LANE CLOSURE REPORT FOR THE WEEK OF: 9/28/2015 Prepared by: Connell Resources, Inc.- Aaron Pacholek Highway No: US 85 Project Location Description- 2015 work from south end of Pierce, CO (mile point 283.450) Project Info Line/Email (970) 373-1584/ to Rockport, CO (mile point 301.000) https://www.codot.gov/projects/us85aulttowyoming (nearest town, intersection, etc.) Brief Description of Project: Widen roadway shoulders, pipe work, rumble strips & Proj. Start Date: June 8th, 2015 Est. Completion Date: October 2016 roadway resurfacing. CDOT Project Manager: Nicola Upright Phone: (970) 506-4945 Contractor & Contact (Prime) Connell Resources, Inc.- Aaron Pacholek Phone: (970) 223-3151 (call mobile first) Other Contact: Connell Resources, Inc.- Lloyd Deschene (970) 227-7600 or Traffic Masters, Inc.- (970) 674-3450

DAY DATE TIMES LOCATION OF CLOSURE MM# to MM# Direction LANE(S) CLOSED

N S SUN 9/27 No Work No Work E W

US 85 between CR 120 to CR 114 301.0 – 298.0 N S 7:00 a.m.- MON 9/28 US 85 between CR 96 to CR 90 287.0 – 284.0 One lane road 5:00 p.m. 293.3

US 85 between CR 120 to CR 114 N S 7:00 a.m.- 301.0 – 298.0 One lane road TUE 9/29 US 85 between CR 96 to CR 90 5:00 p.m. 287.0 – 284.0

US 85 between CR 120 to CR 114 301.0 – 298.0 N S 7:00 a.m.- WED 9/30 US 85 between CR 96 to CR 90 287.0 – 284.0 One lane road 5:00 p.m. US 85 & CR 108 293.3

US 85 between CR 120 to CR 114 301.0 – 298.0 N S 7:00 a.m.- One lane road THU 10/1 US 85 between CR 96 to CR 90 287.0 – 284.0 5:00 p.m. US 85 & CR 108 293.3

US 85 between CR 120 to CR 114 N S 7:00 a.m.- 301.0 – 298.0 FRI 10/2 US 85 between CR 96 to CR 90 One lane road 5:00 p.m. 287.0 – 284.0

N S SAT 10/3 No Work No Work E W

OS/OW Restrictions, Detours, Speed Reductions, Etc.: Width restriction of 12 feet from 6 a.m. until 6 p.m. on working days. Speed reduction to 40 m.p.h. in work zones and overnight in areas. Motorist should expect uneven lanes. Motorist should expect delays. Pilot cars will be guiding traffic through work areas.