowloon City Tower 3, K.
    [Show full text]
  • 5 Days in HK
    5 days in HK Contact us | turipo.com | [email protected] 5 days in HK Our Hong Kong trip plan. Full day by day travel plan for our summer vacaon in Hong Kong. It is hard to visualize unless you’ve been there and experienced the energy that envelops the enre country. Every corner of Hong Kong has something to discover, here are the top aracons and things to do in Hong Kong to consider, our China travel guide. Contact us | turipo.com | [email protected] Day 1 - Hong Kong Park & Victoria Peak Contact us | turipo.com | [email protected] Day 1 - Hong Kong Park & Victoria Peak 1. Hong Kong Park 4. Victoria Peak Duration ~ 2 Hours Duration ~ 1 Hour Mid-level, Hong Kong Victoria Peak, The Peak, Hong Kong Rating: 4.5 Start the day off with an invigorang walk through Hong Kong Park, admiring fountains, landscaping, and even an At the summit, incredible visuals await—especially around aviary before heading towards the Peak Tram, which takes sunset. you to the top of the famous Victoria Peak. WIKIPEDIA Victoria Peak is a mountain in the western half of Hong Kong 2. Hong Kong Zoological And Botanical Gardens Island. It is also known as Mount Ausn, and locally as The Duration ~ 1 Hour Peak. With an elevaon of 552 m, it is the highest mountain on Hong Kong island, ranked 31 in terms of elevaon in the Hong Kong Hong Kong Special Administrave Region. The summit is Rating: 2.9 more.. Nearby the peak Tram Hong Kong Zoological and Botanical Gardens, a free aracon, is also not even 5 minutes away from the Peak Tram.
    [Show full text]
  • Public Waste Recovery Facilities (Central and Wan Chai)
    Public Waste Recovery Facilities (Central and Wan Chai) The one-year programme "Mobile Community Recycling Shop" will end on September 16, 2012 (Sunday). Upon the completion of the “Mobile Community Recycling Shop" programme, citizens are encouraged to continue to practice source separation of waste by making good use of the waste recovery facilities at their residential buildings, housing estates or workplaces. For convenience, we have compiled below a list of some public waste recovery facilities in Central and Wan Chai for reference. Please note the exact locations and opening hours of the recovery facilities may be adjusted as per the actual operational situations. Thank you for your kind attention. Three-coloured Recyclables Collection Bins 6) Junction of Ice House Street and Chater 1) Lockhart Road Market Road 2) Outside Sogo Department Store, Hennessy Road 7) Corridor of Central Pier no. 9 3) Pavement near junction of Yee Wo Street and 8) Statue Square,Chater Road(Prince Paterson Street Building) 4) Open space between Statue Square and Prince’s 9) Chater Garden, Chater Road Building (opposite to AIG Tower) 5) In front of Central MTR Station exit C at 18 Des 10) Hong Kong City Hall Voeux Road Central Glass Bottles Collection Point Name Address Working hour Shop S45, basement, East Buddhist Compassion Relief Tue to Sat 10:00 a.m. - 3:00 p.m. Point Centre, 1056 King’s road, Tzu-chi Foundation (except Sun and Mon) Hong Kong 1 Stadium Path, So Kon Po, Olympic House 24 hours Causeway Bay, Hong Kong. Central and Western District Elderly Community Centre - 11/F, Sheung Wan Municipal St.
    [Show full text]
  • 1193Rd Minutes
    Minutes of 1193rd Meeting of the Town Planning Board held on 17.1.2019 Present Permanent Secretary for Development Chairperson (Planning and Lands) Ms Bernadette H.H. Linn Professor S.C. Wong Vice-chairperson Mr Lincoln L.H. Huang Mr Sunny L.K. Ho Dr F.C. Chan Mr David Y.T. Lui Dr Frankie W.C. Yeung Mr Peter K.T. Yuen Mr Philip S.L. Kan Dr Lawrence W.C. Poon Mr Wilson Y.W. Fung Dr C.H. Hau Mr Alex T.H. Lai Professor T.S. Liu Ms Sandy H.Y. Wong Mr Franklin Yu - 2 - Mr Daniel K.S. Lau Ms Lilian S.K. Law Mr K.W. Leung Professor John C.Y. Ng Chief Traffic Engineer (Hong Kong) Transport Department Mr Eddie S.K. Leung Chief Engineer (Works) Home Affairs Department Mr Martin W.C. Kwan Deputy Director of Environmental Protection (1) Environmental Protection Department Mr. Elvis W.K. Au Assistant Director (Regional 1) Lands Department Mr. Simon S.W. Wang Director of Planning Mr Raymond K.W. Lee Deputy Director of Planning/District Secretary Ms Jacinta K.C. Woo Absent with Apologies Mr H.W. Cheung Mr Ivan C.S. Fu Mr Stephen H.B. Yau Mr K.K. Cheung Mr Thomas O.S. Ho Dr Lawrence K.C. Li Mr Stephen L.H. Liu Miss Winnie W.M. Ng Mr Stanley T.S. Choi - 3 - Mr L.T. Kwok Dr Jeanne C.Y. Ng Professor Jonathan W.C. Wong Mr Ricky W.Y. Yu In Attendance Assistant Director of Planning/Board Ms Fiona S.Y.
    [Show full text]
  • Agreement No. TD 50/2007 Traffic Study for Mid-Levels Area
    Agreement No. TD 50/2007 Traffic Study for Mid-Levels Area Executive Summary 半山區發展限制範圍 研究範圍 August 2010 Agreement No. TD 50/2007 Executive Summary Traffic Study for Mid-Levels Area TABLE OF CONTENTS Page 1. INTRODUCTION 1 1.1 Background 1 1.2 Study Objectives 2 1.3 Study Approach and Process 3 1.4 Structure of this Executive Summary 3 2. EXISTING TRAFFIC CONDITIONS 4 2.1 Review of Available Transport Data 4 2.2 Supplementary Traffic Surveys 4 2.3 Existing Traffic Situation 5 3. REDEVELOPMENT POTENTIAL IN MID-LEVELS 8 3.1 Identification of Potential Redevelopment Sites 8 3.2 Maximum Permissible GFA of the Potential Redevelopment Sites 9 3.3 Establishment of Redevelopment Scenarios 10 4. TRAFFIC IMPACT ASSESSMENTS 13 4.1 Transport Model Development 13 4.2 Redevelopment Traffic Generation 14 4.3 Junction Performance Assessments 15 4.4 Effects of West Island Line 17 5. TRAFFIC IMPROVEMENT PROPOSALS 18 5.1 Overview 18 5.2 Proposed Improvement Measures 18 5.3 Measures Considered But Not Pursued 20 6. REVIEW OF THE MID-LEVELS MORATORIUM 22 6.1 Overview 22 6.2 Lifting the MM 22 6.3 Strengthening the MM 23 6.4 Alternative Means of Planning Control 23 6.5 Retaining the MM 24 7. CONCLUSION 25 7.1 Recommendations 25 7.2 Way Forward 26 LIST OF TABLES Page Table 2.1 Summary of Surveys Undertaken 4 Table 2.2 Comparison of Key Demographic and General Traffic Characteristics in Mid-Levels, Happy Valley and Braemar Hill 6/7 Table 3.1 Potential Redevelopment Sites by Type of Lease and Land Use Zoning 8 Table 3.2 Maximum Permissible GFA of the Potential Redevelopment Sites 9 Table 3.3 Summary of Redevelopment Scenarios 10 i Agreement No.
    [Show full text]
  • The Hongkong and Shanghai Banking Corporation Branch Location
    The Hongkong and Shanghai Banking Corporation Bank Branch Address 1. Causeway Bay Branch Basement 1 and Shop G08, G/F, Causeway Bay Plaza 2, 463-483 Lockhart Road, Causeway Bay, Hong Kong 2. Happy Valley Branch G/F, Sun & Moon Building, 45 Sing Woo Road, Happy Valley, Hong Kong 3. Hopewell Centre Branch Shop 2A, 2/F, Hopewell Centre, 183 Queen's Road East, Wan Chai, Hong Kong 4. Park Lane Branch Shops 1.09 - 1.10, 1/F, Style House, Park Lane Hotel, 310 Gloucester Road, Causeway Bay, Hong Kong 5. Sun Hung Kai Centre Shops 115-117 & 127-133, 1/F, Sun Hung Kai Centre, Branch 30 Harbour Road, Wan Chai, Hong Kong 6. Central Branch Basement, 29 Queen's Road Central, Central, Hong Kong 7. Exchange Square Branch Shop 102, 1/F, Exchange Square Podium, Central, Hong Kong 8. Hay Wah Building Hay Wah Building, 71-85 Hennessy Road, Wan Chai, Branch Hong Kong 9. Hong Kong Office Level 3, 1 Queen's Road Central, Central, Hong Kong 10. Chai Wan Branch Shop No. 1-11, Block B, G/F, Walton Estate, Chai Wan, Hong Kong 11. Cityplaza Branch Unit 065, Cityplaza I, Taikoo Shing, Quarry Bay, Hong Kong 12. Electric Road Branch Shop A2, Block A, Sea View Estate, Watson Road, North Point, Hong Kong 13. Island Place Branch Shop 131 - 132, Island Place, 500 King's Road, North Point, Hong Kong 14. North Point Branch G/F, Winner House, 306-316 King's Road, North Point, Hong Kong 15. Quarry Bay Branch* G/F- 1/F, 971 King's Road, Quarry Bay, Hong Kong 16.
    [Show full text]
  • Distribution Point of Sold Tourist Octopus
    Distribution point of Sold Tourist Octopus All 7-Eleven at MTR stations and the below listed stores G01 Shun Tak Centre, 200 Connaught Rd C, HK-Macau Ferry Terminal, HK Shop 289 on 2nd Floor, Shun Tak Centre, 200 Connaught Road Central, Hong Kong Shop 1C, 1D & 1E, G/F, Queen's Terrace, 1 Queen Street, Sheung Wan, HK Shops F & G, Ground Floor, Hollywood Garden, No. 222 Hollywood Road, Sheung Wan, HK G/F & the Cockloft, No. 298 Des Voeux Road Central, Sheung Wan, Hong Kong Shop B, Ground Floor, 106 Jervois Street, Sheung Wan, Hong Kong G/F., No.40 Elgin Street, Central, Hong Kong G/F, Teng Fuh Commercial Building, 331-333 Queen's Road Central, Central, HK Shop No.106, First Floor, Infinitus Plaza, No.199 Des Voeux Road Central, Hong Kong Shop No. 5, G/F, The Peak Galleria, 118 Peak Road, Hong Kong G/F., Winner House,15 Wong Nei Chung Road, Happy Valley, HK Shop E & F, G/F., New Spring Gdn Mansion, 47-56 Spring Garden Lane, Wanchai, HK G6, G/F, Harbour Centre, 25 Harbour Rd., Wanchai, HK Shop 3, G/F, Professional Bldg., 19-23 Tung Lo Wan Road, HK Shop 2, 20 Luard Road, Wanchai, HK Shop A, G/F, 151 Lockhart Road, Wanchai, HK Portion of shop A, B & C, G/F Sun Tao Bldg, 12-18 Morrison Hill Rd, HK Shop C, G/F Pak Shing Bldg, 168-174 Tung Lo Wan Rd, Causeway Bay, HK Shop C, G/F, Siu Fung Building, 9-17 Tin Lok Lane, Wanchai, HK G4, G/F, Hennessy House (CLI Bldg), 313-317B Hennesy Rd, Wanchai, HK Shop B, G/F, Allied Kajima Bldg., 138 Gloucester Road, Wanchai, HK Shop 3, UG/F., Kam Kwong Mansion, 36-44 King Kwong St, Happy Valley, HK G/F, The Chinese Bank Bldg, 2A Pottinger St, 61-65 Des Voeux Rd C, HK Shop C, G/F, Grand View Comm Bldg, Nos.29-31 Sugar St, Causeway Bay, HK G/F., No.
    [Show full text]
  • When Is the Best Time to Go to Hong Kong?
    Page 1 of 98 Chris’ Copyrights @ 2011 When Is The Best Time To Go To Hong Kong? Winter Season (December - March) is the most relaxing and comfortable time to go to Hong Kong but besides the weather, there's little else to do since the "Sale Season" occurs during Summer. There are some sales during Christmas & Chinese New Year but 90% of the clothes are for winter. Hong Kong can get very foggy during winter, as such, visit to the Peak is a hit-or-miss affair. A foggy bird's eye view of HK isn't really nice. Summer Season (May - October) is similar to Manila's weather, very hot but moving around in Hong Kong can get extra uncomfortable because of the high humidity which gives the "sticky" feeling. Hong Kong's rainy season also falls on their summer, July & August has the highest rainfall count and the typhoons also arrive in these months. The Sale / Shopping Festival is from the start of July to the start of September. If the sky is clear, the view from the Peak is great. Avoid going to Hong Kong when there are large-scale exhibitions or ongoing tournaments like the Hong Kong Sevens Rugby Tournament because hotel prices will be significantly higher. CUSTOMS & DUTY FREE ALLOWANCES & RESTRICTIONS • Currency - No restrictions • Tobacco - 19 cigarettes or 1 cigar or 25 grams of other manufactured tobacco • Liquor - 1 bottle of wine or spirits • Perfume - 60ml of perfume & 250 ml of eau de toilette • Cameras - No restrictions • Film - Reasonable for personal use • Gifts - Reasonable amount • Agricultural Items - Refer to consulate Note: • If arriving from Macau, duty-free imports for Macau residents are limited to half the above cigarette, cigar & tobacco allowance • Aircraft crew & passengers in direct transit via Hong Kong are limited to 20 cigarettes or 57 grams of pipe tobacco.
    [Show full text]
  • Annual Report 2011 Corporate Information
    CHINA 中國 KOWLOON DEVELOPMENT COMPANY LIMITED HONG KONG 香港 MACAU 九龍建業有限公司 澳門 Kowloon Development Company Limited (Stock Code: 34) has been pursuing a three-tier development strategy in the Greater China region, with its core property business in the Hong Kong and Mainland China markets, and carrying out its Macau property business through its 73.4%-owned listed subsidiary, Polytec Asset Holdings Limited (Stock Code: 208). The Group is now well positioned in all three markets, with its attributable landbank exceeding 5 million sq m. It is committed to enhance its competitive advantages and to become one of the few listed companies in Hong Kong to have capacity to grow significantly in all three markets. 九龍建業有限公司(股份代號:34)在大中華地區奉行三線發展策略,核心業務為香港及中國內地市場之地產 業務,並通過其擁有73.4%權益之上市附屬公司保利達資產控股有限公司(股份代號:208)經營澳門地產業 務。本集團目前在區內三大市場作出卓越部署,其應佔土地儲備逾五百萬平方米,並致力提升本身之競爭優 勢,目標成為少數能夠在三大市場取得顯著增長之香港上市公司之一。 CONTENTS 002 Corporate Information 004 Highlights 005 Group’s Business Structure 006 Five-Year Financial Summary 010 Chairman’s Statement 016 Review of Operations 038 Financial Review 040 Profile of Directors 042 Corporate Governance Report 050 Report of the Directors 059 Independent Auditor’s Report 060 Consolidated Income Statement 061 Consolidated Statement of Comprehensive Income 062 Consolidated Balance Sheet 064 Balance Sheet 065 Consolidated Statement of Changes in Equity 066 Consolidated Cash Flow Statement 067 Notes on the Accounts 127 Particulars of Properties KOWLOON DEVELOPMENT COMPANY LIMITED CORPORATE INFORMATION BOARD OF DIRECTORS AND COMMITTEES
    [Show full text]
  • This Announcement Is for Information Purposes Only and Does Not Constitute an Invitation Or Offer to Acquire, Purchase Or Subscribe for Securities
    This announcement is for information purposes only and does not constitute an invitation or offer to acquire, purchase or subscribe for securities. The Stock Exchange of Hong Kong Limited (the “Hong Kong Stock Exchange”) and Hong Kong Securities Clearing Company Limited (“HKSCC”) take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. In connection with the Global Offering, Goldman Sachs (Asia) L.L.C. (“Goldman Sachs”), as stabilizing manager, and/or its affiliates and agents on behalf of the Underwriters, may over-allocate or effect transactions with a view to stabilising or maintaining the market price of the H Shares at a level higher than that which might otherwise prevail for a limited period commencing from the day on which the H Shares commence trading on the Stock Exchange. However, there is no obligation on Goldman Sachs or any person acting for it to conduct any such stabilizing action. Such stabilization may be effected in all jurisdictions where it is permissible to do so, in each case in compliance with all applicable laws and regulatory requirements, including the Securities and Futures (Price Stabilizing) Rules made under the Securities and Futures Ordinance (Cap. 571 of the Laws of Hong Kong). Such stabilization, if commenced, will be conducted at the absolute discretion of the stabilizing manager or any person acting for it and may be discontinued at any time, and must be brought to an end after a limited period.
    [Show full text]
  • HIA Report for Reprovisioning of Harcourt Road Fresh Water
    HERITAGE IMPACT ASSESSMENT FOR REPROVISIONING OF HARCOURT ROAD FRESH WATER PUMPING STATION Client: Water Supplies Department Heritage Consultant: February 2014 HERITAGE IMPACT ASSESSMENT FOR REPROVISIONING OF HARCOURT ROAD FRESH WATER PUMPING STATION Applicant: Water Supplies Department Heritage Consultant: AGC Design Ltd. Acknowledgements The author of this report would like to acknowledge the following persons, parties, organisations and departments for their assistance and contribution in preparing this report: • Water Supplies Department, The Government of the Hong Kong SAR • Antiquities and Monuments Office • Urbis Limited HERITAGE IMPACT ASSESSMENT FOR REPROVISIONING OF HARCOURT ROAD FRESH WATER PUMPING STATION TABLE OF CONTENT List of Figures ............................................................................................................... ii List of Abbreviations .................................................................................................... iv 1.0 INTROUCTION ................................................................................................. 1 1.1 Purpose of the Report ................................................................................................................. 1 1.2 Description of Project ................................................................................................................. 1 1.3 Study Area for HIA ...................................................................................................................... 3 1.4 Scope of HIA
    [Show full text]