Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor “Ventspils nafta”, Jsc (reception of oil and oil products from pipelines and tank cars, storage, loading to tankers) 08/13- “Ventspils nafta” terminals, Supervision of in-site process pipeline junction reconstruction 1. Company infrastructure present Ltd./ --- works “Ventspils nafta” terminals, Engineering design documenation for butanization facility 2. 04/13-08/13 Company infrastructure Ltd./ --- modernization project “Ventspils nafta” terminals, Design and setup of 6 kV electrical installations, software. 3. 01/13-07/13 Pump station No.2 Ltd./ „SZMA V” JSC Technological process setup “Ventspils nafta” terminals, Feasibility study of buthanization facility modernization 4. 12/12- 06/13 Company infrastructure Ltd./ --- scenarios “Ventspils nafta” terminals, Development of construction design for internal process pipes 5. 09/12- 02/13 Company infrastructure Ltd./ --- junctions “Ventspils nafta” terminals, 08/12- 06/13 6. Ltd./ --- Pump station No.2 Reconstruction supervision of process pump station No.2 “Ventspils nafta” terminals, Developmet and start-up of upgraded versions of APCS and 7. 07/12- 11/12 Pump station No.4 Ltd./ „SZMA V” JSC energy ACS software. Process equipment commissioning “Ventspils nafta” terminals, 6 kV electric equipment, software development and start-up, 8. 02/12- 11/12 Pump station No.3 Ltd./ „SZMA V” JSC process equipment commissioning “Ventspils nafta” terminals, 02/12-11/12 9. Ltd./ --- Pump station No.4 Reconstruction supervision of process pump station No.4 Development of engineering design for construction of new “Ventspils nafta” terminals, 09/11-11/12 10. Ltd./ Company infrastructure pipeline route from “Ventspils nafta” termināls ltd. territory to oil jetties. “Ventspils nafta” terminals, Engineering design for heating units alteration and development 11. 09/11-12/12 Railway unloading platform No.4 Ltd./ of software for vapor recovery system “Ventspils nafta” terminals, 11/11 -12/11 12. Ltd./ Company infrastructure Leak detection software development “Ventspils nafta” terminals, Supervision of process pump station No.3 reconstruction 13. 07/11- 10/12 Pump station No.3 Ltd./ process. “Ventspils nafta” terminals, Engineering design for Extension of industrial waste water pre- 14. 06/11-02/12 Company infrastructure Ltd./ treatment facilities. “Ventspils nafta” terminals, Engineering design for reconstruction of Pump stations No.2- 15. 08/10 -06/11 Pump stations No. 2,3,4 Ltd./--- No.4.

“Ventspils nafta” terminals, 08/10 -10/10 16. Ltd./--- Berths No.2,3 Automation solutions of berths No.2, No.3. 17. 08/10 -02/11 “Ventspils nafta” terminals, Company infrastructure Development and approval of engineering design project for 1 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor vapor recovery system of,„Ventspils nafta” termināls” Ltd. Ltd./--- Design supervision. Software development, adjustment and commissioning for “Ventspils nafta” terminals, 05/10 -10/10 18. Ltd./ „SZMA V” JSC Company infrastructure „Ventspils nafta” termināls” pump station located in Ventspils, Talsu str. 75. “Ventspils nafta” terminals, Construction and installation works, procurement of materials 19. 04/10- 12/11 Company infrastructure Ltd./ ZRF „Rumba” Ltd. and equipment for „Ventspils nafta” termināls” piping system. “Ventspils nafta” terminals, Engineering design of pump station No.6 located in “Ventspils 20. 12/09-02/10 Pump station No.6a Ltd./--- nafta” termināls” rented area. Engineering design of communication channel connecting the “Ventspils nafta” terminals, pieres located at Dzintaru str. 90 (Ventspils) and pieres in 21. 11/09-12/09 Company infrastructure Ltd./A-Servis Group Ltd. “Ventspils nafta” termināls” area (Talsu str.75, Ventspils). Procurement, installation works, commissioning. “Ventspils nafta” terminals, Procurement, installation and commissioning of fire detection 22. 11/09-04/10 Company infrastructure Ltd./ A-Servis Group Ltd. and fire-fighting equipment “Ventspils nafta” terminals, Engineering design of replacement and re-location of foam 23. 10/09 Storage tanks No. 401-410 Ltd./--- generators of storage tanks No.401 - 410 “Ventspils nafta” terminals, Engineering design of pipeline construction in “Ventspils nafta” 24. 10/09-12/09 Company infrastructure Ltd./ termināls” rented area. “Ventspils nafta” terminals, 11/09- 05/10 25. Ltd./--- Company infrastructure Construction of benzene butanization facilities complex “Ventspils nafta” terminals, Development of joint automatic process control centre (APCS) 26. 05/09-06/10 Platform No.1 Ltd./ for “Ventspils nafta” terminals, Ltd. Construction design „Newly-designed pipeline corridor from “Ventspils nafta” terminals, Ventspils Nafta territory to oil berths. Pipeline section No.4 on 27. 04/09-09/09 Company infrastructure Ltd./ „Ventbunkers“ JSC territory. Editing and re-approval of the documentation“. “Ventspils nafta” terminals, Development of engineering design of the project „“Ventspils 28. 04/09-08/09 Company infrastructure Ltd./ nafta” terminals, Ltd.“Butanization facilities complex“ “Ventspils nafta” terminals, Development of engineering design of „“Ventspils nafta” 29. 04/09-08/09 Company infrastructure Ltd./ terminals, Ltd.“ pump station No.9 “Ventspils nafta” terminals, Development and adaptation of software for integration of 6 30. 08/08-11/08 Company infrastructure Ltd./SZMA V, Jsc CONTRALOTRON flow meters into the existing system. “Ventspils nafta” terminals, Front-end engineering of the project „“Ventspils nafta” 31. 08/08-09/08 Company infrastructure Ltd./ --- terminals, Ltd.“Butanization facilities complex“ “Ventspils nafta” terminals, Front-end engineering of the project „Newly-designed pipeline 32. 08/08-10/08 Company infrastructure Ltd./ --- corridor from “Ventspils nafta” terminals, Ltd”. 2 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Front-end engineering of the project „Connections and fittings of “Ventspils nafta” terminals, 08/08-10/08 33. Ltd./ --- Company infrastructure complex vapour recovery facilities located on jetties No.2 and No.3“ “Ventspils nafta” terminals, Front-end engineering of the project „Construction of pump- 34. 08/08-10/08 Company infrastructure Ltd./ --- house in tank farm 6x20000 m3 zone“ “Ventspils nafta” terminals, Development of engineering design of the project “Ventspils 35. 07/08 Company infrastructure Ltd./ --- Nafta, ltd. Connections ad fittings of loading arms on jetty No.2” “Ventspils nafta” terminals, Modernization of APCS (transfer of dispatch control system into 36. 06/08-09/08 Company infrastructure Ltd./ --- control room of platform No.1) Engineering design of modernization of oil loading/unloading “Ventspils nafta” terminals, 04/08-09/08 37. Ltd./SZMA V, Jsc Company infrastructure pump emergency shut-down system, delivery of equipment and materials, software development, adjustment and alignment “Ventspils nafta” terminals, Engineering design of pipeline DN400 for loading of oil on 2nd 38. 04/08- 05/08 Company infrastructure Ltd./ --- Pier berth No.31 “Ventspils nafta” terminals, APCS modernization concept (development of joint control 39. 01/08-05/08 Platforms No. 1,2,3,4 Ltd./ --- centre of platforms No. 1,2,3,4) Engineering design of local water treatment constructions, 40. “Ventspils nafta” terminals, 01/08- 12/08 Company infrastructure construction and assembly works, procurement, adjustment and Ltd./ --- alignment 12/07- “Ventspils nafta” terminals, Construction design of industrial pipelines No.29, 31 to berths 41. Company infrastructure postponed Jsc./ --- 35A, 36 “Ventspils nafta” terminals, Pre-design inspection of industrial waste water pre-treatment 42. 12/07-01/08 Company infrastructure Ltd./ --- plants “Ventspils nafta” terminals, Engineering design of diesel-fuel transfer applying pumps No. 43. 10/07-11/07 Platform No.3 Ltd./ --- 150, 152 of pump station No.4 Engineering design of transposition of industrial pipelines No. “Ventspils nafta” terminals, 06/07-12/07 44. Ltd./ --- Company infrastructure 29-31 to the coastal zone of Pier No.1; integration to technologies of Pier no.2 “Ventspils nafta” terminals, 04/07 -12/07 45. Ltd./ --- Company infrastructure Medium-voltage equipment maintenance “Ventspils nafta” terminals, Changes in the project “The remote control of the foam fire- 46. 10/06-11/06 Loading/unloading railway platform No.3 Ltd./ --- fighting valves at the Loading/unloading railway platform No.3” “Ventspils nafta” terminals, 04/06- 07/06 47. Ltd./ --- Storage area 1,3 Adjustment of high-voltage electrical equipment “Ventspils nafta” terminals, 04/06- 07/06 48. Ltd./ --- Relay-type protection of 6 kV circuits “Ventspils nafta” terminals, Supervision of development of an information system for the 49. 03/06- 12/10 Dispatching office Ltd./ --- dispatching service 3 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor “Ventspils nafta” terminals, 08/05-02/06 50. Ltd./ Venceb, Jsc Loading/unloading railway platform No.4 Detailed design of spur tracks “Ventspils nafta” terminals, 06/05-12/05 51. Ltd./ --- Switchgears No.2, 34,12,16,18 Testing of relay-type protection system “Ventspils nafta” terminals, 02/05-04/05 52. Ltd./ --- Storage area 1 Repair or the projector SCADA. 53. 10/04-11/04 Ventspils nafta, Jsc / --- Tank farm Metrological certification of the system SAAB TRL/2 of 5 tanks. 54. 06/04-08/04 Ventspils nafta, Jsc / --- Dispatching office Modernisation of the dispatching office Information System 55. 05/04- 08/04 Ventspils nafta, Jsc / --- Tank farm Metrological certification of the system SAAB TRL/2 of 20 tanks. 56. 11/03-12/03 Ventspils nafta, Jsc / --- Dispatching office Repair of a dispatching office projector 57. 06/03-07/03 Ventspils nafta, Jsc / --- Tank farm Metrological certification of the system SAAB TRL/2 of 18 tanks. Draft and detailed design, construction and assembly, supply of Ventspils nafta, Jsc / --- 05/03-11/04 58. Venceb, Jsc Loading/unloading railway platform No.4 equipment and materials, installation, system adjustment. Comprehensive commissioning. Start-up. Supervision. Transfer of process control system from the joint operators’ 59. 02/03-03/03 Ventspils nafta, Jsc / --- Process control system of the Company room to the operators’ room of the 4th storage area. Metrological certification of the system SAAB Tank Radar of 15 60. 10/02-12/02 Ventspils nafta, Jsc/ --- Tank farm tanks. 61. 08/02-11/02 Ventspils nafta, Jsc / --- Water and foam supply on Pier 2 Detailed design of transfer. 62. 08/02-10/02 Ventspils nafta, Jsc / --- Pipelines160 and 161 saddles on Pier 3 Detailed design of reconstruction. Concept of development of information and control complex of 63. 07/02-11/02 Ventspils nafta, Jsc / --- Company Infrastructure common infrastructure systems. 64. 07/02-12/02 Ventspils nafta, Jsc / --- Dispatch service of the Company Update of information system of the dispatch service. Ventspils nafta, Jsc / SKONTO Construction of the technological pump- 65. 05/02- 09/03 Electrical engineering and automation work package. BŪVE, Ltd station No.7 66. 02/02-05/02 Ventspils nafta, Jsc / --- Fire-fighting system Detailed design of upgrade of unified fire alarm system. 67. 02/02-05/02 Ventspils nafta, Jsc /--- Storage areas No.No.1, 2, 3 Software development for process automated control system. Crude oil and light oil products unloading 68. 02/02-11/02 Ventspils nafta, Jsc / --- Detailed design of reconstruction. Supervision. railway platform No.1 Metrological certification of the system SAAB Tank Radar L/2 69. 07/01-12/01 Ventspils nafta, Jsc / --- Tank farm (TRL/2) of 70 tanks. Enlargement of the dispatch system, transfer of calculations 70. 06/01-03/02 Ventspils nafta, Jsc / --- Dispatch system of the Company from Krava to Oracle. 71. 03/01-07/01 Ventspils nafta, Jsc / --- Pump station No.7 and manifold No.10 Development of a detailed design of construction. Supervision. Metrological certification of the system SAAB Tank Radar L/2 72. 03/01-06/01 Ventspils nafta, Jsc / --- Storage area No.1 (TRL/2) of 21 tanks. 4 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Enlargement of technological information indicator board (6 73. 03/01-06/01 Ventspils nafta, Jsc / --- Storage area No.1 modules added). Transfer of process control of tanks 401 - 404 of storage area No.4 to the Operators’ Room of storage area No.4. Transfer of 74. 02/01-03/01 Ventspils nafta, Jsc / --- Tank farm process control of tanks 405 - 410 to the Operators’ Room of storage area No.3. New pipeline corridor from Ventspils 75. 06/00 -12/03 Ventspils nafta, Jsc / --- Detailed design of reconstruction. nafta Ltd to the piers Metrological certification of the system SAAB Tank Radar L/2 76. 03/00-06/00 Ventspils nafta, Jsc / --- Tank farm (TRL/2) of 12 tanks. 77. 02/00-05/01 Ventspils nafta, Jsc / --- Storage area No.1 Development of SCADA system. 78. 02/00-05/01 Ventspils nafta, Jsc / --- Storage area No.1 Development of fire-fighting SCADA system. Ventspils nafta, Jsc / Full Automation, electrical engineering, automated fire fighting and Responsibility Contract New tank farm 79. 11/99-07/01 Company created by fire alarm, complex commissioning, warranty service and 2 х 50 000 m3 SKONTO BŪVE Ltd and maintenance. Venceb Jsc Development of a backup network for automated fire fighting 80. 08/99-02/00 Ventspils nafta, Jsc / --- Storage areas No.No.2 and 3 and fire alarm system. 81. 08/99-02/00 Ventspils nafta, Jsc / --- Power supply of the Company (6 kV) SCADA system. Draft design. Tank farm 24 х 5 000 m3 of storage area 82. 06/99-10/99 Ventspils nafta, Jsc / --- Development of fire-fighting SCADA system. No.2 Ventspils nafta, Jsc / New two-side loading/unloading railway Automation, electrical engineering, automated fire-fighting and 83. 05/99-03/01 Venceb Jsc platform fire alarm, complex commissioning. Tank farm 24х5 000 m3 of storage area 84. 05/99-10/99 Ventspils nafta, Jsc / --- Development of SCADA system. No.2 Metrological certification of the system SAAB Tank Radar L/2 85. 05/99-12/99 Ventspils nafta, Jsc / --- Storage areas No.No.2 and 3 (TRL/2) of 2nd and 3rd storage area tanks. Ventspils nafta, Jsc / Two-side loading/unloading railway 86. 02/99-07/00 Development of detailed design of technology. AO “ Venceb” platform Ventspils nafta, Jsc / Full Responsibility Contract 87. 12/98-02/99 Company created by Tank farm 6 х 20 000 m3 Transfer of 6 kV line and lightning conductor. SKONTO BŪVE Ltd and Venceb Jsc Ventspils nafta, Jsc / ABB Power supply of the Company (10 kV). 88. 12/98-03/99 Detailed design of reconstruction. Latvia Distributing Device No.9 Ventspils nafta, Jsc / Detailed design of reconstruction. Design of compensation of 89. 12/98-03/99 Power supply of the Company (0.4 kV) Venceb, Jsc reactive power in the network of the Company. 5 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor 90. 10/98-12/99 Ventspils nafta, Jsc / --- Dispatch control system Development of technological information dispatch system. Detailed design of SCADA. Detailed design of SCADA for Ventspils nafta, Jsc / Full automated fire alarm and fire fighting. Detailed design of power Responsibility Contract supply and electric lighting control system. Detailed design of 91. 07/98-12/99 Company created by New tank farm 6 х 20 000 m3 SKONTO BŪVE Ltd and technology. Automation, electrical engineering, complex Venceb Jsc commissioning, warranty service and maintenance, training of Customer’s personnel. Ventspils nafta, Jsc / 06/98- 09/98 92. Ierosme Loading/unloading railway platform Draft design. 93. 06/98-05/99 Ventspils nafta, Jsc / --- Storage area No.3 Development of SCADA for fire alarm system. 94. 06/98-08/98 Ventspils nafta, Jsc / --- Storage area No.3 Detailed design of reconstruction of electric lighting. 95. 06/98-08/98 Ventspils nafta, Jsc / --- Pump Stations No.3, 4 Detailed design of reconstruction of electric lighting. Ventspils nafta, Jsc / Detailed design of reconstruction. Electrical engineering and 96. 03/98-12/99 Industrial sewerage system Venceb Jsc automation. Detailed design of process automated control system. Detailed Ventspils nafta, Jsc / New tank farm design of automated fire alarm and fire fighting control system. 97. 02/98-12/99 SKONTO BŪVE, Ltd 2 х 50 000 m3 Detailed design of power supply and electric lighting control system. Development of SCADA of fire-fighting system. Detailed design of process automated control system. Detailed Ventspils nafta, Jsc / New diesel oil tank farm design of automated fire alarm and fire fighting control system. 98. 02/98-12/99 SKONTO BŪVE, Ltd 2 х 20 000 m3 Detailed design of power supply and electric lighting control system. Development of SCADA of fire-fighting system. Reconstruction of process automated control system, including the integration of SCADA systems of tank farms 15 х 20000 m3, 99. 12/97-11/98 Ventspils nafta, Jsc / --- Storage area No.3 5 х 20000 m3 and 18 х 2 0000 m³. Oil accounting system, balances and inventory. Shutdown of pumps from the piers in case of an emergency. Ventspils nafta, Jsc / Detailed design of reconstruction of fire fighting pump station 100. 12/97-01/98 Power supply of the Company (0.4 kV) LEC, Ltd complex transformer substation. Detailed design of reconstruction. General layout of cable 101. 12/97-04/98 Ventspils nafta, Jsc / --- Power supply of the Company (6 kV) network. Power supply of the Company (0.4 kV). Detailed design of reconstruction. Power supply. Electric 102. 10/97-12/97 Ventspils nafta, Jsc / --- Repairing and engineering workshop lighting. Power devices. Development of detailed design of reconstruction of the unified 103. 06/97-07/97 Ventspils nafta, Jsc / --- Storage area No.3 automated fire alarm and fire fighting system of the tank farm.

6 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Ventspils nafta, Jsc / Development of SCADA system for technological process Full Responsibility Contract automatic remote control system. 104. 06/97- 07/98 Company created by Tank farm 5 х 20 000 m3 SKONTO BŪVE Ltd and Development of SCADA for fire fighting system. Venceb Jsc Complex commissioning, setting-up and commissioning. Power supply of the Company (6 kV). 105. 09/96-11/96 Ventspils nafta, Jsc / --- Detailed design of reconstruction. Distributing Device No.12 Ventspils nafta, Jsc / Pier for loading/unloading tankers 100 Detailed design of reconstruction of electrical engineering, 106. 07/96-10/96 Venceb, Jsc 000 tons deadweight technological process automation and custody transfer of oil. Detailed design of enlargement of electrical engineering, Ventspils nafta, Jsc / 05/96-09/96 3 107. Venceb, Jsc Oil tank farm 5 х 20 000 m technological process automation, fire alarm and fire fighting system. Power supply of the Company (6 kV). 108. 03/96-07/96 Ventspils nafta, Jsc / --- Detailed design of reconstruction. Distributing Device No.16 Power supply of the Company (6 kV). 109. 03/96-06/96 Ventspils nafta, Jsc / --- Detailed design of reconstruction. Distributing Device No.4 110. 01/96-10/96 Ventspils nafta, Jsc / --- Stop pipelines of Piers No. 1, 2, 3 Development of pressure blocking SCADA system. Power supply of the Company (0.4 kV). 111. 12/95-04/96 Ventspils nafta, Jsc / --- Detailed design of reconstruction. Transformer Substations 1 – 2 – 3 Industrial, ballast and rain water Complex commissioning (less than 0,5 mg/l of oil). Warranty 112. 11/95-02/96 Ventspils nafta, Jsc / --- purifying station service. Maintenance. Detailed design of reconstruction of technological process and 113. 08/95-06/96 Ventspils nafta, Jsc / --- Boiler house of the tank farm fire fighting automation. Ventbunkers, Jsc (Reception from pipeline and tank cars, storage and loading to tankers) Engineering design of construction of diesel fuel transhipment 114. 06/09-11/09 Ventbunkers, Jsc Company infrastructure system Construction supervision of installation of process pipelines for 115. 06/09-11/09 Ventbunkers, Jsc Company infrastructure diesel fuel mixing and grading in tanks No.29.2, No.29.4. Development of engineering design of connection of tanks 116. 02/09-03/09 Ventbunkers, Jsc Company infrastructure No.12, no.13 to pumps station No.32. Engineering design of diesel oil mixing and grading unit 117. 11/08- 06/08 Ventbunkers, Jsc/--- Company infrastructure construction Supervision of fire-protection equipment installation on the 118. 10/08- 02/09 Ventbunkers, Jsc/--- Company infrastructure existing railway loading/unloading platform. Ventbunkers, Jsc / Engineering design of replacement of pump No. 51 within the 119. 10/07- 01/08 Tank farm No. 7 Venceb, Jsc framework of Tank farm No.7 expansion project 120. 10/07- 07/08 Ventbunkers, Jsc Railway loading rack Engineering design of installation of fire fighting equipment on 7 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor existing railway loading rack 121. 08/07- 03/09 Ventbunkers, Jsc Company infrastructure Engineering design of bunkerage technology system Engineering design of reconstruction of firefighting system of 122. 08/07- 01/08 Ventbunkers, Jsc Company infrastructure water treatment premises Ventbunkers, Jsc / Tank farm No.7 (3 х 20000 m³ and 1 х 123. 04/07 -12/07 Update of tank farm expansion solutions Venceb, Jsc 5000 m³) Software development, start-up and commissioning of fire alarm 124. 01/07- 12/08 Ventbunkers, Jsc Pier No.3 system 125. 07/05- 09/05 Ventbunkers , Jsc / --- Pier No.3 Design of repair of the fire-fighting system Ventbunkers, Jsc / Railway platform for unloading of Changes in the detailed design of connection of YPCM 3216 126. 05/05- 09/05 Venceb, Jsc damaged tank cars equipment to the platform Ventbunkers, Jsc / SZMA V, Reconstruction of the fire fighting pump 127. 09/04-12/04 Commissioning and start-up Jsc station Ventbunkers, Jsc / Tank farm No.7 (3 х 20000 m³ and 1 х 128. 07/04- 12/08 Supervision of tank farm building Venceb, Jsc 5000 m³) 129. 07/03- 12/04 Ventbunkers, Jsc / --- Pump station No.30 and manifold No.60 Reconstruction of power supply system. Ventbunkers, Jsc / Tank farm No.7 (3 х 20000 m³ and 1 х Draft and detailed design of enlargement of the tank farm. 130. 05/03–07/04 Venceb, Jsc 5000 m³) Supervision of construction of the tank farm. Ventbunkers, Jsc / Supervision of construction of the 1st start-up complex of the 131. 12/02-12/04 Company infrastructure Venceb, Jsc loading railway platform for dark and light oil products. Construction of the 1st start-up complex of the loading railway 132. 12/02-12/04 Ventbunkers, Jsc / --- Company infrastructure platform for dark and light oil products. Electrical engineering and automation. Manifold No.60 and installation of the 133. 10/02-02/03 Ventbunkers, Jsc / --- pump PLENTY G2000-1000 at Pump Detailed design of reconstruction. Station No.30 Ventbunkers, Jsc / Design documentation on reconstruction, in part of 134. 10/02-12/02 Fire fighting pump station Siltumelektroprojekts, Jsc technological process automation. Ventbunkers, Jsc / 10/02-10/06 3 135. Venceb, Jsc Tank farm 6 х 20000 m Supervision of construction. Design documentation on detailed design for fuel oil loading 136. 09/02-11/02 Ventbunkers, Jsc / --- Operating railway platform No.1 technological equipment. 137. 09/02-12/02 Ventbunkers, Jsc / --- 9 tanks of tank farm No.7 (13 х 5000 m3) Technological process and fire fighting automated control system Tanker loading pipeline for dark oil from 138. 08/02-10/02 Ventbunkers, Jsc / --- Design documentation on reconstruction. pump station No.2 to oil pier No.2 139. 08/02-12/02 Ventbunkers, Jsc / --- Admission Office Supervision of construction.

8 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor 140. 11/01-02/02 Ventbunkers, Jsc / --- Power supply of the Company (0,4 kV) Detailed design of the operational control building. Detailed design of reconstruction. Construction of cable 141. 11/01-01/02 Ventbunkers, Jsc / --- Power supply of the Company (0,4 kV) ductwork for communication network and automation. Ventbunkers, Jsc / 10/01-03/02 3 142. Venceb, Jsc Tank farm 2 х 20000 m Detailed design. Ventbunkers, Jsc / Detailed design of construction of tanker loading pipelines for 143. 08/01-01/02 Infrastructure of the Company Venceb, Jsc diesel fuel from tank farms No.2, 3 of Pier 2. 144. 07/01-08/01 Ventbunkers, Jsc / --- Tank farm 5 х 5000 m3 Design of heating system of fuel oil tanks. 145. 04/01-08/01 Ventbunkers, Jsc / --- Ventbunkers, Jsc Development of concept of development. 146. 04/01-06/01 Ventbunkers, Jsc / --- Set of buildings Detailed design of construction. Ventbunkers, Jsc / 03/01-10/01 147. Venceb, Jsc Oil product unloading railway platforms Complex detailed design. 148. 03/01-06/01 Ventbunkers, Jsc / --- Tank farm No.7 Detailed design of earth connection and lightning protection. Ventbunkers, Jsc / Detailed design of enlargement in part of electrical engineering 149. 02/01-06/01 Thermal oil boiler house Venceb, Jsc and technological process automation. 150. 08/00-12/00 Ventbunkers, Jsc / --- Tank farm 13х5000m3 and fuel oil pipeline Detailed design of reconstruction. 151. 06/00-08/00 Ventbunkers, Jsc / --- Switchboard no.9 (10 kV) Detailed design of enlargement (electrical engineering). Ventbunkers, Jsc / Detailed design of renovation of the Naftas Filtrs fire fighting 152. 11/99-02/00 Siltumelektroprojekts, Jsc system. Detailed design of renovation. Automation and electrical 153. 06/99-07/99 Ventbunkers, Jsc / --- Domestic sewer network engineering. Ventbunkers, Jsc / Detailed design of renovation of the fire fighting system. 154. 06/99-07/99 Pier No.3 Siltumelektroprojekts, Jsc Automation and electrical engineering. 09/98-03/99 Development of technological process and fire fighting process 155. Ventbunkers, Jsc / --- Diesel oil tank farm 4 х 20 000 m3 08/00-03/01 SCADA system. Commissioning of the object. Ventbunkers, Jsc / Development of automated control system, connection to the oil 156. 12/97-07/98 Tanks No.No.131, 134 Venceb, Jsc pipeline No.24. Detailed design of reconstruction. Automation, electrical 157. 10/97-02/98 Ventbunkers, Jsc / --- Diesel oil tank farm 4 х 20 000 m3 engineering and automated fire fighting. Detailed design of building and reconstruction, 1st start-up Ventbunkers, Jsc / stage. System for monitoring and accounting oil products of the 158. 10/97-02/98 Oil product trans-shipment complex Venceb, Jsc tank farm. Detailed design of building and reconstruction, 2nd start-up stage. Detailed design of automation of fire fighting process and Ventbunkers, Jsc / Tank farm pipeline L-24. SCADA system. Detailed design of 159. 07/97-12/97 Venceb, Jsc 3(2) х 10 000 m3 reconstruction. Electrical engineering. Detailed design of reconstruction. Power supply and 10 kV electric actuation.

9 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor 01/96-09/96 Ventbunkers, Jsc / Assembly and complex commissioning of the fuel oil trans- 160. Tank farm 30 000 t 05/96-10/96 Venceb,Jsc shipment object. 01/96-07/96 Ventbunkers, Jsc / Detailed design and development of automated fire fighting and 161. Tank farm 30 000 t 03/96-10/96 Venceb, Jsc fire alarm system for the fuel oil trans-shipment object. Detailed design of electrical engineering for fuel oil trans- 162. 12/95-02/96 Ventbunkers, Jsc / --- Tank farm 30 000 t shipment object. Detailed design and documentation for approval. Relay-type protection of 10 kV power supply system. Power supply of the Company (10 kV). 163. 12/95-02/96 Ventbunkers, Jsc / --- Detailed design of reconstruction. 10kV electric actuation of the pump station Power supply of the Company (10 kV). Ventbunkers, Jsc / 12/95-02/96 164. Venceb, Jsc Complex Transformer Substation 2 х Detailed design of reconstruction. 630 kVA Detailed design and organisation of equipment and material 04/95-03/96 Ventbunkers, Jsc / supplies for technical provision of automated operation dispatch 165. Tank farm 30 000 t 12/95-10/96 Venceb, Jsc control system of fuel oil trans-shipment object. Development of SCADA system of fuel oil trans-shipment object. LatRosTrans, Ltd (oil and oil products storage and transportation) 166. 11/14-03/15 LatRosTrans, Ltd / --- Džūkste oil transshipment facility Automatic process control system modification 167. 06/14-10/14 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Design of modification of automatic fire suppression system Refurbishment of automatic process control system for diesel 168. 10/13-04/14 LatRosTrans, Ltd / --- Ventspils Reception Point fuel fiscal metering unit Ilukste Pipeline Service Station ACS medium and top layer 169. 09-13-10/13 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station software upgrading Reconstruction design for diesel fuel accounting automatic 170. 10/12- 01/13 LatRosTrans, Ltd / --- Ventspils Reception Point process control system 171. 08/12- 10/12 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Reconstruction design of internal transshipment pipelines Development of engineering design for temporary shut-down of 172. 08/10- 10/10 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Ilūkste pipeline service station 173. 03/10 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Upgrading of “Account” software complex Sketch design of simplified reconstruction of company facilities 174. 02/10- 07/10 LatRosTrans, Ltd / --- and control centre The detailed design for the technology reconstruction of the 175. 07/06- 07/07 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Ilukste PSS based on the scheme “from pump to pump” Maintenance of the diesel fuel metering system at Acceptance 176. 06/06- 09/06 LatRosTrans, Ltd / --- Acceptance and Delivery Unit Ventspils and Delivery Unit Ventspils 177. 05/06-09/06 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Detailed Design of replacing the 20kV power transformers, 10 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor supply and assembly works 178. 01/06-08/07 LatRosTrans, Ltd / --- Skrudaliena Oil Transmission Station Construction of a diesel fuel custody transfer unit 179. 08/05-03/06 LatRosTrans, Ltd / --- Skrudaliena Oil Transmission Station Detailed design of a diesel fuel custody transfer unit 1 Pre-design operations, selection of the site, development of Oil Product Pipeline Polotsk-Ventspils, 180. 04/05- 08/05 LatRosTrans, Ltd / --- requirements for equipment supplies for oil product pipeline and within run between 90.5 and 147 km custody transfer unit 181. 04/05- 10/05 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Upgrade of the automated fire fighting system 1 182. Ilukste Pipeline Service Station, Dzukste Testing and adjusting of the power supply ACS relay-type 04/05- 10/05 LatRosTrans, Ltd / --- 1 Oil Transmission Station protection 183. 06/04- 09/04 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Installation of a wide-screen display panel 1 Ilukste Pipeline Service Station, Dzukste Reconstruction Ilukste Pipeline Service Station, modernization 184. 02/04- 07/05 LatRosTrans, Ltd / --- Oil Transmission Station Dzukste Oil Transmission Station LatRosTrans, Ltd / PA Bypass pipelines. Technical modernization (renovation) the oil 185. 12/03- 12/04 Oil product pipeline “Baltijas Inženierbūve” pipeline (146,7-158 km). Technology reconstruction, installation of a diesel fuel custody 186. 11/03–06/05 LatRosTrans, Ltd / --- Ventspils Reception Point transfer unit. Supervision. Metrological certification of the Ventspils Reception Point diesel fuel custody transfer unit. Supervision of upgrade (renovation) of oil product pipeline 187. 08/03- 12/04 LatRosTrans, Ltd / Oil product pipeline (146,7-158 km). LatRosTrans, Ltd / --- Upgrade of system of passage of main pipelines cleaning and 188. 07/03- 03/04 Main pipelines SZMA V, Jsc diagnostics facility. Diesel fuel custody transfer unit of 189. 04/03-12/03 LatRosTrans, Ltd / --- Detailed design. reception unit Ventspils Equipping of automated fire-fighting system in the electric motor 190. 11/02-12/02 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station room. Station upgrade to ensure oil throughput capacity up to 5 mil 191. 05/02- 09/03 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station tons per annum. Supply of booster pumps. Construction of operators’ room. Construction of cable trestlework. 192. 04/02-09/02 LatRosTrans, Ltd / --- Skrudaliena-1, 2 Oil Transmission Station Reconstruction of water drainage and sewerage system. Construction (to ensure oil throughput capacity up to 5 mil tons 193. 04/02- 06/03 LatRosTrans, Ltd / --- Dzukste Oil Transmission Station per annum) on a turnkey basis.

11 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Detailed design for enhancement of throughput capacity of oil product pipeline Polotsk–Ventspils in the run Ilukste–Ventspils Main pump station of the Ilukste Pipeline 194. 01/02- 09/03 LatRosTrans, Ltd / --- up to 8 mil tons per annum; detailed design of by-pass pipelines Service Station, oil product pipeline (looping). Detailed design of reconstruction of main pump station of Ilukste Pipeline Service Station. Skrudaliena-1, 2 Oil Transmission Detailed design of reconstruction of water supply and drainage 195. 11/01-06/02 LatRosTrans, Ltd / --- Station systems. 196. 11/01-06/02 LatRosTrans, Ltd / --- Integrated communications system Detailed design of reconstruction. 197. 09/01-01/02 LatRosTrans, Ltd / --- Oil product pipeline Detailed design of construction of looping. 198. 09/01-01/02 LatRosTrans, Ltd / --- New Oil Transmission Station Dzukste Detailed design of construction. Skrudaliena-1, 2 Oil Transmission Station, Ilukste Pipeline Service Station, Complex reconstruction of technology of LatRosTrans,Ltd 199. 06/01- 10/03 LatRosTrans, Ltd / --- Dzukste Oil Transmission Station, oil objects. product pipeline Polotsk-Ventspils on the territory of Latvia Skrudaliena-1, 2 Oil Transmission Complex reconstruction of automation of LatRosTrans,Ltd 200. 12/00-10/03 LatRosTrans, Ltd / --- Station, Ilukste Pipeline Service Station, objects. Dzukste Oil Transmission Station Equipment for SAAB TRL/2 operational monitoring system for 201. 10/00-03/02 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station the Station tank farm, commissioning and setting-up. Skrudaliena-1, 2 Oil Transmission Complex reconstruction of power supply of LatRosTrans,Ltd 202. 09/00-12/02 LatRosTrans, Ltd / --- Station, Ilukste Pipeline Service Station, objects. Dzukste Oil Transmission Station 203. 09/00-06/01 LatRosTrans, Ltd / --- Dzukste Oil Transmission Station Supervision of fire fighting and fire alarm system reconstruction. LatRosTrans, Ltd / SKONTO 09/00-06/01 204. BŪVE, Ltd Dzukste Oil Transmission Station Reconstruction of fire fighting and fire alarm system. Development of technical recommendations on renovation and 205. 08/00-10/00 LatRosTrans, Ltd / --- Oil pipeline change of insulation. 206. 06/00-09/00 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Detailed design of filter areas. Radio relay communication line in the 207. 01/00-06/00 LatRosTrans, Ltd / --- run from Byelorussia border to Construction. Skrudaliena Oil Transmission Station 208. 12/99-02/00 LatRosTrans, Ltd / --- Oil custody transfer unit No.703 Maintenance. 209. 10/99-07/00 LatRosTrans, Ltd / --- Skrudaliena Oil Transmission Station Supervision of fire fighting and fire alarm system reconstruction. LatRosTrans, Ltd/ SKONTO 10/99-07/00 210. BŪVE, Ltd Skrudaliena Oil Transmission Station Reconstruction of fire fighting and fire alarm system.

12 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Ilukste Pipeline Service Station, Skrudaliena-1, 2 Oil Transmission Detailed design of reconstruction of power supply of 211. 10/99-05/00 LatRosTrans, Ltd / --- Station, Dzukste Oil Transmission LatRosTrans, Ltd objects. Station, signal boxes Testing of microprocessor equipment in relation with the year 212. 10/99-03/00 LatRosTrans, Ltd / --- Oil custody transfer unit No.703 2000 contingency problem. Comprehensive detailed design of reconstruction fire fighting 213. 10/99-03/00 LatRosTrans, Ltd / --- Dzukste Oil Transmission Station system. Construction of complex transformer substation No.3, cable 214. 12/98-07/99 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station trestlework. 215. 11/98-06/99 LatRosTrans, Ltd / --- Skrudaliena-1, 2 Oil Transmission Station Development of detailed design of power supplies reconstruction. Skrudaliena-1, 2 Oil Transmission 216. 09/98-06/00 LatRosTrans, Ltd / --- Detailed design of automation equipment upgrade. Station, Dzukste Oil Transmission Station Development of detailed design of reconstruction of fire fighting 217. 07/98-12/98 LatRosTrans, Ltd / --- Skrudaliena Oil Transmission Station and fire alarm system power supply. Complex commissioning, commissioning of the custody transfer 218. 07/98-04/99 LatRosTrans, Ltd / --- Oil custody transfer unit No.703 unit No.703, Metrological certification. 219. 05/98-07/98 LatRosTrans, Ltd / --- Dzukste Oil Transmission Station Development of detailed design of working external lighting. Development of design of electric equipment reconstruction at 220. 05/98-08/98 LatRosTrans, Ltd / --- Skrudaliena Oil Transmission Station the 3rd panel room, electric installation. 221. 04/98-07/98 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Reconstruction of the panel room and lighting of the trestlework. Supervision of automated fire alarm and fire fighting system 222. 03/98-07/99 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station reconstruction. 223. 03/98-07/99 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Reconstruction of automated fire alarm and fire fighting system. Development and installation of a new software package for 224. 11/97-03/98 LatRosTrans, Ltd / --- Information system of the Company data communication between SAAB Tank Radar L/2 metering system and the central dispatch office in Daugavpils. Development of detailed design of reconstruction and update of 11/97-06/98 Skrudaliena-1, 2 Oil Transmission 225. LatRosTrans, Ltd / --- fire fighting and fire alarm system in part of automation and 07/98-12/98 Station technology. Development of detailed design of the tank farm automated 226. 06/97-10/97 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station control system.

13 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Development and installation of a new software package for data communication between automated operation dispatch control system in Daugavpils and corresponding systems of the 227. 05/97-09/97 LatRosTrans, Ltd / --- Computer network of the Company companies Naftotekis (Lithuania), Druzba (Byelorussia); oil accounting unit No.703 and automated operation dispatch control system, Ventspils Nafta,Ltd, Oil Product Pipeline Druzba. Development of detailed design of reconstruction of fire fighting 228. 12/96-04/97 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station and fire alarm system in part of power supply and technology. Oil custody transfer unit No.703 of the 229. 11/96-05/97 LatRosTrans, Ltd / --- Development of detailed design of reconstruction. acceptance and delivery unit Ventspils Development of detailed design of reconstruction of fire fighting 230. 10/96-03/97 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station and fire alarm system in part of automation. Automated operation dispatch control Development of control algorithms and development of 231. 10/96 LatRosTrans, Ltd / --- system interface. Detailed design of oil products accounting and monitoring in the 232. 09/96-01/97 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station tank farm. Development of requirements specification to development of 233. 08/96-11/96 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station automated operation dispatch control system at the tank farm. Detailed design of reconstruction of process automated control 234. 07/96-12/98 LatRosTrans, Ltd / --- Skrudaliena Oil Transmission Station system. Development of requirements specification to development oil 235. 04/96-07/96 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station products accounting and monitoring in the tank farm. Development of detailed design of valve control, power supply 236. 03/96-04/96 LatRosTrans, Ltd / --- Dzukste Oil Transmission Station and power electric lighting. 237. 03/96-10/96 LatRosTrans, Ltd / --- Ilukste Pipeline Service Station Detailed design for development of a commercial system. Latvian run of the pipelines Polotsk – Development of a detailed design of automated operation Ventspils and Polotsk – Birziai, Latvian 238. 07/94-12/96 LatRosTrans, Ltd / --- dispatch control system with an operational control dispatch run of the oil product pipeline Disna - office in Daugavpils. Ilukste–Ventspils Naftas Parks, Jsc (reception of oil products from pipeline, storage and loading to tankers) Development of monitoring, accounting and automated process 239. 08/98-03/99 Naftas Parks,Jsc / --- Oil Terminal control system, adjustment, setting-up and commissioning. Naftas Parks,Jsc 05/98-03/99 240. Venceb,Jsc Oil Terminal Development of SCADA systems of fire fighting and fire alarm. 241. 04/98-12/98 Naftas Parks,Jsc / --- Power supply of the Company Detailed design of reconstruction.

14 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Detailed design of process control system (4th start-up stage) 242. 04/98-08/98 Naftas Parks,Jsc / --- Tank farm 4 х 10 000 m3 with the system of impure oil products’ utilisation. Naftas Parks,Jsc / 01/98-02/98 3 243. “Kaskāde-SZMA” Tank farm 3 х 20 000 m and pipeline Power supply. Naftas Parks,Jsc / Tank farms 1 х 10 000 m3, 5 х 5 000 m3, 244. 07/97-12/97 Detailed design of reconstruction. “Ierosme” 3 х 20 000 m3 Naftas Parks,Jsc / Detailed design; organisational and engineering support, 245. 11/96-07/98 Diesel fuel trans-shipment object Venceb,Jsc assembly, commissioning of automation system, stage 2 and 3. Naftas Parks,Jsc / 07/96-03/98 3 3 246. Venceb,Jsc Tank farm 1 х 10 000 m + 1 х 5 000 m Development of SCADA systems. Naftas Parks,Jsc / 07/96-03/97 3 247. Venceb,Jsc Tank farm 4 х 5 000 m Development of SCADA systems. Naftas Parks,Jsc / 07/96-08/96 248. Venceb,Jsc Tank farm Detailed design for oil products monitoring and accounting.

Naftas Parks,Jsc / Detailed design; organisational and engineering support, 249. 11/95-08/96 Diesel fuel trans-shipment object Venceb,Jsc assembly, commissioning of automation system, stage 1.

VARS Co, Ltd (reception of nitrile acrylic acid from tank cars, storage and loading to tankers) Supervision of modernisation of the automatic fire fighting 250. 11/04-12/04 VARS Co, Ltd/ SZMA V, Jsc Nitrile acrylic acid trans-shipment complex control system

251. 05/96-08/96 VARS Co, Ltd/ --- Nitrile acrylic acid trans-shipment complex Detailed design of automation.

252. 04/96-09/96 VARS Co, Ltd / --- Nitrile acrylic acid trans-shipment complex Control system (supplies, applied programming, engineering).

Ventamonjaks,Jsc., Ventall Terminals, Ltd. (reception of oil products and chemicals from tank cars, storage and loading to tankers) “Ventall Termināls” Design documentation for installation of two vacuum pumps 253. 05/14-12/14 Company infrastructure serviss” Ltd /--- under modification project of vacuum pump station “Ventamonjaks serviss” 08/10- 12/10 254. Jsc/--- Company infrastructure Modernization design for fire extinguishing system “Ventamonjaks”, Jsc / Development of technical documentation for replacement of 255. 08/10- 12/10 MBC.Metrology Bureau Company infrastructure secondary control and monitoring equipment of compressor Consulting, Ltd (pos.C-1A,B, C, D), II stage. Replacement of compressors’ secondary monitoring and control “Ventamonjaks”, Jsc / instruments (pos.C-1A,B,C,D) : replacement of equipment and 256. 04/10- 09/10 MBC.Metrology Bureau Company infrastructure Consulting, Ltd materials, installation works, software development, commissioning. 15 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor “Ventamonjaks”, Jsc / Development of technical documentation for replacement of 257. 02/10-03/10 MBC.Metrology Bureau Company infrastructure secondary control and monitoring equipment of compressor Consulting, Ltd (pos.C-1A,B, C, D) Replacement of secondary control and monitoring equipment of “Ventamonjaks”, Jsc / compressor (pos.C-1B,C) - replacement of equipment and 258. 07/09-12/09 MBC.Metrology Bureau Company infrastructure Consulting, Ltd materials; installation works; development, installation and start- up of software. “Ventamonjaks”, Jsc / Development of technical documentation for exchange of 259. 08/08-12/08 MBC.Metrology Bureau Company infrastructure Consulting, Ltd secondary control equipment of compressor (pos.C-1A,B, C, D) Ventamonjaks, Jsc/ 11/07- 11/08 260. SZMA V Jsc Liquid gas storage Transposition of liquid gas storage: software, controller setup Ventamonjaks, Jsc/ Latus 10/07-12/07 261. Sardze, Ltd. Company infrastructure Setup of 10 kV power supply network relays 262. 09/07- 02/08 Ventall Terminals , Ltd/--- Tank farm 2x2000m3 Pre-design of tank farm 2x2000 building 263. 09/07- 12/07 Ventall Terminals , Ltd/--- Tank farm 4x15000 m3 Pre-design of tank farm 4x15000 building Detailed design of replacing the data collection and control 264. 03/07- 07/07 Ventall Terminals , Ltd. /--- Company infrastructure system fire automatics 265. 03/07- 09/08 Ventall Terminals , Ltd. New tank R-4 Tank building supervision Supervision of pump stations’ reconstruction and oil 266. 02/07- 01/08 Ventall Terminals , Ltd. /--- Company infrastructure transhipment to tankers pipeline system reconstruction Ventall Terminals , Ltd./ Software development and setup of fire fighting automation 267. 02/07- 03/08 Company infrastructure SZMA V Jsc system 268. 04/06-11/06 Ventall Terminals , Ltd/--- Company infrastructure Engineering design of data collection and control 269. Ventamonjaks, Jsc/ 01/06-02/06 AST №165 10 kV cabinet reconstruction . SIEMENS, Ltd 270. 11/05- 12/06 Ventall Terminals, Ltd./ -- Tank farm М-168 Installation and commissioning x 271. Ventall Terminals , Ltd. / 08/05- 07/06 Railway platform on track 2 and 15 Construction of a two-sided unloading platform for oil products 1 SZMA V, Jsc. Design of reconstruction of pipelines and pump station used for 272. 06/05-12/06 Ventall Terminals, Ltd./ -- Company infrastructure product transfer to tankers 273. 06/05-05/07 Ventall Terminals, Ltd./ -- Company infrastructure Design of construction of a tank V=20000m3 274. 06/05-11/06 Ventall Terminals, Ltd./ -- Birth 35А Detailed design of installation of a stationary lifting crane Detailed design of a pipeline from the railway platform on track 275. 06/05-09/05 Ventall Terminals, Ltd./ -- Company infrastructure 2 and 15 to the tank farm 16 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor 276. 04/05-06/06 Ventall Terminals, Ltd./ -- Railway platform on track 2 and 15 Construction supervision 277. 05/04-06/04 Ventamonjaks, Jsc / --- A storage building A detailed design of renovation 1 Modernisation of the existing fire protection system of 278. 09/04-10/04 Ventamonjaks, Jsc / --- Company infrastructure Ventamonjaks, Jsc. A draft design of a common fire protection and fire fighting system of Ventamonjaks, Jsc and Vars, Ltd. A detailed design of the control system transfer from the central 279. 08/04- 12/04 Ventamonjaks, Jsc / --- Tank farm M-168 control office of the ammonia storage to the control office of volatile flammable liquids, installation, commissioning 280. 08/04- 12/04 Ventamonjaks, Jsc / --- 10kV distribution cabinet Modernisation design - A detailed design of the automatic vapour control system in the pans of tanks 101А, 101В. - A detailed design for remote regulation of the product flow 281. 06/04-08/04 Ventamonjaks, Jsc / --- from tanks 21/1, 21/2, 21/3, 21/4, 21/5, 21/6, Т001, Т002. - A detailed design of monitoring and control of operation of the gas purifying plant of Berth 34. 282. The detailed design of construction of pump station and 03/03-12/04 Ventamonjaks, Jsc / --- Pump station and railway platforms . unloading railway platform for oil products. 283. 03/03-12/04 Ventamonjaks, Jsc / --- Tank farm 6 х 10000 m3 The detailed design of construction of a tank farm 1 . 284. Concept of update of technological process automated remote 06/96-09/96 Ventamonjaks, Jsc / --- Ammonia trans-shipment complex . control. 285. Detailed design, concordance, engineering, organisational 04/95-04/96 Ventamonjaks, Jsc / --- Heat energy custody transfer system 1 matters, support during commissioning. Latvenergo, Municipal State Stock Company (electric power production and distribution) Development of re-construction design for 110/10 kV substation Latvenergo JSC, Latvijas Substation No.32 „Gajoks”, in 286. 01/12- 06/12 elektriskie tīkli JSC, Nr.32 „Gajoks”; re-construction design for telecommunication Daugavpils, Patversmes str. 7 „Sadales tīkls” JSC part of 10kV distribution unit 287. 04/08- 05/09 Sadales Tikls JSC/ --- Substation No. 61 “Liepaja” Engineering design of shut-off equipment 110 kV 288. 03/08 -04/09 Latvenergo/ --- Kegums Water Power Station Development of fire alarm subsystem Latvenergo / 12/05-12/06 289. SZMA-Riga, Ltd. Daugava Water Power Station Concept and requirements specification for control system 290. Latvenergo, Rigas 10/05- 06/06 The design of reconstruction of ТР-901 on Brivibas Street . elektrotikls Branch 291. Latvian Mobile Telephone Station 06/05-09/05 Latvenergo/ Remus, Ltd. Electric circuits construction design . Viganti, Mezmales 17 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Latvenergo, Ziemelaustrumu Dwelling house "Sterkeni" (Aizkraukle 292. 05/05-07/05 Electric circuits construction design elektriskie tikli Branch region) Latvenergo, Ziemelaustrumu 01/05-04/05 293. elektriskie tikli Branch Dwelling house "Mezares" Electric circuits construction design Check-up and adjustment of the relay-type protection system 294. 06/04- 06/07 Latvenergo/SIEMENS Ltd Marupe 100kV substation and automatics 295. 02/04–08/05 Latvenergo/Atrium, Ltd Riga Water Electric Generation Plant 6 kV and 0.4 kV: programming, documenting, personnel training Detailed design of reconstruction of fire fighting system. 296. 12/00-02/01 Latvenergo / --- Plavinas Water Electric Generation Plant Supervision of fire fighting system reconstruction. 297. 09/99-10/99 Latvenergo/ LEC,Ltd Building estate 149–168 Bauskas Street Reconstruction of power supplies system. Detailed design. Reconstruction of potern and drain pumps’ power supplies Kegums Water Electric Generation Plant 298. 07/99-10/99 Latvenergo/ LEC,Ltd system. Detailed design of electrical engineering and automation. No.2 Supervision on reconstruction and complex commissioning. Riga Heat Electric Generation Plant Detailed design of data collection and visualisation system in Other works at the 299. 09/97-12/97 Latvenergo / --- object, see also No.2 part of automation. Item 300. 08/97-11/97 Riga Heat Electric Generation Plant Data collection system from primary devices and sensors, Other works at the 300. Latvenergo / --- object, see also 09/97-12/97 No.2 visualisation of the data at the operators’ stations. Item 299. Reconstruction of hydroelectric generator drying pumps Kegums Water Heat Electric Generation 301. 05/96-06/96 Latvenergo / --- stations. Detailed design of technology, engineering, electrical Plant No.1 engineering and automation. Juglas Jauda, Jsc Engineering design of power generation equipment connection 302. 04/07- 03/08 Juglas Jauda, Jsc/ --- Cogeneration station, Brivibas 401, Riga to Latvenergo power supply network

303. 05/07- 06/07 Juglas Jauda, Jsc/ --- Cogeneration station, Brivibas 401, Riga Supply, installation and setup of the equipment Consultations on implementation of cogeneration station project 304. 05/07-07/08 Juglas Jauda, Jsc/ --- Cogeneration station, Brivibas 401, Riga (electrotechnics) Supervision of power generation equipment connection to 305. 05/07-07/08 Juglas Jauda, Jsc/ --- Cogeneration station, Brivibas 401, Riga Latvenergo power supply network 306. 05/07- 06/07 Juglas Jauda, Jsc/ --- Cogeneration station, Brivibas 401, Riga Design of emergency light system of cogeneration station

Latvijas Gaze, Jsc (gas transport, storage and distribution) 307. 03/15- Latvijas Gaze, Jsc/ --- Company infrastructure Development of technical solutions for repairs of high pressure present (P<6 bar) overground gas pipeline Dn700 mm and average pressure (P<4 bar) overground gas pipelines Dn250 mm and Dn150 mm in the area of Salaspils, Krustpils, Rencēnu un 18 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Lubānas streets (Riga) 03/15- 308. Latvijas Gaze, Jsc/ --- Korneti gas metering station present Feasibility study for reconstruction of station’s metering lines Construction supervision of adjusting main pipeline Vilnius-Riga 02/15- 309. Latvijas Gaze, Jsc/ --- Company infrastructure 445.605 km – 489.055 km section and related branches to present operation pressure up to 1.6 MPa 01/15- Design for substitution of two oil tanks in IUGS compression 310. Latvijas Gaze, Jsc/ --- Compression station No.2 present station No.2 12/14- 311. Latvijas Gaze, Jsc/ --- Gas gathering station No.2 IUGS gas gathering station No.2 reconstruction design present 08/14- ALFA shopping mall extension : relocation of gas supply 312. Latvijas Gaze, Jsc/ --- ALFA shopping centre present networks from construction area Design works for construction of Iecava – Liepāja gas transport 313. 08/14- 12/14 Latvijas Gaze, Jsc/ --- Company infrastructure pipeline valve station and reconstruction of branch connection to Nākonte gas distribution station Development of work organization Project for preparation of 314. 05/14- 08/14 Latvijas Gaze, Jsc/ --- GDS Sloka branch pipeline to Sloka gas distribution station for internal inspection Supervision of reconstruction of branch pipeline to GDS Connection of branch pipeline to 315. 05/14- 10/14 Latvijas Gaze, Jsc/ --- Baldone connection to Riga – Panevezys gas transport Baldone GDS pipeline High pressure (P<16 bar) distribution Engineering design for reconstruction of high pressure (P<16 316. 11/13-03/14 Latvijas Gaze, Jsc/ --- pipeline valve station bar) distribution pipeline valve station 11/13- Underwater legs of transport pipelines Capital repairs of underwater legs of transport pipelines Pskov- 317. Latvijas Gaze, Jsc/ --- present Pskov-Riga and Izborsk– Incukalns UGS Riga and Izborsk – Incukalns UGS: supervision Underwater legs of transport pipelines 10/13- Latvijas Gaze, Jsc/ Skonto Capital repairs of underwater legs of transport pipelines Pskov- 318. Pskov- Riga and Izborsk – Incukalns present Buve, Ltd. Riga and Izborsk – Incukalns UGS UGS Revision of technical documentation of Capital repairs of existing culvert of Riga – Panevezys gas pipeline underwater leg under Musa river bed with substitution of pipes and valve Latvijas Gaze, Jsc/ TUV 10/13-12/13 319. Nord Baltik Ltd. Company infrastructure stations Pn248, Pn249 and Capital repairs of existing culvert of Riga – Panevezys gas pipeline underwater leg under Memele river bed with substitution of pipes and valve stations Pn252, Pn253 Risk assessment and interaction analysis of Eastern Baltic 320. 10/13 Latvijas Gaze, Jsc/ --- Company infrastructure cluster Project developed under the EU Infrastructure regulation 321. 08/13- Latvijas Gaze, Jsc/ --- Company infrastructure On-site construction supervision: 19 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor - reconstruction of interconnection unit connecting branch pipeline directed to GDS Lode and transport pipeline Virieši - Tallinn; present -reconstruction of CS Viriesi valve stations of transport pipelines Pskov-Riga and Izborsk – Incukalns UGS; - renovation of section LK P132-LK P133 of transport pipeline Pskov-Riga and construction or valve station No.P132 Engineering design for for adjusting main pipeline Vilnius-Riga 322. 05/13-12/13 Latvijas Gaze, Jsc/ --- Company infrastructure 445.605 km – 489.055 km section and related branches to operation pressure up to 1.6 MPa 03/13- Latvijas Gaze, Jsc/ Skonto 323. Korneti gas metering station Reconstruction of “Korneti” gas metering station present Buve, Ltd. Reconstruction design projects for branch pipeline (directed to GDS Baldone) junction with main pipeline Riga-Panevezys and 324. 12/12-04/13 Latvijas Gaze, Jsc/ --- Company infrastructure for branch pipeline (directed to GDS Lode) junction with main pipeline Viriesi –Tallinn Draft design and feasibility study for adjusting main pipeline 325. 08/12-10/12 Latvijas Gaze, Jsc/ --- Company infrastructure Vilnius-Riga 445.605 km – 489.055 km section and related branches to operation pressure up to 1.6 MPa Design of junction point of gas transporting pipelines Iecava – 326. 07/12- 01/13 Latvijas Gaze, Jsc/ --- Company infrastructure Liepaja and Riga-Panevezys in Iecava region Upgrading of air-gas cooler control system in compressing units 327. 04/12- 11/12 Latvijas Gaze, Jsc/ --- Inchukalns Underground Gas Storage No1, No.2 (design, commissioning and programming ) Design of valve units of gas transporting pipelines Pskov-Riga 328. 03/12- 08/12 Latvijas Gaze, Jsc/ --- Company infrastructure and Izborsk-Incukalns UGS for upcoming re-construction of CS Viresi Reinstallation design for valve unit No.Т8 at gas transporting 329. 03/12- 08/12 Latvijas Gaze, Jsc/ --- Company infrastructure pipeline Viresi-Tallinn in Naukseni region. Pskov-Riga gas pipeline section LK Developing capital repairs Project for Pskov-Riga gas pipeline 330. 02/12- 07/12 Latvijas Gaze, Jsc/ P132-LK P133 section LK P132-LK P133 Engineering design for installation of gas flow regulator at 331. 09/11-12/11 Latvijas Gaze, Jsc/ Korneti gas metering station Korneti gas metering station Developing capital repairs Project for underwater passes over 332. 10/11- 08/12 Latvijas Gaze, Jsc/ Gauja river of Pskov-Riga and Izborsk-Inchukalns gas pipelines Design development for capital repairs of main gas pipeline 333. 07/11- 11/11 Latvijas Gaze, Jsc/ --- Inchukalns Underground Gas Storage branch towards Riga-1 Gas Distribution Unit.

20 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Upgrading of gas balance accounting unit at Inchukalns 334. 12/10- 11/11 Latvijas Gaze, Jsc/ --- Inchukalns Underground Gas Storage Underground Gas Storage Inchukalns Underground Gas Storage, Refurbishment of Inchukalns Underground Gas Storage, 335. 06/10- 12/11 Latvijas Gaze, Jsc/ --- Compressor station No.1 Compressor station No.1. Supervision of gas dehydration unit refurbishment works. Latvijas Gaze, Jsc/ Skonto Inchukalns Underground Gas Storage, Construction of gas dehydration unit for Inchukalns 336. 06/10- 02/12 Buve, Ltd. Compressor station No.1 Underground Gas Storage, Compressor station No.1 Design of capital repairs of underwater leg of Riga-Panevezys Latvijas Gaze, Jsc/ Skonto main gas pipeline. Engineering exploration, design works and 337. 03/10- 12/11 Main gas pipeline Riga-Panevezys Buve, Ltd. piping procurement for underwater leg of Riga-Panevezys main gas pipeline. Capital repairs works. Latvijas Gaze, Jsc/ Pitro Inchukalns Underground Gas Storage, 338. 06/09-08/10 Equipment procurement for gas dehydration unit Fiorentini S.p.A. Compressor station No.1 Latvijas Gaze, Jsc/ Pitro Inchukalns Underground Gas Storage, Supervision of setup, testing and commissioning of gas 339. 06/09- 04/12 Fiorentini S.p.A. Compressor station No.1 dehydration unit equipment Latvijas Gaze, Jsc/ Rumba, 02/09-05/09 340. Ltd. GDS “Zirni”, GDS “Lutrini” Engineering design of GDS “Zirni”, GDS “Lutrini” 341. 09/08-12/08 Latvijas Gaze, Jsc/ --- GDP-2, GDP-3 GDP-2, GDP-3 methanol flow metering system reconstruction 342. 06/08- 07/09 Latvijas Gaze, Jsc/ --- GDS “Ziemeli” Designer supervision of GDS “Ziemeli” reconstruction Inchukalns Underground Gas Storage 343. 07/08- 12/09 Latvijas Gaze, Jsc/ --- Design engineering of gas dehydration unit construction Compressor Station No.1 344. 11/07- 07/08 Latvijas Gaze, Jsc/ --- Riga-2 Gas Distributing Station (GDS) Construction design of gas branch-line and GDS-2 345. 03/07- 02/08 Latvijas Gaze, Jsc/ --- Riga-3 GDS Supervision of construction of gas pipeline and GDS-3 Inchukalns Underground Gas Storage. 346. 02/07- 08/08 Latvijas Gaze, Jsc/ --- Reconstruction of Gas gathering station No.1. Supervision. Gas gathering station No.1. Latvijas Gaze, Jsc / PBG Inchukalns Underground Gas Storage Design of automation and electrical heating, programming of 347. 08/06- 12/06 S.A. Facility.Gas gathering station No.1. the controllers, delivery of the cabinets Latvijas Gaze, Jsc / PalL Inchukalns Underground Gas Storage. 348. 08/06- 08/06 The design of electrical heating and delivery of the materials Poland Sp.z o.o. Gas gathering station No. 1. Gas pipelines “Ziemelu Loks” and “GRP- Design of the riders for gas pipelines “Ziemelu Loks” and “GRP- 349. 06/06- 08/06 Latvijas Gaze, Jsc /----- 90” 90” at the Region of Stopini near the area of “Zakisi” 350. 03/06- 03/07 Latvijas Gaze, Jsc /--- GDS “Riga-3” Design of a gas pipeline and the GRS „Riga-1” Latvijas Gaze, Jsc / 11/05- 12/05 351. Elektrosistemas, Ltd. Inchukalns Underground Gas Storage 20 kV electric equipment circuit diagram of the GS2 and GS-3 352. 11/05- 06/06 Latvijas Gaze, Jsc /--- GDS “Riga-1” Detailed design of reconstruction Supervision of construction operations for power supply and 353. 07/05- 07/06 Latvijas Gaze, Jsc /--- Inchukalns Underground Gas Storage power surge protection systems

21 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Inchukalns Underground Gas Storage. 354. 05/05- 11/07 Latvijas Gaze, Jsc /--- CS-1 reconstruction, Stage 1 Compressor Station No.1 Inchukalns Underground Gas Storage. 355. 02/05- 11/07 Latvijas Gaze, Jsc / --- Supervision of the 1st stage of reconstruction Compressor Station No.1 Latvijas Gaze, Jsc / Design of SCADA of the gas distribution networks, 356. 11/04- 11/05 Gas distribution networks Klinkmann, Ltd. programming of the automation facilities Latvijas Gaze, Jsc / Modification of SCADA for the backup chromatograph at the 357. 11/04- 12/04 Korneti Gas Metering Station SZMA Riga, Ltd Korneti Gas Metering Station Latvijas Gaze, Jsc / Adjustment of SCADA, equipment supplies, software 358. 11/04- 04/07 Inchukalns Underground Gas Storage Atrium, Ltd development for the gas metering unit Inchukalns Underground Gas Storage, Reconstruction design. Development of engineering requirements 359. 11/04- 12/06 Latvijas Gaze, Jsc /--- Gas gathering station 1 and specifications, expert evaluation of tender offers. Development of a visualisation system for the operation control 360. 10/04- 12/04 Latvijas Gaze, Jsc /--- Inchukalns Underground Gas Storage centre Latvijas Gaze, Jsc / Engineering services for equipment supply to the 20kV 361. 09/04- 03/06 Inchukalns Underground Gas Storage SIEMENS, Ltd. distribution substations 362. 06/04–12/04 Latvijas Gaze, Jsc /--- Inchukalns Underground Gas Storage Design of a power supply system and a surge protection system Design and construction of the three new methanol storages, 363. 05/04–10/05 Latvijas Gaze, Jsc /--- Gas gathering stations 1, 2, 3 dismantling of the existing storage Latvijas Gaze, Jsc/ 03/04–06/04 364. Atrium, Ltd Compressor Station No.1 Detailed design of a gas metering unit Latvijas Gaze, Jsc / 02/04 -09/04 365. Atrium, Ltd Inchukalns Underground Gas Storage Gas treatment plant 366. 10/03- 05/04 Latvijas Gaze, Jsc / --- Compressor shop № 2 Development of the SCADA for air-coolers of substations 2 and 3. 367. 08/03- 12/03 Latvijas Gaze, Jsc / --- Collecting units 1,2,3 Supplying of “Siemens” computer techniques. 368. 08/03- 01/04 Latvijas Gaze, Jsc / --- Korneti Gas Metering Station Ensuring of data backup for Korneti Gas Metering Station. Latvijas Gaze, Jsc / --- 07/03- 11/04 369. Giprospetsgaz, Ltd Compressor Station No.1 Detailed design of reconstruction. Equipping of operation control centre and development of Other works at the 370. 12/02- 12/03 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage object, see also technical control system. Item 375. 371. 06/02 Latvijas Gaze, Jsc / --- Liepaja 19 Radio Str and 62 Toma Str Design of gas supply distribution network. Development of a functional model of SCADA technical control 372. 06/02-08/02 Latvijas Gaze, Jsc / --- Dispatch control centre system and design of server of process data. 373. 03/02-05/02 Latvijas Gaze, Jsc / --- Gas Regulating Station Valmiera-II Detailed design of construction. Detailed design on inspection pistons reception tube and 374. 12/01-02/02 Latvijas Gaze, Jsc / --- Pipeline (Pskov - Riga) change of line valves within the Gauja river underpass.

22 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Design projects of technical control system and operational Other works at the 375. 12/01-03/02 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage object, see also control system. Item 370. Odorant storage warehouse of Gas 376. 11/01-04/02 Latvijas Gaze, Jsc / --- Regulating Station of Heat and power Detailed design of automation. plant No.2 377. 05/01-10/01 Latvijas Gaze, Jsc / --- Gas Regulating Station Standard design of lightning protection system. Gas Regulating Station Riga-1 of “Gazes 378. 05/01-09/01 Latvijas Gaze, Jsc / --- Detailed design of reconstruction. Transports” maintenance area 379. 12/00-02/01 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage Detailed design of fibre LAN development, Stage 2. Detailed design for connection of compressed air supercharger 380. 12/00-01/01 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage “Rally 072”. Expert evaluation and concordance of technical solutions and 381. 09/00-01/01 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage technology part designs. 382. 07/00-12/00 Latvijas Gaze, Jsc / --- Infrastructure of the company Development concept of technical control system. Attestation, certifying and development of software, 383. 04/00-07/00 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage commissioning of a metering unit of Compressor Shop 2. 384. 04/00-12/00 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage Feasibility study of supercharger capacity reservation. 385. 02/00-03/00 Latvijas Gaze, Jsc / --- Gas Reduction station Uzvara Development of detailed design of reconstruction. 386. 09/99-11/99 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage Change of impulse line equipment. Development of an optic LAN for process automated control 387. 09/99-12/99 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage system. Detailed design. Reconstruction and update of gas custody transfer station of 388. 05/99-08/99 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage the Compressor Shop No.2. Detailed design. Feasibility study of reconstruction without enlargement of gas 389. 12/98-07/99 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage storage capacity. Vapour control and fire alarm system of Compressor Plant 390. 10/98-12/98 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage No.2. Detailed design. Other works at the 391. 10/98-04/99 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage Automation and electrical heating of gas dehumidifier filters. object, see also Item 394. Detailed design of system upgrade of fan motors for gas 392. 10/97-12/97 Latvijas Gaze, Jsc / --- Compressor plant cooling. Power supply. 10 kV electric actuation. 393. 09/97-06/98 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage Reconstruction and enlargement. Versions of technical solutions. Detailed design of automation of gas dehumidifier filters. Other works at the 394. 02/97-07/97 Latvijas Gaze, Jsc / --- Inchukalns Underground Gas Storage object, see also Electric heating of the gas filters. Item 391. Parventas Siltums, Ltd (Preparation of steam and hot water for industrial and civil objects)

23 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor 02/99-02/00 02/00-02/01 02/01-02/02 Parventas Siltums, Ltd 395. Boiler house of the tank farm Maintenance of technological process and fire fighting SCADA. 02/02-02/03 / --- 02/03-02/04 02/04- 02/05 396. 04/98-07/98 Parventas Siltums, Ltd/ --- Boiler house Design of steam and fuel oil calculation. Detailed design of reconstruction. Power supply and 0.4 kV 397. 01/98-04/98 Parventas Siltums, Ltd/ --- Panel room of the boiler house units actuation. 398. 12/97-01/98 Parventas Siltums, Ltd/ --- Boiler house of the tank farm Commissioning and setting-up. Supervision of reconstruction (automation, fire alarm, 399. 07/97-09/97 Parventas Siltums, Ltd/ --- Boiler house of the tank farm automated fire fighting, electrical engineering). 06/97-07/97 Parventas Siltums, Ltd / 06/97-08/97 400. Kaskade-SZMA Fuel oil system Development of fire fighting and fire alarm SCADA system. 02/98-03/98 06/97-11/97 Parventas Siltums, Ltd / 401. Fuel oil system Development of SCADA system. 12/97-01/98 Kaskade-SZMA Fuel oil tank farm Detailed design of reconstruction. Industrial sewerage. 402. 05/97-07/97 Parventas Siltums, Ltd/ --- 30 000 m3 of the boiler house Automation. 0,4 kV power supply and 0,4 kV electric actuation. Fuel oil tank farm 403. 02/97-05/97 Parventas Siltums, Ltd/ --- Detailed design of reconstruction. Electrical engineering. 30 000 m3 of the boiler house Baltic Coal Terminal, JSC 404. 04/08- 07/08 Baltic Coal Terminal, JSC/ -- Company infrastructure Adjusting of protection relay 10 kV Mazeikiu Nafta, Jsc (petroleum refinery) Detailed design of oil monitoring and control at oil storage tank 405. 05/96-08/96 Mazeikiu Nafta, Jsc / --- Pump station No.15 farm 4 х 50 000 m3. Rigas Udens (water supplies to civil and industrial objects) Designing, delivery and building of new gasholder tank at the Daugavgriva Sewerage bio-Treatment Daugavgriva Sewerage water bio-Treatment Station 406. 10/06-02/08 Rigas Udens / --- Station Design, delivery and construction of the new gasholder tank at the sewerage biological treatment station Daugavgriva Daugavgriva Water bio-Treatment Development of requirements specification to initial 407. 10/99 Rigas Udens / --- Station sedimentation basin. Supervision. Development of advanced concept of process computer control 408. 07/97-03/98 Rigas Udens / --- Riga municipal water treatment plant system. Development of requirements specification to automation of Water bio-Treatment Station line.

24 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Jurmalas Udens, Ltd (water supplies to civil and industrial objects) Jurmalas Udens, Ltd./ 04/06-12/07 409. “O.A.S.Būve” The water supply systems of Jurmala Renovation and expansion of the water supply system of Jurmala Ventspils Tirdzniecibas osta (commercial seaport) Ventspils Tirdzniecibas osta 10/01- 12/01 410. /Venceb, Jsc Berth No.17 Detailed design of power supplies system. Ventspils Tirdzniecibas osta 08/01-10/01 411. / BMGS-Trans Railway terminal Juras Parks Detailed design of reconstruction of air conductors 110 kV. 06/00-12/00 Ventspils Tirdzniecibas osta Detailed design of power supply and electricity network 412. External electricity network 10 kV 04/01-05/01 / BMGS-Trans reconstruction for Railway Terminal Juras Parks. Design. 413. 08/99-10/99 Ventspils Tirdzniecibas osta Ventspils commercial seaport Detailed design of reconstruction of berths power supplies system. Juras projekts, Ltd

414. 07/13-12/13 Juras projekts, Ltd/ --- Development of “Krievu Sala” infrastructure General layout diagram for infrastructure development

Development of documentation related to construction solutions of 415. 03/09-08/09 Juras projekts, Ltd --- engineering design “Typical construction solutions for elevated passenger platform”. 416. 08/08-12/08 Juras projekts, Ltd Kundzinsala multifunctional terminal Engineering design of access road (I stage, 1st phase) Prospective general layout, engineering design of I phase 1st 417. 05/08-01/09 Juras projekts, Ltd Kundzinsala multifunctional terminal stage, extended draft design and engineering design of I phase 2nd and 3rd stages. Approval of documents. 418. 10/07-12/09 Juras projekts, Ltd Development of “Krievu Sala” infrastructure Draft and engineering design (general layout) Liepaja Oil Terminal, Ltd Oil transhipment terminal (Liepaja, 419. 06/07-05/08 Liepaja Oil Terminal, Ltd Engineering design for the construction of the terminal Zemgales str. 8/12) Mangalu kugu remonta rupnica (dockyard) Mangalu kugu remonta 03/99-04/99 420. rupnica / BMGS Mangali dockyard Detailed design of reconstruction of berths power supplies system Aldaris, Jsc (brewing company) 421. 01/99-03/99 Aldaris, Jsc / SIEMENS Aldaris, Jsc Process data acquisition and visualisation system of the plant. Riga Airport 422. Riga Airport / Detail design of construction of a radar and bilateral station in 10/05-12/05 Company infrastructure . SZMA V, Jsc. the territory of the Riga Airport

25 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Detailed design development on power supplies 10 kV relay Riga Airport / Jensen 12/99-01/00 423. Consult and Arhis Inženieri Power supply system of the airport scheme protection.

Latus Sardze, Ltd. (construction and installation of engineering systems) 424. 01/06-04/06 Latus Sardze, Ltd. / --- Engineering operations referring to 10 kV electrical installations . Latvian Environment, Geology and Meteorology Agency 425. Latvian Environment, 07/05-11/05 Geology and Meteorology Design of power supply of a metrological radar set . Agency /--- Īpašu uzdevumu ministra elektroniskās pārvaldes lietās sekretariāts (Secretariat of Special Assignments Minister for Electronic Government Affairs) Secretariat of Special Assignments Minister for 426. 06/06 -07/07 Electronic Government State Integrated Information System Support of State Integrated Information System (1 stage) Affairs/-- Secretariat of Special Assignments Minister for Arrangement and support of State Integrated Information System 427. 06/06- 12/09 State Integrated Information System Electronic Government (1 stage) Affairs/-- Secretariat of Special Assignments Minister for 428. 05/06- 12/09 Electronic Government State Integrated Information System Improvement of the State integrated information system (2 stage) Affairs/-- Secretariat of Special 429. Assignments Minister for Development and implementation of the State integrated 12/05- 12/06 State Integrated Information System . Electronic Government information system (1 stage) Affairs/-- LR Iekslietu ministrijas Informacijas centrs (Information Centre of Latvian Ministry of Interior) LR Iekslietu ministrijas Modernization and testing of 2nd generation Schengen 430. 07/08-12/09 Latvian Ministry of Interior Informacijas centrs/ information system software and related registers. Development of the technical copy of Latvian National LR Iekslietu ministrijas 06/06- 11/07 431. Informacijas centrs/ Latvian Ministry of Interior Schengen Information System software and integration with the national data registers LR Iekslietu ministrijas Software of the Register of Punishments (development and 432. 11/05-01/07 Informacijas centrs/ Latvian Ministry of Interior Siemens, Ltd implementation). LR Iekslietu ministrijas Design, development and implementation of the Integrated 433. 02/02- 07/04 Informacijas centrs/ Latvian Ministry of Interior Siemens, Ltd Information System.

26 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor 12/00-05/01 06/01-08/01 LR Iekslietu ministrija Information system “Register of 434. Development and implementation of software. 07/01-08/01 Informacijas centrs Passwords" 03/01-04/01 Ministry of Finance of Latvia A PHARE program project: Adoption of the National Information Ministry of Finance LV/ 435. 11/04-05/06 System according to the Schengen Information System SIEMENS, Ltd Requirements Development of agriculture management mechanism according 436. 11/03- 05/04 Ministry of Finance LV/ --- to the EU policy: equipment and software supplies. “Severstallat”, Jsc Setting-up works under the project "The line of manufacture of 437. 09/03 “Severstallat” Jsc / --- pipes". “Investment Latvia” PRO Kapital Latvia PRO/ “SZMA- 08/03-02/04 438. Riga” Ltd S/c “Domina” Visualization and adjustment of top level BMS. Rinuzi Oil Terminal 439. On-site supervision of construction project “Expansion of Light 02/11-07/11 “Naftimpekss”, Ltd./--- Rinuzi Oil Terminal . oil tank farm”. Upgrading of Naftimpekss, Ltd. tank farm “Unipark” automated 440. 03/10- 10/10 SZMA-Riga, Ltd/--- control system 441. 11/09- 12/11 “Naftimpekss”, Ltd./--- Rinuzi Oil Terminal Construction supervision of 27500 m3 oil storage tank Design works for the project of installation of 4 additional tanks 442. 06/09- 07/11 “Naftimpekss”, Ltd. Rinuzi Oil Terminal in Rinuzi oil terminal.

443. 01/08- 04/08 SZMA-V, Jsc/--- Rinuzi Oil Terminal, 2nd phase, Tank No.5 Fitting and adjustment of fire alarm system

444. 01/08- 04/08 SZMA-V, Jsc/--- Rinuzi Oil Terminal, 2nd phase, Tank No.5 Extension of APCS .

445. 06/05-08/06 SZMA-Riga, Ltd/-- Rinuzi Oil Terminal Construction of the 1st Phase .

Naftas Serviss, Ltd (oil products trans-shipment terminal)

27 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Pre-design development of a general layout (trans-shipment capacity – 8.0 mil tons per annum). Draft Construction design (trans-shipment capacity – 2.7 mil tons per annum and 8.0 mil Naftas Serviss Ltd / tons per annum). Detailed design of construction (trans- 446. 10/02-03/04 NAFTAS SERVISS terminal BMGS, Jsc shipment capacity – 2.7 mil tons per annum and 8.0 mil tons per annum). Construction and assembly in part of automation, automated fire fighting, power supply and communications. Complex commissioning and commissioning of the object. CEMEX cement works in Broceni Engineering design documentation for substitution of reducer 447. 09/13-12/13 CEMEX, Ltd/--- Cement works in Broceni No. 5 448. 06/08-10/10 SNEF Latvia Cement works in Broceni Supply of materials, installation of plants and equipment, testing 449. 01/08-10/08 “TVA Construction”, Ltd/--- Company infrastructure Ground bed installation works 450. 07/07- 12/07 “TVA Construction”, Ltd/--- Cemex Cement works Earth loop installation 451. 03/06- 08/06 BROCĒNI, Jsc/SZMA-V, Jsc. Company infrastructure Design of transfer of communication networks “KU Lat-Holding”, Ltd Design of tank farm reconstruction and loading/unloading 452. 07/07- 02/08 “KU Lat-Holding”, Ltd Tvaika str.35, Riga equipment Reaton, Ltd Construction project of Commercial building with product 453. 12/07-11/08 Reaton, Ltd Viskalu str.11, Riga exhibition premises „Siltumelektroprojekts”, Jsc Development of engineering design documentation for the „Siltumelektroprojekts”, Jsc 08/08-11/08 454. /--- foundation of ПТ-25/30-2,9/06+T-32-2B3 turbine unit LR State Agency for Defence Properties State Agency for Defence Development of construction design for jet fuel storage facilities 455. 06/09 - present “Lielvarde” air base Properties in Ogre district. Vexoil, Ltd 456. 04/06- 07/07 Vexoil, Ltd/ --- Meza miers Oil Terminal Detailed design of reconstruction Development and coordination of draft design of reconstruction. 457. 11/04-03/05 Vexoil, Ltd/ --- Meza miers Oil Terminal Price analysis and selection of an equipment supplier. Free Port of Riga administration, Ltd

28 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Free Port of Riga 03/08-12/09t 458. administration, Ltd RO-Pax and cruise ship terminal Technical and economic assessment ,engineering design Ventspils Free Port administration Analysis and provision of information in connection with the Ventspils Free port optimum technological solutions of the facilities to be 04/12- 459. administration/ constructed in Ventspils free port area: present Ernst&Young Baltic, Ltd -Liquefied natural gas bunkerage terminal - Oil-contaminated waste-water treatment plants 04/12- Ventspils Free port Feasibility studies and technical specification for jetty 460. present administration/5AM, Ltd electrification project in Ventspils free port area Ventspils Free port Developing of pre-design documentation for construction of 461. 07/11-08/11 administration/--- liquid gas unloading and storage terminal in Ventspils Central Board of the State Border Guard Of Latvian Ministry of Interior Central Board of the State Supervision of implementation of the Stage 1 of the Latvian 462. 02/06- 07/07 Border Guard sea-border video monitoring system project Central Board of the State Detailed design of a Latvian sea-border video monitoring 463. 08/04-12/04 Border Guard Of Latvian Ministry of Interior system. Madona oil depot Development of design documentation for engineering design of 464. 02/09 “SZMA-Rīga”, Ltd. Madona oil depot reconstruction (process automation and fire alarm parts) “Rišon”, Ltd. Development of 3D animation promo materials for railway 465. 02/09- 03/09 “Rishon”, Ltd. platform and bridge for pipelines across Ogre river. „Riga fertilizer terminal”, Ltd. Mineral fertilizers short-term storage, Development of 1st and 2nd stage sketch design documentation, Riga fertilizer terminal” , Ltd 08/10- 03/13 466. / --- and transshipment facilities in Free port 1st and 2nd stage engineering design documentation and 3rd of Riga stage sketch design. Construction supervision Riga fertilizer terminal” , Ltd Pre-design solutions of Mineral fertilizers short-term storage 467. 12/09-03/10 / --- capacity and transhipment facilities in Free port of Riga „Neste Latvija”, Ltd. Fuelling system modernization (electric installations, software ,„Neste Latvija” Ltd. light oil storage 468. 09/14- present “Neste Latvija”, Ltd. / --- development) for reconstruction of fueling island No.1 and terminal construction of new track shoulders

29 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Engineering design for fuelling system modernization (electric ,„Neste Latvija” Ltd. light oil storage 469. 04/14-09/14 “Neste Latvija”, Ltd. / --- installations, software development) for reconstruction of fueling terminal island No.1 and construction of new track shoulders ,„Neste Latvija” Ltd. light oil storage 470. 10/13-12/13 “Neste Latvija”, Ltd. / --- Additive dosing solution for automatic loading system terminal Terminal’s two-way data exchange between on-site 471. 07/12- 12/15 “Neste Latvija”, Ltd. / --- Riga terminal application(s) and truck loading facilities TopTech MultiLoad II ,„Neste Latvija” Ltd. light oil storage Development of pre-design documentation for extension of 472. 09/11-12/11 “Neste Latvija”, Ltd. / --- terminal pump station and pipeline route to the berth. Neste Latvija” Ltd. light oil storage Development of pre-design documentation for extension of 473. 09/11-12/11 “Neste Latvija”, Ltd. / --- terminal pump station and pipeline directed to jetty Modernization of Neste Latvia terminal refueling points No.232, ,„Neste Latvija” Ltd. light oil storage 474. 08/11-12/11 “Neste Latvija”, Ltd. / --- 242, 252: development of engineering design, software, electric terminal installation and commissioning works 475. 01/10-12/10 “Neste Latvija”, Ltd. / --- Construction of road trucks handling facilities 476. 12/09-08/10 “Neste Latvija”, Ltd. / --- APCS upgrading Engineering design “Upgrading of road trucks filling capacity 477. 10/09-12/09 “Neste Latvija”, Ltd. / --- allowing adding of FAME additives into diesel fuel “. „Rīgas centrālais termināls”, Ltd. „ Rīgas centrālais Pre-design solutions for Bulk cargo terminal in Riga, Krievu 478. 05/11- 11/12 termināls”Ltd. Sala area. Latvijas Gaisa satiksme Design of voltage regulators for diesel rotor (0.4 kV stabilized 479. 07/12- 04/13 Latvijas Gaisa satiksme Riga airport power supply equipment) in ATC tower Latvijas Dzelzceļš SJSC Railway infrastructure modernization in Zolitūde, Imanta, Latvijas Dzelzceļš SJSC / 09/14- Babīte, Bulduri, Dzintari, Pumpuri, Melluži, Asari, Lielupe, 480. „RBSSKALS Būvsabiedrība Railway passenger infrastructure present un Leonard Weiss RTE” Dubulti, Sloka, Vaivari, Majori, Olaine, Cukurfabrika, Jelgava stations’ areas. Latvijas Dzelzceļš SJSC/ 06/14- 481. „RBSSKALS Cesis railway station Engineering design for construction of lifted railway platforms present Būvsabiedrība” Ltd Railway track reconstruction in Work organization plan for relocation of external gas supply 482. 02/14-05/14 Latvijas Dzelzceļš SJSC /--- Bolderaja station system BMGS JSC/ Latvijas Electrification of 2nd railway track of Technical advisory and feasibility study of proposed technical 483. 12/13-03/14 Dzelzceļš SJSC Skrīveri – Aizkraukle line solutions 30 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Adaptation of Skriveri-Muldakmens electrification project 484. 04/13-08/13 Latvijas Dzelzceļš/ SJSC--- solutions to the existing topographical layout „PortTransServis”, Ltd. Economic feasibility study for process equipment construction 485. 12/12-01/13 PortTransServis Ltd. of pentane and isopentane receiving, storage and ship loading terminal „Ventstone Complex”, Ltd. Design engineering for liquefied natural gas terminal and 486. 10/13-11/13 „Ventstone Complex”,Ltd/--- cogeneration station construction in Ventspils, Ziemeļu str.21 „Deloitte Latvia”, Ltd. Technical consultations for assessment of technical condition of Oil product terminals „OVI terminal” 487. 01/14-05/14 „Deloitte Latvia”, Ltd/-- „OVI terminal” (Tvaika str. 35, Riga) and „Woodison Terminal” and„Woodison Terminal” (Tvaika str. 39, Riga) Riga municipal police Advisory on operative communication system design and 488. 03/14-05/14 Riga municipal police/-- hardware procurement tender : drafting of tender documentation and definition of bidding requirements AB „Klaipeda nafta” (Lietuva) Liquified natural gas terminal Project: engineering and 04/13- AB „Klaipeda nafta” /AS 489. construction works related to port infrastructure (jetty) with present BMGS suprastructure (equipment) RBSSKALS Estonian Branch Economic feasibility study for process equipment construction 490. 12/12-01/13 PortTransServis Ltd. of pentane and isopentane receiving, storage and ship loading terminal Transneft, Jsc Transneft, Jsc / Development of documentation Power supply of the Linear 491. 08/05-09/05 VAMI-avtomatika, Ltd. telemechanics control station block-box Transneft, Jsc / Detailed design of reconstruction of remote control system 2777 492. 07/02-11/02 Oil pipeline Surgut- Polotsk Giprotruboprovod, Ltd km of the line section. Transneft, Jsc / Design and research for Reconstruction of remote control 493. 07/02-11/02 Giprotruboprovod, Ltd system of 2449 km. Transneft, Jsc / Preparation of technical documentation and design and 494. 06/02- 04/03 Samur Oil transmission plant Giprotruboprovod, Ltd research for reconstruction of automation.

31 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Transneft, Jsc / Preparation of technical documentation and design and 495. 06/02-04/03 Sulak Oil transmission plant Giprotruboprovod, Ltd research for reconstruction of automation. Transneft, Jsc / Oil Transmission Plant of the Oil Design of automation system reconstruction, development of 496. 01/02-04/03 Giprotruboprovod, Ltd Transmission Base Tikhoretskaya 3 centralised control system of electrically actuated valves. Transneft, Jsc / Oil Transmission Plant of the Oil Design of automation system reconstruction, development of 497. 12/01- 04/03 Giprotruboprovod, Ltd Transmission Base Tikhoretskaya 2 centralised control system of electrically actuated valves. Transneft, Jsc / Oil Transmission plant Mikhailovka 498. 10/01- 04/03 Design for reconstruction of automation system. Giprotruboprovod, Ltd (Almetyevsk -Gorky II) Oil Transmission plant Naberezhnie Transneft, Jsc / 10/01- 04/03 499. Giprotruboprovod, Ltd Chelni of the pipeline Kiengop- Detailed design of reconstruction of automation system. Naberezhnie Chelni Transneft, Jsc / Oil Transmission plant Karabash of the 500. 10/01- 04/03 Detailed design of reconstruction of automation system. Giprotruboprovod, Ltd pipeline Karabash -Almetyevsk-Kaleikino Transneft, Jsc / Oil Transmission plant Kiengop of the 501. 10/01- 04/03 Detailed design of reconstruction of automation system. Giprotruboprovod, Ltd pipeline Kiengop- Naberezhnie Chelni Transneft, Jsc / Oil Transmission plant Uralskaya of the 502. 10/01- 04/03 Detailed design of reconstruction of automation system. Giprotruboprovod, Ltd pipeline Perm-Almetyevsk Transneft, Jsc / Oil Transmission plant Mikhailovka of 503. 10/01-04/03 Detailed design of reconstruction of automation system. Giprotruboprovod, Ltd the pipeline Almetyevsk -Gorky III Transneft, Jsc / Oil Transmission plant Kovali of the 504. 10/01-10/02 Detailed design of reconstruction of automation system. Giprotruboprovod, Ltd pipeline Almetyevsk -Gorky III Transneft, Jsc / Oil Transmission plant Kovali of the 505. 10/01-09/02 Detailed design of reconstruction of automation system. Giprotruboprovod, Ltd pipeline Almetyevsk -Gorky II Transneft, Jsc / Oil Transmission plant 1,4 of the Oil 506. 09/01-04/03 Detailed design of reconstruction of automation system. Giprotruboprovod, Ltd Transmission Base Tikhoretskaya Transneft, Jsc / 03/01-03/02 507. Giprotruboprovod, Ltd Oil Transmission plant Mostovaya Detailed design of reconstruction of automation system. Transneft, Jsc / 03/01-03/02 508. Giprotruboprovod, Ltd Oil Transmission plant Debessi Detailed design of reconstruction of automation system. St Petersburg Sea Port Detailed design of general-purpose chemical fertiliser 509. 02/95-05/96 St Petersburg Sea Port Berth No.107 transmission complex. Narva Elektrijaamad, Jsc (Narva Electric Power Stations) Narva Elektrijaamad (Narva Feasibility study of renovation proposals for central control 510. 02/09-06/09 Electric Power Stations), Narva Electric Power Stations JSC panel 32 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Narva Elektrijaamad (Narva 511. 08/05-04/06 Electric Power Stations)/ Baltiysk Power Station Development of an energy metering system OÜ Olimps Detailed design of electric power accounting system Narva Elektrijaamad (Narva modernisation; Development of software; Supply of basic 512. 03/04-08/04 Electric Power Stations)/ Narva Electric Power Stations software (SCADA system); Supply of equipment for power OÜ Olimps accounting system; System testing, complex commissioning, personnel training Viru Olitoostas, Jsc (shale oil production and shipment to consumers) Viru Olitoostas, Jsc/ Draft design of process and automation part of the railway 513. 01/04-05/04 Railway facility Siltumelektroprojekts, Jsc platform Eurodek Kopli Services, Jsc Terminal in Tallinn (reception, storage and loading of crude oil and oil products to tankers) Eurodek Kopli Services, Jsc EURODEK KOPLI SERVICES, Jsc Development and commissioning of SCADA for pump stations 514. 11/03- 01/05 Terminal in Tallinn / OÜ Olimps terminal No.2, 3 of tank farms 1,2,3,4,5 and the "Old Farm". Eurodek Kopli Services, Jsc EURODEK KOPLI SERVICES, Jsc 515. 10/03-11/03 Terminal in Tallinn / OÜ Connection of fibre-optic cable conductors, check. Olimps terminal Eurodek Kopli Services, Jsc EURODEK KOPLI SERVICES, Jsc Working design of update of process automated control system 516. 08/02-02/03 Terminal in Tallinn / OÜ Olimps terminal for supplementary works. Eurodek Kopli Services, Jsc EURODEK KOPLI SERVICES, Jsc 517. 02/02-08/02 Terminal in Tallinn / OÜ Detailed design of update of process automated control system. Olimps terminal Eurodek Kopli Services, Jsc EURODEK KOPLI SERVICES, Jsc Development of a conceptual design and a technical task on the 518. 09/01-10/01 Terminal in Tallinn terminal technological process monitoring and control system. “NK “Rosneft” – Nahodkanefteprodukt” (Oil production and realisation) “НК “Rosneft” – Design of SCADA for the fire-fighting pump station No.1. 519. 09/05- 12/05 Fire fighting pump station No.1 Nahodkanefteprodukt”, Jsc/ Process set-up “НК “Rosneft” – 04/05- 12/05 520. Nahodkanefteprodukt”, Jsc/ Pump station No.8 Design of SCADA for the pump station No.8. Process set-up “НК “Rosneft” – 521. 05/04- 06/05 Nahodkanefteprodukt”, Jsc/ Company infrastructure Automated supervisory control office of the company Atrium, Ltd “НК “Rosneft” – 522. 07/04- 05/05 Nahodkanefteprodukt”, Jsc/ Company infrastructure Detailed design of the company SCADA system Atrium, Ltd

33 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor “НК “Rosneft” – Detailed design of the railway platform. SCADA, automation, 523. 07/04-05/05 Nahodkanefteprodukt”, Jsc/ Company infrastructure Atrium, Ltd process engineering “НК “Rosneft” – Consulting in development of automated process control 524. 02/04-08/04 Nahodkanefteprodukt”, Jsc/ Company infrastructure system concept and detailed design for NK “Rosneft” - Atrium, Ltd “Nahodkanefteprodukt” Tuapse – Nefteprodukt Tuapse-Nefteprodukt/ 12/14 525. Kombit Engineering Ltd. Company infrastructure Front-end engineering: Heating networks, 2nd stage Tuapse-Nefteprodukt/ Pre-commissioning of process pipelines on Southern Mall 526. 11/14- present Company infrastructure Kombit Engineering Ltd. (Jetties 1 and 2) 08/14- Tuapse-Nefteprodukt/ Construction supervision: Modernization of treatment facilities. 527. Company infrastructure present Kombit Engineering Ltd. Re-equipment of operating wells 08/14- Tuapse-Nefteprodukt/ Construction supervision: Reconstruction of process pipelines 528. Company infrastructure present Kombit Engineering Ltd. on oil jetties. Surge relief system. 04/14- Tuapse-Nefteprodukt/ Construction supervision: "Re-equipment of fuelling system in 529. Company infrastructure present Kombit Engineering Ltd. production facility No.1 Tuapse-Nefteprodukt/ Construction supervision: process pipelines on Southern Mall 530. 10/13-12/14 Company infrastructure Kombit Engineering Ltd. jetties 12/13- Tuapse-Nefteprodukt/ Design and survey works for modernization of gas handling and 531. Company infrastructure present Kombit Engineering Ltd. gas equalizing systems Tuapse-Nefteprodukt/ 11/13-12/13 Pre-commissioning of right bank water treatment facilities 532. Kombit Engineering Ltd. Company infrastructure 11/13- Tuapse-Nefteprodukt/ Design and survey works for transferring of oil-heating station 533. Company infrastructure present Kombit Engineering Ltd. from low-sulfur fuel oil to natural gas Design and survey works for process pipelines from vehicle Tuapse-Nefteprodukt/ 10/13-11/13 534. Kombit Engineering Ltd. Company infrastructure bridge to railway postern , substitution of pipelines on junction well 10/13- Tuapse-Nefteprodukt/ Pre-commissioning of gas handling system and gas equalizing 535. Company infrastructure present Kombit Engineering Ltd. system Tuapse-Nefteprodukt/ 09/13-12/13 536. Kombit Engineering Ltd. Company infrastructure Pre-commissioning of Vertical steel tanks 20000 m3 №№37,38 Tuapse-Nefteprodukt/ 09/13-12/13 537. Kombit Engineering Ltd. Company infrastructure Pre-commissioning of Vertical steel tanks 10000 m3 №№39,40 09/13- Tuapse-Nefteprodukt/ 538. Company infrastructure Design and survey works for re-equipment of pump station №7" present Kombit Engineering Ltd.

34 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Pre-commissioning for process pipelines from vehicle bridge to Tuapse-Nefteprodukt/ 09/13-11/13 539. Kombit Engineering Ltd. Company infrastructure railway postern , substitution of pipelines on junction well. APCS adjustment 08/13- Tuapse-Nefteprodukt/ 540. Company infrastructure Fire safety station ТП-8А: Construction supervision present Kombit Engineering Ltd. 08/13- Tuapse-Nefteprodukt/ 541. Company infrastructure Modernization of jetty No.3. Supervision present Kombit Engineering Ltd. 08/13- Tuapse-Nefteprodukt/ Petrochemicals’ fiscal metering system. Construction 542. Company infrastructure present Kombit Engineering Ltd. supervision Tuapse-Nefteprodukt/ Design and survey works for automatic fueling area. Revision 543. 07/13-11/13 Company infrastructure Kombit Engineering Ltd. of detailed design documentation Tuapse-Nefteprodukt/ Design and survey works for: Re-equipment of VST 10 000 m3 544. 07/13-12/13 Company infrastructure Kombit Engineering Ltd. (№№32-36) for diesel fuel storage Design and survey works for modifying the VST 10000m3 for Tuapse-Nefteprodukt/ 01/13- 08/13 545. Kombit Engineering Ltd. Company infrastructure storage of vehicle gasoline and jet fuel (installation of pontoons) Tuapse-Nefteprodukt/ Design and survey works for transformer substation 10kV-6kV. 546. 12/12-09/13 Company infrastructure Kombit Engineering Ltd. Editing of technical documentation Tuapse-Nefteprodukt/ Development the declaration of intent for commercial 547. 11/12-01/13 Company infrastructure Kombit Engineering Ltd. accounting units on process piping from oil refinery Tuapse-Nefteprodukt/ Design and survey works for process piping from oil refinery to 548. 11/12-12/12 Company infrastructure Kombit Engineering Ltd. the facility tanks. Editing of technical documentation Tuapse-Nefteprodukt/ Supervision of construction of process piping from vehicle 549. 11/12-12/12 Company infrastructure Kombit Engineering Ltd. bridge to railway postern Tuapse-Nefteprodukt/ 10/12-12/12 550. Kombit Engineering Ltd. Company infrastructure Supervision of construction of transformer substation 10kV-6kV Tuapse-Nefteprodukt/ Design and survey works for modernization of gas handling and 551. 10/12-03/13 Company infrastructure Kombit Engineering Ltd. equalizing system Commissioning of process pipelines from Tuapse oil refinery to Tuapse-Nefteprodukt/ 08/12- 12/12 552. Kombit Engineering Ltd. Company infrastructure company storage tanks. Passing through Sochinskaya str. APCS. Tuapse-Nefteprodukt/ Design solutions for increasing storage capacity (drafting of 553. 07/12-08/12 Company infrastructure Kombit Engineering Ltd. declaration of intent) Tuapse-Nefteprodukt/ APCS of units No.186 (1,2,3). Commissioning of overall APCS 554. 07/12- 09/12 Company infrastructure Kombit Engineering Ltd. of the company Tuapse-Nefteprodukt/ Design and survey works for process piping from vehicle bridge 555. 06/12-12/12 Company infrastructure Kombit Engineering Ltd. to railway postern

35 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Tuapse-Nefteprodukt/ Research and design for integration of APCS of pump station 556. 06/12- 09/12 Company infrastructure Kombit Engineering Ltd. No.5 into existing APCS Tuapse-Nefteprodukt/ Research and design for APCS and fire-fighting ACS of deep- 557. 05/12- 06/12 Company infrastructure Kombit Engineering Ltd. water jetties 1a,1b. Tuapse-Nefteprodukt/ 05/12-07/12 558. Kombit Engineering Ltd. Company infrastructure Research and design of transformer substation 10кV/6кV Tuapse-Nefteprodukt/ Commissioning of deep-water jetty No.1a interrelated with light 559. 04/12- 06/12 Company infrastructure Kombit Engineering Ltd. and dark oil product transshipment facility Tuapse-Nefteprodukt/ Commissioning of oil technology process equipment of Tuapse 560. 04/12- 06/12 Company infrastructure Kombit Engineering Ltd. oil refinery Tuapse-Nefteprodukt/ Design and survey works for process piping on jetties No.1, 561. 03/12- 11/12 Company infrastructure Kombit Engineering Ltd. No.2 (South pier) Tuapse-Nefteprodukt/ Research and design for Vertical steel tanks 10000 m3 No.39, 562. 03/12-04/12 Company infrastructure Kombit Engineering Ltd. 40 with JET technology». Allocation of 1st start-up facility Tuapse-Nefteprodukt/ Research and design for process pipelines from traffic bridge to 563. 03/12-06/12 Company infrastructure Kombit Engineering Ltd. railway gallery. APCS binding. Tuapse-Nefteprodukt/ Research and design for process pipelines of tank farm No.2 564. 03/12-06/12 Company infrastructure Kombit Engineering Ltd. (III start-up facility). APCS binding. Tuapse-Nefteprodukt/ Research and design for process pipelines from Tuapse oil 565. 03/12-06/12 Company infrastructure Kombit Engineering Ltd. refinery to company storage tanks. APCS binding. Tuapse-Nefteprodukt/ Reasearch and design for overall APCS. Units 186-1,2,3. APCS 566. 03/12-05/12 Company infrastructure Kombit Engineering Ltd. binding design. Tuapse-Nefteprodukt/ Research and design for Left shore treatment facilities. Start-up 567. 03/12- present Company infrastructure Kombit Engineering Ltd. facilities No.3, 4. Tuapse-Nefteprodukt/ Research and design for Right shore treatment facilities. 568. 03/12-07/12 Company infrastructure Kombit Engineering Ltd. Sewerage pump station No. 7. Tuapse-Nefteprodukt/ Research and design for Right shore treatment facilities. (III 569. 03/12- 12/12 Company infrastructure Kombit Engineering Ltd. start-up facility). APCS binding. Tuapse-Nefteprodukt/ Research and design for transformer substation 10кV/6кV. 570. 03/12-04/12 Company infrastructure Kombit Engineering Ltd. Refurbishment of ТП-13". Research and design for System of commercial accounting of Tuapse-Nefteprodukt/ 03/12- 09/12 571. Kombit Engineering Ltd. Company infrastructure oil products on oil jetties No.4, 5. Transformer substation 2х630 кVа". Research and design for upgrading of automated fire-fighting Tuapse-Nefteprodukt/ 01/12-06/12 572. Kombit Engineering Ltd. Company infrastructure station and automated fire-fighting control system. Temporary exclusion of VST-10000 m3 No.32 from overall APCS.

36 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Research and design for upgrading of Coalescent treatment Tuapse-Nefteprodukt/ 01/12- 05/13 573. Kombit Engineering Ltd. Company infrastructure facilities. Rearrangement of operating wells of protective drainage system Research and design for Company overall APCS. Integration of Tuapse-Nefteprodukt/ pump station No.5 into existing APCS. Process pipeline 574. 01/12- 07/12 Company infrastructure Kombit Engineering Ltd. protection from overpressure and ensuring control over their operation. Tuapse-Nefteprodukt/ Commissioning of APCS and automatic fire-fighting CS of deep- 575. 01/12-04/12 Company infrastructure Kombit Engineering Ltd. water jetties 1a and 1b. Tuapse-Nefteprodukt/ Research and design for process pipelines from traffic bridge to 576. 01/12-02/12 Company infrastructure Kombit Engineering Ltd. railway gallery (3rd stage). Junction points. Tuapse-Nefteprodukt/ Design and survey works for process pipelines from Tuapse oil 577. 01/12- 03/12 Company infrastructure Kombit Engineering Ltd. refinery to company storage tanks. Switchboard room Tuapse-Nefteprodukt/ Design and survey works for process pipelines from Tuapse oil 578. 12/11 Company infrastructure Kombit Engineering Ltd. refinery to company storage tanks. APCS development Tuapse-Nefteprodukt/ Design and survey works for deep-sea terminal. Upgrading 579. 11/11- 02/12 Company infrastructure Kombit Engineering Ltd. APCS with hydroblow protection system Tuapse-Nefteprodukt/ Design and survey works for reconstruction of process pipelines 580. 09/11- 06/12 Company infrastructure Kombit Engineering Ltd. on jetties. Completion. Tuapse-Nefteprodukt/ Design and survey works for light oil pump station No.5. 581. 08/11-12/11 Company infrastructure Kombit Engineering Ltd. Integration with existing APCS. Units No. 186 (1,2,3) Tuapse-Nefteprodukt/ 08/11- 08/13 582. Kombit Engineering Ltd. Company infrastructure Design and survey works for object’s heat networks Design and survey works for Automated industrial process Tuapse-Nefteprodukt/ 07/11- 11/11 583. Kombit Engineering Ltd. Company infrastructure control system including control room of tank farm No.1. System integration into current APCS of pump station No.5 Tuapse-Nefteprodukt/ Design and survey works for Vertical Steel Tanks 10000 m3 584. 07/11- 09/11 Company infrastructure Kombit Engineering Ltd. No.39,40 with JET technology» Tuapse-Nefteprodukt/ Commissioning of automatic fire-fighting control system for VST 585. 07/11- 08/11 Company infrastructure Kombit Engineering Ltd. 10000 m3 Nr.32, 33, 34, 35, 36 Tuapse-Nefteprodukt/ Design and survey works for deep-sea gas blowing control 586. 06/11- 08/11 Company infrastructure Kombit Engineering Ltd. system Tuapse-Nefteprodukt/ 06/11- 08/11 3 587. Kombit Engineering Ltd. Company infrastructure APCS commissioning for 10000 m VST Nr.32, 33, 34, 35, 36 Tuapse-Nefteprodukt/ Commissioning of process pipeline excess pressure protection 588. 06/11- 09/11 Company infrastructure Kombit Engineering Ltd. system for industrial process APCS Project Tuapse-Nefteprodukt/ 06/11- 09/11 589. Kombit Engineering Ltd. Company infrastructure Design and survey for process pipelines of tank farm No.2 37 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Tuapse-Nefteprodukt/ Design and survey works for process pipelines from 590. 06/11- 10/11 Company infrastructure Kombit Engineering Ltd. prefabricated bridge to railway gallery (3rd stage) Tuapse-Nefteprodukt/ 05/11- 02/12 591. Kombit Engineering Ltd. Company infrastructure Design and survey works for refurbishment of berth No.3 Tuapse-Nefteprodukt/ 05/11- 02/12 592. Kombit Engineering Ltd. Company infrastructure Design and survey works for refurbishment of berth No.6 Tuapse-Nefteprodukt/ Design and survey works for APCS of light oil pump station 593. 04/11-05/11 Company infrastructure Kombit Engineering Ltd. No.5. Development of self-contained system. Tuapse-Nefteprodukt/ Design and survey works for oil fiscal metering unit. Volume 594. 04/11- 03/12 Company infrastructure Kombit Engineering Ltd. metering and quality detection system on berths No.4, No.5 Tuapse-Nefteprodukt/ Design and survey works for fire-fighting depot. Transformer 595. 04/11-08/11 Company infrastructure Kombit Engineering Ltd. substation ТП-8А . Design and survey works for company communication system Tuapse-Nefteprodukt/ 04/11-07/11 596. Kombit Engineering Ltd. Company infrastructure (5th stage). External communication networks. Multifunctional industrial communication system. Pre-design works for deep-sea berth 1A designed for Tuapse-Nefteprodukt/ 03/11- 03/11 597. Kombit Engineering Ltd. Company infrastructure transshipment of dark and light oil in Tuapse sea port. Amending design and estimate documentation for metering unit. Tuapse-Nefteprodukt/ Design and survey works for oil technology of Tuapse oil 598. 02/11- 06/12 Company infrastructure Kombit Engineering Ltd. refinery Company APCS including tank farm control room (5th stage). Tuapse-Nefteprodukt/ 02/11-06/11 599. Kombit Engineering Ltd. Company infrastructure Commissioning of automatic reactive power compensation system for 6,0 and 0,4 kV network. Tuapse-Nefteprodukt/ Pre-design solutions for refurbishment of gas recovery and gas 600. 01/11- 03/11 Company infrastructure Kombit Engineering Ltd. surge systems. Tuapse-Nefteprodukt/ Design and survey works for APCS development for "VST- 601. 01/11- 06/11 Company infrastructure Kombit Engineering Ltd. 20000 m3 №№37,38.” (VST –Vertical Steel Tank) Tuapse-Nefteprodukt/ Design and survey works for APCS development Project : 602. 01/11- 07/11 Company infrastructure Kombit Engineering Ltd. "VST-10000 m3 №№39,40.” , Tuapse-Nefteprodukt/ Design and survey works for process piping refurbishment at oil 603. 11/10- 12/10 Company infrastructure Kombit Engineering Ltd. loading berths. APCS for oil loading berths No.3,4,6" Tuapse-Nefteprodukt/ 11/10- 08/11 604. Kombit Engineering Ltd. Company infrastructure Design and survey works for staff canteen construction project. Tuapse-Nefteprodukt/ 11/10- 10/11 605. Kombit Engineering Ltd. Company infrastructure Design and survey works for 10 kV/6kV transformer sub-station Tuapse-Nefteprodukt/ 11/10- 07/11 606. Kombit Engineering Ltd. Company infrastructure Design and survey works for Control Room project. Tuapse-Nefteprodukt/ Design and survey works for APCS development for VST, 607. 11/10-12/10 Company infrastructure Kombit Engineering Ltd. 10000 m3 No.32,33,34,35,36 38 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Tuapse-Nefteprodukt/ Adjustment and commissioning of operational process pre-set 608. 11/10- 12/10 Company infrastructure Kombit Engineering Ltd. control system for storage tanks No.1-6» Design and survey works for development of automatic Tuapse-Nefteprodukt/ 07/10- 12/10 609. Petroproekt Ltd. Company infrastructure operational process control system and automatic fire-fighting control system of sea terminals 1a, 1b. , Design and survey works on control centre APC system. Tuapse- 12/09- 08/10 610. Nefteprodukt/Petroproekt Company infrastructure Overpressure protection and extraplant management of process pipelines. Tuapse- Procurement, adjustment and commissioning of Automated 611. 12/09- 08/10 Company infrastructure Nefteprodukt/Petroproekt process control system of storage tanks No.1-No.6 Tuapse- Design and survey works on APCS of light petrochemical pump 612. 09/09-01/10 Tank farm of section No.1 Nefteprodukt/Petroproekt station No.5 Design and survey works for APCS of tank farm control centre . Tuapse- 09/09-11/09 613. Nefteprodukt/Petroproekt Tank farm of section No.1 Introduction of reactive power compensation system in 6 kV / 0.4 kV power network of process pump station No.7 Design and survey works for APCS of tank farm control centre . Tuapse- Development of testing and selection method of relay protection 614. 09/09-12/09 Tank farm of section No.1 Nefteprodukt/Petroproekt response instruments and emergency control systems of 6 kV power network . Design and survey works for APCS of tank farm control centre . Tuapse- 09/09-10/09 615. Nefteprodukt/Petroproekt Tank farm of section No.1 Introduction of soft starting technology for 0.4 kV electric motors of process pump station No.7 Design and survey works within the framework of “RN- 616. 07/08- 08/10 Tuapse – Nefteprodukt Company infrastructure Tuapsenefteprodukt” reconstruction project (stage No.2) Development of technical documentation for tank No.14 APCS 617. 03/09-06/09 Tuapse – Nefteprodukt Company infrastructure project Design and survey works within the framework of APCS of the 618. 12/08-04/09 Tuapse – Nefteprodukt Tank farm of section No.1 company facilities and control room of tank farm No.1 (stage No.4) 619. 06/08-12/09 Tuapse – Nefteprodukt Company infrastructure Detailed design of oil-products fiscal metering system 620. 06/08- 12/08 Tuapse – Nefteprodukt Berth No.5 Technical re-equipment of berth No.5. Equipment supply Engineering documentation of “ Video wall information control 621. 02/08-04/08 Tuapse – Nefteprodukt Tank farm of section No.1 system” of the object “APCS of the section No.1 tank farm control room” APCS of tanks No. 21, 22. Engineering documentation, 622. 02/08-05/09 Tuapse – Nefteprodukt Tank farm 2x20 000m3 development of engineering design, supply of equipment. Installation supervision and commissioning. Staff training. 39 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Engineering documentation, development of engineering design Loading/unloading railway platform No.2 623. 02/08-11/08 Tuapse – Nefteprodukt for “Loading/unloading railway platform No.2 with unloading with unloading pump station No.3 pump station No.3” Loading/unloading railway platform No.2 Supply of equipment. Installation supervision and 624. 02/08-11/08 Tuapse – Nefteprodukt with unloading pump station No.3 commissioning. Staff training. APCS of Light oil tank farm. Tanks No. 42-47. Design and 625. 11/07-05/08 Tuapse – Nefteprodukt Light oil tank farm exploration works. APCS of Light oil tank farm. Tanks No. 9-12, 15-19, 23-25. 626. 11/07-05/08 Tuapse – Nefteprodukt Light oil tank farm Supply of equipment. Installation supervision and commissioning. Staff training. Installation of multi-access display system (based on video wall) 627. 11/07–04/08 Tuapse – Nefteprodukt Tank farm of section No.1 in Section No.1 tank farm control room. Installation supervision and commissioning. Electric heating of pump station No.7. Installation supervision 628. 11/07–03/08 Tuapse – Nefteprodukt Pump station No.7 and commissioning. 629. 11/07-07/08 Tuapse – Nefteprodukt Tank farm of section No.1 APCS of the plant. Installation supervision and commissioning. APCS of mazoute loading technology for pump station No.7 630. 07/06–07/07 Tuapse – Nefteprodukt Pump station No.7 (pumping of dark oil products) Development of APCS for Loading/unloading railway platform 631. 04/06–07/07 Tuapse – Nefteprodukt Loading/unloading railway platform No.1 No.1 Adjustment works for modification of Loading/unloading railway 632. 12/06–07/07 Tuapse – Nefteprodukt Loading/unloading railway platform No.1 platform No.1 Oil heating station (thermal oil boiler room). Working 633. 04/06-09/06 Tuapse – Nefteprodukt Oil heating station documentation The modernisation of the loading/unloading railway platform 634. 01/06-09/06 Tuapse – Nefteprodukt Loading/unloading railway platform No.1 No. 1 for the unloading of the fuel oil. Working documentation 635. 04/05- 03/07 Tuapse – Nefteprodukt --- Company infrastructure Development of SCADA for light oil railway platform No.3 Design operations, development of a concept of the oil terminal 636. 04/05- 12/05 Tuapse – Nefteprodukt --- Company infrastructure automated control system Rosneftbunker, JSC 01/15- Rosneftbunker, Jsc/ Kombit Pre-commissioning works: Liquid cargo storage base. Railway 637. Multifunctional Port terminal “Ust-Luga” present Engineering Ltd. unloading facility No.4. APCS 01/15- Rosneftbunker, Jsc/ Kombit Pre-commissioning works: Liquid cargo storage base. Railway 638. Multifunctional Port terminal “Ust-Luga” present Engineering Ltd. unloading facility No.4 Rosneftbunker, Jsc/ Kombit Design documentation: Liquid cargo storage base. Railway 639. 10/14-12/14 Multifunctional Port terminal “Ust-Luga” Engineering Ltd. unloading facility No.3.Reconstruction. APCS

40 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Front-end engineering: relocation of oil unloading facilities’ Rosneftbunker, Jsc/ Kombit 09/14-10/14 640. Engineering Ltd. Multifunctional Port terminal “Ust-Luga” No.1, 2, 3 APCS hardware from unloading control room to maintenance room Rosneftbunker, Jsc/ Kombit 02/14- 07/14 641. Engineering Ltd. Multifunctional Port terminal “Ust-Luga” APCS of unloading facility No.4 for viscous oil products Survey of design documentation, pipeline system and Rosneftbunker, Jsc/ VAMI 02/14- 04/14 642. Avtomatika Ltd. Multifunctional Port terminal “Ust-Luga” equipment for process setup of light oil transshipment unit (Liquid cargo storage base) 11/13- Rosneftbunker, Jsc/ Kombit Supervision of viscous oil unloading facility No.4 and power 643. Multifunctional Port terminal “Ust-Luga” present Engineering Ltd. units No. 4, 5. Rosneftbunker, Jsc/ VAMI Examination of design documentation, pipeline system and 644. 05/13-08/13 Multifunctional Port terminal “Ust Avtomatika Ltd. equipment for process setup of light oil transshipment facilities Design of Liquid cargo storage base in Ust-Luga sea port. Rosneftbunker, Jsc/ Kombit 05/13-12/13 645. Engineering Ltd. Multifunctional Port terminal “Ust Unloading railway station No.4 for high-viscosity products, with infrastructure Examination of thermal balance in mazout unloading stations Rosneftbunker, Jsc/ Kombit 04/13 646. Engineering Ltd. Multifunctional Port terminal “Ust №1,2 and in automated thermal oil heating station during oil and petrochemical unloading at maximum capacity Rosneftbunker, Jsc/ Kombit Process setup and commissioning of light oil unloading facility 647. 11/12- 06/13 Multifunctional Port terminal “Ust-Luga” Engineering Ltd. No.3 of pump station No.10.1 Rosneftbunker, Jsc/ Kombit Editing of technical documentation for light oil unloading facility 648. 09/12-11/12 Multifunctional Port terminal “Ust-Luga” Engineering Ltd. No.3 of pump station No1 09/12- Rosneftbunker, Jsc/ Kombit APCS commissioning for light oil unloading facility No.3 of 649. Multifunctional Port terminal “Ust-Luga” present Engineering Ltd. pump station No.1 Survey of design documentation for process setup of mazout Rosneftbunker, Jsc/ VAMI 08/12- 11/12 650. Avtomatika Multifunctional Port terminal “Ust-Luga” facility in framework of 2nd stage of bulk cargo complex construction Rosneftbunker, Jsc/ Kombit Re-development of APCS software for mazout unloading 651. 06/12 Multifunctional Port terminal “Ust-Luga” Engineering Ltd. railway platforms No.1 , No. 2 Rosneftbunker, Jsc/ Kombit Development of detailed design documentation for hot water, 652. 02/12-06/12 Multifunctional Port terminal “Ust-Luga” Engineering Ltd. nitrogen and air supply of railway loading platforms No.1, No.2 . Editing of detailed APCS design documentation for railway Rosneftbunker, Jsc/ Kombit 01/12- 07/12 653. Engineering Ltd. Multifunctional Port terminal “Ust-Luga” unloading platform No.3 with light oil unloading pump station No.1. Object integration with APCS. Development of process regulations for commissioning and Rosneftbunker, Jsc/ Kombit 12/11- 11/12 654. Engineering Ltd. Multifunctional Port terminal “Ust-Luga” startup of facilities constructed in framework of 1st and 2nd stage of bulk cargo complex storage facilities

41 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Rosneftbunker, Jsc/ Re-drafting of engineering documentation for light oil unloading 655. 06/11-07/11 Multifunctional Port terminal “Ust-Luga” Petroproekt, Ltd pump station Design documentation for standby power supply system of Rosneftbunker, Jsc/ 10/10- 02/11 656. Petroproekt, Ltd Multifunctional Port terminal “Ust-Luga” emergency and process reserved quota power consumers at railway loading/unloading facilities 1,2,3. Rosneftbunker, Jsc / Design documentation and software development for automatic 657. 4/10 – 11/11 Multifunctional Port terminal “Ust-Luga” «SPIK SZMA» JSC control system of fuel oil unloading facility No.2 , Rosneftbunker, Jsc/ VAMI Design project documentation of Automatic fire-fighting process 658. 12/09-09/10 Multifunctional Port terminal “Ust-Luga” Avtomatika control system of bulk cargo storage facilities. Editing of design project documentation after completion of Rosneftbunker, Jsc/ construction supervision of loading/unloading facility No3, pump 659. 12/09- 04/13 Multifunctional Port terminal “Ust-Luga” Petroproekt, Ltd station, foot bridges connecting loading/unloading facilities No. 1, No.2, No.3. Preparing of operation charts and modes of mazout unloading Rosneftbunker, Jsc/ facility. Preparing of operational manuals for unloading facility 660. 10/09-12/09 Multifunctional Port terminal “Ust-Luga” Petroproekt equipment units. Composing of manuals of oil products heating and unloading operations. Development of comprehensive testing program of equipment Rosneftbunker, Jsc/ 08/09-09/09 661. Petroproekt, Ltd Multifunctional Port terminal “Ust-Luga” operation and control systems of mazout unloading facility. Preparing of process manual for mazout unloading facility. Rosneftbunker, Jsc / Engineering design of pedestrian overpasses over railway 662. 05/09- 09/09 Multifunctional Port terminal “Ust-Luga” Petroproekt, Ltd unloading platforms. Mazout unloading railway platform No.1. Construction 663. 03/09-05/09 Rosneftbunker, Jsc /--- Multifunctional Port terminal “Ust-Luga” supervision Light oil unloading railway platform No.2. Construction 664. 02/09-12/09 Rosneftbunker, Jsc / Multifunctional Port terminal “Ust-Luga” supervision Mazout unloading railway platform No.2. Construction 665. 01/09-01/13 Rosneftbunker, Jsc /--- Multifunctional Port terminal “Ust-Luga” supervision APCS installation supervision and commissioning for railroad 666. 07/08- 12/11 Rosneftbunker, Jsc /--- Multifunctional Port terminal “Ust-Luga” loading/unloading platform No.1. “Fluid cargo complex” project, Multifunctional Port terminal “Ust-Luga” APCS detailed design development for railroad 667. 07/08- 12/09 Rosneftbunker, Jsc /--- Multifunctional Port terminal “Ust-Luga” loading/unloading platform No.1. “Fluid cargo complex” project, Multifunctional Port terminal “Ust-Luga” Working draft of two mazout unloading railway platforms, for 668. 02/08-11/08 Rosneftbunker, JSC/ --- Multifunctional Port terminal “Ust-Luga” 144 tank wagons each within the framework of “ Multifunctional Port Terminal Ust-Luga Fluid cargo complex”

42 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Baltiyskiy Universalniy Terminal (“Baltic Multifunctional Terminal”), Ltd. Baltiyskiy Universalniy Terminal Ltd/ Ust-Luga Oil storage and bunkerage terminal in Development of pre-design solutions and technical 669. 08/10- 10/10 design and engineering Ust-Luga sea port requirements for off-site utilities connection. company “MN Druzhba”JSC MN Druzhba JSC/ Technical support during supervision of BPS-2 administrative 670. 04/11-12/11 Baltic Pipeline System (BPS-2) Petroproekt Ltd unit construction process. General subcontract work scope for capital construction Project «Baltic Pipeline System. Ust-Luga oil storage base. Contract subject: complete scope of turnkey works in relation to the following parts of the Project:  Automation, incl. APCS procurement, automatic fire-fighting control system procurement, local control point automation system procurement, completion of HMI/SCADA. MN Druzhba JSC/ Ust-  Electric systems, lighting, grounding and lightning protection, 671. 09/10-12/11 Luga design and Baltic Pipeline System (BPS-2) engineering company power equipment, ,power supply, electric heating systems  Fire detection and alarm systems  Communication systems and networks  Automated power accounting system with utility control elements  Automated information and measuring system of commercial energy metering  Full-scale adjustment of systems and Project facilities MN Druzhba JSC/ Ust- Analysis and revision of design documentation of capital 672. 05/10- 09/10 Luga design and Baltic Pipeline System (BPS-2) construction Project «Baltic Pipeline System. Ust-Luga oil engineering company storage base» MN Druzhba JSC/ Ust- 05/10- Construction and installation works for exterior lighting system 673. Luga design and Baltic Pipeline System (BPS-2) present engineering company of Ust-Luga oil storage base Development of design project documentation for construction MN Druzhba JSC/ 674. 02/10-11/10 Baltic Pipeline System (BPS-2). of Baltic Pipeline System . Administrative facilities complex in Petroproekt JSC “Ust-Luga” port terminal. Baltic Pipeline System (Primorsk) Initial design documentation for construction of oil and 675. 07/13 Petroproekt Ltd./--- Specialized sea port Primorsk petrochemicals’ transshipment terminal in sea port of Primorsk

43 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Construction supervision of Bunkerage facility for marine fuel 676. 04/10- 12/11 “Neftegazstroyproekt” Ltd. Specialized sea port Primorsk loading into tankers at specialized sea port Primorsk. Design of Bunkerage facility for marine fuel loading into tankers 677. 04/10- 05/11 “Neftegazstroyproekt” Ltd. Specialized sea port Primorsk at specialized sea port Primorsk. The design documentation for the object: “Construction of the terminal for crude oil and oil products and of objects of Specialized Oil Loading Seaport 678. 09/05- 05/07 Petrotrans-Primorsk, Ltd./ -- engineering infrastructure at Specialized Oil Loading Seaport Primorsk Primorsk”

Lukoil-Kaliningradmorneft, Ltd Lukoil-Kaliningrdmorneft, 04/04-08/04 679. Ltd Supply of video projection modules Trading house Kaliningradneftc Seaport Oil trans-shipment complex on Trading house 02/05-05/05 680. Kaliningradneft / --- Vostochnij Peninsula in the city of Design documentation Baltiysk Refuelling base Transbunker St.Petersburg Transbunker St.Petersburg/ Development of working documentation of 0.4 kV power supply 681. 03/05-08/05 Minor Area of the Refuelling Base VAMI-avtomatika to technological consumers Transbunker St.Petersburg/ 03/05-08/05 682. VAMI-avtomatika Refuelling Base Development of automation solutions for the Refuelling Base Tetoil, Plc Tetoil Jsc.,/Baltic Oli The Oil Transhipment Terminal „Tetoil”, The design documentation for the object:„”Construction of the 683. 06/06- 08/07 terminals Plc Kaliningrad city Oil Transhipment Terminal „Tetoil” in Kaliningrad city” Agroinveststroi, JSC “Transbunker Sankt- Development of working documentation of technical sulphur 684. 08/07 -12/08 Peterburg”/ VAMI- Commercial sea port “Ust-Luga” avtomatika, Plc. loading unit «Gazpromneft-ONPZ» JSC (Оmsk) Omskproekt/ Petrproekt Pre-design works for SGC unloading, storage and piping 685. 02/13-03/13 JSC terminal Vostokbunker 686. 10/13-12/13 Petroproekt Ltd./-- Pre-design works for unloading railway facility (Vostokbunker) “Aviacionnie Tehnologii Topliva”, JSC

44 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Aviacionnie Tehnologii 12/14-02/15 687. Topliva JSC/--- Sheremetyevo Airport Concept design of POL storage facility Aviacionnie Tehnologii Reconstruction of Central fuelling unit in Sheremetyevo airport. 688. 11/14- present Topliva JSC/ Neftehimstroy Sheremetyevo Airport JSC Preliminary/Engineering design Aviacionnie Tehnologii Design works for two vertical steel tanks 10000 m3 in POL 689. 0813- present Topliva JSC/--НПП Sheremetyevo Airport Спецгеопарк storage area Aviacionnie Tehnologii 06/13-present 690. Topliva JSC/--- Kolcovo airport Reconstruction design for POL storage area in Kolcovo airport Aviacionnie Tehnologii Design of pump and filtering station providing jet fuel 691. 05/13-present Domodedovo airport Topliva JSC/--- transportation to CAFS and fueling point in Domodedovo airport Aviacionnie Tehnologii Design of development concept for Sheremetyevo fuelling 692. 03/13- 09/13 Sheremetyevo Airport Topliva JSC/--- facility CAFS POL storage 03/13- Aviacionnie Tehnologii Development of engineering binding for oil product metering 693. present Topliva JSC/--- and quality control system of POL storage Aviacionnie Tehnologii Disposition of land plots No.1, No.2, No.3, main buildings and 694. 02/13-03/13 Pulkovo Airport Topliva JSC/--- constructions on general layout diagrams Aviacionnie Tehnologii Design of development concept for Sheremetyevo fuelling 695. 11/12-12/12 Sheremetyevo Airport Topliva JSC/--- facility POL storage development until 2030 Aviacionnie Tehnologii 11/12- present Design works for administration and catering building 696. Topliva JSC/--- Sheremetyevo Airport Aviacionnie Tehnologii Design works for pre-platform fueling point located in 697. 11/12- present Sheremetyevo Airport Topliva JSC/--- Sheremetyevo-1 segment (2nd stage) Commissioning and integration of oil product metering and 698. 10/12- 05/13 Aviotehnologia ASP JSC/--- Sheremetyevo Airport quality control system into current automatic process control systems of alternative POL storage Aviacionnie Tehnologii Preliminary and detailed design documentation for construction 699. 09/12- present „Krimsk” fuelling facility POL storage Topliva JSC of „Krimsk” fuelling facility POL storage Preliminary studies and introduction and development concept 700. 08/12-10/12 TZK Sheremetyevo JSC Sheremetyevo Airport for jet fuel supply APCS Engineering solutions for process module equipment 701. 03/12- 07/12 Aviotehnologia ASP JSC/--- Knevichi Airport (manufactured by Aviotehnologia ASP JSC) located in receiving and active storage facilities of Knevichi airport APCS and Accounting equipment installation supervision and 702. 09/11- 06/12 Aviotehnologia ASP JSC Sheremetyevo Airport commissioning for alternative oil and lubricants storage in Sheremetyevo airport

45 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor Procurement of APCS and Accounting equipment and 703. 04/11- 07/11 Aviotehnologia ASP JSC Knevichi Airport frequency control power distribution boards for airport loading unit pumping facilities Installation supervision, commissioning and certification of 704. 04/11-08/11 Aviotehnologia ASP JSC Knevichi Airport metering methods at all metering and accounting points of airport loading facility Aviacionnie Tehnologii Equipment procurement for APCS and automatic accounting 705. 11/10- 07/11 Topliva JSC/ Petroproekt Sheremetyevo Airport system of alternative oil and lubricants storage in Sheremetyevo Ltd. airport Aviacionnie Tehnologii Design of APCS and automatic accounting system of alternative 706. 11/10- 08/11 Topliva JSC/ Petroproekt Sheremetyevo Airport Ltd. oil and lubricants storage in Sheremetyevo airport Aviacionnie Tehnologii 09/10-01/11 707. Topliva JSC, Knevichi Airport Construction design for fueling facility in Knevichi airport “Aviacionnie Tehnologii Design works within the framework of fuels-lubes storage of 708. 12/08-01/11 Sheremetyevo airport Topliva”, JSC/ --- fueling station in Sheremetyevo airport. Design works of construction of POL storage in Geledzhik “Aviacionnie Tehnologii 11/07- 04/08 709. Topliva”, JSC/ --- Gelendzhik airport airport. Automation of technical process and automated metering of fuel materials. “Karelskiy Okatysh”, JSC (Russia) 710. 06/14- 10/14 Karelsky Okatysh JSC/--- Design for reequipment of tank heating system using thermal oil 03/14- 711. Karelsky Okatysh JSC/--- Design and supervision: Tail thickening unit present Development of detailed design documentation for POL storage 712. 03/12- 07/12 Karelsky Okatysh JSC/--- Karelsky Okatysh POL storage reconstruction in order to expand diesel fuel storage capacity. Development of design documentation for POL storage 713. 03/12- present Karelsky Okatysh JSC/--- Karelsky Okatysh POL storage reconstruction in order to expand diesel fuel storage capacity. Development of detailed design documentation for replacement 714. 03/12- 07/12 Karelsky Okatysh JSC/--- Karelsky Okatysh POL storage of diesel fuel pumping equipment of POL storage facilities. Pre-design solutions for feasibility studies of boiler house 715. 05/11- 10/12 Karelsky Okatysh JSC/--- construction/reconstruction . Karelsky Okatysh JSC/ Design, adjustment and putting into operation of APCS for 716. 04/11- 01/12 TekomProf Ltd. railway unloading facility Karelsky Okatysh JSC/ Completing and procurement of APCS equipment railway 717. 04/11- 08/11 TekomProf Ltd. unloading facility Karelsky Okatysh JSC/ Design of solutions for pump anchoring at mazout heating units 718. 05/10- 09/10 Tapflo Ltd. of railway unloading facility

46 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv

Track Record

Customer /General No. Due Date Object Short Description of the Work Performed Notes Subcontractor -Development of design and engineering documentation for reconstruction of mazout unloading system . - Design of refurbishment of condensate gathering system of central boiler plant. 719. 02/10-12/10 Karelsy Okatysh, JSC - Development of operation procedure for railway unloading facility applied for manual unloading of oil and lubricants. Commissioning, putting into operation and operational testing of the facility. Front-end engineering works for iron-ore slurry pre-heating Polymir, JSC facilities, Production 720. 04/09-05/09 Karelsy Okatysh, JSC system using heated vapour in slurry mixing units with following section No.3 transportation of the heated mass by railway transport Polymir, JSC (Belorussia) Construction design for the project of reconstruction of vacuum Polymir, JSC facilities, Production 721. 12/08-06/09 “Polymir”, JSC/”Slav”, JSC evaporation system used for stripping of sodium rhodanate section No.3 water solution. "Batumi oil terminal", Ltd (Georgia) Batumi oil terminal, Ltd / 01/11- 10/11 722. Fabregas Equipment Ltd. Batumi oil terminal, Ltd Detailed engineering design for oil vapor odor control unit Batumi oil terminal, Ltd / 01/11- 10/11 723. Fabregas Equipment Ltd. Batumi oil terminal, Ltd Detailed engineering design for vapor recovery unit Batumi oil terminal, Ltd / Detailed engineering design for industrial and rain waste water 724. 01/11- 10/11 Batumi oil terminal, Ltd Fabregas Equipment Ltd. treatment unit Batumi oil terminal, Ltd / Detailed engineering design for industrial and rain waste water 725. 01/11- 10/11 Batumi oil terminal, Ltd Fabregas Equipment Ltd. treatment unit Batumi oil terminal, Ltd / Detailed engineering design for industrial and rain waste water 726. 01/11- 10/11 Batumi oil terminal, Ltd Fabregas Equipment Ltd. treatment unit Batumi oil terminal, Ltd/ Engineering design of oil vapour trasfering from oil tankers and 727. 02/10-07/10 Conti Chemical Company”, removing of mercaptan/H2S from oil vapours during tankers Ltd loading on berth No.1 and tandem loading/unloading operations ASKI-Mangistau (Kazakhstan) Advisory assistance in relation to selection of optimal process 728. 06/10-12/10 Aski-Mangistau LLC/ --- Aski-Mangistau, Kazakhstan solutions.

47 10 Turaidas Street, Riga, LV-1039, Tel: +371 67045670, Fax: +371 67045671; e-mail: [email protected]; http://www.olimps.lv