Arkansas State Highway and Transportation Department
Total Page:16
File Type:pdf, Size:1020Kb

4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 110551
HWY. 50-NORTH (OVERLAY) (S)
ROUTE: 147 COUNTY: CRITTENDEN DISTRICT: 01 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 1.60 MILES OF HIGHWAY 147 IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, TACK COAT, ACHM SURFACE COURSE, COLD MILLING, ACHM PATCHING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------11 APAC-TENNESSEE, INC. | MEMPHIS, TN | 627,641.49 ------12 DRUMMOND ASPHALT CONST., INC. | WYNNE, AR | ------
1 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 110552
WOODALE RD.-I-40 (FORREST CITY) (OVERLAY) (S)
ROUTE: 1B COUNTY: ST. FRANCIS DISTRICT: 01 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 3.39 MILES OF HIGHWAY 1 IN ST. FRANCIS COUNTY. THIS PROJECT CONSISTS OF TACK COAT, ACHM SURFACE COURSE, COLD MILLING, ACHM PATCHING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------11 APAC-TENNESSEE, INC. | MEMPHIS, TN | 1,249,821.25 ------13 DRUMMOND ASPHALT CONST., INC. | WYNNE, AR | ------12 M & T PAVING & CONST. CO., INC. | FORREST CITY, AR | 1,244,694.37 ------
2 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 020522
I-530/HWY. 270 BRIDGE ABUTMENT SLOPE REPAIR (S)
ROUTE: 530 COUNTY: JEFFERSON DISTRICT: 02 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO REPAIR THE BRIDGE ABUTMENT SLOPE ON I-530 IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF CONCRETE RIPRAP, ROCK FILL, CONCRETE DITCH PAVING, MAINTENANCE OF TRAFFIC, EROSION CONTROL, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------20 D & D PAVING, INC. | SHERRILL, AR | ------16 GRAVES AND ASSOCIATES, INC. | PINE BLUFF, AR | 189,668.00 ------21 KESSER INTERNATIONAL, INC. | LITTLE ROCK, AR | 197,247.77 ------11 1911 CONSTRUCTION COMPANY, INC. | PINE BLUFF, AR | 133,464.20 ------13 R. L. PERSONS CONST., INC. | POPLAR BLUFF, MO | ------15 REDSTONE CONST. GROUP, INC. | LITTLE ROCK, AR | 199,846.90 ------17 JAMES A. ROGERS EXCAVATING, INC. | ALEXANDER, AR | ------14 SALT CREEK PAVING & CONST. CO., INC. | BENTON, AR | ------19 SIMCO, INC. | NO. LITTLE ROCK, AR | ------18 SOUTHERN STATE CONSTRUCTION | HERMITAGE, AR | ------12 R. THOMPSON, INC. | HAMBURG, AR | ------
3 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 020524
TAYLOR PHILLIPS RD.-HWYS. 81/425 (OVERLAY) (S)
ROUTE: 65 COUNTY: JEFFERSON DISTRICT: 02 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 2.25 MILES OF HIGHWAY 65 IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF ACHM BINDER AND SURFACE COURSES, COLD MILLING, ACHM PATCHING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------14 CRANFORD CONSTRUCTION CO. | NO. LITTLE ROCK, AR | ------17 D & D PAVING, INC. | SHERRILL, AR | ------16 GRAVES AND ASSOCIATES, INC. | PINE BLUFF, AR | ------12 M & T PAVING & CONST. CO., INC. | FORREST CITY, AR | ------11 PINE BLUFF SAND & GRAVEL CO. | PINE BLUFF, AR | 1,288,132.19 ------15 REDSTONE CONST. GROUP, INC. | LITTLE ROCK, AR | 1,318,689.86 ------13 SALT CREEK PAVING & CONST. CO., INC. | BENTON, AR | ------
4 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 030395
LA LINE-BRADLEY & HWY. 29-WEST (OVERLAY) (S)
ROUTE: 29 & 160 COUNTY: LAFAYETTE DISTRICT: 03 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 5.77 MILES OF HIGHWAYS 29 AND 160 IN LAFAYETTE COUNTY. THIS PROJECT CONSISTS OF TACK COAT, ACHM SURFACE COURSE, COLD MILLING, ACHM PATCHING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------12 B & H CONTRACTING, L.P. | PARIS, TX | 1,584,913.66 ------11 JET ASPHALT & ROCK CO., INC. | EL DORADO, AR | 1,551,270.27 ------13 JOHNSVILLE COMPANY, LLC | HERMITAGE, AR | ------
5 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 040585
HWYS. 22/64-NORTH (OVERLAY) (S)
ROUTE: 64 COUNTY: SEBASTIAN DISTRICT: 04 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 0.99 MILE OF HIGHWAY 64 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF TACK COAT, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------11 FORSGREN, INC. | FORT SMITH, AR | 542,878.10 ------
6 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 040587
SEBASTIAN CO. LINE-NORTH (OVERLAY) (S)
ROUTE: 64 COUNTY: CRAWFORD DISTRICT: 04 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 2.17 MILES OF HIGHWAY 64 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, TACK COAT, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------11 FORSGREN, INC. | FORT SMITH, AR | 926,234.60 ------
7 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 040589
MILL CREEK-SOUTH (OVERLAY) (S)
ROUTE: 71 COUNTY: SCOTT DISTRICT: 04 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 2.27 MILES OF HIGHWAY 71 IN SCOTT COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, TACK COAT, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, EROSION CONTROL ITEMS, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------13 B & H CONTRACTING, L.P. | PARIS, TX | 799,156.50 ------12 BLACKSTONE CONSTRUCTION, LLC | RUSSELLVILLE, AR | 664,768.99 ------11 FORSGREN, INC. | FORT SMITH, AR | 695,136.88 ------
8 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB FS5007
CO. RD. 142-HWY. 124 (S)
ROUTE: 110 COUNTY: CLEBURNE & WHITE DISTRICT: 05 APHN: NO
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 10.49 MILES OF HIGHWAY 110 IN CLEBURNE AND WHITE COUNTIES. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------12 ATLAS ASPHALT, INC. | JONESBORO, AR | 1,159,367.79 ------13 CRANFORD CONSTRUCTION CO. | NO. LITTLE ROCK, AR | ------11 DELTA ASPHALT OF ARK., INC. | PARAGOULD, AR | 1,126,994.47 ------14 ROGERS GROUP, INC. | NASHVILLE, TN | 1,247,755.26 ------
9 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB FS5008
HWY. 67-EAST (S)
ROUTE: 258 COUNTY: WHITE DISTRICT: 05 APHN: NO
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 0.61 MILE OF HIGHWAY 258 IN WHITE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------11 DELTA ASPHALT OF ARK., INC. | PARAGOULD, AR | 112,051.61 ------12 SALT CREEK PAVING & CONST. CO., INC. | BENTON, AR | ------
10 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 050247
CAVE CITY-SOUTH (OVERLAY) (S)
ROUTE: 167 COUNTY: INDEPENDENCE DISTRICT: 05 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 2.25 MILES OF HIGHWAY 167 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------11 ATLAS ASPHALT, INC. | JONESBORO, AR | 440,499.21 ------
11 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 050248
HWY. 58E-LAWRENCE CO. LINE (OVERLAY) (S)
ROUTE: 63 COUNTY: SHARP DISTRICT: 05 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 5.26 MILES OF HIGHWAY 63 IN SHARP COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------11 ATLAS ASPHALT, INC. | JONESBORO, AR | 890,802.90 ------12 DELTA ASPHALT OF ARK., INC. | PARAGOULD, AR | 874,165.22 ------13 PACE CONSTRUCTION CO., LLC | ST. LOUIS, MO | 1,130,000.00 ------
12 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 061256
HWY. 70-SEVIER ST. CABLE MEDIAN BARRIER (F)
ROUTE: 30 COUNTY: SALINE DISTRICT: 06 APHN: YES
FEDERAL AID PROJECT 9050
THE PURPOSE OF THIS PROJECT IS TO INSTALL WIRE ROPE SAFETY FENCE FOR 4.461 MILES OF INTERSTATE 30 SOUTH OF BENTON IN SALINE COUNTY. THIS PROJECT CONSISTS OF GRADING, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, CONCRETE DITCH PAVING, EROSION CONTROL ITEMS, WIRE ROPE SAFETY FENCE AND MISC. ITEMS.
PROPOSAL PROPOSAL DAYS AMOUNT
NUMBER HOLDER BID FOR AWARD ------18 COLLINS & HERMANN, INC. | | ST. LOUIS, MO | 45 | 1,880,143.01 ------16 CRANFORD CONSTRUCTION CO. | | NO. LITTLE ROCK, AR | | ------14 INTERSTATE IMPROVEMENT, INC. | | FARIBAULT, MN | | ------13 MARTIN MARIETTA MATERIALS, INC. | | HOT SPRINGS, AR | | ------11 NATIONWIDE CONSTRUCTION GROUP | | CHESTERFIELD, MI | 25 | 1,638,959.05 ------17 REDSTONE CONST. GROUP, INC. | | LITTLE ROCK, AR | | ------15 SALT CREEK PAVING & CONST. CO., INC. | | BENTON, AR | | ------12 R. THOMPSON, INC. | | HAMBURG, AR | | ------
13 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 061304
HWY. 5-NORTH (SEL. SECS.) (OVERLAY) (S)
ROUTE: 7 COUNTY: GARLAND DISTRICT: 06 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 4.10 MILES OF HIGHWAY 7 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------14 B & H CONTRACTING, L.P. | PARIS, TX | ------12 CRANFORD CONSTRUCTION CO. | NO. LITTLE ROCK, AR | 752.071.12 ------11 MARTIN MARIETTA MATERIALS, INC. | HOT SPRINGS, AR | 682,177.68 ------13 REDSTONE CONST. GROUP, INC. | LITTLE ROCK, AR | 762,020.05 ------
14 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 061305
FOUR MILE CR.-NORTH & SOUTH (OVERLAY) (S)
ROUTE: 5 COUNTY: LONOKE DISTRICT: 06 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 2.00 MILES OF HIGHWAY 5 IN LONOKE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------11 CRANFORD CONSTRUCTION CO. | NO. LITTLE ROCK, AR | 360,681.71 ------12 REDSTONE CONST. GROUP, INC. | LITTLE ROCK, AR | ------13 ROGERS GROUP, INC. | NASHVILLE, TN | 324,737.38 ------
15 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 061306
HWY. 128-BISMARCK (OVERLAY) (S)
ROUTE: 7 COUNTY: HOT SPRING DISTRICT: 06 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 4.31 MILES OF HIGHWAY 7 IN HOT SPRING COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------14 B & H CONTRACTING, L.P. | PARIS, TX | ------12 CRANFORD CONSTRUCTION CO. | NO. LITTLE ROCK, AR | 726,375.71 ------11 MARTIN MARIETTA MATERIALS, INC. | HOT SPRINGS, AR | 737,048.65 ------13 REDSTONE CONST. GROUP, INC. | LITTLE ROCK, AR | 709,821.49 ------
16 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 070351
HWY. 273-NORTH (OVERLAY) (S)
ROUTE: 9 COUNTY: DALLAS DISTRICT: 07 APHN: NO
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 4.00 MILES OF HIGHWAY 9 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF TACK COAT, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------12 CRANFORD CONSTRUCTION CO. | NO. LITTLE ROCK, AR | ------14 D & D PAVING, INC. | SHERRILL, AR | ------11 JET ASPHALT & ROCK CO., INC. | EL DORADO, AR | 836,362.18 ------13 JOHNSVILLE COMPANY, LLC | HERMITAGE, AR | ------
17 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB FS8008
MARTINVILLE-HWY. 65 (S)
ROUTE: 124 COUNTY: FAULKNER DISTRICT: 08 APHN: NO
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 5.71 MILES OF HIGHWAY 124 IN FAULKNER COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, AGGREGATE SURFACE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING, ACHM PATCHING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------12 ATLAS ASPHALT, INC. | JONESBORO, AR | ------11 DELTA ASPHALT OF ARK., INC. | PARAGOULD, AR | 920,827.43 ------13 REDSTONE CONST. GROUP, INC. | LITTLE ROCK, AR | ------14 ROGERS GROUP, INC. | NASHVILLE, TN | 890,650.43 ------
18 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 080406
TYLER RD. (RUSSELLVILLE)-EAST (OVERLAY) (S)
ROUTE: 64 COUNTY: POPE DISTRICT: 08 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 2.96 MILES OF HIGHWAY 64 IN POPE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURFACE COURSE, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------11 BLACKSTONE CONSTRUCTION, LLC | RUSSELLVILLE, AR | 736,176.00 ------12 ROGERS GROUP, INC. | NASHVILLE, TN | 757,076.06 ------
19 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 080407
HWY. 28-SOUTH (SEL. SECS.) (OVERLAY) (S)
ROUTE: 27 COUNTY: YELL DISTRICT: 08 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 5.12 MILES OF HIGHWAY 27 IN YELL COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURFACE COURSE, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------12 BLACKSTONE CONSTRUCTION, LLC | RUSSELLVILLE, AR | 995,829.54 ------11 MARTIN MARIETTA MATERIALS, INC. | HOT SPRINGS, AR | ------13 ROGERS GROUP, INC. | NASHVILLE, TN | 1,037,371.65 ------
20 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 009901
HWY. 143-BERRYVILLE (S)
ROUTE: 62 COUNTY: CARROLL DISTRICT: 09 APHN: YES
FEDERAL AID PROJECT STP-0008(29)
THE PURPOSE OF THIS PROJECT IS TO WIDEN 2.777 MILES OF HWY. 62 IN CARROLL COUNTY. A PORTION OF THE PROJECT IS 5 LANE OPEN SHOULDER AND THE REMAINDER IS 5 LANE CURB AND GUTTER. A PORTION OF THE OPEN SHOULDER SECTION IS ON NEW LOCATION. THIS PROJECT CONSISTS OF GRADING, MINOR DRAINAGE STRUCTURES, AGGREGATE (CLASS 7), ACHM BASE, BINDER, AND SURFACE COURSES, MAINTENANCE OF TRAFFIC ITEMS, EROSION CONTROL ITEMS, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------15 APAC-CENTRAL, INC. | FAYETTEVILLE, AR | 10,632,942.96 ------17 CROUSE CONSTRUCTION CO. | HARRISON, AR | 9,977,083.74 ------11 DECCO CONTRACTORS-PAVING, INC. | ROGERS, AR | 12,910,668.87 ------20 HEAVY CONSTRUCTORS OF ARKANSAS, LLC | BERRYVILLE, AR | ------19 J. JOHNSON CONST. CO. INC. | ROGERS, AR | ------12 LEO JOURNAGAN CONST. CO., INC. | SPRINGFIELD, MO | 9,437,158.81 ------13 KOSS CONSTRUCTION CO. | TOPEKA, KS | ------18 MCGEORGE CONTRACTING CO., INC. | PINE BLUFF, AR | ------14 MOBLEY CONTRACTORS, INC. | MORRILTON, AR | ------16 NABHOLZ CONSTRUCTION CORPORATION | ROGERS, AR | ------
21 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 090307
I-540-HWY. 94 & I-540-HWY. 71B (OVERLAY) (S)
ROUTE: 62 & 264 COUNTY: BENTON DISTRICT: 09 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 3.90 MILES OF HIGHWAYS 62 AND 264 IN BENTON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE, TACK COAT, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------12 APAC-CENTRAL, INC. | FAYETTEVILLE, AR | 1,120,596.47 ------11 DECCO CONTRACTORS-PAVING, INC. | ROGERS, AR | 1,370,162.77 ------13 HUTCHENS CONSTRUCTION CO. | CASSVILLE, MO | 1,183,287.21 ------
22 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 100730
HWY. 1/FOX MEADOW LN. & HWY. 91/UNIVERSITY LOOP SIGNALS(JONESBORO)(S)
ROUTE: 1 & 91 COUNTY: CRAIGHEAD DISTRICT: 10 APHN: YES
FEDERAL AID PROJECT STP-9227(44)
THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT AND INSTALL TRAFFIC SIGNALS AT THE INTERSECTIONS OF HWY. 1 AND FOX MEADOW LN. AND HWY. 91 & UNIVERSITY LOOP IN THE CITY OF JONESBORO IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF TRAFFIC SIGNAL EQUIPMENT, REMOVAL AND DISPOSAL ITEMS, PAVEMENT MARKINGS AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------12 ALL SERVICE ELECTRIC, INC. | HOT SPRINGS, AR | 228,523.15 ------16 CONSTRUCTION MGMT. & MAINT., INC. | NO. LITTLE ROCK, AR | 268,000.00 ------15 DESOTO COUNTY ELECTRIC, INC. | HORN LAKE, MS | ------14 EWING SIGNAL CONSTRUCTION, LLC | NIXA, MO | ------17 L.E.G. ENTERPRISES, INC. | CABOT, AR | 232,804.63 ------11 SHELBY ELECTRIC CO., INC. | MEMPHIS, TN | 243,604.77 ------13 TOWNSHIP BUILDERS, INC. | LITTLE ROCK, AR | 269,778.00 ------
23 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 100745
I-55-NORTH (BLYTHEVILLE) (OVERLAY) (S)
ROUTE: 61 COUNTY: MISSISSIPPI DISTRICT: 10 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 2.00 MILES OF HIGHWAY 61 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF TACK COAT, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------11 DELTA ASPHALT OF ARK., INC. | PARAGOULD, AR |734,269.03 ------
24 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB 100746
HWY. 49-EAST & HWY. 158-SOUTH (OVERLAY) (S)
ROUTE: 1 & 14 COUNTY: POINSETT DISTRICT: 10 APHN: YES
STATE JOB
THE PURPOSE OF THIS PROJECT IS TO OVERLAY 5.02 MILES OF HIGHWAYS 1 AND 14 IN POINSETT COUNTY. THIS PROJECT CONSISTS OF TACK COAT, ACHM SURFACE COURSE, COLD MILLING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------12 ASPHALT PRODUCERS, LLC | JONESBORO, AR |684,197.82 ------11 ATLAS ASPHALT, INC. | JONESBORO, AR |712,051.08 ------
25 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB FA5307
HWY. 155-EAST (PHASE 1) (S)
ROUTE: CR 14 COUNTY: PERRY DISTRICT: 08 APHN: -
FEDERAL AID PROJECT STPR-0053(26)
THE PURPOSE OF THIS PROJECT IS TO RECONSTRUCT APPROXIMATELY 1.04 MILES OF COUNTY ROAD 14 IN PERRY COUNTY. THIS PROJECT CONSISTS OF CLEARING, GRADING, AGGREGATE BASE COURSE, MINOR DRAINAGE STRUCTURES, EROSION CONTROL ITEMS AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------18 BLACKSTONE CONSTRUCTION, LLC | RUSSELLVILLE, AR | ------22 BOWDEN SPECIALTIES, INC. | DARDANELLE, AR |758,333.13 ------24 CROW PAVING, INC. | MORRILTON, AR |741,858.00 ------14 HARDROCK CONSTRUCTION, INC. | RUSSELLVILLE AR | ------23 JCI CONSTRUCTION, INC. | MAYFLOWER, AR |806,795.15 ------19 J. JOHNSON CONST. CO. INC. | ROGERS, AR |730,817.95 ------12 LENTZ CONST. CO., INC. | MORRILTON, AR |887,812.35 ------15 TOM LINDSEY CONTRACTOR, INC. | CONWAY, AR | ------11 MOBLEY CONTRACTORS, INC. | MORRILTON, AR |764,664.00 ------21 NABHOLZ CONSTRUCTION CORPORATION | ROGERS, AR |691,782.71 ------25 NATIONWIDE CONSTRUCTION GROUP | CHESTERFIELD, MI | ------17 REDSTONE CONST. GROUP, INC. | LITTLE ROCK, AR |820,824.04 ------20 JAMES A. ROGERS EXCAVATING, INC. | ALEXANDER, AR |854,814.44 ------13 R. THOMPSON, INC. | HAMBURG, AR | ------16 TOWNSHIP BUILDERS, INC. | LITTLE ROCK, AR |1,067,505.00 ------
26 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB SA5340
CO. RD. 43-CO. RD. 45 (RESEAL) (S)
ROUTE: CR 42 COUNTY: PERRY DISTRICT: 08 APHN: -
STATE AID JOB
THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 3.95 MILES OF COUNTY ROAD 42 IN PERRY COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TREATMENT, PAVEMENT MARKINGS AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------13 C & F CONST. CO., INC. | SMACKOVER, AR | ------11 SALT CREEK PAVING & CONST. CO., INC. | BENTON, AR |96,340.32 ------12 SPA CONSTRUCTION CO., INC. | HOT SPRINGS, AR |101,531.94 ------
27 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB SA5548
HWY. 84-NORTHWEST (SURFACING) (S)
ROUTE: CR 272 COUNTY: PIKE DISTRICT: 03 APHN: -
STATE AID JOB
THE PURPOSE OF THIS PROJECT IS TO RECONSTRUCT BASE COURSE AND SURFACE APPROXIMATELY 2.76 MILES OF COUNTY ROAD 272 IN PIKE COUNTY. THIS PROJECT CONSISTS OF RECONSTRUCTED BASE COURSE, PRIME COAT, DOUBLE ASPHALT SURFACE TREATMENT, PAVEMENT MARKING AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------14 C & F CONST. CO., INC. | SMACKOVER, AR |247,771.94 ------11 PIKE COUNTY | MURFREESBORO, AR |164,999.09 ------12 SALT CREEK PAVING & CONST. CO., INC. | BENTON, AR |248,245.16 ------13 SPA CONSTRUCTION CO., INC. | HOT SPRINGS, AR |276,742.87 ------
28 4/13/11 – 2:00 P.M. ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
JOB SA6728
SHARP COUNTY OVERLAY (SEL. SECS.) (S)
ROUTE: CRS 23 & 16 COUNTY: SHARP DISTRICT: 05 APHN: -
STATE AID JOB
THE PURPOSE OF THIS PROJECT IS TO SURFACE 2.40 MILES OF COUNTY ROAD 23 (GRANGE ROAD) AND 1.40 MILES OF COUNTY ROAD 16 (NELSONVILLE ROAD) IN SHARP COUNTY. THIS PROJECT CONSISTS OF TACK COAT, ACHM SURFACE COURSE, PAVEMENT MARKINGS, STANDARD SIGNS AND MISC. ITEMS.
PROPOSAL PROPOSAL AMOUNT NUMBER HOLDER BID ------12 ATLAS ASPHALT, INC. | JONESBORO, AR |363,930.13 ------11 DELTA ASPHALT OF ARK., INC. | PARAGOULD, AR |332,095.37 ------
29